PERFORMANCE_WORK_STATEMENT_0010789055_tm16_lodging_ _meals_draft_III_020316.pdf

PDF 46 KB Posted

Attached to
Lodging and Meals Federal contract opportunity
Solicitation number
W9124J-16-R-0035
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Sam Houston

About this file

Performance Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to Lodging and Meals, newest first.
File Type Posted
Combined_Synopsis_Solicitation_0010789055_tm16_lodging__meals_final_I_020416.pdf PDF
Military_sample_menu.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

LODGING AND MEALS FOR THE TRANSMARINER FY16 MISSION

AT MILITARY OCEAN TERMINAL SUNNY POINT (MOTSU)

PART 1

GENERAL INFORMATION

1. General: This is a non-personal services contract to provide Lodging and Meals for 100 Soldiers in support of the Trans-Mariner FY16 (TM16) mission in Sunny Point, North Carolina.

The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1. Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to provide the required Lodging and Meals as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2. Background: This contract is requirement to successfully complete the mission parameters of the TM16 at Sunny Point, North Carolina.

1.3. Objectives: The objective of this contract is to provide life support services, to include lodging and meals for the soldiers involved in the TM16 mission during the performance of said mission.

1.4. Scope: Provide lodging and subsistence for up to 100 soldiers, daily, participating in the TM16. Additional requirements include access to an overnight parking lot to park at least eighteen vans and five sedans daily; office space with an available internet connection to conduct in-processing; and laundry facilities or services. Daily meals will include a full hot breakfast and hot dinner for up to 100 soldiers each day.

1.5. Period of Performance: The period of performance will begin 13 February 2016 and end 21 May 2016.

1.6. General Information

1.6.1. Quality Control: Quality Control is the responsibility of the contractor. The contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.246-1, Contractor Inspection Requirements).

The Contractor shall develop, implement and maintain an effective Quality Control System which includes a written Quality Control Plan (QCP). The QCP shall implement standardized procedure/methodology for monitoring and documenting contract performance to ensure all contract requirements are met. The Contractors’ QCP must contain a systematic approach to monitor operations to ensure acceptable services/products are provided to the Government. The QCP, as a minimum, shall address continuous process improvement; procedures for scheduling, conducting and documentation of inspection; discrepancy identification and correction;

corrective action procedures to include procedures for addressing Government discovered non-conformances; procedures for root cause analysis to identify the root cause and root cause corrective action to prevent re-occurrence of discrepancies; procedures for trend analysis;

procedures for collecting and addressing customer feedback/complaints. The contractor shall upon request provide to the Government their quality control documentation The Contractor shall provide to the Government their quality control documentation within five (5) calendar days after contract award; changes to the QCP after award shall be submitted to the Contracting Officer (KO) and Contracting Officer’s Representative (COR) within five (5) working days prior to the proposed changes thereafter. After acceptance of the quality control plan the contractor shall receive the Contracting Officer’s acceptance in writing of any proposed change to their QC system.

1.6.2. Corrective Actions: At any time it is determined by the KO that the quality control system, personnel, instructions, controls, tests, or records are not providing results which conform to contract requirements, action shall be taken by the Contractor to correct the deficiency. If a Contract Deficiency Report (CDR) is issued the Contractor shall develop a Corrective Action Plan (CAP) which identifies the root cause, Corrective Action (CA) for the root cause, CA for the specific non-conformance and CA to the root cause to prevent recurrence and a timeline for completion.

1.6.3. Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is a Government only document primarily focused on what the Government must do to assure that the contractor has performed in accordance with the requirements of the contract.

1.6.4. Federal Government Holidays: The following is a list of legal Federal Holidays observed by the government and military. Any of the following holidays falling on a Saturday will be observed on the preceding Friday and holidays falling on a Sunday will be observed on the following Monday.

