W91237-13-R-0006_RDB_MAINT_RFP.pdf
PDF 1 MB Posted
- Attached to
- IDC for Mowing and Maintenance Services for R. D. Bailey Lake, WV. Federal contract opportunity
- Solicitation number
- W9123713R0006
About this file
REQUEST FOR PROPOSAL - SOCLICATION W91237-13-R-0006 FOR MOWING AND MAINTENANCE SERVICES AT R.D. BAILEY LAKE JUSTICE WV.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 13-R-0006_Amenment_1.pdf | ||
| RDB_Exhibits_Pages_76-113.pdf | ||
| Pages_from_RDB_Exhibits_Pages_1-12.pdf | ||
| RDB_Exhibits_Pages_36-75.pdf | ||
| Pages_from_RDB_Exhibits_Pages_13-20b.pdf | ||
| Pages_from_RDB_Exhibits_Pages_21-35b.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 10:00 AM local time 20 Dec 2012
X
A X B X C
D
EX
X G F 203 - 218
219 - 233 X H 234 - 237
BRANDON.H.LEWIS@USACE.ARMY.MIL
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 237
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W91237 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 3 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
Room 1106 conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
BRANDON H LEWIS 304-399-5664
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 22
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
23 - 77 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
79 - 80
X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 81 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 82 - 95 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
96 - 201
PART II - CONTRACT CLAUSES
USACE, CONTRACTING DIVISION
BRANDON H. LEWIS, 502 8TH STREET
HUNTINGTON WV 25701-2070
304-399-5664
304-399-5281FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
20 Nov 2012
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W91237-13-R-0006
Section B - Supplies or Services and Prices
BID SCHEDULE
Questions that the offeror may wish to have answered should be submitted in writing to Brandon H. Lewis, Contract Specialist, Corps of Engineers, Huntington District, 502 Eighth Street, Huntington , WV 25701 or brandon.h.lewis@usace.army.mil .
Technical questions must be received in the Huntington District Office not later than December 11, 2012.
BASE CONTRACT PERIOD – DATE OF AWARD THRU 31 DECEMBER 2013
SECTION C-1 DESCRIPTION/SPECIFICATIONS
SECTION C-2 BUILDINGS, FACILITIES, MECHANICAL, ELECTRICAL,
WATER AND SEWER SYSTEMS
(All bid items covered in Section C-15 GENERAL
SECTION C-3 GRASS MOWING AND MAINTENANCE OF LANDSCAPED
AREAS:
ITEM DESCRIPTION QUAN U/M U/P AMOUNT
0001 Below Dam Fisherman Access 12 EA ________ _________
0002 Visitor Center & Access Road 12 EA ________ _________
0003 Visitor Center Overlook Hillside 6 EA ________ _________
0004 Big Branch Day Use Area 12 EA ________ _________
0005 Guyandotte Point Day Use Area 12 EA ________ _________
0006 Primitive Camping Area 12 EA ________ _________
0007 Campground Access Road 12 EA ________ _________
0008 Reedy Creek Camping Area 11 EA ________ _________
0009 Locust Branch Camping Area 11 EA ________ _________
0010 Dwelling A 1 EA ________ _________
0011 Dwelling B 1 EA ________ _________
SECTION C-3 SUBTOTAL _____________
SECTION C-4 CLEANING SERVICES, RECREATION AREAS:
(Not Applicable To This Contract)
SECTION C-5 GUARDRAILS, SIGNS, BARRICADES, BUMPERS,
CURBS AND POSTS:
(All Items covered in Section C-15 GENERAL)
SECTION C-6 MAINTENANCE AND REPAIR OF ROADS, PARKING
AREAS PULL OFFS, AND LAUNCHING RAMPS:
(All Items covered in Section C-15 GENERAL)
SECTION C-7 DRIFT, DEBRIS, AND TRASH REMOVAL:
(All Items covered in Section C-15 GENERAL)
SECTION C-8 CLEANING, SERVICING, AND MAINTENANCE OF
GOVERNMENT VEHICLES AND EQUIPMENT:
(Not Applicable To This Contract)
SECTION C-9 JANITORIAL AND POLICING SERVICE FOR THE
VISITOR CENTER/RESOURCE MANAGERS OFFICE:
(Not Applicable To This Contract)
SECTION C-10 NATURAL RESOURCE MANAGEMENT:
(All other items covered in Section C-15 GENERAL)
ITEM DESCRIPTION QUAN U/M U/P AMOUNT
0012 Picnic Table Board Replacement 50 EA ________ _________
SECTION C-10 SUBTOTAL _____________
SECTION C-11 BEACH AND SWIM BOUY MAINTENANCE:
(Not Applicable To This Contract)
SECTION C-12 PARK ATTENDANT:
(Not Applicable To This Contract)
SECTION C-13 WILDFIRE SUPRESSION AND DISASTERS:
SECTION C-14 MAINTENANCE OF NAVIGATION AIDS:
SECTION C-15 GENERAL:
ITEM DESCRIPTION QUAN U/M U/P AMOUNT
0013 General Maintenance Worker 80 HR ________ _________
0014 Laborer, Grounds Maintenance 4,500 HR ________ _________
0015 Electrician, Maintenance 40 HR ________ _________
0016 Survey Aid 80 HR ________ _________
0017 Heavy Equipment Operator (John Deere 310J Backhoe, 450J Dozer, 670CH Grader, 323D Skid Steer & attachments) 40 HR ________ _________
0018 Tractor Operator (John Deere 5565E Tractor with loader, mower, brush hog, box blade, mixer & spreader attachments) 40 HR ________ _________
0019 Dump Truck Operator 40 HR ________ _________ (6 ton or larger, requires CDL, 10 ton trailer)
0020 Boat Operator (14-32 foot with 15 - 90 hp motor) 40 HR ________ _________
0021 Chainsaw and Operator (20 inch bar min.) 600 HR ________ _________
0023 String Trimmer and Operator (16 inch cut min. with brush blade attachment) 80 HR ________ _________
0024 Riding Mower and Operator (16 hp and 48 inch cut min.) 8 HR ________ _________
0025 Boat and Operator (14-18 ft. flat bottom, tiller steer, 15 - 40 hp motor) 320 HR ________ _________
0026 Truck and Driver (full size 1/2 ton 80 HR ________ _________ or larger with 4’ x 8’ bed )
0027 Dump Truck and Operator (6 ton or larger, requires CDL) 50 HR ________ _________
0028 Excavator and Operator (min. 115 hp, 25 feet reach, 3 cubic yard bucket with tracks and mechanical thumb) 80 HR ________ _________
0029 Truck, Trailer and Operator (min. 25 ton capacity, for hauling heavy equipment including excavator, requires CDL) 8 HR ________ _________
