This is a solicitation for environmental assessment services. The U.S. Army Corps of Engineers Sacramento District intends to award a firm-fixed-price contract to provide programmatic environmental assessment and analysis services, including air quality and noise analysis, in support of an environmental assessment for the Utah Test and Training Range. Quotes are due by March 30, 2022. The solicitation will be evaluated based on technical capability, mission capability, past performance, and cost/price factors. Services required include completion of an environmental assessment, noise analysis and modeling, air quality analysis utilizing the Air Force Air Conformity Applicability Model, and preparation of associated decision documents. The period of performance is 12 months from award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Questions.docx | DOCX document | |
| DOPAA Programmatic UTTR EA (Final Draft 10.6.21).pdf | ||
| 1997 EA Range Management Plan for UTTR.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9123822R0030 15-Mar-2022
b. TELEPHONE NUMBER
000-000-0000
8. OFFER DUE DATE/LOCAL TIME
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912389. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
JOSEPH D WARBY
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY CORPS OF ENGINEERS, SACRAMENTO
CONTRACTING DIVISION
1325 J STREET
SACRAMENTO CA 95814-2922
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
X SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$16,500,000
NAICS:
541620
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF79
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W9123822R0030
Section SF 1449 - CONTINUATION SHEET
PERFORMANCE WORK STATEMENT
PART 1
GENERAL INFORMATION
1.0 General: This is a non-personal service, Firm Fixed-Price Performance-Based contract to provide Environmental Services, including noise analysis and modeling services, in support of an
Environmental Assessment (EA) for the U.S. Air Force (USAF) addressing updated operations of the Utah Test and Training Range (UTTR, Installation) supported by Hill Air Force Base (Hill
AFB), Utah. This contract will be managed by the U.S. Army Corps of Engineers, Sacramento
District (USACE) Contracting Office and assigned Contracting Officer (KO). The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the primary
Contractor who, in turn, is responsible to the Government.
1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the environmental support services as defined in this
Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
1.2 Background: The EA shall provide sufficient, documented information to analyze potential environmental impacts associated with an updated Range Management Plan for the
UTTR. Additionally, the airspace over the UTTR spans a large area across Utah and into Nevada, covering a number of small communities (Technical Exhibit 5 - UTTR Airspace Chart). While a smaller, site-specific noise study was accomplished in 2016 to establish the LUCIN D/E in accordance with the Federal Aviation Administration (FAA), a full Installation noise impact analysis, including an updated noise contour, with associated noise modeling operational data documentation (NMODD) packages, will be incorporated into the evaluation of the associated airspace, including ground and air operations, in order to meet National Environmental Policy Act
(NEPA) requirements.
1.3 Objectives: The primary objectives associated with this PWS are:
• Complete an EA to evaluate potential environmental impacts of the proposed project.
• Complete a noise analysis and any required modeling, including updated noise contour with associated NMODD, for the proposed updated UTTR Range Management Plan in support of the EA.
• Complete an air quality analysis utilizing the USAF Air Conformity Applicability Model
(ACAM).
• Prepare a Finding of No Significant Impact (FONSI), Finding of No Practicable Alternative
(FONPA), or Notice of Intent (NOI) to complete an Environmental Impact Statement (EIS) depending on results of the assessment.
• Provide recommendations for mitigation measures to minimize impacts to less than significant (incorporated as part of the EA document).
1.4 Scope: Environmental Assessment: The Contractor shall provide services for the completion of the Air Force Environmental Impact Analysis Process (EIAP) per 32 CFR 989 and all other pertinent requirements in support of the updated Range Management Plan for the UTTR, as detailed in Part 5. The Contractor shall also complete an associated noise analysis and air quality analysis to support the preparation of the EA. The NMODD shall provide all the information needed to duplicate any noise analysis. The ACAM shall assist in the air quality analysis.
1.5 Period of Performance: The period of performance shall be for twelve (12) months from the date of award. In the event unforeseen delays occur that are beyond the control of the
Contractor (e.g. regulatory constraints, military missions); the Contractor shall submit a request for a change in schedule for review by the USACE Contracting Officer (KO), Project Manager
(PM), Tech Lead, and the UTTR Technical Representative.
1.6 General Information:
1.6.1 Place of Performance: The work being performed by this contract will support proposed activities at the UTTR. No field work or site visits will be required to complete the proposed tasks, though may be accommodated only if necessary; All data should be able to be collected via other avenues. If site visits are needed, coordination with the UTTR Technical Representative will be required with a minimum of three weeks’ notice of anticipated dates.