New Year’s Day 1st day of January Martin Luther King Jr.'s Birthday 3rd Monday of January Presidents Day 3rd Monday of February Memorial Day Last Monday of May Independence Day 4th day of July Labor Day 1st Monday of September Columbus Day 2nd Monday of October Veterans Day 11th day of November Thanksgiving Day 4th Thursday of November

Christmas Day 25th day of December

1.6.4.1. Hours of Operation: The contractor is responsible for conducting business, between the hours of 8:00 a.m. through 5:00 p.m. Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons.

The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.5. Place of Performance: The work to be performed under this contract will be performed at the contractor’s place of business providing the lodging, meals, and additional services. The mission will be conducted at MOTSU, Sunny Point, North Carolina. Contractor facilities must be located within 15 miles of the MOTSU mission site.

1.6.6. Type of Contract: The government will award a Firm Fixed Price (FFP) Purchase Order.

1.6.7. Security Requirements: Not Applicable

1.6.7.1. Physical Security: Not Applicable

1.6.7.4. Security of Classified Items, Systems and Information: The Contractor, as a general rule, shall not have access to classified information; however, should classified documents fall into the possession of the Contractor, the Contractor shall immediately contact the COR for disposition instructions (if applicable).

1.6.8. Safety: The Contractor shall establish and maintain a Safety Plan (SP) of which a draft plan shall be submitted to the KO at the time of proposal. Contractor’s final SP shall be submitted No Later Than (NTL) five (5) calendar days after contract award.

1.6.8.1. In order to provide safety control for protection to the life and health of employees and other persons; for prevention of damage to property, materials, supplies, and equipment; and for avoidance of work interruptions in the performance of this contract, the Contractor shall comply with the following Safety Accident Prevention Standards: 29 CFR 1910, Occupational Safety and Health Standards; 29 CFR 1926, Safety and Health regulations for Construction; Army Corps of Engineers Manual 385-1-1, Safety and Health Requirements Manual. The Contractor shall comply with the above and all other applicable DOD, Army, Federal, State and Local safety and health requirements.

1.6.8.2. Reporting of Fire and Safety Hazards: The Contractor shall train personnel to recognize fire and safety hazards and encourage personnel in the performance of their duties to report fire and safety hazards and unsafe conditions to their supervisor. The Contactor shall take corrective action to remedy reported deficiencies IAW the terms of this contract. The COR shall be notified of deficiencies beyond the terms of this contract.

1.6.8.3. Environment and OSHA: The Contractor shall comply with all Federal, State, and Local environmental and occupational safety laws, rules, and regulations. Any apparent conflict between compliance with such Federal, State, and Local environmental and occupational safety laws, rules, regulations, and compliance with the requirements of the contract shall be immediately brought to the attention of the KO or authorized representative for final resolution.

The Contractor shall notify the KO or authorized representative in writing in addition to any verbal notification of such conflict. The Contractor shall be liable for all fines, penalties, and costs which result from violations of, or failure to comply with, all such Federal, State, and Local laws, rules, and regulations. All unsafe acts or conditions fostered by the Contractor or Contractor personnel may be grounds for the KO or authorized representative to halt any and all Contractor performance with a commensurate deduction of monies due to the Contractor until such unsafe conditions are corrected. The Contractor shall take due caution not to endanger personnel during performance of this contract. Upon discovery of a serious hazard such as, but not limited to, fire, or large fuel spill, the Contractor shall notify the KO or designated representative and COR.

1.6.8.4. Reporting Mishaps: The Contractor shall adhere to reporting of mishaps IAW AR 385- 10, The Army Safety Program and DA Pam 385-40, Army Accident Investigations and Reporting. In addition the Contractor shall report: (1) Injury or occupational illness to on-duty Contractors; (2) Damage to GFM, GFP, or GFE provided to a Contractor; (3) Contractor accidents involving Army property and personnel.

1. 6.8.5. Personnel Safety: The Contractor shall immediately correct all safety deficiencies upon notification of the deficiencies by the KO, COR or other designated representative, and shall notify the KO of the corrective action to be taken.