0030 Aerial Lift Truck and Operator (min.
300 lb bucket capacity, 25 ft. vertical reach, outrigger stabilized) 24 HR ________ _________
0031 Negotiated Work 1 JB For Sum __________
0032 Guaranteed Amount 1 EA $6,600.00
0033 Vacant
SECTION C-15 SUBTOTAL _____________
TOTAL BASE CONTRACT PERIOD: $__________________________
OPTION PERIOD ONE - 1 JANUARY 2014 THRU 31 DECEMBER 2014
SECTION C-2 BUILDINGS, FACILITIES, MECHANICAL, ELECTRICAL,
WATER AND SEWER SYSTEMS
(All bid items covered in Section C-15 GENERAL
SECTION C-3 GRASS MOWING AND MAINTENANCE OF LANDSCAPED
AREAS:
ITEM DESCRIPTION QUAN U/M U/P AMOUNT
1001 Below Dam Fisherman Access 12 EA ________ _________
1002 Visitor Center & Access Road 12 EA ________ _________
1003 Visitor Center Overlook Hillside 6 EA ________ _________
1004 Big Branch Day Use Area 12 EA ________ _________
1005 Guyandotte Point Day Use Area 12 EA ________ _________
1006 Primitive Camping Area 12 EA ________ _________
1007 Campground Access Road 12 EA ________ _________
1008 Reedy Creek Camping Area 11 EA ________ _________
1009 Locust Branch Camping Area 11 EA ________ _________
1010 Dwelling A 1 EA ________ _________
1011 Dwelling B 1 EA ________ _________
SECTION C-3 SUBTOTAL _____________
SECTION C-4 CLEANING SERVICES, RECREATION AREAS:
(Not Applicable To This Contract)
SECTION C-5 GUARDRAILS, SIGNS, BARRICADES, BUMPERS,
(All Items covered in Section C-15 GENERAL)
SECTION C-7 DRIFT, DEBRIS, AND TRASH REMOVAL:
(All Items covered in Section C-15 GENERAL)
SECTION C-8 CLEANING, SERVICING, AND MAINTENANCE OF
GOVERNMENT VEHICLES AND EQUIPMENT:
(Not Applicable To This Contract)
SECTION C-9 JANITORIAL AND POLICING SERVICE FOR THE
VISITOR CENTER/RESOURCE MANAGERS OFFICE:
(Not Applicable To This Contract)
SECTION C-10 NATURAL RESOURCE MANAGEMENT:
(All other items covered in Section C-15 GENERAL)
ITEM DESCRIPTION QUAN U/M U/P AMOUNT
1012 Picnic Table Board Replacement 50 EA ________ _________
SECTION C-10 SUBTOTAL _____________
SECTION C-11 BEACH AND SWIM BOUY MAINTENANCE:
(Not Applicable To This Contract)
SECTION C-12 PARK ATTENDANT:
1013 General Maintenance Worker 80 HR ________ _________
1014 Laborer, Grounds Maintenance 4,500 HR ________ _________
1015 Electrician, Maintenance 40 HR ________ _________
1016 Survey Aid 80 HR ________ _________
1017 Heavy Equipment Operator (John Deere 310J Backhoe, 450J Dozer, 670CH Grader, 323D Skid Steer & attachments) 40 HR ________ _________
1018 Tractor Operator (John Deere 5565E Tractor with loader, mower, brush hog, box blade, mixer & spreader attachments) 40 HR ________ _________
1019 Dump Truck Operator 40 HR ________ _________ (6 ton or larger, requires CDL, 10 ton trailer)
1020 Boat Operator (14-32 foot with 15 - 90 hp motor) 40 HR ________ _________
1021 Chainsaw and Operator (20 inch bar min.) 600 HR ________ _________
1023 String Trimmer and Operator (16 inch cut min. with brush blade attachment) 80 HR ________ _________
1024 Riding Mower and Operator (16 hp and 48 inch cut min.) 8 HR ________ _________
1025 Boat and Operator (14-18 ft. flat bottom, 1026 Truck and Driver (full size 1/2 ton 80 HR ________ _________
1027 Dump Truck and Operator (6 ton or
1028 Excavator and Operator (min. 115 hp, 25 feet reach, 3 cubic yard bucket with tracks and mechanical thumb) 80 HR ________ _________
1029 Truck, Trailer and Operator (min. 25 ton capacity, for hauling heavy equipment including excavator, requires CDL) 8 HR ________ _________