1.6.2 Type of Contract: The Government will award a Firm Fixed-Price Performance-Based contract for the services described herein.
1.6.3 Hours of Operation: The Contractor is responsible for conducting business between the hours of 0700 to 1700 MST Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar
Government directed facility closings. For other than Firm Fixed-Price contracts, the Contractor will not be reimbursed when the Government facility is closed for the above reasons. The
Contractor must, at all times, maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.4 Recognized Holidays: The following holidays are recognized as Federal holidays and
Government offices will not be open:
New Year’s Day Labor Day
Martin Luther King Jr.’s Birthday Columbus Day
President’s Day Veteran’s Day
Memorial Day Thanksgiving Day
Independence Day Christmas Day
Juneteenth Day
1.6.5 Quality Control: The Contractor shall develop and maintain an effective Quality Control
Program (QCP) to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s QCP is the means by which they assure themselves that their work complies with the requirement of the contract. The Contractor shall provide the KO a copy of the QCP upon request. After acceptance of the QCP the Contractor shall receive the KO’s acceptance in writing of any proposed changes to their QC system.
1.6.6 Quality Assurance: The Government shall evaluate the Contractor’s performance under this contract in accordance with the performance requirements specified in Technical Exhibit 1.
1.6.7 Special Qualifications and Contractor Expertise: The Contractor is responsible for ensuring all employees possess and maintain current training and certification requirements. The
Contractor shall provide the necessary personnel and equipment to successfully execute this contract within the period of performance. Key Contractor personnel with demonstrated and relevant UTTR experience shall be identified. The Contractor shall be responsible for determining the requirements for licensed professionals and certifications. The proposed action involves a military installation with operational and safety requirements for various activities.
Personnel working on field tasks for this contract should have demonstrated experience working at the UTTR to understand the hazards associated with the Installation.
The Contractor shall notify the COR of any changes in key personnel. The change of key personnel is subject to approval by the KO. Replacements, if approved, shall be equal to or exceed the personnel qualifications of the personnel originally proposed.
1.6.8 Key Personnel: The follow personnel are considered key personnel by the Government:
1.6.8.1 Project Manager. The Contractor shall provide a PM, who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the PM is absent shall be designated in writing to the KO, Tech Lead, and the HQ UTTR
Technical Representative. The PM or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The PM or alternate shall be available between 0700 and 1700 MST, Monday thru Friday except Federal holidays or when the
Government facility is closed for administrative reasons.
1.6.8.2 Environmental Scientist. Environmental Scientists assigned to the contract shall have a minimum of a Bachelor of Science (B.S.) degree with five (5) years of related experience in environmental compliance and the NEPA process. Personnel with a Master of Science (M.S.)
degree shall have a minimum of three (3) years related experience. The names of personnel completing the work shall be designated in writing to the KO, Tech Lead, and the HQ UTTR
Technical Representative.
1.6.8.3 Archeologist. The Contractor shall provide an Archaeologist who meets the Secretary of the Interior Standards for the Professional Archaeologist, including a graduate degree in archaeology or anthropology, and has at least three (3) years professional experience. The archaeologist shall have professional experience with cultural resource surveys, and cultural resource management and conservation expertise in Rocky Mountain regions. Experience in other regions is valued and will also be taken into consideration. The names of personnel completing the work shall be designated in writing to the KO, Tech Lead, and the HQ UTTR Technical
Representative.
1.6.9 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as
Contractor products or that Contractor participation is appropriately disclosed.
1.6.10 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference, including kick-off meeting, convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart
42.5. The KO, PM, Tech Lead, the HQ UTTR Technical Representative, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the KO will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.6.11 Phase In/Phase Out Period: Not Applicable
1.6.12 Contractor Travel: Contractor is not expected to travel CONUS during the performance of this contract. However, should travel become necessary, the Contractor will be authorized travel expenses where applicable and consistent with the substantive provisions of the Joint Travel
Regulation (JTR) and the limitation of funds specified in this contract. All travel requires
Government approval/authorization and notification to the KO.
1.6.13 Other Direct Costs: This category includes travel (outlined in 1.6.12 and 6.1), reproduction, and shipping expenses.
