W91249-18-R-0034_Amendment_0001.pdf
PDF 350 KB Posted
- Attached to
- Security Guard Support Federal contract opportunity
- Solicitation number
- W91249-18-R-0034
About this file
AMENDMENT 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_&_Answers_W91249-18-R-0034.pdf | ||
| W91249-18-R-0034.pdf | ||
| DD_254_Security_Support.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9124918R0034
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
THE PURPOSE OF THIS AMENDMENT IS TO:
A. EXTEND THE CLOSING DATE OF THE SOLICITATION TO 11 SEPTEMBER 2018 AT 3:00PM EST.
B. ADDRESS CHANGES IN THE PWS, SECTION L, SECTION M, AND OTHER SOLICITATION UPDATES.
C. PLEASE SEE PAGE 2 FOR FURTHER DETAILS.
1. CONTRACT ID CODE PAGE OF PAGES
S 1 30
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124918R0034
X 9B. DATED (SEE ITEM 11)
24-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Sep-2018
CODE
MICC - FORT GORDON
271 HERITAGE PARK LANE
BLDG. 35200
FT GORDON GA 30905
W91249 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 07-Sep-2018 12:00 AM to 11-Sep-2018 03:00 PM.
SUPPLIES OR SERVICES AND PRICES
Global Changes
CLIN 0001 -- CLIN 4003
The PSC code R430 has been added.
The WSC Equipment code 000 has been added.
The MDAP/MAIS Code 000 has been added.
The NAICS code 561612 has been added.
INSPECTION AND ACCEPTANCE
The Acceptance/Inspection Schedule for CLIN 0001 has been changed from:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
To:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
The Acceptance/Inspection Schedule for CLIN 0002 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0003 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1001 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1002 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1003 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2001 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2002 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2003 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3001 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3002 has been changed from:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3003 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4001 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4002 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4003 has been changed from:
N/A N/A N/A Government
To:
The following have been added by reference:
52.222-41 Service Contract Labor Standards MAY 2014
The following have been modified:
ADDENDUM 52.212-1
A. Proposal Submittal and Inquiries.
1. Proposals shall be submitted prior to the closing date and time identified on SF 1449, to the following address:
Mission and Installation Contracting Command – Fort Gordon Attn: Marc Thompson
271 Heritage Park Lane Bldg. 35200, Rm# 135
Fort Gordon, GA 30905 or by email to marc.a.thompson32.civ@mail.mil
2. Electronic submission via facsimile will not be accepted. Offers shall be submitted via electronic email or shall be hand carried or mailed through a commercial/Government carrier.
3. The point of contact responsible for supplying additional information and answering all inquiries is the Contracting Officer via the Contract Specialist. All questions regarding this solicitation shall be submitted in writing via email no later than 31 August 2018. Address all questions or concerns the offeror may have to the Contract Specialist and Contracting Officer, Jason King at jason.l.king1.civ@mail.mil.
4. Site Visit: There will be no Site Visit conducted.
B. GENERAL INSTRUCTIONS.
1. The selection of a source for award purposes will be conducted utilizing source selection (negotiated) procedures as delineated in FAR Part 15.3. Offers will be evaluated using the criteria under Addendum 52.212-2, “Evaluation Factors for Award.” Noncompliance with the Request for Proposal (RFP) requirements may hamper the Government's ability to properly evaluate the proposal and may result in elimination of the proposal from further consideration for contract award.
2. The Offer. The submission of the documentation specified below will constitute the offeror's acceptance of the terms and conditions of the RFP, concurrence with the Performance Work Statement, and contract type.
3. It is the Government’s intention to award without discussions. Offerors are encouraged to present their best technical proposal and prices in their initial proposal submission. However, in accordance with (IAW) FAR Part 15.306, should discussions become necessary, the Government reserves the right to hold them. If this occurs, a competitive range will be determined and offerors notified. The competitive range may be limited for purposes of efficiency IAW FAR Part 15.306 (c)(2).
4. Instructions outlined in paragraph C below, prescribe the format for the proposal and describe the approach for the development and presentation of proposal data. These instructions are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals.
5. If an offeror believes that the requirements in these instructions contain an error, an ambiguity, omission, or are otherwise deemed unsound, the offeror shall immediately notify the KO in writing with supporting rationale.
