Quality Assurance Surveillance Plan (QASP) for requirement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PWS_-_SBITC_(V6).pdf | ||
| W9124J-16-R-0096_CombinedSynopsisSolicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan
For
Office of the Chief of Chaplains Strong Bonds Instructor Training Certification
(Phase II Singles and Phase IV Families Relationship Skills Training)
Contract #W9124J-16-R-0096
14 June 2016
Mrs. Regina M. Espinoza Mr. George Watlington Jr.
Contracting Officer Contracting Officer’s Representative Mission & Installation Contracting Command Office of the Chief of Chaplain Fort Sam Houston, Texas Pentagon, Washington, DC
TABLE OF CONTENTS
Subject Page Number
1. Overview 3
2. Description of Services 3
3. Roles and Responsibilities 3
4. Contract Quality Requirements 4
5. Government Surveillance 4
6. Non-Conforming Performance 5
7. Deduct Plan 6
8. Data Analysis 6
9. Acceptance of Services 6
10. COR Status Report 6
11. Contractor Manpower Reporting Application (CMRA) 6
12. Contractor Performance Assessment Reporting System (CPARS) 6
13. Combating Trafficking In Persons 7
14. COR/Quality Assurance Surveillance Files 7
15. QASP Changes 7
1. Overview.
1.1. Purpose. The purpose of this Quality Assurance Surveillance Plan (QASP) is to identify the methods and procedures the Government will use to ensure it receives the services under this contract as identified in the Performance Work Statement (PWS).
1.2. Intent. The intent of this QASP is to: 1) ensure Contractor performance meets or exceeds contract terms, conditions and specifications; 2) hold the Contractor accountable for quality control; and 3) encourage the Contractor to take appropriate steps to control and improve quality.
Accordingly, the Government will perform surveillance on the contract in accordance with this QASP, but reserves the right to monitor the contract in any manner necessary, at any times necessary, and at all places necessary to ensure that the rendered services conform to contract requirements. The Government also reserves the right to perform quality assurance at the Subcontractor level and perform quality assurance at the contractor's place of business, if applicable. Resolution of non-conforming services discovered at the Subcontractor level will be addressed with the prime Contractor.
2. Description of Services.
2.1. Scope of Work. The contractor shall provide certification training for Army chaplains, chaplain assistants and volunteer instructors in married couples, Army Families, and single Soldier relationship skills and education program that focuses on life-changing habits (Be Proactive; Begin With the End in Mind; Put First Things First; Think Win-Win; Seek First to Understand Then to Be Understood; Synergize; and Sharpen the Saw). Training will also be focused on providing instruction for increasing personal credibility (Self Trust) and behavior in ways that inspire trust in relationships (Relationship Trust). A total of seven (7) training events will be conducted annually.
2.2. Type of Contract. The government will award a Firm Fixed Price contract for instructor fees with Cost-Reimbursable CLIN for travel.
3. Roles and Responsibilities.
3.1. Government.
3.1.1. Contracting Officer (KO). The KO is the only person with the authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
3.1.2. Contracting Officer’s Representative (COR). The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies;
coordinate availability of Government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
3.2. Contractor.
3.2.1. Program Manager. The contractor shall provide a program manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
4. Contract Quality Requirements.
4.1. Contractor’s Quality Control Program. The Contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract.
The Contractor shall ensure services are performed in accordance with this PWS. The Contractor shall identify, prevent, and ensure non-recurrence of defective services.
4.2. Government Quality Assurance. The Government shall evaluate the Contractor’s performance under this contract in accordance with this QASP. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance and minimum acceptable defect rate(s).
5. Government Surveillance.
5.1. Methods of Surveillance. The following Methods of Surveillance will be utilized in monitoring the Contractors’ performance:
5.1.1. 100% Inspection
5.1.2. Periodic Inspection
5.1.3. Customer Feedback. The DA Form 5477, Customer Complaint Record, Attachment 2, will be used to document/record all complaints. The following procedures will be followed when a complaint is received.
• The COR will investigate and determine the validity of the complaint.