1.6.14 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.6.15 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications, or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR
Subpart 9.5. The Contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.16 Notification Requirements: The Contractor is required to notify the KO and Contracting
Office Representative (COR) of critical issues that may affect the contract performance and/or human health and the environment. On critical issues, verbal notification should be made immediately to the KO, followed by written notification as soon as practical.
1.6.17 Security Requirements: In the event of a site visit, the Contractor shall obtain visitor passes (used by both prime Contractor and subcontractor staff) during the duration of the visit.
Notification of acquiring visitor passes will be requested through HQ UTTR three weeks prior to anticipated visit. All passes shall be returned to the HQ UTTR or designate upon expiration of the badge, upon completion of the project, or when possession of the badge is no longer necessary
(e.g., upon removal of contracted personnel from specific projects). The Contractor shall verify that identification credentials presented by all Contractor and subcontractor employees to obtain security passes or decals used during the duration of this contract are current and correct.
1.6.17.1 Physical Security: The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.
1.6.18 No Smoking Policy: Except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines.
1.6.19 Safety:
1.6.19.1 U.S. Army Corps of Engineers’ Safety and Health Requirements Manual, EM 385-
1-1, and OSHA Requirements: The Contractor will be required to comply with all pertinent provisions of the latest version of the USACE Safety and Health Requirements Manual, EM 385-
1-1 in effect on the date of the contract award. EM 385-1-1 and its changes are available at:
http://www.publications.usace.army.mil/USACE-publications/Engineer-Manuals/.
The Contractor must also comply with Occupational Safety and Health Act (OSHA) standards.
OSHA standards are subject to change. It is the Contractor's responsibility to maintain familiarity with current OSHA standards.
1.6.19.2 Zero Accident Program: The Sacramento District, in its continual pursuit of excellence in safety has established a goal of zero contractor injuries. To attain this goal, it will be necessary for the Contractor management personnel to communicate to the workers an expectation of zero injuries; that it is no longer acceptable to take chances that shortcuts taken because of laziness or even while trying to do an efficient job are no longer welcomed; that praise for shortcuts or chance-taking will not exist. It is imperative that Contractor management clearly sets forth the expectation for zero injuries so that the workers can begin to believe that the company is truly serious about safety. From the standpoint of worker psychology, zero is the only supportable goal. In attaining zero-injury performance, there is no substitute for the concept of setting and communicating safety performance expectations to the workers.
1.6.19.3 COVID-19: The Contractors shall note, due to COVID-19 restrictions, access to project sites could potentially be delayed. Contractors are required to adhere by the current guidance available from the Center for Disease Control (CDC), applicable State of Utah orders, and HQ
UTTR restrictions.
http://www.publications.usace.army.mil/USACE-publications/Engineer-Manuals/
PART 2
DEFINITIONS & ACRONYMS
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2 Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government.
Note: The only individual who can legally bind the Government.
2.1.3 Contracting Officer’s Representative (COR): An employee of the U.S. Government appointed by the KO to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement (PWS).
2.1.5 Deliverable: Anything that can be physically delivered, though may include non-manufactured things such as meeting minutes or reports.
2.1.6 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the
PWS. When Key Personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.8 Quality Assurance (QA): The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9 Quality Control (QC): All necessary measures taken by the contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.10 Quality Control Program (QCP): Contractor’s QCP is the means by which they assure themselves that their work complies with the requirement of the contract.