The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion.
6. In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals. Unless the offeror requests otherwise, the Government will destroy extra copies of such unsuccessful proposals.
7. All referenced documents for this solicitation are available on the Federal Business Opportunities (FedBizOpps) website at https://www.fbo.gov/. Potential offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.
8. Debriefings. The KO will promptly notify offerors of any decision to exclude them from the competitive range, whereupon they may request and receive a debriefing in accordance with FAR 15.505. The KO will notify offerors who were in the competitive range but were not selected for award in accordance with FAR 15.503(b).
Upon such notification, unsuccessful offerors may request and receive a debriefing in accordance with the requirements of FAR 15.506.
C. Proposal Preparation Instructions
1. Offerer’s proposal shall consist of 3 volumes: (1) Technical, (2) Past Performance, and (3) Price.
2. Proposal Format
(a) Offerors shall submit one copy via email or through commercial mail system.
(b) If submitting through the commercial mail system the proposals shall be organized into 3 volumes. Each volume of the proposal should be separately bound in a coil-bound or spiral-bound binder. A cover sheet should be bound in each book, clearly marked as to volume number, title, copy number, solicitation identification and the offeror's name. The same identifying data should be placed on the spine of each binder. All text shall be single spaced and printed black on white paper (Black and white requirement does not apply to graphics, photos, etc., Company stationary and logos are acceptable). Printing shall be easily readable (12-pitch type or 10 point proportional spacing.) Cross-references should be utilized to preclude unnecessary duplication of data between sections. For submitting electronic copies via email the file name shall be “Company Name – Initial” for the first submission. The file name of later submissions (if necessary), shall be “Company Name – Revision X’ with X indicating the number of the revision. Page limitations are as follows:
Table 2
VOLUME TITLE NO. HARD
COPIES (Applies to Hand Carry and
Mail Offer)
NO. OF Email Copies
PAGE LIMITS
I Technical 1 Original 1 (10)
II Past Performance 1 Original 1 3 pages per reference III Price 1 Original 1 N/A
(c) Proposal Limitation. The proposal shall not exceed the limits stated above. If the page limits are exceeded, the pages in excess of the limit shall be removed and returned, unread, to the offeror. The Government will not accept any changes to the contractor’s proposal after the closing date of the solicitation (See FAR 15.208 for further information regarding late proposals). If discussions become necessary, page limitations may be placed on responses to Evaluation Notices (ENs). The specified page limits for EN responses will be identified in the letters forwarding the ENs to the offerors.
(d) Page Limit Includes: All appendices, charts, graphs, diagrams, tables, photographs, drawings, etc.
(e) Page Limit does not include covers for volumes, tables of contents, glossary of abbreviations and acronyms, indices, title pages, cross reference indices, and section dividers/tables if they are inserted solely to provide ease to the reader in locating parts/sections of the proposal. Pages will be counted if they contain any other information, i.e., diagrams, extraneous data, etc. Pages marked “This page intentionally left blank” will not be counted.
(f) What Counts As A Page? A page shall be an 8 ½ X 11” sheet of paper. When both sides of a sheet display printed material, it shall be counted as two pages. Letter size and spacing requirements for illustrations and tables can be at the discretion of the offeror but must be easily readable. Fold-outs will be counted as the appropriate number of pages based on an 8 ½” X 11” sheet of paper. Margins shall be at least 1 inch on the top and bottom and 3/4 inch on the side. The Contractor shall number each page in order to eliminate any confusion. In the event contractor creates an ambiguity in their numbering of pages, the Government may exercise its own discretion in counting pages. In the event contractor creates an ambiguity in their numbering of pages, the Government may exercise its own discretion in counting pages.
(g) Indexing. Each volume shall contain a more detailed table of contents to delineate the subparagraphs within that volume. Tab indexing shall be used to identify sections.
(h) Glossary of Abbreviations and Acronyms. Each volume shall contain a glossary of all abbreviations and acronyms used, with a definition for each.