1030 Aerial Lift Truck and Operator (min.
300 lb bucket capacity, 25 ft. vertical reach, outrigger stabilized) 24 HR ________ _________
1031 Negotiated Work 1 JB For Sum __________
1032 Guaranteed Amount 1 EA $3,300.00
1033 Vacant
TOTAL FOR OPTION PERIOD ONE: $__________________________
OPTION PERIOD TWO - 1 JANUARY 2015 THRU 31 DECEMBER 2015
SECTION C-2 BUILDINGS, FACILITIES, MECHANICAL, ELECTRICAL,
WATER AND SEWER SYSTEMS
(All bid items covered in Section C-15 GENERAL
SECTION C-3 GRASS MOWING AND MAINTENANCE OF LANDSCAPED
AREAS:
ITEM DESCRIPTION QUAN U/M U/P AMOUNT
2001 Below Dam Fisherman Access 12 EA ________ _________
2002 Visitor Center & Access Road 12 EA ________ _________
2003 Visitor Center Overlook Hillside 6 EA ________ _________
2004 Big Branch Day Use Area 12 EA ________ _________
2005 Guyandotte Point Day Use Area 12 EA ________ _________
2006 Primitive Camping Area 12 EA ________ _________
2007 Campground Access Road 12 EA ________ _________
2008 Reedy Creek Camping Area 11 EA ________ _________
2009 Locust Branch Camping Area 11 EA ________ _________
2010 Dwelling A 1 EA ________ _________
2011 Dwelling B 1 EA ________ _________
SECTION C-3 SUBTOTAL _____________
SECTION C-4 CLEANING SERVICES, RECREATION AREAS:
(Not Applicable To This Contract)
SECTION C-5 GUARDRAILS, SIGNS, BARRICADES, BUMPERS,
(All Items covered in Section C-15 GENERAL)
SECTION C-7 DRIFT, DEBRIS, AND TRASH REMOVAL:
(All Items covered in Section C-15 GENERAL)
SECTION C-8 CLEANING, SERVICING, AND MAINTENANCE OF
GOVERNMENT VEHICLES AND EQUIPMENT:
(Not Applicable To This Contract)
SECTION C-9 JANITORIAL AND POLICING SERVICE FOR THE
VISITOR CENTER/RESOURCE MANAGERS OFFICE:
(Not Applicable To This Contract)
SECTION C-10 NATURAL RESOURCE MANAGEMENT:
(All other items covered in Section C-15 GENERAL)
ITEM DESCRIPTION QUAN U/M U/P AMOUNT
2012 Picnic Table Board Replacement 50 EA ________ _________
SECTION C-10 SUBTOTAL _____________
SECTION C-11 BEACH AND SWIM BOUY MAINTENANCE:
(Not Applicable To This Contract)
SECTION C-12 PARK ATTENDANT:
2013 General Maintenance Worker 80 HR ________ _________
2014 Laborer, Grounds Maintenance 4,500 HR ________ _________
2015 Electrician, Maintenance 40 HR ________ _________
2016 Survey Aid 80 HR ________ _________
2017 Heavy Equipment Operator (John Deere 310J Backhoe, 450J Dozer, 670CH Grader, 323D Skid Steer & attachments) 40 HR ________ _________
2018 Tractor Operator (John Deere 5565E Tractor with loader, mower, brush hog, box blade, mixer & spreader attachments) 40 HR ________ _________
2019 Dump Truck Operator 40 HR ________ _________ (6 ton or larger, requires CDL, 10 ton trailer)
2020 Boat Operator (14-32 foot with 15 - 90 hp motor) 40 HR ________ _________
2021 Chainsaw and Operator (20 inch bar min.) 600 HR ________ _________
2023 String Trimmer and Operator (16 inch cut min. with brush blade attachment) 80 HR ________ _________
2024 Riding Mower and Operator (16 hp and 48 inch cut min.) 8 HR ________ _________
2025 Boat and Operator (14-18 ft. flat bottom, 2026 Truck and Driver (full size 1/2 ton 80 HR ________ _________
2027 Dump Truck and Operator (6 ton or
2028 Excavator and Operator (min. 115 hp, 25 feet reach, 3 cubic yard bucket with tracks and mechanical thumb) 80 HR ________ _________
2029 Truck, Trailer and Operator (min. 25 ton capacity, for hauling heavy equipment including excavator, requires CDL) 8 HR ________ _________
2030 Aerial Lift Truck and Operator (min.
300 lb bucket capacity, 25 ft. vertical reach, outrigger stabilized) 24 HR ________ _________
2031 Negotiated Work 1 JB For Sum __________
2032 Guaranteed Amount 1 EA $3,300.00
2033 Vacant
TOTAL FOR OPTION PERIOD TWO: $__________________________
OPTION PERIOD THREE - 1 JANUARY 2016 THRU 31 DECEMBER 2016
SECTION C-2 BUILDINGS, FACILITIES, MECHANICAL, ELECTRICAL,
WATER AND SEWER SYSTEMS
(All bid items covered in Section C-15 GENERAL
SECTION C-3 GRASS MOWING AND MAINTENANCE OF LANDSCAPED
AREAS:
ITEM DESCRIPTION QUAN U/M U/P AMOUNT
3001 Below Dam Fisherman Access 12 EA ________ _________
3002 Visitor Center & Access Road 12 EA ________ _________
3003 Visitor Center Overlook Hillside 6 EA ________ _________
3004 Big Branch Day Use Area 12 EA ________ _________
3005 Guyandotte Point Day Use Area 12 EA ________ _________
3006 Primitive Camping Area 12 EA ________ _________
3007 Campground Access Road 12 EA ________ _________
3008 Reedy Creek Camping Area 11 EA ________ _________
3009 Locust Branch Camping Area 11 EA ________ _________
3010 Dwelling A 1 EA ________ _________
3011 Dwelling B 1 EA ________ _________
SECTION C-3 SUBTOTAL _____________
SECTION C-4 CLEANING SERVICES, RECREATION AREAS:
(Not Applicable To This Contract)
SECTION C-5 GUARDRAILS, SIGNS, BARRICADES, BUMPERS,
(All Items covered in Section C-15 GENERAL)
SECTION C-7 DRIFT, DEBRIS, AND TRASH REMOVAL:
(All Items covered in Section C-15 GENERAL)
SECTION C-8 CLEANING, SERVICING, AND MAINTENANCE OF
GOVERNMENT VEHICLES AND EQUIPMENT:
(Not Applicable To This Contract)
SECTION C-9 JANITORIAL AND POLICING SERVICE FOR THE
VISITOR CENTER/RESOURCE MANAGERS OFFICE:
(Not Applicable To This Contract)
SECTION C-10 NATURAL RESOURCE MANAGEMENT:
(All other items covered in Section C-15 GENERAL)
