A.03.09_Plans_and_Specifications_3_of_4.pdf
PDF 22 MB Posted
- Attached to
- Service Bridge Demo and Construction Federal contract opportunity
- Solicitation number
- W9123719B0004
About this file
Plans and Specifications, 3 of 4
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| D.03.05_Synopsis_of_Award.pdf | ||
| C.04.01_Abstract_of_Bids.pdf | ||
| B.08.02_W9123719B0004-0001.pdf | ||
| A.03.17_Pre-Bid_Question_&_Answers.pdf | ||
| A.03.09_Plans_and_Specifications_2_of_4.pdf | ||
| A.03.09_Plans_and_Specifications_1_of_4.pdf | ||
| A.03.09_Plans_and_Specifications_4_of_4.pdf | ||
| B.08.02_W9123719B0004.pdf | ||
| B.01.03_Pre-Solicitation_Synopsis.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2�"
I10x8.65(TYP.)
1�"1�"
BOLT w/ WASHER AND NUT
FOR �"" DIAM. x 2�" LG.
I6x4.03
I10x8.65
(ALUMINUM) (TYP.)
2"x�" GRATING
(ALUMINUM) (TYP.)
2"x�" GRATING
I10x8.65(TYP.)
(ALUMINUM) (TYP.)
2"x�" GRATING
2" 2"
�"(GAP)
I10x8.65
L4x4x�
L4x4x�"
�" (GAP)
�"(GAP)
(ALUMINUM) (TYP.)
2"x�" GRATING
�"(GAP)
I10x8.65
L4x4x�
L4x4x�
SCALE: 3" = 1’-0"
SECTION
S-110
F
SCALE: 3" = 1’-0"S-105
K S-110
SCALE: 3" = 1’-0"
SECTION
S-110
K
SCALE: 3" = 1’-0"
SECTION
S-105
E
F S-110
SCALE: 3" = 1’-0"S-105
SCALE: 3" = 1’-0"
SECTION
S-110
L
DETAIL: I10x8.65 AND L4x4x� CONNECTION
L S-110
DETAIL: C10 AND I10x8.65 CONNECTION
0 1’ 2’ 4’
SCALE: �" = 1’-0"
NOTES:
25% PT
(TYP.)
25% PT
(TYP.)
R
R
S -1
.d g n
21 37
IP
P
W P :d m s \S -1
.d g n
H E
D X J J
K
:1
/1 /2
L
R H -N
E T
A P
P \C
A D
A P
P S \A
P P
S \L
R H
W o rk s p a c e \W o rk s p a c e \P ro je c tW is e I n te rP lo t
O rg a n iz e r\ m is c \d e s ig n s c ri p t\ s td v .p e n
N O
N E d e fa u lt i s i n u s e
-F
E B -2
:0
IN
D
IA
N F
O R
K O
F C
O N
O T
T O
N C
R E
E K
A T
W O
O D L
A K
E
N E
W C
U M
B E
R L
A N
D
O H
S E
R V
IC
E B
R
ID
G E R
E H
A B
H U
N T
IN
G T
O N D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
N T
IN
G T
O N
W E
S T V
IR
G
IA
T
A K
E E
X T
E R
IO
R S
T A
IR
S
Y S
T E
M
IN
T
A K
E S
T R
U C
T U
R E
S A
S
C P
W
C L
C
S-110
4. FASTENERS AND HARDWARE SHALL BE 304 STAINLESS STEEL.
3. ALL BOLT HOLES SHALL BE �" UNLESS OTHERWISE NOTED.
BETWEEN PANNELS.
AND BANDED BARS SHALL BE WELDED AT ALL BEARING BARS. MINIMUM 6 FASTENERS AND�" SPACING
SPACED AT 1�" WITH CROSS BARS SPACED AT 4"; CENTER SURFACE SHALL BE SERRATED
2. ALUMINUM GRATING SHALL BE DIRECT METALS OR APPROVED EQUAL. 2"x� BEARING BARS
1. ALL STRUCTURAL COMPONENTS SHALL BE ALUMINUM 6061-T6 UNLESS OTHERWISE NOTED.
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
SHEET OF
fiof Engineers
US Army Corps
Huntington District
/1
/2
BEAMS (TO REMAIN)
EXISITING EMBEDED
BEAMS (TO REMAIN)
EXISITING EMBEDED
(TO BE DEMOLISHED)
AND PLATFORMS
EXISTING STAIRS, HANDRAIL,
TO REMAIN.