3. Proposal Content
(b) Volume I – Technical Volume
(1) The Technical Volume shall be clear, concise, and include sufficient detail for effective evaluation and for substantiating the validity of stated claims in the Offeror’s proposal. Legibility, clarity and coherence are very important. Your responses will be evaluated against the Technical factors defined in Addendum 52.212-2, Evaluation Factors for Award. The proposal should not simply rephrase or restate the Government's requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Statements that the offeror understands, can, or will comply with the PWS (including referenced publications, technical data, etc.); statements paraphrasing the PWS or parts thereof (including applicable publications, technical data, etc.); and phrases such as “standard procedures will be employed” or “well known techniques will be used,” etc., will be considered unacceptable. Offerors shall assume that the Government has no prior knowledge of their facilities and experience, and will base its evaluation on the information presented in the offeror's proposal. Elaborate brochures or documentation, binding, detailed art work, or other embellishments are unnecessary and are not desired.
(2) The Technical Volume shall, at a minimum, be prepared in a form consistent with the Performance Work Statement (PWS) and the evaluation criteria for award set forth in Addendum 52.212-2 of this solicitation. The section shall be prepared in an orderly format and in sufficient detail to enable the Government to make a thorough evaluation of the contractor’s technical competence and ability to comply with the contract task requirements specified in the PWS. The offeror shall address as specifically as possible the actual methodology you would use for accomplishing the PWS tasks. The volume shall be organized according to the following general outline:
-Table of Contents -List of Table and Drawings
Factor 1: Technical Capability consists of two Subfactors:
Subfactor 1A: Technical Ability Subfactor 1B: Management Approach
SUBFACTOR 1A: Technical Ability The Offeror’s overall technical approach shall demonstrate its knowledge and understanding of this requirement and its capability to perform all tasks in the Performance Work Statement. The Offeror’s technical approach shall also concisely and clearly address the Offeror’s approach to plan, organize, control and perform the major performance objectives below:
Monitor and control entry and egress in support of training operations inside designated secured training areas.
Maintain physical control over all entrances to the secured area, ensuring all personnel entering have required security clearance.
Maintain accurate logs of all personnel entering the secured areas; also maintain control and accountability over all items, documents, information technology and training equipment and/or software entering and leaving the secured areas.
Provide directions to personnel entering the secured areas, preventing unauthorized persons from entering the areas.
Provide security briefings to all personnel requiring access to security areas.
Assist in the training of designated personnel on alarm settings.
Provide assistance for in-processing new service members requiring clearances.
Escort personnel requiring entrance in BLDG 29815, Allison Hall, 24 hour secured building.
Monitor all security cameras.
SUBFACTOR 1B: Management Approach:
The Offeror’s overall technical approach shall demonstrate its knowledge and understanding of the magnitude and complexity of this requirement and its capability to perform all tasks in the Performance Work Statement. The Offeror’s technical approach shall also concisely and clearly address the Offeror’s approach to plan, organize, control and perform the major performance objectives below:
The Offeror’s management approach shall describe the extent to which subcontractors and/or teaming partners (hereafter referred to as “personnel”) shall be used to meet the requirement. The Offeror’s management approach shall address its procedures to monitor and manage performance by all personnel to ensure timely quality work and performance. The Offeror’s staffing approach shall identify its proposed labor categories. The Offeror’s staffing plan shall describe its plans for recruiting personnel to manage and conduct simultaneous moves.
(c) Volume II - Past Performance. Offeror shall identify and submit recent and relevant performance/experience information from at least three (3) but no more than five (5) Federal, State, or Local Government task orders or contracts that the Offeror has performed. Recent is defined as within the past three (3) calendar years from the closing date of this RFP. Relevant is defined as work performed that is similar to that anticipated by the PWS. Each narrative shall also include contract number and amount: the name, telephone number, and email address of the Government representative who can verify past performance. The Past Performance evaluation will be accomplished by reviewing aspects of an Offeror's recent and relevant Past Performance, focusing on and targeting performance which is relevant to the effort as it directly relates to the work being procured under this solicitation and as defined in Addendum 52.212-2
Past Performance information described herein is required on the offeror and all subcontractors, teaming partners, and/or joint venture partners proposed to perform 50% of the proposed effort based on the total proposed price.
1. The offeror shall include documentation regarding their relevant past performance as it directly relates to the work being procured under this solicitation. The offeror SHALL NOT go back any farther than 3 years for services for the submitted data. The past performance data shall document a successful history of past contract performance.