ITEM DESCRIPTION QUAN U/M U/P AMOUNT
3012 Picnic Table Board Replacement 50 EA ________ _________
SECTION C-10 SUBTOTAL _____________
SECTION C-11 BEACH AND SWIM BOUY MAINTENANCE:
(Not Applicable To This Contract)
SECTION C-12 PARK ATTENDANT:
(Not Applicable To This Contract)
3013 General Maintenance Worker 80 HR ________ _________
3014 Laborer, Grounds Maintenance 4,500 HR ________ _________
3015 Electrician, Maintenance 40 HR ________ _________
3016 Survey Aid 80 HR ________ _________
3017 Heavy Equipment Operator (John Deere 310J Backhoe, 450J Dozer, 670CH Grader, 323D Skid Steer & attachments) 40 HR ________ _________
3018 Tractor Operator (John Deere 5565E Tractor with loader, mower, brush hog, box blade, mixer & spreader attachments) 40 HR ________ _________
3019 Dump Truck Operator 40 HR ________ _________ (6 ton or larger, requires CDL, 10 ton trailer)
3020 Boat Operator (14-32 foot with 15 - 90 hp motor) 40 HR ________ _________
3021 Chainsaw and Operator (20 inch bar min.) 600 HR ________ _________
3023 String Trimmer and Operator (16 inch cut min. with brush blade attachment) 80 HR ________ _________
3024 Riding Mower and Operator (16 hp and 48 inch cut min.) 8 HR ________ _________
3025 Boat and Operator (14-18 ft. flat bottom, 3026 Truck and Driver (full size 1/2 ton 80 HR ________ _________
3027 Dump Truck and Operator (6 ton or
3028 Excavator and Operator (min. 115 hp, 25 feet reach, 3 cubic yard bucket with tracks and mechanical thumb) 80 HR ________ _________
3029 Truck, Trailer and Operator (min. 25 ton capacity, for hauling heavy equipment including excavator, requires CDL) 8 HR ________ _________
3030 Aerial Lift Truck and Operator (min.
300 lb bucket capacity, 25 ft. vertical reach, outrigger stabilized) 24 HR ________ _________
3031 Negotiated Work 1 JB For Sum __________
3032 Guaranteed Amount 1 EA $3,300.00
3033 Vacant
TOTAL FOR OPTION PERIOD THREE: $__________________________
OPTION PERIOD FOUR - 1 JANUARY 2017 THRU 31 DECEMBER 2017
SECTION C-2 BUILDINGS, FACILITIES, MECHANICAL, ELECTRICAL,
WATER AND SEWER SYSTEMS
(All bid items covered in Section C-15 GENERAL
SECTION C-3 GRASS MOWING AND MAINTENANCE OF LANDSCAPED
AREAS:
ITEM DESCRIPTION QUAN U/M U/P AMOUNT
4001 Below Dam Fisherman Access 12 EA ________ _________
4002 Visitor Center & Access Road 12 EA ________ _________
4003 Visitor Center Overlook Hillside 6 EA ________ _________
4004 Big Branch Day Use Area 12 EA ________ _________
4005 Guyandotte Point Day Use Area 12 EA ________ _________
4006 Primitive Camping Area 12 EA ________ _________
4007 Campground Access Road 12 EA ________ _________
4008 Reedy Creek Camping Area 11 EA ________ _________
4009 Locust Branch Camping Area 11 EA ________ _________
4010 Dwelling A 1 EA ________ _________
4011 Dwelling B 1 EA ________ _________
SECTION C-3 SUBTOTAL _____________
SECTION C-4 CLEANING SERVICES, RECREATION AREAS:
(Not Applicable To This Contract)
SECTION C-5 GUARDRAILS, SIGNS, BARRICADES, BUMPERS,
(All Items covered in Section C-15 GENERAL)
SECTION C-7 DRIFT, DEBRIS, AND TRASH REMOVAL:
(All Items covered in Section C-15 GENERAL)
SECTION C-8 CLEANING, SERVICING, AND MAINTENANCE OF
GOVERNMENT VEHICLES AND EQUIPMENT:
(Not Applicable To This Contract)
SECTION C-9 JANITORIAL AND POLICING SERVICE FOR THE
VISITOR CENTER/RESOURCE MANAGERS OFFICE:
(Not Applicable To This Contract)
SECTION C-10 NATURAL RESOURCE MANAGEMENT:
(All other items covered in Section C-15 GENERAL)
ITEM DESCRIPTION QUAN U/M U/P AMOUNT
4012 Picnic Table Board Replacement 50 EA ________ _________
SECTION C-10 SUBTOTAL _____________
SECTION C-11 BEACH AND SWIM BOUY MAINTENANCE:
(Not Applicable To This Contract)
SECTION C-12 PARK ATTENDANT:
(Not Applicable To This Contract)
SECTION C-13 WILDFIRE SUPRESSION AND DISASTERS:
(All Items covered in Section C-15 GENERAL)
4013 General Maintenance Worker 80 HR ________ _________
4014 Laborer, Grounds Maintenance 4,500 HR ________ _________
4015 Electrician, Maintenance 40 HR ________ _________
4016 Survey Aid 80 HR ________ _________
4017 Heavy Equipment Operator (John Deere 310J Backhoe, 450J Dozer, 670CH Grader, 323D Skid Steer & attachments) 40 HR ________ _________
4018 Tractor Operator (John Deere 5565E Tractor with loader, mower, brush hog, box blade, mixer & spreader attachments) 40 HR ________ _________
4019 Dump Truck Operator 40 HR ________ _________ (6 ton or larger, requires CDL, 10 ton trailer)
4020 Boat Operator (14-32 foot with 15 - 90 hp motor) 40 HR ________ _________
4021 Chainsaw and Operator (20 inch bar min.) 600 HR ________ _________
4023 String Trimmer and Operator (16 inch cut min. with brush blade attachment) 80 HR ________ _________
4024 Riding Mower and Operator (16 hp and 48 inch cut min.) 8 HR ________ _________
4025 Boat and Operator (14-18 ft. flat bottom, 4026 Truck and Driver (full size 1/2 ton 80 HR ________ _________
4027 Dump Truck and Operator (6 ton or
4028 Excavator and Operator (min. 115 hp, 25 feet reach, 3 cubic yard bucket with tracks and mechanical thumb) 80 HR ________ _________
4029 Truck, Trailer and Operator (min. 25 ton capacity, for hauling heavy equipment including excavator, requires CDL) 8 HR ________ _________