BEAMS AT PLATFORMS
DEMOLISHED. EMBEDED
AND PLATFORMS TO BE
EXISTING STAIRS, HANDRAIL,
TO REMAIN.
BEAMS AT PLATFORMS
DEMOLISHED. EMBEDED
AND PLATFORMS TO BE
EXISTING STAIRS, HANDRAIL,
DEMOLITION PLAN
(NOT TO SCALE)
S -1
.d g n
22 37
IP
P
W P :d m s \S -1
.d g n h e c x jb
:1
/1 /2
IP
P
W P :d
\S
T D
V .p e n
N O
N E d e fa u lt i s i n u s e
-F
E B -2
:0
IA
N F
O R
K O
F C
O N
O T
T O
N C
R E
E K
A T
W O
O D L
A K
E
N E
W C
U M
B E
R L
A N
D
O H
S E
R V
IC
E B
R
ID
G E R
E H
N T
IN
G T
O N D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
N T
IN
G T
O N
W E
S T V
IR
G
A K
E E
X T
E R
IO
R S
T A
IR
S
Y S
T E
M
IN
T
A K
E S
T R
U C
T U
R E
S A
S
C P
W
C L
C
S-111
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
SHEET OF
®of Engineers
US Army Corps
Huntington District
/1
/2
O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
SHEET OF
®of Engineers
US Army Corps
Huntington District
/1
/2
23 37
IP
P
W P :d m s \E -1
.d g n h e c x jb
:1
/1 /2
IP
P
W P :d
\S
T D
V .p e n
P P
R \c a d d \M a rt in \s td \c o lo r.
tb l
-F
E B -2
:1
E L E
C T
R
IC
A L D
E M
O
IN
D
IA
N F
O R
K O
F C
O N
O T
T O
N C
R E
E K
A T
W O
O D L
A K
E
N E
W C
U M
B E
R L
A N
D
O H
S E
R V
IC
E B
R
ID
G E R
E H
N T
IN
G T
O N D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
N T
IN
G T
O N
W E
S T V
IR
G
E-101
G
C
R G
C
J J
E -1
.d g n
NOTES
MECHANICAL DRAWINGS.
EXISTING GAS LINE, SEE
TO BE REMOVED.
EXISTING TELEPHONE LINE
NOT TO SCALE
ELEVATION AT INTAKE STRUCTURE
BRIDGE NOT SHOWN FOR CLARITY
IN 1" CONDUIT TO BE REMOVED.
EXISTING GAGING STATION FEED
FOR CLARITY
BRIDGE NOT SHOWN
NOT TO SCALE
PLAN VIEW AT BRIDGE ABUTMENT
EXIST. CONCRETE DUCT BANK
OF EXISTING GAS LINE.
APPROXIMATE LOCATION ~
F
#6 GND IN 3" C.
EXIST. 4#4/0 AND
EXIST. SPARE 3" C.
EXIST. HANDHOLE 2.
LIMITS OF EXCAVATION FOR NEW ABUTMENT.
FROM INTAKE STRUCTURE TO A POINT BEYOND
EXISTING TELEPHONE LINE TO BE REMOVED
EXISTING GAGING STATION FEED IN 1" CONDUIT TO BE REMOVED.
CONDUCTORS TO INTAKE STRUCTURE.
CONDUCTORS IN HANDHOLE 2 TO NEW
MAY BE RE-USED TO SPLICE EXISTING
REMOVED. EXISTING POLARIS CONNECTORS
EXIST. ALUMINUM JUNCTION BOX TO BE
1. LOCATE EXISTING UTILITIES PRIOR TO ANY EXCAVATION.
EXISTING 1‚" CONDUIT TO BE REMOVED.
TO BE REMOVED.
WIRING IN ƒ" CONDUIT
EXISTING BRIDGE LIGHT
EXISTING ƒ" CONDUIT TO BE REMOVED.
TO BE REMOVED.
WIRING IN ƒ" CONDUIT
EXISTING BRIDGE LIGHT
EXISTING ƒ" CONDUIT TO BE REMOVED.
EXISTING 1‚" CONDUIT TO BE REMOVED.
EXISTING 2•" CONDUIT TO BE REMOVED.
TO MAIN PANEL IN INTAKE STRUCTURE.