2.1.11 Subcontractor: One that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.
2.1.12 Work Day: The number of hours per day the Contractor provides services in accordance with the contract.
2.1.13 Work Week: Monday through Friday, unless specified otherwise.
2.2 Acronyms:
AAM Advanced Acoustic Model
ACAM Air Conformity Applicability Model
AFCEC Air Force Civil Engineer Center
AICUZ Air Installation Compatible Use Zone
AFI Air Force Instruction
AFH Air Force Handbook
APP Accident Prevention Plan
BA Biological Assessment
CDC Center for Disease Control
CEG Civil Engineer Group
CEQ Council on Environmental Quality
CFR Code of Federal Regulations
CMR Contractor Manpower Reporting
CONUS Continental United States (excludes Alaska and Hawaii)
COR Contracting Officer Representative
COTR Contracting Officer's Technical Representative
CUI Controlled Uncontrolled Information
DNL Day-Night Average A-weighted sound level
DOPAA Description of Proposed Action and Alternatives
EA Environmental Assessment
EIAP Environmental Impact Analysis Process
EIS Environmental Impact Statement
FSC Federal Service Code
FY Fiscal Year
DOD Department of Defense
DoDI DoD Instruction
FAA Federal Aviation Administration
FAR Federal Acquisition Regulation
FGDB File Geodatabase
FONSI Finding of No Significant Impact
FONPA Finding of No Practicable Alternative
GHG Greenhouse Gas
HAFB Hill Air Force Base
HQ Headquarters
ICRMP Integrated Cultural Resources Management Plan
IICEP Interagency and Intergovernmental Coordination for
Environmental Planning
INRMP Integrated Natural Resources Management Plan
JOG Joint Operational Graphic
JTR Joint Travel Regulation
KO Contracting Officer
LOE Level of effort
MILCON Military Construction
MST Mountain Standard Time
NEPA National Environmental Policy Act of 1969
NGA National Geospatial-Intelligence Agency
NHPA National Historic Preservation Act
NMODD Noise Model Operational Data Documentation
NOA Notice of Availability
NOI Notice of Intent
OCI Organizational Conflict of Interest
OSHA Occupational Safety and Health Act
PBA Performance-based Acquisition
POC Point of Contact
PM Project Manager
PWS Performance Work Statement
QA Quality Assurance
QC Quality Control
QCP Quality Control Program
RFP Request for Proposal
RNM Rotorcraft Noise Model
ROI Region of Influence
SHPO State Historic Preservation Office
SPK Sacramento District USACE
SPSFIE Spatial Data Standards for Facilities, Infrastructure, and
Environment
TE Technical Exhibit
UIC Unit Identification Code
USACE U.S. Army Corps of Engineers
USAF U.S. Air Force
USFWS U.S. Fish and Wildlife Service
UTM Universal Transverse Mercator
UTTR Utah Test and Training Range
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3.0 Government Furnished Items and Services:
3.1 Services: None
3.2 Facilities: None
3.3 Utilities: None
3.4 Equipment: None
3.5 Materials: The Government will make accessible to the Contractor all previous developed reports and studies as well as historic documents necessary to complete this project.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4.0 Contractor Furnished Items and Responsibilities:
4.1 General: The Contractor shall furnish all supplies, equipment, facilities, and services required to perform work under this contract that are not listed under Part 3 of this PWS.
4.2 Secret Facility Clearance: Not Applicable.
4.3 Materials: The Contractor shall furnish all materials and supplies necessary to meet the requirements under this PWS except as provided under Part 3.0.
4.4 Equipment: The Contractor shall furnish all equipment necessary to meet the requirements under this PWS except as provided under Part 3.0.
4.5 Government Safety Requirements: The Contractor shall conduct all activities in accordance with USACE safety requirements; PWS 1.6.19. The Contractor needs to be aware that if a site visit is required that they will be visiting an active bombing range and safety and understanding of this work environment need to be taken into consideration. Personnel coming to the UTTR or working on this project should have an understanding of the issues pertaining to work on an active bombing range.
4.6 Air Quality Calculations: The Contractor shall be responsible for performing all air quality calculations required in the preparation of the EA utilizing the USAF ACAM.
4.7 Noise Analysis: The Contractor shall be responsible for performing all noise calculations required in the preparation of the EA utilizing the NMODD.
4.8 Contractor Manpower Reporting (CMR): The Contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for USACE via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address www.ecmra.mil.
Reporting inputs will be for the labor executed during the period of performance during each
Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year.
Contractors may direct questions to the help desk at: dod.ecmra.support.desk@mail.mil.
Contractor User Guide is available at https://www.ecmra.mil/help/help.html.
http://www.ecmra.mil/ mailto:dod.ecmra.support.desk@mail.mil https://www.ecmra.mil/help/help.html
PART 5
SPECIFIC TASKS
5.0 Specific Tasks:
Basic Services: The Contractor shall provide all qualified personnel, management, supervision, materials, and other items and non-personal services necessary to perform the EA in accordance with the EIAP, and associated noise impact analysis with any accessory modeling as required for the EA, as defined in this PWS. No work shall be accomplished beyond what is specified in this
PWS unless specifically directed by the KO.
The EA and subsequent FONSI or FONPA will be conducted in completion of the EIAP as specified by 32 CFR 989. The EA shall be completed to support the UTTR updated Range
Management Plan (RMP). The Contractor shall assume average document review, and appropriate
QA/QC for all deliverables. The EA shall be prepared using existing data from the proponent and the installation, except for the noise analysis, to include applying the updated RMP draft DOPAA for the UTTR. The text of the EA itself (not counting appendices, etc) will not exceed 75 pages as required by the Council on Environmental Quality (CEQ) guidance issued in July 2020.