2. In conducting the Past Performance evaluation, the Government reserves the right to use both the information provided in the offeror’s Past Performance Volume and information obtained from other sources, such as the Past Performance Information Retrieval System (PPIRS) or similar systems, Defense Contract Management Agency (DCMA) and commercial sources. Offerors are reminded that both independent data and data provided by offerors in their proposals may be used by the Government to evaluate offeror past performance. However, the burden of providing thorough, complete, and current past performance information as requested in this paragraph remains with the offerors. Proposals that do not contain the information requested by this paragraph risk rejection or a less than acceptable performance rating by the Government. All past performance comments received will be taken into account and could affect the overall rating. The overall past performance evaluation is a subjective decision based on the whole of all data received. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR
15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”
4. Submission Requirements. The offeror shall submit a Past Performance Volume containing the following:
The offeror shall provide documentation outlining the offeror’s past performance with contracts, as a prime or major subcontractor, which is the same or similar in nature, size, and complexity to the services being procured under this Solicitation. The submittal shall include rationale supporting your assertion of relevance and how it was determined that the work performed previously was the same or similar in nature, size, and complexity to the work specified by this solicitation. Offerors are required to explain what aspects of the contracts are deemed relevant to the proposed effort, and to what aspects of the proposed effort they relate.
(d) Volume III- Price – The offeror shall complete SF1449 – Continuation Sheets -- Supplies or Services and Prices/Costs section of the solicitation.
The Government reserves the right to require the submission of Other Than Certified Cost or Pricing Data as is deemed necessary to arrive at a fair and reasonable price.
ADDENDUM 52.212-2
EVALUATION FACTORS FOR AWARD
a. Basis for Contract Award
(1) This is a best value source selection conducted in accordance with Federal Acquisition Regulation (FAR) 15.3, Source Selection, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Army Federal Acquisition Regulation Supplement (AFARS). Award will be made to a single offeror who is deemed responsible in accordance with the Federal Acquisition Regulation (FAR), whose proposal conforms to the solicitation requirements, and whose proposal, judged by an overall assessment of the evaluation criteria and other considerations specified in this solicitation, represents the Lowest Priced Technically Acceptable offer.
(2) Trade-offs between cost/price and non-cost/price factors are not permitted. Unreasonably high, unbalanced, inaccurate or incomplete price proposals, may be the grounds for eliminating a proposal from competition.
The Government will evaluate proposed prices for reasonableness using price analysis techniques. Proposed prices evaluated as unreasonable may be grounds for eliminating a proposal from competition.
b. Award for All of the Work. The Government intends to award 1 contract as a result of this solicitation. Offers received for less than the stated number of items listed in the Solicitation Schedule will be considered ineligible for award. As set forth in FAR 52.215-1 (f)(4), the Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a), Clarifications and award without discussions). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In the event that discussions are held, a competitive range determination will be made. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
c. Evaluation Criteria
(1) The proposals will be evaluated under the following three evaluation factors:
Factor 1: Technical Capability Subfactor 1A: Technical Ability Subfactor 1B: Management Approach
` Factor 2: Past Performance Factor 3: Price
(2) Factor 1 - Technical Capability. The Technical Factor evaluation provides an assessment of the offeror’s capability to satisfy the Government’s minimum requirements.
Factor 1 – Capabilities consist of three Subfactors:
Subfactor 1A: Technical Ability Subfactor 1B: Management Approach SUBFACTOR 1A: Technical Ability
The proposal clearly demonstrates that the Offeror has a very good understanding of the entire requirement; has a very good methodology to perform all tasks successfully and on time, and has a very efficient, effective and sound approach to plan, organize, control and perform the major performance objectives. The proposal’s overall technical approach has little potential to disrupt or degrade performance or to increase costs.
SUBFACTOR 1B: Management Approach
The proposal clearly demonstrates that the Offeror has very sound procedures to monitor and manage performance of all personnel, to ensure timely quality work and performance. The proposal clearly demonstrates that the Offeror has offered properly qualified personnel to perform this requirement, has a very sound recruiting and retention plan to ensure the continued availability of personnel and has a very efficient, effective and sound staffing approach that ensures an appropriate number of personnel are available to perform this requirement. The proposal’s overall management and staffing approach has little potential to disrupt or degrade performance or to increase costs.