4030 Aerial Lift Truck and Operator (min.
300 lb bucket capacity, 25 ft. vertical reach, outrigger stabilized) 24 HR ________ _________
4031 Negotiated Work 1 JB For Sum __________
4032 Guaranteed Amount 1 EA $3,300.00
4033 Vacant
TOTAL FOR OPTION PERIOD FOUR: $___________________
TOTAL AMOUNT FOR BASE PERIOD AND ALL OPTIONS: $________________
NOTES:
A- For all bid items with government owned equipment the government will be responsible for all fuels, oils, and preventative maintenance. For all bid items stated as "EQUIPMENT AND OPERATOR" the contractor shall be responsible for all fuels, oils, and maintenance of mentioned equipment.
B- This is an Indefinite Delivery-Indefinite Quantity Contract. All quantities listed in Section B (Bid Schedule) are estimates only and are not guaranteed. They are to be used only as an aid in preparing your price proposal.
C- The government reserves the right to place orders for items or combinations of items not in excess of $1,650,000.00 during the entire contract period. The government guarantees to order $6,600.00 against the base period of this contract and $33000.00 for each option period, if exercised.
END OF SECTION B
Section C - Descriptions and Specifications
SPECIFICATIONS
R. D. BAILEY LAKE
SECTION C
DESCRIPTION/SPECIFICATIONS
TABLE OF CONTENTS
SECTION C-1 GENERAL
Page
C-1.1 BACKGROUND ...................................................................................................C-1-1 C-1.2 SCOPE OF WORK.............................................................................................. C-1-1 C-1.3 TASK ORDERS ................................................................................................. C-1-3 C-1.4 NEGOTIATION ................................................................................................. C-1-3 C-1.5 WORKING HOURS ........................................................................................... C-1-4 C-1.6 PERMITS AND LICENSES .............................................................................. C-1-5
C-1.7 IDENTIFICATION OF CONTRACT EMPLOYEES AND VEHICLES ......... C-1-5
C-1.8 SAFETY AND SECURITY REQUIREMENTS ............................................... C-1-5 C-1.9 ACCIDENT REPORTING ................................................................................. C-1-7 C-1.10 DAMAGE REPORTS ........................................................................................ C-1-7
C-1.11 CONTRACT EMPLOYEES' CONDUCT AND COMPETENCY .................... C-1-7
C-1.12 DAMAGE OR LOSS OF CONTRACTORS SUPPLIES AND PROPERTY ... C-1-8
C-1.13 SUPERVISION ................................................................................................... C-1-8 C-1.14 ENVIRONMENTAL PROGRAM ..................................................................... C-1-9 C-1.15 CONTRACT DISCREPANCY REPORT (CDR) .............................................. C-1-9 C-1.16 MORNING MEETINGS .................................................................................... C-1-10 C-1.17 QUALITY CONTROL ....................................................................................... C-1-10 C-1.18 QUALITY ASSURANCE .................................................................................. C-1-10 C-1.19 DEFICIENCIES ................................................................................................. C-1-11 C-1.20 CONTRACTOR WORK SCHEDULES ............................................................ C-1-11 C-1.21 EMERGENCY WORK ...................................................................................... C-1-11 C-1.22 INTERRUPTIONS TO SYSTEMS .................................................................... C-1-12
C-1.23 GOVERNMENT FURNISHED MATERIALS AND EQUIPMENT ............... C-1-12
C-1.24 CONTRACTOR FURNISHED ITEMS ............................................................. C-1-14 C-1.25 SAFEGUARDING GOVERNMENT PROPERTY ........................................... C-1-16 C-1.26 MINIMUM MANPOWER REQUIREMENTS ................................................. C-1-16 C-1.27 MINIMUM PERSONNEL QUALIFICATIONS ............................................... C-1-16 C-1.28 OTHER CONTRACTORS AND VOLUNTEERS ............................................. C-1-17 C-1.29 APPLICABLE PUBLICATIONS ...................................................................... C-1-18 C-1.30 PREWORK CONFERENCE .............................................................................. C-1-18 C-1.31 REPORTS ........................................................................................................... C-1-18 C-1.32 HOURLY BID SCHEDULE ITEMS ................................................................. C-1-19 C-1.33 DEFINITIONS..................................................................................................... C-1-19
SECTION C-2
BUILDINGS, FACILITIES, MECHANICAL, ELECTRICAL,
WATER AND SEWAGE SYSTEMS
C-2.1 GENERAL .......................................................................................................... C-2-1 C-2.2 WORK TO BE PERFORMED............................................................................ C-2-1 C-2.3 PLAN FOR WINTERIZATION OF RECREATION AREAS ........................... C-2-2 C-2.4 PLAN FOR REOPENING OF RECREATION AREA ...................................... C-2-3 C-2.5 CLEANING RECREATION AREAS................................................................. C-2-3 C-2.6 EQUIPMENT LIST ............................................................................................. C-2-3
SECTION C-3
GRASS MOWING AND MAINTENANCE OF
LANDSCAPED AREAS
C-3.1 GENERAL........................................................................................................... C-3-1 C-3.2 WORK TO BE PERFORMED............................................................................ C-3-1 C-3.3 MOWING OPERATIONS .................................................................................. C-3-1 C-3.4 MOWING CYCLE .............................................................................................. C-3-3 C-3.5 PLANTING OR REPLACING TREES .............................................................. C-3-4 C-3.6 TREE AND BRUSH CUTTING ......................................................................... C-3-4
C-3.7 ACCESS ROAD CLEARING ……………………………………………. ........C-3-4
C-3.8 SERVICE EQUIPMENT …………………………………………………….... C-3-4
C-3.9 SERVICE AREAS............................................................................................... C-3-5
SECTION C-4