1.6.9. Personnel: For purposes of this paragraph, the term “personnel” or “employee(s)” refers to any person performing work related to this contract, including but not limited to, the Contractor’s employees, agents, representatives, or Subcontractors. The Contractor shall staff this effort with trained, competent and capable employee(s) for the discipline they are assigned to. Contractor personnel shall present a clean, neat and professional appearance. The Contractor shall ensure that employees meet all applicable Federal, State, Local, and installation certification, licensing, medical requirements, and qualifications to perform all assigned tasks and functions as defined in this contract prior to commencement of work. The Contractor shall not permit any personnel to work under this contract if such person is identified by a Government authorized representative to the Contractor as a potential threat to the health, safety, security, general well being, or operational mission of the Army and the surrounding area. All Contractors’ personnel shall comply with installation security and access procedures and the Contractor’s final SP.

1.6.9.1. Contractor’s personnel whose tasks involve operation of any vehicles shall possess a valid U.S. State driver’s license, certificates and permits applicable for the type and class of vehicle being operated.

1.6.9.2. Contractor’s personnel shall either be a United States Citizen or authorized to work in the United States or possess a valid U.S. Immigration T-151 or I-94, Alien Registration Card.

1.6.9.3. Speaking, Reading, and Understanding English: Contractor shall hire and staff personnel who can communicate with Government representatives and where reading, understanding, and discussing environmental, health, and safety warnings are an integral part of an employee’s duties. Contractor’s employee shall be able to understand, read, write, and speak the English language fluently. English shall be the only language used with regard to this contract for written correspondence, discussions and other business transactions.

1.6.9.4. Conflict of Interest & Employment of Government Personnel: The Contractor shall not knowingly employ any person who is a U.S. Government employee if employing that person would create a conflict of interest. Additionally, the Contractor shall not knowingly employ any person who is an employee of the Government, either military or civilian, unless such person seeks and receives written approval according to DOD 5500.7-R, Joint Ethics Regulations (JER) by the individual’s commander or director. A copy of the authorization will be provided to the COR. In addition, the Contractor is prohibited from employing Government Quality Assurance Representatives (QAR) whom the Contractor knows or should have known are responsible for monitoring any contracts/subcontracts awarded to the service provider.

1.6.9.5. Conduct of Employees: Contractor employees shall conduct themselves IAW installation policies concerning conduct and DOD 5500.7-R, Joint Ethics Regulation. The KO may require the Contractor to remove from the job site any employee working under this contract for reason of misconduct, security, found to be, or suspected to be under the influence of alcohol, drugs, or other incapacitating agents. Contractor employees shall be subject to dismissal from the premises if such action is necessary in the best interests of the Government. The removal from the job site or dismissal from the premises shall not relieve the Contractor of the requirement to provide sufficient personnel to perform the services as required by this PWS.

Contractor personnel will not get in a confrontational situation with Government or Government personnel. KO and COR will be responsible for providing a resolution to all disputes and disagreements.

1.6.10. Special Qualifications: Not Applicable

1.6.11. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5, Post Award Orientation. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the Contracting Officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.6.12. Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies;

coordinate availability of government furnished property; and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.13. Key Personnel: The follow personnel are considered key personnel by the government:

Project Manager (PM)/Alternate PM. The Contractor shall provide a PM who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the KO/COR within five (5) calendar days after contract award, thereafter any changes shall be provided five

(5) business days prior to expected change and no less than 24-hours after unplanned changes.

The PM or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The PM or alternate shall be available between 8:00 a.m. through 5:00 p.m., Monday through Friday except Federal holidays or when the Government facility is closed for administrative reasons.

1.6.14. Identification of Contractor Employees: The Contractor (to include subcontractors) shall provide each employee an Identification (ID) Badge, which includes at a minimum, the Company Name, Employee Name and a color photo of the employee. ID Badges for Key Personnel shall also indicate their job title. ID Badges shall be worn at all times during which the employee is performing work under this contract. Each Contractor (to include subcontractors) employees shall wear the ID Badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit. The Contractor (to include subcontractors) shall be responsible for collection of ID Badges upon completion of the contract or termination of employee. A listing of issued identification cards shall be furnished to the Contracting Officer prior to the contract performance date and updated as needed to reflect Contractor and Subcontractor personnel changes. All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.6.15. Supervision of Contractor Employees: The Government will not exercise any supervision or control over Contractor or subcontractor employees while performing work under the contract. Such employees shall be accountable solely to the Contractor, not the Government.