The Technical Capabilities sub-factors will be assigned an adjectival rating of Acceptable or Unacceptable. The subfactor ratings will be used to determine an overall rating for the factor. If any sub-factor receives an Unacceptable rating, the overall Technical Capabilities factor will be rated Unacceptable.
Table A-1. Technical Acceptable/Unacceptable Ratings Rating Description Acceptable Proposal meets the requirements of the solicitation.
Unacceptable Proposal does not meet the requirements of the solicitation.
(3) Factor 2 - Past Performance. The Past Performance evaluation will assess the offeror’s probability of meeting the minimum past performance solicitation requirements as indicated by that offeror’s record of past performance. Past Performance is assessed at the factor level after evaluating aspects of the offeror’s recent past performance and focusing on performance that is relevant to the services being procured under this solicitation.
Offerors are cautioned that in conducting the performance risk assessment, the Government may use data provided in the offeror’s proposal and data obtained from other sources, such as the Past Performance Information Retrieval System (PPIRS) or similar systems and State Department Watch Lists. Past performance areas of evaluation include:
- Quality of Service
- Schedule
- Cost Control
- Customer Satisfaction
(a) Each offeror will receive a past performance evaluation rating based only on the Offeror's recent past performance that is relevant to the Contract requirements.”
(b) Recency Assessment. An assessment of the past performance information will be made to determine if it is recent. To be recent, the effort must be ongoing or must have been performed during the past three years from the date of issuance of this solicitation. Past performance information that fails this condition will not be evaluated.
(c) Relevancy Assessment. To be relevant, the effort must be similar in nature of work, size, and complexity. The Government will conduct an in-depth evaluation of all recent performance information obtained to determine if it is the same or similar in nature of work, size, and complexity to the services/products being procured under this solicitation.
A relevancy determination of the offeror’s (including joint venture partner(s) and major and critical subcontractor(s)) past performance will be made. In determining relevancy for individual contracts, consideration will be given to the effort, or portion of the effort, being proposed by the offeror, teaming partner, or subcontractor whose contract is being reviewed and evaluated. In establishing what is relevant for the acquisition, consideration should be given to what aspects of an offeror’s contract history would give the most confidence that the offeror will satisfy the current procurement. The past performance information provided in the proposal and obtained from other sources will be used to establish the relevancy of past performance.
(d) The Past Performance Evaluation Team will review this past performance information and determine the quality and usefulness as it applies to performance confidence assessment.
(e) Assigning Ratings. The Past Performance Factor will be assigned one of the ratings defined below.
Table 4. Past Performance Evaluation Ratings Rating Description Acceptable Based on the offeror’s performance record, the
Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.
Unacceptable Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.
(f) Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered “acceptable.”
(4) Factor 3 – Price. Price will not be scored or rated. Evaluation of price will be performed using one or more of the price analysis techniques in FAR 15.404-1(b). Through these techniques the Government will determine whether prices are reasonable, complete and balanced.
Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s). As part of price evaluation, the government will evaluate its option to extend services (see FAR Clause 52.217-8) by adding one-half of the offeror's final option period price to the offeror's total price. Thus, the offeror's total price for the purpose of evaluation will include the base period, 1st option, 2nd option, 3rd option, 4th option and 1/2 of the 4th option. Offerors are not required to enter a price for the six-month period.
Unbalanced Pricing may be evaluated in accordance with FAR 15.404-1(g), as applicable, to assess potential performance risk which could result in unreasonably high prices
Definitions.
Reasonableness. A price is reasonable if, in its nature and amount, it does not exceed that which would be incurred by a prudent person in the conduct of competitive business.
Completeness/Accuracy. The offeror’s proposal is in compliance with the Price Volume instructions in the solicitation.
PWS
Performance Work Statement (PWS)
Security Support
Services for the
Headquarters
U.S. Army Ordnance School
Ordnance Electronics Maintenance Training Department Fort Gordon, GA 30905-5733
PART 1 GENERAL INFORMATION
1. GENERAL: This is a non-personal service contract to provide security support services to the U.S. Army Ordnance Schools (USAODS) at Fort Gordon, Georgia. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor; who in turn is responsible to the Government.
1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform security support services as defined in this Performance Work Statement except for those items specified as Government furnished property and services.