TO BE REMOVED FROM HANDHOLE 2
EXIST. 4#4/0 AND #6 GND IN 2•" C.
STRUCTURE TO HANDHOLE 2.
TO BE REMOVED FROM MAIN PANEL IN INTAKE
EXISTING 4#4/0 AND #6 GND IN 2•" CONDUIT
RESOURCE MANAGER.
2. COORDINATE DISCONNECTION OF COMMERCIAL SERVICE WITH
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
SHEET OF
®of Engineers
US Army Corps
Huntington District
/1
/2
24 37
IP
P
W P :d m s \E -1 d g n h e c x jb
:1
/1 /2
IP
P
W P :d
\S
T D
V .p e n
P P
R \c a d d \M a rt in \s td \c o lo r.
tb l
-F
E B -2
:2
L E
C T
R
IC
A L N
E W
IN
D
IA
N F
O R
K O
F C
O N
O T
T O
N C
R E
E K
A T
W O
O D L
A K
E
N E
W C
U M
B E
R L
A N
D
O H
S E
R V
IC
E B
R
ID
G E R
E H
N T
IN
G T
O N D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
N T
IN
G T
O N
W E
S T V
IR
G
E-102
G
C
R G
C
J J
E -1 d g n
MECHANICAL DRAWINGS.
NEW GAS LINE, SEE
IN NEW 3/4" CONDUIT.
NEW TELEPHONE LINE
NOT TO SCALE
ELEVATION AT INTAKE STRUCTURE
NEW 1" SPARE CONDUIT.
NOT TO SCALE
LIGHTING PLAN
20'-0" (TYP.)
NOT TO SCALE
LIGHT DETAIL
FITTING AND BONDING JUMPER FOR EACH CONDUIT.
CONDUITS AT INTAKE STRUCTURE. INSTALL EXPANSION
CONNECT NEW CONDUITS TO EXISTING EMBEDDED
TELEPHONE LINE.
EXISTING DIRECT BURIED
NOT TO SCALE
NOT TO SCALE
NEW ABUTMENT.
NEW ABUTMENT.
ELEVATION VIEW AT NEW ABUTMENT
PLAN VIEW AT NEW ABUTMENT
EXIST. CONCRETE DUCT BANK
#6 GND IN 3" C.
EXIST. 4#4/0 AND
EXIST. SPARE 3" C.
EXIST. HANDHOLE 2.
CAP FOR FUTURE USE.
1" RIGID STEEL C. SPARE,
FOR CLARITY.
BRIDGE NOT SHOWN
CO. REQUIREMENTS.
HANDHOLE PER TELEPHONE
SPLICE TELEPHONE LINE IN
SEE DETAIL THIS DRAWING.
NEW PRECAST HANDHOLE,
NOTES
CONDUIT.
LINE IN NEW ƒ"
NEW TELEPHONE
UP TO BRIDGE LIGHT.
IN ƒ" RIGID STEEL C.
NEW 2#12 AND #12 GND
CAP FOR FUTURE USE.
1‚" RIGID STEEL C. SPARE,
IN NEW ƒ" CONDUIT.
NEW BRIDGE LIGHT WIRING
NEW 1‚" SPARE CONDUIT.
IN NEW ƒ" CONDUIT.
NEW TELEPHONE LINE
(TYP. FOR 7)
SEE DETAIL THIS SHEET.
NEW LED LIGHT FIXTURE,
CONDUIT FROM PANEL TO HANDHOLE 2.
NEW 4#4/0 AND #6 GND IN NEW 2•"
(TYP. FOR 7)
LITHONIA TWS LED P1 50K 120 PE.
WITH PHOTOCONTROL, EQUAL TO
LUMEN, 5000K COLOR TEMPERATURE,
NEW 120V, 25W, LED LIGHT FIXTURE, 1476
THREADED ROD (TYP.)
NEW HOT DIP GALVANIZED
B-LINE B3100 SERIES (TYP.)
PIPE HANGER, EQUAL TO
NEW HOT DIP GALVANIZED
STEEL ELBOW (TYP.)
NEW PVC COATED RIGID
NEW "LB" FITTING (TYP.)
FOR BRIDGE LIGHTS.
NEW ƒ" RIGID STEEL C.
NEW 2#12 AND #12 GND IN
TO BRIDGE LIGHT.