CLEANING SERVICES, RECREATION AREAS
SEE SECTION C-2.5
SECTION C-5
GUARDRAILS, SIGNS, BARRICADES, BUMPERS,
CURBS AND POSTS
C-5.1 GENERAL........................................................................................................... C-5-1 C-5.2 WORK TO BE PERFORMED............................................................................ C-5-1 C-5.3 SCHEDULE OF WORK ..................................................................................... C-5-1 C-5.4 LOCATION OF WORK...................................................................................... C-5-1 C-5.5 EQUIPMENT LIST ............................................................................................. C-5-1
SECTION C-6
MAINTENANCE AND REPAIR OF ROADS, PARKING
AREAS, PULL-OFFS, AND LAUNCHING RAMPS
C-6.1 GENERAL........................................................................................................... C-6-1 C-6.2 WORK TO BE PERFORMED............................................................................ C-6-1 C-6.3 SCHEDULE OF WORK ..................................................................................... C-6-1 C-6.4 LOCATION OF WORK...................................................................................... C-6-1 C-6.5 EQUIPMENT LIST ............................................................................................. C-6-1
SECTION C-7
DRIFT, DEBRIS, AND TRASH REMOVAL
C-7.1 GENERAL........................................................................................................... C-7-1 C-7.2 WORK TO BE PERFORMED............................................................................ C-7-1 C-7.3 SCHEDULE OF WORK ..................................................................................... C-7-2 C-7.4 SPECIAL REQUIREMENTS ............................................................................. C-7-2 C-7.5 PREVENTION OF LANDSCAPE DEFACEMENT .......................................... C-7-3 C-7.6 RESTORATION OF LANDSCAPE DAMAGE................................................. C-7-3 C-7.7 EQUIPMENT LIST ............................................................................................. C-7-3
SECTION C-8
CLEANING, SERVICING, AND MAINTENANCE OF GOVERNMENT
VEHICLES AND EQUIPMENT
NOT APPLICABLE TO THIS CONTRACT
SECTION C-9
JANITORIAL AND POLICING SERVICES
SEE SECTION C-2.5
SECTION C-10
NATURAL RESOURCE MANAGEMENT
C-10.1 GENERAL........................................................................................................... C-10-1 C-10.2 WORK TO BE PERFORMED............................................................................ C-10-1 C-10.3 EQUIPMENT LIST ............................................................................................. C-10-4
SECTION 11
BEACH AND SWIM BUOY MAINTENANCE
SECTION C-12
PARK ATTENDANT
SECTION C-13
WILDFIRE SUPPRESSION AND DISASTERS
C-13.1 GENERAL........................................................................................................... C-13-1 C-13.2 WORK TO BE PERFORMED............................................................................ C-13-1 C-13.3 SPECIAL PROVISIONS.....................................................................................C-13-3 C-13.4 SCHEDULE OF WORK ..................................................................................... C-13-3 C-13.5 EQUIPMENT LIST ............................................................................................. C-13-4
SECTION C-14
MAINTENANCE OF NAVIGATION AIDS
C-14.1 GENERAL........................................................................................................... C-14-1 C-14.2 WORK TO BE PERFORMED............................................................................ C-14-1 C-14.3 SCHEDULE OF WORK ..................................................................................... C-14-1 C-14.4 LOCATION OF WORK...................................................................................... C-14-1 C-14.5 SPECIAL PROVISIONS..................................................................................... C-14-2 C-14.6 EQUIPMENT LIST ............................................................................................. C-14-2
SECTION C-15
GENERAL BID SCEHDULE ITEMS
C-15 GENERAL........................................................................................................... C-14-3
SECTION C-16
CHANGES IN SPECIFICATIONS AND DRAWINGS
DESCRIPTION/SPECIFICATIONS
SECTION C-1
General
C-1.1. BACKGROUND. The project is located on the Guyandotte River, a tributary of the Ohio River in Wyoming and Mingo counties, near Justice, West Virginia. Project purposes include flood control, recreation, fish and wildlife enhancement and water quality. Approximate annual visitation to Corps operated recreation areas is 450,000.
C-1.2. SCOPE OF WORK. The Contractor shall furnish all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise provided herein, required to perform the operation and maintenance service at the R. D. Bailey Lake project, as specified and in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, Drawings, Attachments, Exhibits, etc., contained herein or incorporated by reference.
Award of a contract does not guarantee that the Government will order all of the types of services listed under the contract from the Contractor. The Government reserves the right to perform any portion of the services listed.
The quantities listed in the bid schedule are approximate and are provided as information only to assist in preparation of proposals. They are not guaranteed and the actual quantities may be more or less than shown. Variation in these estimated quantities shall not be justification for modification of the contract or request for additional payment.
Contractor's work and responsibility shall include, but shall not be limited to, all planning, programming, administration and management necessary to assure that all services provided are conducted in accordance with the contact and all applicable laws, regulations, codes, or directives. Contractor shall ensure that all work meets or exceeds critical reliability rates or tolerances specified or included in referenced documents. Contractor shall perform all related Contractor administrative services necessary to perform the work such as supply, procurement, quality control, Contractor financial control, and maintenance of accurate and complete records and files.
It is emphasized that the work described in this contract is a critical part of the Corps mission.