The Contractor, in turn, shall be accountable to the Government for Contractor or subcontractor employees.

1.6.16. Contractor Travel: Not Applicable

1.6.17. Other Direct Costs: Not Applicable

1.6.18. Data Rights: Not Applicable

1.6.19. Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.6.20. Phase In /Phase Out Period: Not applicable

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS: Federal Acquisition Regulation (FAR), Dictionary of US Army Terms, AR 310-25 and Authorized Abbreviations and Brevity Code, AR 310-50, are the references for definitions and acronyms not listed below.

2.1.1. CONTRACT ADMINISTRATOR: The official Government representative delegated authority by the Contracting Officer to administer a contract. This individual is normally a member of the appropriate Contracting/Procurement career field and advises on all technical contractual matters.

2.1.2. CONTRACTOR: A supplier or vendor awarded a contract to provide specific supplies or services to the government. The term used in this contract refers to the prime.

2.1.3. CONTRACTING OFFICER (KO): A person with authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.4. CONTRACTING OFFICER'S REPRESENTATIVE (COR): An employee of the U.S.

Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.5. CONTROLLED AREA: A controlled space extending upward and outward from a specified point. This area is typically designated by a commander or director, wherein sensitive information or operations occur and requires limitations of access.

2.1.6. DEFECTIVE SERVICE: A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.7. DELIVERABLE: Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.8. GOVERNMENT-FURNISHED PROPERTY (GFP) OR GOVERNMENT PROPERTY

(GP): Property in the possession of, or directly acquired by, the Government and subsequently made available to the Contractor.

2.1.9. KEY PERSONNEL: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.10. PHYSICAL SECURITY: Actions that prevent the loss or damage of Government property.

2.1.11. PROPERTY ADMINISTRATOR (PA) or PLANT CLEARANCE OFFICER (PLCO):

An authorized representative of the KO appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of the Contractor.

2.1.12. QUALITY ASSURANCE: The government procedures to verify that services being performed by the Contractor are acceptable in accordance with established standards and requirements of this contract.

2.1.13. QUALITY ASSURANCE SPECIALIST: An official Government representative concerned with matters pertaining to the contract administration process and quality assurance/quality control. Acts as technical advisor to the Contracting Officer in these areas.

2.1.14. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.15. QUALITY CONTROL: All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.16. SUBCONTRACTOR: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.17. WORK DAY: The number of hours per day the Contractor provides services in accordance with the contract.

2.1.18. WORK WEEK: Monday through Friday, except for Federal holidays unless specified otherwise.

2.2. ACRONYMS:

ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AQL Acceptable Quality Level AR Army Regulation AT Antiterrorism CFR Code of Federal Regulations CMR Contract Manpower Reporting CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf CPARS Contractor Performance Assessment Reporting System DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation FPCON Force Protection Condition HIPAA Health Insurance Portability and Accountability Act of 1996 JER Joint Ethics Regulation JTR Joint Travel Regulation KO Contracting Officer MOTSU Military Ocean Terminal Sunny Point OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PA Property Administrator PIPO Phase In/Phase Out PM Project Manager POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement

QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services: The Government will not provide any services, facilities, utilities (to include water or electric), equipment, or materials to execute tasks in conjunction with this contract.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1. General: The Contractor shall furnish all labor, supervision, transportation, vehicles, supplies, equipment, materials, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2. Secret Facility Clearance: Not applicable

4.3. Materials: The Contractor shall provide materials to support the requirements of this contract to meet the requirements under this PWS.

4.4. Equipment: The Contractor shall provide equipment to support the requirements of this contract to meet the requirements under this PWS.