FOR NEW ƒ" C. UP
NEW "T" FITTING
HANDHOLE 2.
PANEL IN INTAKE STRUCTURE TO
2•" RIGID STEEL C. FROM MAIN
NEW 4#4/0 AND #6 GND IN NEW
NOT TO SCALE
M
IN
LOGO "TELEPHONE".
TO PG1730CA0043, WITH THE
PG1730BA30 WITH COVER EQUAL
HANDHOLE EQUAL TO QUAZITE
17" X 30" X 30" DEEP PRECAST
EXIST. DIRECT BURIED TELEPHONE LINE
NEW PRECAST HANDHOLE DETAIL
1. NEW CONDUCTORS SHALL BE SINGLE CONDUCTOR COPPER, TYPE XHHW-2.
STEEL BELOW GRADE.
2. NEW CONDUIT SHALL BE RIGID STEEL ABOVE GRADE, PVC COATED RIGID
3. NEW HARDWARE SHALL BE HOT DIP GALVANIZED, OR STAINLESS STEEL.
BE LESS THAN 100 MEGOHMS.
FOR 15 SECONDS. MINIMUM INSULATION-RESISTANCE VALUES SHALL NOT
DC. TAKE READINGS AFTER 1 MINUTE AND UNTIL THE READING IS CONSTANT
AND ADJACENT CONDUCTORS. APPLIED POTENTIAL SHALL BE 1000 VOLTS
RESISTANCE TEST ON ALL NEW CONDUCTORS WITH RESPECT TO GROUND
4. AFTER INSTALLATION, PRIOR TO TERMINATING, PERFORM INSULATION-
EXISTING GAS METER LOCATION
" PIPE4
-1FROM 1" TO 1
EXISTING TRANSITION
INTAKE STRUCTURE
COORDINATE REMOVAL WITH UTILITY COMPANY.
REINSTALLATION NEAR NEW BRIDGE.
REMOVE GAS METER & KEEP FOR
TO METER ONCE NEW BRIDGE IS INSTALLED
LOCATION & INSTALL NEW FROM HERE
BREAK EXISTING PIPE AT THIS
: THD. ELBOW4
-1EXISTING 90 DEG 1
(UTILITY COMPANY OWNED)
VALVE LOCATION
APPROXIMATE YARD
(MUST BE REMOVED BY UTILITY COMPANY)
GAS LINE
EXISTING UNDERGROUND 1"
NOTES
1.
2.
3.
THE NEW ABUTTMENT HAS BEEN CONSTRUCTED & THE NEW BRIDGE INSTALLED
THE GAS METER IS TO BE RELOCATED IN ACCORDANCE WITH MP-102 ONCE
4. NO DEMOLITION INSIDE OF THE INTAKE STRUCTURE IS REQUIRED
3.
THEIR APPROVED CONTRACTORS
SPECIFICATIONS. THIS WORK MUST BE DONE BY THE UTILITY COMPANY OR ONE OF
NEW UNDERGROUND PIPING IS TO BE INSTALLED PER DWG. MP-101 AND THE CONTRACT
REMOVE ALL UNDERGROUND GAS PIPING BETWEEN THE METER & THE YARD VALVE.
ELBOW.
OUTSIDE OF THE INTAKE STRUCTURE. THE NEW PIPE IS TO BE RECONNECTED TO THIS EXISTING
BE REMOVED ON THE BRIDGE SIDE OF THE METER. DISCONNECT THE PIPE AT THE ELBOW ON THE
" LINE SHALL4
-1" SIZE UNDER THE LANDSIDE ABUTMENT. ALL 1" AND 14
-1TRANSITIONS TO A 1
THE GAS LINES ARE 1" IN SIZE GOING INTO & COMING OUT OF THE GAS METER. THE LINE
ISOLATED USING THE UPSTREAM YARD VALVE THAT IS INDICATED.