The Contractor shall perform to the standards in this contract for security support services.
1.2 Background: This requirement is for security support personnel for the Ordnance School. The Ordnance School has a mission of planning, providing, and sustaining Initial Entry Training (IET) for different Military Occupational Specialist (MOSs). The additional support personnel will assist in ensuring only authorized access to OEMTD’s training facilities.
1.3 Objectives:
1.3.1 Provide security support services to USAODS, OEMTD Fort Gordon, Georgia.
1.3.2 Provide security training/briefings to USAODS, OEMTD personnel.
1.4 Scope: Provide security support services to organizations located at Fort Gordon, Georgia to support training in a secured facility. The Contractor shall monitor and control entry and egress in support of training operations inside designated secured training areas.
1.5 Period of Performance: The period of performance (PoP) shall be for 12 months and four (4) 12- month option years. The PoP reads as follow:
Base Year - 30 September 2018 to 29 September 2019
Option Year I - 30 September 2019 to 29 September 2020
Option Year II - 30 September 2020 to 29 September 2021
Option Year III - 30 September 2021 to 29 September 2022
Option Year IV - 30 September 2022 to 29 September 2023
1.6 General Information
1.6.1 Quality Control: Quality Control is the responsibility of the Contractor. The Contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.246-1
Contractor Inspection Requirements). The Contractor shall develop, implement and maintain an effective Quality Control System which includes a written Quality Control Plan (QCP). The QCP shall implement standardized procedure/methodology for monitoring and documenting contract performance to ensure all contract requirements are met.
The Contractors’ QCP must contain a systematic approach to monitor operations to ensure acceptable services/products are provided to the Government. The QCP as a minimum shall address continuous process improvement; procedures for scheduling, conducting and documentation of inspection; discrepancy identification and correction; corrective action procedures to include procedures for addressing Government discovered non-conformances; procedures for root cause analysis to identify the root cause and root cause corrective action to prevent re-occurrence of discrepancies; procedures for trend analysis; procedures for collecting and addressing customer feedback/complaints. The Contractor shall upon request provide to the Government their quality control documentation. The QCP is to be delivered within 30 days after contract award. Three copies of a comprehensive written QCP shall be submitted to the KO and COR within 5 working days when changes are made thereafter. After acceptance of the quality control plan the Contractor shall receive the Contracting Officer’s acceptance in writing of any proposed change to their QC system.
1.6.2 Quality Assurance: The Government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.3 Recognized Holidays: The days specified below are legal Federal holidays during which nonessential work shall not be required of the Contractor. If the holiday falls on a Saturday, it is observed on Friday; if the holiday falls on Sunday, it is observed on Monday.
New Year’s Day Labor Day
Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day
Independence Day Christmas Day
Training Holidays and Block Leave: Contractor employees shall be required to work during training holidays and the block leave period. Contractors shall work training holidays, but only when a Military member or Department of the Army (DA) Civilian employee is also present for duty at the work location.
1.6.4 Hours of Operation: Training is conducted in two shifts during the hours of 0800 to 0030. The Contractor is responsible for conducting business, between the hours of 0800 and 0030 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Contractor
Personnel will normally work an 8 hour day/40 hour work week. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essentials.
1.6.5 Place of Performance: The work to be performed under this contract will be performed at Government facilities on Fort Gordon, Georgia.
1.6.6 Type of Contract: The Government will award a firm fixed price contract.
1.6.7 Security Requirements: Contract employees performing on this contract must be a U.S. citizen. At work performance start date, all contract personnel shall have a final secret security clearance and shall maintain the clearance throughout the life of the contract. The contractor is responsible for acquiring the clearances. The security requirements are in accordance with the attached DD Form 254. The contractor shall ensure that all assigned personnel understand applicable security policies and directives found in DOD 5220.22-M, National Industry Security Program Operating Manual (NISPOM); AR 380-5, Information Security Program, and all other applicable policies and regulations.
The contractor shall ensure that classified data is controlled, protected, and safeguarded in accordance with AR 380-5 and current Army and DOD policy. Classified information shall be accessed and stored in government spaces only. The contractor shall agree that any data furnished by the government to the contractor shall be used only for performance under this PWS, and all copies of such data shall be returned to the government upon completion of this effort.