• If the complaint is determined to be invalid, the COR will inform the person who submitted the complaint of the reason(s) as soon as practical.
• For validated complaints that are true contractual non-conformances, the procedures in paragraph 6 below will be followed.
5.2. Surveillance Schedule. A Surveillance Schedule will be created for each month of Contractor performance utilizing the DA 5475, COR Surveillance Schedule, Attachment 3. The schedule is “FOR OFFICIAL USE ONLY” and is not releasable to anyone other than authorized Government personnel. A copy of the Surveillance Schedule will be filed in the Wide Area WorkFlow e-Business Suite, CORT Tool, https://wawf.eb.mil/ (Either as an Attachment to the Monthly COR Status Reports or uploaded separately in the Miscellaneous Documents Section of the CORs’ Online File.).
5.3. Surveillance Instructions/Checklists. Surveillance Checklists, Attachment 4, will be utilized and completed when surveillances are conducted.
5.4. Surveillance Documentation. No later than the 15th of each month surveillance documentation for the preceding month will be uploaded in the Wide Area WorkFlow e- Business Suite, CORT Tool, https://wawf.eb.mil/. Monthly surveillance documentation includes the Monthly Status Report, the Surveillance Schedule and all completed Surveillance Checklist(s) for the preceding month. Surveillance Schedules and completed Surveillance Checklists may be uploaded in CORT Tool either as Attachments to Monthly Status Reports or uploaded separately in the Miscellaneous Documents Section of the CORs’ Online File.).
6. Non-Conforming Performance. Non-conformance occurs when a Contractor fails to meet Contract or Task Order terms, conditions and/or specifications. All instances of non-conformance will be documented and the Contractor will be notified. Resolution of non-conformance discovered at the Subcontractor level will be addressed with the prime Contractor.
Non-conformance is classified as either: Level I (Minor); Level II (Major); or Level III (Critical).
6.1. Level I (Minor). Level I non-conformance is not likely to materially reduce the usability of services for their intended purpose or is a departure from established standards having little bearing on completing the contract requirement. Minor non-conformances can usually be corrected on the spot and can be issued to the Contractor through either a verbal or written Contract Discrepancy Report (CDR). However, the Government is still required to document verbal Level I CDRs. The COR may issue verbal Level I CDRs directly to the appropriate level of Contractor management. The COR will notify the KO as soon as practical when a verbal Level I CDR is issued and document them in their Monthly Reports. If the non-conformance cannot be corrected on the spot, the Contractor shall be given a suspense date to correct the deficiency. The KO will issue and sign written Level I CDRs, Attachment 5.
6.2. Level II (Major). Level II non-conformance is likely to result in failure of the services to meet contract requirements. Also, repeated discrepancies, a large number of documented Level I CDRs and trends indicating failure of the Contractor’s quality control program can be classified as Level II CDRs. The KO issues all Level II CDRs in writing, Attachment 5. The COR will notify the KO as soon as practical when a major non-conformance is identified.
https://wawf.eb.mil/
6.3. Level III (Critical). Level III non-conformances result in hazardous or unsafe conditions due to the manner in which the services are performed; prevent or impact a vital agency mission as a result of performance; or are for repeated or uncorrected Level II CDRs. The Contracting Office Director or Deputy Director issues written Level III CDRs. The COR is responsible for notifying the KO immediately upon discovery of a critical non-conformance.
6.4. Documenting CDRs. Documentation, as a minimum, will include: the Contract or Task Order number; reference to the specific contract requirement; the specific discrepancy to the requirement; where it was discovered; the date and time it was discovered; Contractor representative who was notified; and the suspense date for Contractor response/corrective action.
6.5. Tracking and Resolving CDRs. All CDRs, verbal and written, regardless of issuer will be included in the COR’s Monthly Report. The COR and KO shall track CDRs to ensure the Contractor indentifies and takes appropriate corrective action to the root cause and the specific non-conformance is corrected within the required timeline. The KO will make a final written determination of the Government’s remedies if the non-conformance is not corrected by the Contractor after receiving notice and a reasonable opportunity to correct the work.