INSTALLATION OF THE NEW ABUTMENT. THE GAS METER SHOULD BE
THE GAS METER. THE METER MUST BE MOVED TO ALLOW FOR THE
CONTACT UTILITY COMPANY TO COORDINATE MOVEMENT OF
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
SHEET OF
®of Engineers
US Army Corps
Huntington District
/1
/2
MP100
25 37
IP
P
W P :d m s \C
E L
R H -A
T I0
-D
E M
O
M P
D E
M O .d g n
.3
:1
/1 /2
IP
P
W P :d
\S
T D
V .p e n
P P
R \c a d d \M a rt in \s td \c o lo r.
tb l
-F
E B -2
C
L R
H -A
T I0
-D
E M
O
M P
D E
M O .d g n
M
P
IP
IN
G D
E M
O L
IT
IO
N
J
F
H U
N T
IN
G T
O N D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
N T
IN
G T
O N
W E
S T V
IR
G
R
IN
D
IA
N F
O R
K O
F C
O N
O T
T O
N C
R E
E K
A T
W O
O D L
A K
E
N E
W C
U M
B E
R L
A N
D
O H
S E
R V
IC
E B
R
ID
G E R
E H
A B
N A
T U
R A
L G
A S L
POINT FOR METRAFLEX LOOP
APPROX INSTALLATION
INSTALL PER MANUFACTURER'S INSTRUCTIONS
STRUCTURE
NEW PIPE AT THE INTAKE
TERMINATION POINT FOR
EXISTING ELBOW
YARD VALVE (UTILITY COMPANY OWNED)
APPROX LOCATION OF
OF THIS POINT
WORK UPSTREAM
MUST PERFORM ALL
UTILITY COMPANY
REF: METER BAR
MUST BE DONE BY UTILITY COMPANY (SEE NOTE)
INSTALL NEW 1" UNDERGROUND GAS LINE (APPROX 170 FT)
START OF HOUSE PIPING
LOCATION
GOVERNMENT REPRESENTATIVE FOR
COORDINATE WITH UTILITY COMPANY &
NEAR NEW BRIDGE LAND SIDE ABUTMENT
INSTALL METER
MP101
26 37
IP
P
W P :d m s \C
E L
R H -A
T I- P
IP
IN
G
M P
X X
X .d g n
.6
:1
/1 /2
IP
P
W P :d
\S
T D
V .p e n
P P
R \c a d d \M a rt in \s td \c o lo r.
tb l
-F
E B -2
N T
IN
G T
O N D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
N T
IN
G T
O N
W E
S T V
IR
G
F
M E
C H
A N
IC
A L P
IP
IN
G
J E
F
J E
F
B T
R
C E
L R
H -A
T I- P
IP
IN
G
M P
X X
X .d g n
IN
D
IA
N F
O R
K O
F C
O N
O T
T O
N C
R E
E K
A T
W O
O D L
A K
E
N E
W C
U M
B E
R L
A N
D
O H
S E
R V
IC
E B
R
ID
G E R
E H
A B
PIPING LAYOUT - EXISTING BRIDGE (TO BE REPLACED) SHOWN
METRAFLEX METRALOOP DETAIL
& THE METER HAS BEEN RELOCATED
NEW BRIDGE INSTALLATION IS COMPLETE
NEW PIPING IS TO BE INSTALLED AFTER
EXISTING BRIDGE & PIPING SHOWN
NOTE:
NOTES
S Y
S T
E M D
IA
G R
M
- RESULTS OF PRESSURE & LEAK TESTS, CONDUCTED & DOCUMENTED PER NFPA 54
- PE PIPING WELDER CERTIFICATIONS
8. THE FOLLOWING ITEMS SHOULD BE SUBMITTED BY THE CONTRACTOR FOR GOVERNMENT APPROVAL
7. PAINT ALL METAL PIPING AFTER PRESSURE & LEAK TESTING HAS BEEN COMPLETED.
IS THE RESPONSIBILITY OF THE CONTRACTOR.
THAT ARE REQUIRED TO PEFORM THE LEAK TESTING THAT IS NOT ALREADY INSTALLED AT THE PROJECT
6. ALL PIPING SHALL BE INSTALLED & TESTED IN ACCORDANCE WITH NFPA 54. ANY TEST PORTS OR VALVING
OR EQUAL4
-1 PIPE SHALL BE SUPPORTED USING A CLEVIS STYLE HANGER, B-LINE MODEL B3100 - 1
BRIDGE WILL BE EQUIPPED WITH HORIZONTAL SUPPORTS TO WHICH THE PIPE SUPPORTS CAN BE ATTACHED. THE
SHALL BE SUPPORTED AT A SPACING INTERVAL THAT IS NOT TO EXCEED 10 FT IN LENGTH. THE NEW
5. ALL ABOVE-GROUND PIPING SHALL BE ASTM A53/A53M (BLACK PIPE). HORIZONTAL RUNS OF PIPE
MODEL # MLACT4125 OR APPROVED EQUAL IN THE HORIZONTAL RUN OF PIPE NEAR THE LAND SIDE ABUTMENT.