Much of the work described will be performed in public recreation areas. The Corps is committed to "Customer Care" and providing quality professional service. Failure of a Contractor to perform required work, to perform in a timely manner, or to perform quality work could risk public health and safety and result in the following problems:
a. Falls, snakebites, and reduced use and enjoyment of recreation facilities from lack of mowing.
b. Falls, cuts, infections, and accumulated animal feces from beaches not being cleaned and inspected.
c. Unsafe boating and limiting of lake surface recreation from a lack of drift removal.
d. Closed recreation areas from inoperable water, sewage and electrical systems.
e. Closed parking areas and road closures from lack of maintenance and repair.
f. Destroyed forests and natural areas from lack of emergency response capability.
g. Closed campgrounds, beaches and parks from lack of operators.
h. Significant dollar losses of recreational benefits.
i. Increased administrative and labor costs required for government performance of contracted work.
Therefore, it is the intent of the Government to insure the required services are performed correctly, safely, timely and reliably for a fair and reasonable price. Because of the critical nature of the work the Government cannot "trade off" contractor non-performance for increased Government liability. Further, due to lack of Government personnel, the Government cannot "trade off" a Contractor's lack of Quality Control for increased Government Quality Assurance.
Special attention should be paid to the Evaluation Facotrs for Award that are listed in Section L of this Solication. All offerors must clearly demonstrate they have the technical ability to meet the minimum standards for the wide variety of critical requirements of this contract to insure the Corps mission is completed.
Work included in this contract generally involves all work associated with operation and maintenance of recreation areas at the project except for certain specialized work, or repair or maintenance to major or complex components that the Government determines to require the use of a Contractor or professionals with specialized equipment, or training. However, in extreme conditions (e.g. wildfires, floods, blizzards) contract employees may be required to travel to other Huntington District projects within the state of West Virginia, to assist in the emergency work there. In the event of a disaster or anticipated emergency situation, the contractor may be required to provide emergency work at off-project sites within the state of West Virginia and within 50 linear miles of the project boundary.
Work which does not fall under the scope of this contract includes:
a. Repairs to major components of heating or air conditioning systems.
b. Major maintenance or repair to sewage and water treatment systems.
c. Repair to major or critical electrical components.
d. Maintenance or repair to special architectural features.
e. Work involving Government functions pertaining to flow regulation, dam safety, maintenance of permanent operating equipment, and maintenance and repair work (except for vegetative control and cleaning) at dams, intake structures, spillways, embankments, outlet works, levees, pump stations, and other similar structures.
f. Work which requires formal preparation of Government plans and specifications.
g. Work determined by the Government to be more efficiently handled by a specialty contractor such as fencing, carpet shampooing, etc.
h. Work on articles covered by separate warranty.
i. Service and repairs to Vehicles and equipment.
C-1.3. TASK ORDERS. All work under this contract will be ordered by issuance of individual Task Orders (DD Form 1155, see Exhibit L). No work will be performed under this contract before an individual task order is issued except as specified in C-1.21, Emergency Work. The OO has four basic ways to order work using this contract: Fixed Price Task Orders, Negotiated Task Orders, Estimated Task Orders, and Emergency Task Orders. The type of Task Order used will be at the discretion of the OO. A separate type task order will be issued for each job. No work shall be performed other than that specified on a task order, except Emergency Work as described in Section C-1.21.
Under normal conditions, Task Orders will be issued that require response within 24 hours after receipt. All Task Orders must be completed by the Delivery Date shown in block 10 of the Task Order Form (see Exhibit Q). When the Contractor is notified of emergency work required under these specifications, the Contractor responds and begins work within two hours after receipt of such notification.
C-1.4. NEGOTIATION. Task Orders that are to be performed on an hourly basis (e.g., using items from C-15 of the bid schedule) will be agreed upon by negotiation between the Contractor and the COR. This procedure can be initiated by either the Contractor or the Government through execution of Section I of a Job Request form (Exhibit J). If the Job Request Form is initiated by the Contractor, the Government may concur with the need for the work by completing Section II of the Government's copy of the form. If the Government initiates the Job Request Form, the Contractor shall complete Section II of the Contractor's copy of the form and return the form to the COR. Unless otherwise specified in writing by the COR, the Contractor shall return the completed form within 48 hours of receipt of the request. If the Contractor's proposal is reasonable, a Task Order will be issued. If the Contractor's proposal is considered unreasonable, the Contractor and COR will attempt to reach an agreement through negotiation.
If an agreement cannot be reached, the COR may elect to decline performance of the work, or elect to send the negotiation package to the Contracting Officer for resolution. If subsequent negotiations fail to resolve the matter, the Government reserves the right to obtain the services in question by whatever means deemed to be in the best interest of the Government, including use of its own work force.
The purpose of negotiation is to establish a fair and reasonable price for the job under consideration. The Government and Contractor will negotiate toward the most efficient method of work and the number of hours required. The most efficient method is that method of work which accomplishes the job safely and at the lowest price. Once negotiated the Contractor must perform the job using the method of work and line items agreed upon during negotiations. Task Orders for work under this Section will be written as One Job for Sum under Line Items identified in Schedule B (Bid Schedule), Section C-15. Individual bid schedule items shall be specified on the Job Request Form, or in a Resume of Negotiations.
C-1.5. WORKING HOURS.
a. Normal Working Hours. Normal working hours, except as otherwise specified herein, shall be Monday through Friday, 7:30 a.m. to 4:00 p.m. or as specified on the task order.
Work inside Government buildings or other secured areas shall be performed during the above referenced work hours or as specified by the OO. Work that interferes with other ongoing functions at the project shall be scheduled around normal working hours, as specified by the OO.
Refer to individual sections of this specification for specific schedules of work.
b. Holiday Work. Work may be required on holiday periods during heavy visitation, emergencies, or for other reasons as determined by the OO. Additional personnel may be required to handle the additional work load during holiday periods because of heavy visitation.