The contractor Facility Security Officer (FSO) will ensure there is a procedure for all terminated employees to out process the installation. Compliance with DD Form 254, Department of Defense Contract Security Classification Specification, is required.
1.6.7.1 Handling/Access to Classified Information: The contractor shall comply with FAR 52.204-2, Security Requirements. This clause involves access to information classified "Confidential," "Secret," or "Top Secret" and requires contractors to comply with (1) the Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22-M), and (2) any revisions to DoD 5220.22-M. Any adverse action preventing a contractor from retaining access to classified material must be brought to the attention of the COR and contractor Facility Security Officer (FSO) immediately.
1.6.7.2 Cybersecurity (formerly Information Assurance (IA)/Information Technology (IT)) Training: All contractor employees and associated subcontractors must complete the DoD Cyber Awareness Challenge Training (https://ia.signal.army.mil/DoDIAA) before issuance of network access and annually thereafter.
Certificates of successful completion, for both initial awareness training and annual refresher training shall be provided to the COR via the Army Training and Certification Tracking System (ATCTS). All contractor employees will successfully complete all required IA training as specified in AR 25-2 and as directed by the Government. This required training will be completed within 7calendar days of start date and annually thereafter, if applicable. Training certificates will be provided to the COR within 5 working days of training completion.
1.6.7.3 Contractor employees, to include sub-contractors, requiring access to information systems to fulfill their duties must possess the required favorable security investigation. The IASO/IANO from the activity that the contractor employee is assigned to, will submit an electronic DD 2875, System Authorization Access Request (SAAR) to their Security Office (G2) for verification that the contractor employee meets the requirements of AR 25-2 for accessing the Fort Gordon networks.
(Ref AR 25-2)
1.6.7.4 Information Assurance (IA)/Information Technology (IT) Certification. Per DoD 8570.01-M, DFARS 252.239.7001, and AR 25-2, the contractor employees’ supporting IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.
1.6.7.5 Initial Security Orientation and Annual Security Refresher Training: All contractor employees, including subcontractors, assigned to this contract shall complete the online Initial Security Orientation Training located on the Army Learning Management System (ALMS) site. Log into AKO, “Self Service”, “My Training”, “ALMS”, “Go To Mandatory Training”. Training must be completed within 30 days of reporting for duty. The contractor shall submit certificate of completion for each affected contractor employee and subcontractor employee to the COR and unit/activity security manager. The Annual Security Refresher Training is required annually thereafter. (Ref ALARACT 207/2013, DTG 291848Z Aug 13, Subj: Army Wide Rollout and Requirement for Standardized Computer Web-Based Security Training on the Army Learning Management System (ALMS)).
1.6.7.6 Anti-Terrorism (AT) Level I Training: All contractor employees, including subcontractors, assigned to this contract shall receive an initial Antiterrorism Level I Brief by a certified ATO Level II Officer within 30 days of reporting for duty (Monthly briefings will be offered by the Garrison Antiterrorism Officer). Annual refresher Antiterrorism Level I Training shall be completed on-line at https://jkodirect.jten.mil/Atlas2/faces/page/login/Login.seam or they may attend the monthly training offered by the Garrison ATO. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR and unit/activity security manager (Ref Department of the Army, US Army Contracting Agency, SFCA-CO, 05 Sep 07, subject: Incorporation of Measures into the Contracting Process and AR 525-13, Antiterrorism).
Note: Contractor personnel shall receive an AOR briefing when traveling OCONUS on TDY. Briefing must be provided by a certified ATO Level II Officer within 7 working days prior to TDY departure outside the 50 United States, its territories, and possessions. This is separate from the normal annual AT Level I training requirement (Ref AR 525-13).
1.6.7.7 iWATCH Training: All contractor employees, including subcontractors, assigned to this contract shall receive a brief on the local iWATCH program (provided in conjunction with the AT Level I Training). This training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 days of reporting to duty and annual refresher training with the results reported to the
COR.