7. Deduct Plan. This acquisition does not include a Deduct Plan.
8. Data Analysis. Data Analysis will be performed to identify trends in cost, schedule and/or performance risks. The results of Data Analysis will be documented in COR Status Reports and may be used to make adjustments to surveillance schedules, increase or decrease surveillance, if deemed appropriate. Negative trends noted using Government data/observations could result in issuing the Contractor a Contract Discrepancy Report. Trends noted using Contractor data will not result in a CDR unless the Contractor is not addressing the negative trend.
9. Acceptance of Services. When all services have been deemed acceptable and there is documented objective quality evidence to support acceptable performance the COR will accept the services provided and authorize payment of the Contractor. This is accomplished by approving the Contractor’s Receiving Reports in Wide Area Workflow, e-Business Suite, iRAPT at https://wawf.eb.mil/.
10. COR Status Report. COR Status Reports will be submitted on a Monthly basis, no later than the 15th of each month for the preceding month, to the Contracting Officer via the Wide Area WorkFlow e-Business Suite, CORT Tool. COR Status Reports will provide a synopsis of the Contractors performance for the inclusive dates of the report. The synopsis will contain a summary of: surveillances performed; Customer Feedback, if any; CDRs, if any; an analysis of the Contractors performance; recommended adjustments to surveillance schedules; and any other pertinent contract information. Completed Surveillance Checklists and CDRs, if any, will be included as attachments to COR Status Reports or uploaded separately in the Miscellaneous Documents Section of the CORs’ Online file.
11. Contractor Manpower Reporting Application (CMRA). In accordance with Office of the Secretary of Defense Memorandum, Enterprise-wide Contractor Manpower Reporting Application, dated 28 Nov 2012, the Contractor must report contractor manpower to the
Contractor Manpower Reporting website at https://cmra.army.mil. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year.
The COR shall verify that the Contactor has complied with the required contractor manpower reporting annually and document the results in the VCE, COR Module, CORs’ Online File, CMRA section.
12. Contractor Performance Assessment Reporting System (CPARS). Documented surveillance data (COR Status Reports, Completed Surveillance Checklists, Customer Feedback and CDRs, if any) will be used to support CPARS ratings. CPARS will be completed in accordance with AFARS, Subpart 5142.15 – Contractor Performance Information.
13. Combating Trafficking In Persons (CTIP). In accordance with PGI 222.17 and FAR 52.222-50, the KO will be notified immediately of any information from any source that alleges a Contractor employee, subcontractor and/or subcontractor employee has engaged in conduct that violates the United States Government “zero” tolerance policy regarding trafficking in persons.
14. COR/Quality Assurance Surveillance Files. The official COR/Quality Assurance Surveillance File will be maintained in the Wide Area WorkFlow, e-Business Suite, CORT Tool, https://wawf.eb.mil/, IAW DoDI 5000.72, DoD Standard for COR Certification.
15. QASP Changes. This QASP is a living document and, as such, may be changed as needed based on Data Analysis (trends), contract modifications, etc. The COR will send any recommended changes to the Contracting Officer for approval and the Contracting Officer must approve all changes.
GEORGE WATLINGTON JR.
Contracting Officer’s Representative Office of the Chief of Chaplains
JON P. MARTEL
Contracting Officer Mission & Installation Contracting Office
Attachments:
1. Performance Requirements Summary (PRS)
2. Customer Complaint Record, DA Form 5477
3. Surveillance Schedule, DA Form 5475
4. Surveillance Checklist(s)
5. Contract Discrepancy Report, DA Form 5479 https://cmra.army.mil/
Attachment 1
Performance Requirements Summary (PRS)
Performance Objective
Performance Standard Performance Threshold/Acceptable Quality Level (AQL)
Method of Surveillance (and who performs) {e.g.
100% inspection by COR}
PRS # 1.
The contractor shall provide trainers who shall conduct instructor certification training in married couples, Army Families, and single Soldier relationship skills curriculums as part of the Strong Bonds Instructor Training Course.