The Contractor shall conduct all tasks necessary to complete an EA in support of project requirements. Base task activities include, but are not limited to:
• Identify Key Stakeholders and Create a Point of Contact (POC) list for government review
• Environmental Planning/Consultation Coordination Planning:
o Support the preparation of interagency and intergovernmental coordination letters for agency scoping and public notice of availability.
o Support the preparation of invitation letters for cooperating agencies, if applicable
(Note that submittal of agency coordination letters and cooperating agency invitation letters does not fulfill consultation requirements).
o Support the preparation of Section 106 informal consultation letters with appropriate
State Historic Preservation Office (SHPO) and, if necessary, formal consultation letters.
o Support the preparation of Section 7 informal consultation letters with appropriate U.S.
Fish and Wildlife Service (USFWS) office, and, if necessary, formal consultation letters.
o Assist in the preparation of government-to-government consultation letters with
Federally recognized tribes, as necessary and document any follow up attempts made by the USAF (e.g., emails, telephone calls, and personal meetings).
o Upon USAF review and signature, the Contractor shall prepare agency coordination and consultation letters. These letters shall be packaged on USAF letterhead and signed by the appropriate USAF signature authority. Email packages are preferred. Letter by mail will be dependent on Agency request. In the event of a hard copy mailing, the
Contractor shall then send the signed letters as registered mail, requiring read receipts.
The Contractor shall be responsible for tracking the registered mail receipt of the letters.
o Where applicable, the USAF shall provide responses to coordination and consultation letters to the Contractor and the Contractor will be responsible for drafting the letter.
• The Contractor shall properly evaluate current / baseline conditions and predict potential positive and negative impacts of the Proposed Action(s) and alternatives for the following resource areas (as applicable):
NEPA
o Airspace o Air Quality & Climate Change o Noise / Acoustic Environment (including input from the Noise Analysis task) o Cultural, Archaeological, and Historic Resources o Biological / Natural Resources o Floodplains and Wetlands o Surface Water Resources (quantity and quality) o Soils, Geology, and Hydrogeology (Earth Resources) o Hazardous, Toxic, and Radioactive Materials and Waste o Military Munitions o Land Use o Infrastructure and Utilities o Socioeconomics o Environmental Justice o Safety and Occupational Health o Greenhouse Gasses o Other resource areas as appropriate
• The Contractor shall conduct a cumulative environmental impact analysis for known past, current and reasonably foreseeable projects in the Region of Influence (ROI) (including projects associated with Non-USAF proposals) for resources carried forward for detailed analysis.
• Documentation to be prepared shall include, but is not limited to:
o Preliminary Draft EA (PDEA) o Draft EA (DEA) o Preliminary Final EA and Finding of No Significant Impact (PFEA and FONSI) o Final EA and Finding of No Significant Impact (FEA and FONSI) o Administrative Record
5.1 BASE TASK 1 – PROJECT MANAGEMENT
Subtask 5.1.1 Kick-Off Meeting / Progress Meetings:
The Contractor shall attend a Project kick-off teleconference meeting within 15 days of contract award to discuss requirements and expectations. Meeting minutes shall be submitted within three
(3) business days after completion of the kick-off meeting.
The Contractor shall produce project documentation including meeting summaries for meeting.
Meeting minutes will include meeting attendees, decisions made, action items per POC.
Subtask 5.1.2 Progress Reports, Schedule, and Invoices:
The Contractor shall provide monthly progress reports and invoices. These progress reports will describe the work performed the previous month, the work efforts anticipated for the upcoming month, problems encountered, and resolutions implemented, and the overall percent completion of the project (if required) and will be used to evaluate the associated invoice. Invoice payments shall be submitted by the 10th of each month and include all necessary information and will be prepared in accordance with the milestone/activity schedule approved by the Government.
The Contractor shall prepare a Draft EA schedule for discussion during the project kick-off meeting and provide a Final EA schedule incorporating government comments no later than 10 business days after the meeting.
Subtask 5.1.2.1 Monthly Schedules:
The Contractor shall provide an updated schedule attached to monthly coordination meeting invite.
The schedule will have the most recent changes highlighted in red. The schedule will state if there are no changes to update as well.