OUTSIDE WALL OF THE INTAKE STRUCRURE. INSTALL A METRAFLEX AGA/CSA GAS METRALOOP
ENTIRE LENGTH OF THE BRIDGE & SHALL TERMINATE AT THE EXISITNG ELBOW ON THE
" PIPE SHALL RUN THE4
-1" PIPE SHALL BE MADE NEAR THE LANDSIDE ABUTMENT. THE 14
-1 TO 1
4. 1" SCH. 40 PIPING SHALL BE INSTALLED FROM THE OUTLET OF THE METER & A TRANSITION
PERFORMED BY THE LOCAL UTILTY COMPANY.
3. THE TRANSITION FROM PE TO STEEL PIPE & THE TERMINATION AT THE METER INLET SHALL BE
BY THE UTILITY COMPANY OR ONE OF THEIR APPROVED CONTRACTORS.
TO BE BURIED ABOVE THE PE PIPE. THE BURIED LINE, RISER, & LOCK STOP VALVE MUST BE INSTALLED
UTLITY COMPANY AND SHALL INCLUDE A BURIED DETECTABLE IDENTIFICATION TAPE THAT IS
PIPING SHALL BE BURIED IN ACCORDANCE WITH GUIDELINES ESTABLISHED BY THE GOVERNING
SHALL BE POLYETHYLENE CONFORMING TO ASTM D2513 WITH A MAXIMUM SDR OF 11.5. THE
2. INSTALL UNDERGROUND GAS LINE FROM EXISTING YARD VALVE TO METER. THE PIPE
COMPANY BUT MUST BE INSTALLED PER ALL APPLICABLE STANDARDS & CONTRACT SPECIFICATIONS.
STARTS AT THE OUTLET OF THE METER BAR DOES NOT HAVE TO BE INSTALLED BY THE UTILITY
BY THE UTILITY COMPANY OR ONE OF THEIR APPROVED CONTRACTORS. THE "HOUSE LINE" WHICH
1. RELOCATE GAS METER NEAR ABUTMENT OF NEWLY INSTALLED BRIDGE. THE METER MUST BE INSTALLED
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
SHEET OF
®of Engineers
US Army Corps
Huntington District
/1
/2
14'
SEE SHEET S-101
INTAKE
OF PROJECTION
DIRECTION AND DISTANCE
BOREHOLE ID SHOWING
USCS CLASSIFICATION
LIQUID LIMIT
PLASTIC LIMIT
PLASTIC INDEX
RQD
PIEZOMETER TIP
BEDROCK TYPE
UCS (KSF)
(N-values unless otherwise indicated)
BLOW COUNTS per SAMPLED INTERVAL
EL. 955.0
TO BE REMOVED
ABUTMENT
PROPOSED
PROPOSED BRIDGE ABUTMENT
SCALE:
1" = 5' HORIZONTAL
1" = 5' VERTICAL
27%
INDURATED CLAY
WEATHERED SHALE
SHALE
COAL
SILTSTONE
NATURAL SOIL
FILL
EL. 944.5
PROJECTED 56.07'SW
CD-17-002
EL. 954.6
PROJECTED 3.5'NE
CD-17-001
NOTES
SPECIFICATION SECTION 31 00 00.
AND COMPACTED, CONSISTING OF #57 AGGREGATE IN ACCORDANCE WITH
BEDDING MATERIAL SUCH AS GRAVEL OR CRUSHED ROCK SHALL BE PLACED 2.
DENSITIES AND MOISTURE CONTENT IN ACCORDANCE WITH SPECIFICATIONS.
THE EXCAVATED SURFACE SHALL BE COMPACTED TO ENSURE IN PLACE 1.