4.5. Responsibilities of the Contractor:

a. The Contractor shall provide a safe working environment for key consultants and all persons in his/her employ as prescribed by Engineering Manual (EM) 385-1-1 General Safety Requirements and 29 CFR 1910 “Occupational Health and Safety”. The Contractor shall be responsible for all damages to persons and property that occur in connection with the work and service under this contract, without recourse against the Government.

b. Contractor shall exercise extreme caution to protect building finishes, private property, military property, etc., from damage during the performance of these contract requirements. Contractor shall be responsible for all loss or damage or whatsoever kind and nature to all Government property, while in the performance of these contract requirements, which result in whole or in part from the negligence or omissions of Contractor, any of his Subcontractors or any employee, agent or any representative of the Contractor or Subcontractor(s).

c. The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and Municipal laws, codes, and regulations applicable to the performance of the work.

d. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.

PART 5

SPECIFIC TASKS

5. SPECIFIC TASKS:

5.1. Basic Services: The contractor shall provide services the required Lodging and Meals

5.2. Specific Tasks:

1.5.2.1. Lodging: The hotel will provide rooms for a minimum of 100 individuals, single or double occupancy rooms are acceptable as long as there is one bed per individual. There will always be at least 100 individuals present during the period of performance, despite a few individuals shifting in and out of the mission. As one shifts out another will arrive to take their place and occupy a room. The clean linen and housekeeping schedule shall be provided as follows:

Non-Rotation Week Fridays 19 February 04 March 18 March 01 April 15 April 29 April 13 May

Rotation Week Saturdays 27 February 12 March 26 March 09 April 23 April 07 May 21 May (checkout)

1.5.2.2. Meals: The hotel must be able to provide (by restaurant or other means) a full, hot breakfast and dinner meal for the duration of the event to all individuals, see the attached sample menu. Please provide an alternate and/or additional non-pork protein menu item on a day when pork is served. Buffet style is preferred for the breakfast and dinner meals. Regular Hours of operation: Monday - Friday 0500 - 0630 for Breakfast and 1700-1900 for Dinner; Saturday & Sunday 0800 - 1000 for Breakfast and 1700 - 1900 for Dinner. On rotational Saturdays, Hours of operation: 0500-0630 for Breakfast and 1700 - 1900 for Dinner. On any given weekend (Saturday and/or Sunday), due to additional mission requirements, Hours of operation: 0500 - 0630 for Breakfast and 1700 - 1900 for Dinner. Meal consumption number will shift weekly.

1.5.2.3. Laundry: The contractor shall have available for use coin operated washing/drying machines for mission participants’ use. In lieu of washing/drying machines laundry services shall be provided.

1.5.2.4. Office/Meeting Space: Conference rooms or office space capable of occupying at least fifty (50) individuals must be available with an internet connection for the following days:

Rotation Week Saturdays 27 February 12 March 26 March 09 April 23 April 07 May 21 May (checkout)

1.5.2.5. Parking: The parking area shall be available for overnight parking of vehicles as required for a fleet of up to eighteen (18) vans and five (05) sedans. Parking area will be provided at the prevailing parking rates at the time the service is provided.

5.3. CONTRACTOR MANAGEMENT REPORTING (CMR): The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract. The Contractor shall completely fill in all the information in the format using the following web address https://Contractormanpower.army.pentagon.mil. The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative (COTR) or also know as the Contracting Officer’s Representative (COR); (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data; (5) Estimated direct labor hours (including sub-Contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-Contractors); (7) Total payments (including sub-Contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information); (11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor’s system to the secure website without the need for separate data entries for each required data element at the website.

The specific formats for the XML direct transfer may be downloaded from the website.

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

6.1. The Contractor (to include subcontractors) must abide by all applicable regulations, publications, manuals, and local policies and procedures.

Engineering Manual (EM) 385-1-1 General Safety Requirements 29 CFR 1910, Occupational Health and Safety, US Army Field Manual 21-10 Field Hygiene and Sanitation DoD 5200.08-R, Physical Security Program 32 CFR 147.24, The National Agency AR 190-13, The Army Physical Security AR 385-10, The Army Safety Program DA Pam 385-40, Army Accident Investigations and Reporting Executive Order 13514

File details come from the government source that posted it. Updated .