Subtask 5.1.3 Coordination Meetings/Teleconferences:
The Contractor shall coordinate (e.g., provide call-in services, coordinate schedules) and participate in project coordination review meetings / teleconferences at least once (1+) per month to discuss project scoping, contract issues/concerns, progress reviews, technical project issues/concerns, and general information exchange concerning current and future activities. The
Contractor shall prepare the agenda, minutes, and presentation materials for meetings attended.
Subtask 5.1.4 Interagency and Intergovernmental Coordination:
The Contractor shall assist the HQ UTTR in consultations with regulatory agencies by assisting with preparation and distribution of Interagency and Intergovernmental Coordination for
Environmental Planning (IICEP) letters for the Draft EA (public notice). The EIAP manager will provide the Contractor with a standard USAF letter format, with the appropriate base level signature block. The Contractor shall provide in electronic format the draft letter for IICEP coordination. Each letter shall be addressed to the respective IICEP recipient and incorporate comments from the installation. The HQ UTTR will print the letters on USAF letterhead and submit them to the signature authority. Upon completion of the signature process, HQ UTTR will return the letters to the Contractor. The Contractor, upon notification by HQ UTTR, shall mail the
IICEP letter to each recipient. The Contractor shall use certified return receipt to confirm receipt by the IICEP recipient. The Contractor shall support preparation of consultation letters in a similar manner as that stated for IICEP letters. The Contractor shall Not contact any parties in an official capacity without the coordination with the HQ UTTR or Government representatives.
Subtask 5.1.4.1 Regulatory and Professional Interface:
The Contractor shall assist with oral/written interactions with interested parties related to the project, including other government agencies, regulatory agencies, and other Contractors.
Consultation requirements per the National Historic Preservation Act (NHPA) and regulations
(“Section 106”) or the Endangered Species Act (“Section 7”) or tribal coordination ARE NOT satisfied by sending IICEP letters. As necessary, the Contractor shall support such consultation and coordination efforts in order to appropriately execute the EA. The Contractor shall also provide recommendations on protective measures, permits, etc., if required. Forums may include administrative proceedings, judicial proceedings, formal meetings, or informal meetings.
Requirements include, but are not limited to, presentation materials, agendas, minutes, publications, news releases, public notices, and the maintenance of mailing lists. In addition, all letters written by the Contractor must be provided to the Government in electronic format
(Microsoft Word). All letters are required to be on USAF letterhead and have an appropriate USAF representative signature before mailings.
5.2 BASE TASK 2 – DATA COLLECTION
Subtask 5.2.1 Data Collection Survey:
The Contractor shall perform a data collection survey with technical meetings taking place per the approved schedule.
The Contractor shall work with Installation personnel in collecting data, as well as evaluating field conditions and assessing impacts. Technical meetings with installation personnel will take place during the course of the site review/ data collection effort.
Personnel working on field tasks for this contract should have demonstrated experience working at the UTTR to understand the hazards associated with the Installation.
If data is not available or if additional analysis is required to support the proposed action, the
Contractor shall immediately notify the USACE PM; the Contractor shall not initiate any studies unless directed by the KO.
Subtask 5.2.2 Data Analysis Memo:
The Contractor shall prepare a brief Summary of Findings memo documenting the results of the data collection survey. The Contractor shall assume no Government review will be required but that the memo will be used to help in preparation of subsequent documents. The results of the analysis shall be used to complete the EA.
5.3 BASE TASK 3 - DEVELOPMENT OF THE ENVIRONMENTAL IMPACT
ANALYSIS & EA
Subtask 5.3.1 Noise Analysis:
The Contractor shall complete a noise analysis, including an updated noise contour with associated
NMODD packages, to support the preparation of the updated UTTR Range Management Plan EA.
The Noise Analysis shall include a NMODD, noise contours figures and modeling files, and an analysis write-up for inclusion within the EA document. The analysis shall include a description of the technical methodology by which the studies were conducted, address requirements, and (if applicable as a result of the noise analysis) provide recommendations for mitigation or measures to be implemented in order to minimize noise impacts associated with the Proposed Action and alternatives.
The Contractor shall be responsible for obtaining noise data/acoustic information for all proposed alternatives. The Contractor shall be provided all applicable background information available to
USACE upon contract award. The Contractor shall also be available to provide responses or guidance to any public comments received on the noise modeling conducted for the EA.
The Contractor shall have familiarity with all areas of the Installation aircraft operations and work with Installation personnel to identify all operational units with a flying mission at the Installation.