0 5'
SCALE: 1"=5'
10' 0 5'
SCALE: 1"=5'
10'
ATWOOD LAKE
EL.946.0
EL.954.5
POOL EL. 928.0
NORMAL
N
PROFILE
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
SHEET OF
®of Engineers
US Army Corps
Huntington District
/1
/2
GS101
27 37
IP
P
W P :d m s \G
S S
P I.
d g n h e c x jb
:1
/1 /2
IP
P
W P :d
\S
T D
V .p e n d e fa u lt a tt a c h e d f ro m d ia lo g
-F
E B -2
:4
G
S
P I.
d
IA
N F
O R
K O
F C
O N
O T
T O
N C
R E
E K
A T
W O
O D L
A K
E
N E
W C
U M
B E
R L
A N
D
O H
A
P
A M
P
H U
N T
IN
G T
O N D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
N T
IN
G T
O N
W E
S T V
IR
G
S I
D
S E
R V
IC
E B
R
ID
G E R
E H
U T
M E
N T
P L
A N V
IE
W P
R O
F
IL
E
A N
D D
E T
IL
LEGEND FOR BOREHOLES:
El. XXX.X (NAVD88)
PROJECTED XXX' X.
BH-XX
CL
SH
FOOTING FOUNDATION
PLAN VIEW OF
FOOTING FOUNDATION
0+00
0+50
1+00
1+50
80'0 40'
SCALE: 1"=40'
PLAN VIEW
CD-17-002
CD-17-001
PIPLLL
960960
960960
0+00 0+50 1+00 1+50
2443 19
CL
2040 15
2642 16
2543 18
2340 17
ML
CL
SH
IND. CLAY
SH
SLS
CL
0%
3.4
0%
0%
0%
80%
24.5%
PIPLLL
RQD
UCS RQD
UCS
ML
2037 17
2038 18
CL
SM
CL-ML
CL
CL-ML
ML
SM
CL-ML
ML
CL
ML
CL-ML
1630 14
1819 1
2438 14
SH
IND. CLAY
SH
SLS
CL
0%
0%
16%
42%
77%
34%
15%
28%
0.8
2.4
V
L U
V
L
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
SHEET OF
®of Engineers
US Army Corps
Huntington District
28 37
IP
P
W P :d m s \R -0
.d g n h e c x jb
.0
:1
/1 /2
IP
P
W P :d
\S
T D
V .p e n
N O
N E d e fa u lt i s i n u s e
-F
E B -2
N T
IN
G T
O N D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
N T
IN
G T
O N
W E
S T V
IR
G
W O
O D L
A K
E
IN
D
IA
N F
O R
K O
F C
O N
O T
T O
N C
R E
E K
N E
W C
U M
B E
R L
A N
D
O H
R -0
.d
R V
IC
E B
R
ID
G E R
E H
A B
FOR INFORMATION ONLY
R-001
F O
R I
N F
O R
M A
T
IO
N O
N L
Y
S E
R V
IC
E B
R
ID
G E S
U B
S T
R U
C T
U R
E
J A
W
J J
K A
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
SHEET OF
®of Engineers
US Army Corps
Huntington District
29 37
IP
P
W P :d m s \R -0
.d g n h e c x jb
.0
:1
/1 /2
IP
P
W P :d
\S
T D
V .p e n
N O
N E d e fa u lt i s i n u s e
-F
E B -2
N T
IN
G T
O N D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
N T
IN
G T
O N
W E
S T V
IR
G
W O
O D L
A K
E
IN
D
IA
N F
O R
K O
F C
O N
O T
T O
N C
R E
E K
N E
W C
U M
B E
R L
A N
D
O H
R -0
.d
R V
IC
E B
R
ID
G E R
E H
A B
FOR INFORMATION ONLY
R-002
F O
R I
N F
O R
M A
T
IO
N O
N L
Y
S U
P E
R S
T R
U C
T U
R E
J A
W
J J
K A
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
SHEET OF
®of Engineers
US Army Corps
Huntington District
30 37
IP
P
W P :d m s \R -0
.d g n h e c x jb
.0
:1
/1 /2
IP
P
W P :d
\S
T D
V .p e n
N O
N E d e fa u lt i s i n u s e
-F
E B -2
N T
IN
G T
O N D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
N T
IN
G T
O N
W E
S T V
IR
G
W O
O D L
A K
E
IN
D
IA
N F
O R
K O
F C
O N
O T
T O
N C
R E
E K
N E
W C
U M
B E
R L
A N
D
O H
R -0
.d
R V
IC
E B
R
ID
G E R
E H
A B
FOR INFORMATION ONLY
R-003
F O
R I
N F
O R
M A
T
IO
N O
N L
Y
IN
T
A K
E S
E C
T
IO
N S
J A
W
J J
K A
File details come from the government source that posted it.