Two trainers for Phase II training (2 days per session, 16 hours of instruction, 7 times a year)
Two trainers for Phase IV training (2 days per session, 16 hours of instruction, 7 times a year)
Two trainers for Phase VI training (5 days per session, 40 hours of instruction total, 7 times a year)
Zero deviation from standard
100% Inspection by the
COR
Contractor compliance and initial delivery will be monitored for CPAR reporting period and the results of the data will be used to substantiate objective ratings of contractor performance.
PRS #2
Upon completion of training, the contractor shall provide participants with an end of training survey.
Task 5.2.2
Successful training is defined as 95% of participants indicate that training was effective and skills were learned.
100% Inspection by the
COR
Contractor compliance and initial delivery will be monitored for CPAR reporting period and the results of the data will be used to substantiate objective ratings of contractor performance.
PRS #3
Training shall be conducted to meet the short, medium, and long-term outcomes/standards as defined in the performance work statement.
Short-term outcomes Upon completion of training, Soldier and Family members shall demonstrate:
Enhanced communication, stress management, problem solving, and conflict resolution skills
Knowledge of available resources
Confidence in abilities to manage relationship
Belief that the Army is concerned and supportive
Medium-term outcomes Six (6) to twelve (12) months after training, Soldiers and Family members shall:
Utilize available resources if needed
Exercise learned skills
Demonstrate positive behaviors
Invest more time in relationships
Recommends Strong Bonds training to others
Long-term outcomes Over twelve (12) months after training, Soldiers and Family members shall demonstrate:
Happier Army marriages
Periodic Inspection by the COR
Outcomes will be evaluated through the Army’s Ready and Resilient Campaign and other assessment models developed by the Office of the Chief of Chaplains.
Task 5.2.3
Enhanced Soldier well-being
Reduced risk behaviors
Reduced AWOL
Increased satisfaction with Army life
Increased Army retention
Increased mission productivity
Attachment 2
Customer Complaint Record, DA Form 5477
DA FORM 5477
Attachment 3
Surveillance Schedule, DA Form 5475
Attachment 4
Surveillance Checklist(s)
COR Inspection Checklist & Data Report (Fixed Firm Price Contract)
Meeting Contract Requirements
Contractor: To Be Determined
Contract Number: To Be Determined Service Provided: Strong Bonds Instructor Certification Training COR Name: George Watlington Jr.
Date: YES No N/A
1) Task 5.2 Instructor-Led Training: Did the contractor provide trainers who conducted instructor certification training for the Strong Bonds Instructor Training Course? PWS para 5.2.
Comments:
Did instruction teach participants how to assist Soldiers and their Families in developing a clear definition of their top priorities and the results they want? PWS para 5.2.
Comments:
Did instruction cover how to achieve balance and increase productivity through a weekly and daily planning process? PWS para 5.2.
Comments:
Did instruction cover how to end self-defeating behavior and gain the necessary security needed to change? PWS para 5.2.
Comments:
Did instruction cover how to develop strong relationships based on mutual trust; and preparation to deal with difficult circumstances before they happen? PWS para 5.2.
Comments:
2) Task 5.2.1 Did training equip participants with the knowledge and skills required to provide instruction on the 7 habits? PWS para 5.2.1
Comments:
If a commercial facility was utilized, did the contractor meet mission requirements in coordinating audiovisual support, lodging, security services, shipment of materials, and meeting space? PWS para 5.2.1
3) Task 5.2.2 Did training materials include required video clips, PowerPoint slides, instructor manuals, and essential training aids?
PWS para 5.2.2
Did contractor administer end of training survey and results provided to the COR? PWS para 5.2.2
Comments:
Did feedback from 95% of the participants indicate that training was effective and skills were learned. PWS para 5.2.
Comments:
4) Task 5.2.3 Did training help achieve short, medium, and long-term outcomes as evaluated by the Army’s Ready and Resilient
Campaign, logic model, end of training surveys, or other evaluation tools? PWS para 5.3.
Comments:
Comments summary, to include, positive trends, negative trends, concerns, customer comments, and any additional COR comments:
Attachment 5
Contract Discrepancy Report, DA Form 5479
DA FORM 5479
File details come from the government source that posted it. Updated .