The Contractor will then put together a tentative schedule of interviews needed and provide this schedule to Installation personnel.
The Contractor shall review Installation and community maps to obtain layouts and other useful information. The Contractor will review existing geospatial information and any existing
NOISEMAP files from the most recent data collections. Installation personnel will schedule interviews based on this guidance. Following the Installation’s review of each submittal, the PM shall provide a copy of the review comments to the Contractor.
The Contractor is not responsible for the time used by the USAF/USACE for reviewing submittals that may extend beyond anticipated time. The Contractor shall respond in writing to problematic review comments referenced to the applicable documents within 14 calendar days after receipt of the comments. If the Contractor disagrees with comments, an explanation and alternative course of action should be included if applicable.
The Contractor shall prepare the NMODD for aircraft operations flown in the UTTR airspace.
Planning contours will be developed using the best projections of future operations available and agreed to by the USAF and Contractor. The analysis will cover fixed-wing [and rotary-wing] aircraft operations, including ground and flight operations.
The NMODD shall contain all of the information used to generate all noise contours and shall provide all the information needed to duplicate any noise analysis, including:
• Detailed notes from operational data collection efforts.
• Spreadsheets used for documenting and calculating daily activity with all cells visible.
Hyperlinks should be avoided to ensure the data is clearly understood by the next user.
• The operational data (e.g., aircraft configurations/ flight paths/ firing points/ target locations/ weapons use, amount of ammunition used) used by the respective noise model, and details of all assumptions made during the modeling process.
• Flight profile maps for all permanently assigned aircraft and a flight profile operations summary as generated through the BASEOPS and MRNMAP programs.
The Contractor shall use the latest approved version of NOISEMAP, MRNMAP [and/or Advanced
Acoustic Model (AAM)], and/or Rotorcraft Noise Model (RNM), as appropriate. The Contractor is responsible to ensure that only authorized versions of Department of Defense (DOD) approved acoustic software are used in analysis.
The Contractor will prepare an explanation of how the raw data collected during the interviews was organized and modeled and include this explanation in the NMODD. The individual flight track profile sheets will be prepared using the Joint Operational Graphic (JOG) as the background map. An electronic copy of JOG map in the vicinity of the Installation can be downloaded from the National Geospatial-Intelligence Agency (NGA) if the Contractor has access, otherwise it will be provided by the Installation upon request by the Contractor.
The primary technical services shall be performed by individuals with experience in modeling military aircraft operations in NOISEMAP and other approved models. Services may include, but are not limited to, data gathering, analysis, processing, and manipulation of various types of operational and geospatial data to provide noise contours and supporting documentation which can be plotted in Air Installation Compatible Use Zone (AICUZ) Studies as a follow on-action.
Subtask 5.3.2 Air Quality Analysis:
As part of the EIAP process, the Contractor shall conduct an Air Quality Analysis and an analysis write-up for inclusion within the EA document being completed for the updated UTTR Range
Management Plan.
The UTTR is currently designated an attainment area. For Air Quality Analysis, the Contractor shall perform Air Quality EIAP assessments in accordance with AFI 32-7040, Air Quality
Compliance and Resource Management Program, and shall follow the three-phased assessment
(i.e., Level I, Exempt Action Screening, Level II, Air Quality Quantitative Assessment, and Level
III, Advance Air Quality Assessment) approach outlined in the Air Force Air Quality EIAP Guide
(Volumes 1 and 2) found online at http://aqhelp.com./AQdocs.html.
The Contractor shall perform the air quality EIAP assessment at the lowest level possible (typically
Level I, Exempt Action Screening, or Level II, Air Quality Quantitative Assessment). Level II assessments, at a minimum, shall be performed using the USAF’s ACAM. For the purpose of responding to the Request for Proposal (RFP) and providing an estimated level of effort (LOE) for
Air Quality analysis, only Level I and Level II should be assumed to be required for proposed actions where air quality is NOT expected to be a major issue and/or a General Conformity
Determination is required (as determined with ACAM). However, if upon determining the LOE in response to the RFP, initial assessment (through ACAM) indicates that a Level III, Advance Air
Quality Assessment, is warranted, the Contractor shall submit the LOE for a Level III, Advance
Air Quality Assessment, as a standalone Task.
All air quality assessments must be based on the worst-case annual “net” or the total change (delta) in emissions attributed to direct and indirect emission sources associated with the action. Note that all emission sources that are removed and added associated with the action must be accounted for in the assessment.
The Contractor shall ensure that the analysis includes an assessment of Greenhouse Gas (GHG) emissions and climate change impacts that follows, as a minimum, the USAF’s simplified process http://aqhelp.com./AQdocs.html in Chapter 6 of the Air Force Air Quality EIAP Guide Vol. 1 of 2 to address the August 2016
“Final Guidance Memorandum for Federal Departments and Agencies on Consideration of
Greenhouse Gas Emissions and the Effects of Climate Change in National Environmental Policy
Act Reviews”. The Contractor shall use projected GHG emissions as a proxy for assessing potential climate change effects as described in Chapter 6 of the Air Force Air Quality EIAP Guide
Vol. 1.
Subtask 5.3.3 Biological/Natural Resource Analysis:
The Contractor shall utilize the USFWS IPaC tool and available State of Utah Division of Wildlife
Resources tools to develop a list of sensitive species requiring particular survey activities within the project area. The Contractor shall use existing current survey data and reports, as available, which will be provided by the HQ UTTR upon award for vegetation classification, sensitive species, and habitats information, and to characterize known biological resources within the project area on the main installation. Natural resource data from the existing sources performed under this contract would be used to draft the EA, and for a draft biological assessment (BA) if required by the USFWS. The biological/natural resource analysis prepared for the USFWS consultation will be provided to USACE and the HQ UTTR within 30 days of the receipt of all information received by the Contractor. The Government shall provide comment back to the
Contractor for finalization within 30 days.
Subtask 5.3.4 Preliminary Draft EA:
The Contractor shall prepare a Preliminary Draft EA for internal Government review. The analyses and format shall meet the requirements in 32 CFR 989 and associated guidance, including the
EIAP Desk Reference and the recently updated CEQ guidance to limit all EAs to 75 pages of text
(main body). All air quality calculations required for the EA shall be completed by the Contractor using ACAM. The Contractor shall submit a line-numbered Preliminary Draft EA. The document shall be submitted in only electronic format (1-Word and 1-PDF). The Government will review the Preliminary Draft EA and provide written comments through a Comment Response Matrix within 30 days. If needed, a joint telephone or virtual conference between the HQ UTTR, USACE
Environmental Resources personnel, and the Contractor will be held to clarify the meaning and intent of any government comments. The Contractor shall incorporate and respond to the Comment
Response Matrix within 30 days. The Preliminary Draft EA shall be submitted within 120 days of completion of the Final DOPAA.
Subtask 5.3.5 Draft EA:
The Contractor shall prepare a Draft EA fully addressing the comments on the Preliminary Draft provided by the Government. The Contractor shall submit a line-numbered Draft EA. Upon
Government (including USACE) review and approval, the Draft EA shall be complete and ready for public release. The Contractor shall produce two (2) electronic copies one clean and one showing tracked changes of the Draft EA. The Draft EA shall be submitted within 30 days of receipt of government comments on the Preliminary Draft EA.
Upon Government acceptance of the Draft EA, the Contractor shall submit two (2) electronic format documents (1-Word and 1-PDF Section 508 compliant), one clean and on showing the tracked changes, and one (1) comb-bound hard copy and one (1) DVD/CD copy of the clean Draft
EA.
Subtask 5.3.6 Notice of Availability for Draft EA:
Upon Government acceptance of the Draft EA, the Contractor shall submit a draft Notice of
Availability (NOA). The Contractor shall submit one draft copy of the NOA to the Government at least 30 days prior to publication to ensure that Public Affairs and Judge Advocate have sufficient time for review and approval. Upon approval, the Contractor shall submit one (1) electronic format document (1-Word and 1-PDF Section 508 compliant) of the final NOA, and the Contractor shall publish the NOA for two (2) days (Sunday/Monday) in the legal section of the local newspapers
(Wendover, Tooele, and the Salt Lake Standard Examiner) and make the Draft EA and FONSI available for a 30-day public comment period. Copies of the Draft EA will be placed in designated local libraries and in the locations as agreed upon by the EIAP manager. The NOA shall stipulate comments on the Draft EA and FONSI/FONPA are required within 30 days from publication date.
The Contractor shall compile comments by subject matter, as they are received. The Contractor shall deliver to HQ UTTR within 15 days of the end of the public comment period: (1) a subject matter listing of comments; (2) identified data gaps to address each of the subject matter areas;
and (3) remedies or solutions to the data gaps.
The Contractor shall also provide three (3) comb-bound hard…