A.02.16_Exhibits.pdf

PDF 8 MB Posted

Attached to
Waterline Construction Federal contract opportunity
Solicitation number
W9123719Q0012
Issued by
Department of the Army Corps of Engineers Engineering District Huntington

View the file

Other files for this federal contract opportunity

Other files attached to Waterline Construction, newest first.
File Type Posted
W9123719Q0012.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Untitled Map Write a description for your map.

Legend Waterlines valve

300 ft N

N © 2018 Google

© 2018 Google

© 2018 Google

Exhibit 1 - Aerial Photo

EXHIBIT 2 – Pipe Trench

1. Suitable bedding and initial backfill material shall consist of naturally occurring sand or clay free from trash, roots, debris, excessive moisture, and objects larger than 1”.

2. Pipe trench wall shall be vertical to the top of the initial backfill.

3. Provide select fill No. 8 Stone for bedding material to the depth of 4”.

4. Manually compact embedment material filling all voids around pipe.

EXHIBIT 3 – Map of Existing Utilities

EXHIBIT 4: Maintenance Building Water Piping Schematic

EXHIBIT 5 – Maintenance Building Schematic

EXHIBIT 6 – Visitor Center / Office Water Piping Schematic

EXHIBIT 7 – Visitor Center / Office Schematic

File details come from the government source that posted it.