1.6.7.8 Operation Security (OPSEC) Training: All contractor employees, including subcontractors, assigned to this contract shall complete Level I OPSEC training within 30 days of reporting for duty and then annually thereafter. Initial Level 1 OPSEC training will be conducted monthly by the Garrison
OPSEC Officer or a Level II certified OPSEC Officer. Annual refresher training shall be completed on- line at http://cdsetrain.dtic.mil/opsec/index/htm. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR and unit/activity security manager. OPSEC training guidelines are contained in AR 530-1, Operations Security. The contractor shall adhere to local OPSEC policies and procedures of the government requiring activity. When in a TDY status in support of this work effort, the contractor shall also adhere to any OPSEC policies and procedures in effect at TDY locations.
1.6.7.9 Threat Awareness and Reporting Program (TARP) Training: All contractor employees, including subcontractors, assigned to this contract shall complete TARP training within 30 days of reporting for duty and then annually thereafter.
TARP training will be conducted monthly by the 902nd MI Group. The COR will ensure contractors are notified of available training. Completion of training shall be reported to the COR and the unit/activity security manager (Ref AR 381- 12).
1.6.7.10 Installation Access: All contractor employees, including subcontractors, shall comply with applicable installation and facility access security policies and procedures at all work and TDY locations. All contractors and subcontractors will be issued a Common Access Card (CAC) or an Installation Pass issued through the Automated Installation entry (AIE) Security System to access the installation. The Fort Gordon military installation is a limited access post. Unscheduled gate closures by the military police may occur at any time. In accordance with Army Regulation 525-13, paragraph 5- 19, all prospective contractors will undergo a verification process by the installation Provost Marshal Office, Director of Emergency Services to determine the trustworthiness and suitability prior to being granted access to federal property. This will be accomplished using the National Crime Information Center (NCIC) Interstate Identification Index (III). This is the minimum baseline background check for entrance onto Army Installations for non-CAC holders to include entrance of visitors (Ref AR 190-13, paragraph 8-2). All personnel entering or exiting the installation may experience a delay due to vehicle inspections, registration checks, verification of seat belt use, etc. All vehicles and personnel are subject to search and seizure. The search and seizure provisions shall apply to contractor personnel while within Fort Gordon's area of jurisdiction. Contractor personnel shall comply with all entry control requirements and security policies/procedures in effect. Security procedures may change without notice.
1.6.7.11 Identification of Contractor Employees: In accordance with FAR 37.114 contractor employees shall identify themselves as a contractor at all times while on the job, e.g., in the workplace, when attending meetings, in email, when answering government telephones, or when making phone calls.
1.6.7.11.1 ID Badges: The contractor shall provide each contractor employee an identification (ID) badge on contract start date or on employment start date. The ID badge shall be made of nonmetallic material, be easily readable, and shall contain the following minimum information: Employee's Name, Contract Company Name and Employee's Photograph.
Contract employees shall wear proper identification at Government workplaces at all times.
1.6.7.11.2 Display of ID Badges: Contractor employees shall wear the ID badge at all times when performing work under this contract to include attending government meetings and conferences. Unless otherwise specified in the contract, each contract employee shall wear the ID badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit such placement.
1.6.7.11.3 Answering Telephones: Contractor employees shall identify themselves as a contract employee when answering and making calls on government telephones.
1.6.7.11.4 Utilizing Electronic Mail: When contractor employees send e-mail messages to government personnel while performing on this contract, the contractor employee's e-mail address shall include the company name together with the person's name (ex: John Smith, Contractor, ABC Company). When contractor employees require access to a government computer, the contractor employee shall be required to obtain a Common Access Card (CAC). To do so, the contractor employee shall request a CAC through the COR.
NOTE: The government issued CAC is the property of the U.S. Government and shall be returned to the COR upon expiration of the contract, replacement or termination of the contract employee (CAC must be turned in to the COR on contractor employee's last day of employment). Unauthorized possession of the CAC can be prosecuted criminally under section 701, title 18, United States Code.
1.6.7.12 Eligibility Verification for Employment: E-Verify is an Internet-based system that compares information from an employee's Form I-9, Employment Eligibility Verification, to data from U.S. Department of Homeland Security and Social Security Administration records to confirm employment eligibility. The U.S. Department of Homeland Security is working to stop unauthorized employment. By using E-Verify to determine the employment eligibility of their employees, companies become part of the solution in addressing this problem. All U.S. employers must complete and retain a Form I-9 for each individual they hire for employment in the United States. This includes citizens and noncitizens.
On…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.