The ten Federal holidays observed are:
New Year's Day (January 1st) Martin Luther King Day (3rd Monday in January) President's Day (3rd Monday in February) Memorial Day (Last Monday in May) Independence Day (July 4th) Labor Day (1st Monday in September) Columbus Day (2nd Monday in October) Veterans Day (November 11th) Thanksgiving Day (4th Thursday in November) Christmas Day (December 25th)
When one of the above designated holidays falls on a Sunday, the following Monday is observed as a legal holiday. When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday. Work shall be scheduled around the above listed Federal holidays except as specified herein or as approved by the OO.
c. Emergency Working Hours. Emergency working hours shall be 24 hours per day, 7 days per week.
d. Inclement Weather Work. The Contractor shall maintain the schedule of services regardless of inclement weather. Exceptions may be approved by the COR when severe conditions make it impractical or dangerous to perform the work. The Contractor will be notified, by modification to the Task Order, of any COR determination to extend the performance period due to inclement weather.
C-1.6. PERMITS AND LICENSES. The Contractor shall, at his own expense, obtain any licenses or permits required to perform the contract required to perform all aspects, requirements and work of this contract. The Contractor shall comply with all current Federal, State, and local laws and regulations and shall comply with any subsequent changes. Regulations by the West Virginia Department of Labor (WVDOL) require all contractors working in the state to have a current West Virginia Contractors License. The WVDOL may be contacted at (304) 558-7890 for details.
C-1.7. IDENTIFICATION OF CONTRACT EMPLOYEES AND VEHICLES. The Contractor shall furnish his employees, other than office and clerical personnel, standardized uniforms with the contractor’s company name printed legibly and professionally on the shirt or vest, within 30 days after notice of award of the contract. Any employee hired 30 calendar days after award of the Contract shall be in the required uniform within 14 calendar days of the date of hire.
Contractor uniforms shall not resemble U.S. Army Corps of Engineers uniforms. Blue-jeans type pants and T-shirts with sleeves will be considered acceptable uniforms. Work vests meeting the requirements of High Visibility Apparel as specified in Section C-1.8, may be used as the standardized uniform when worn over a shirt/jacket and when the contractor’s company name is printed legibly and professionally upon the vest. Stained or faded uniforms shall not be worn.
Contractor employees and subcontractors shall wear these uniforms at all times they are performing work under this contract. Exceptions may be granted by the COR for short term workers, or during disasters, emergencies, wildfire suppression, or special circumstances specified by the COR. All vehicles used by the Contractor to perform work under this contract shall be identified with the company name prominently displayed on the outside of both front doors of each vehicle in a professional manner to provide an attractive and readily visible means of identification.
The Contractor may require his employees to report in their own vehicles to the project, but these personal vehicles must be parked in the Contractor's compound, or at a site designated by the COR. All vehicles used in performance of work must be marked. Vehicles used by the Contractor to perform administrative functions such as morning meetings or crew supervision must also be marked.
C-1.8. SAFETY AND SECURITY REQUIREMENTS.
a. General. If the Contractor fails or refuses to promptly comply with safety and security requirements as specified herein, the COR or any other project employee may stop all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such work stoppage shall be made subject to any claims for extension of time or for excess costs or damages sustained by the Contractor. Also, the Contractor will not be paid for work not performed as a result of the stop order.
The Contractor shall comply with all current provisions of the Occupational Safety and Health Act (OSHA) in addition to the standards of the Corps of Engineers Manual, EM 385-1-1, and the requirements listed in Exhibit O, and as otherwise stated herein. Special attention shall be given to the requirements for monthly and weekly safety meetings. The Contractor shall inform the COR a minimum of 7 days prior to a Contractor monthly safety meeting, to permit a Government representative to attend.
b. Contractor Accident Prevention Plan (APP). The Contractor shall prepare an Accident Prevention Plan to affirm that he is committed to the Safety Program and identify the procedures he shall use to satisfy the requirements of the program, and following the outline provided in EM 385-1-1, Appendix A as a minimum (See Exhibit M).The contractor shall address each element and sub-element in the outline in the order they appear in Appendix A. If other areas of the EM 385-1-1 are pertinent to the contract the contractor must assure these areas are addressed as well. Any item from the outline that does not apply must be listed, with a brief explanation of the reason it is not required. The plan must be accepted by the Contracting Officer prior to commencement of any work. The Web Address for EM-385-1-1 is:
http://usace.army.mil/CESO/Documents/EM385-1-1FINAL.pdf.
One copy of the completed Accident Prevention Plan shall be provided to the COR, at least one week prior to the pre-work conference. This plan must be accepted by the Contracting Officer prior to the commencement of any work.
Contractor crews of two or more must have at least two people holding current certification in First Aid and CPR as approved by the American Red Cross. Individuals working alone must hold current certification in First Aid as approved by the American Red Cross.
c. Activity Hazard Analysis.
(1) The contractor shall prepare and use Activity Hazard Analyses (AHA’s) as one of many tools to insure safe performance of work. It is the Contractor’s responsibility to prepare the AHA’s. For re-occurring jobs, sample or previously prepared AHA’s may be provided by the Government for the Contractor’s information and to assist the Contractor in the development of site specific AHA’s pertinent to performing the work.
The Contractor is encouraged to revise or add to these AHA’s as necessary to address changing conditions. Prior to performing jobs with inherent hazards, the Contractor shall review at a “Tool Box” safety meeting, approved AHA’s with those employees who shall perform that work each time the work is ordered. The Government may request advanced notification of the time and date of the above AHA Tool Box safety meeting for Contractor employees so that Government representatives may attend such reviews. The AHA form is located in Exhibit O.
(2) All employees performing work under this contract shall wear personal protective equipment (PPE) as specified in EM 385-1-1 and as needed to mitigate the hazards identified in the AHA. See Exhibit H for examples of proper PPE for various types of work on this contract.
(3) The Government will require the Contractor to prepare an AHA for any jobs for which an adequate AHA does not already exist. A copy of the AHA shall be submitted to the COR and must be approved before the Contractor starts the job. This copy of the AHA will become the property of the Government.
(4) A copy of an approved AHA is required for each Task Order issued by the Government. A copy of the approved AHA’s shall be available at all times to workers at each associated job site.
d. Public Safety. The Contractor shall ensure that reasonable precautions are taken to protect…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .