W91236-16-B-0004-0002.pdf
PDF 36 KB Posted
- Attached to
- Maintenance Dredging, Quinby Creek, Virginia Federal contract opportunity
- Solicitation number
- W91236-16-B-0004
About this file
Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W91236-16-B-0004-0006.pdf | ||
| Abstract_of_Offerors.pdf | ||
| W91236-16-B-0004-0005.pdf | ||
| W91236-16-B-0004-0004.pdf | ||
| Quinby_ProjNet_as_of_6Sept2016_Redacted.pdf | ||
| W91236-16-B-0004-0003.pdf | ||
| 02-2103_minor_permit_modification_that_removes_1000_cy_limitation.pdf | ||
| W91236-16-B-0004-0001.pdf | ||
| 2016_QUINBY_CREEK_MAINTENANCE_DREDGING_FINAL_PLANS_AND_SPECS.pdf | ||
| W91236-16-B-0004.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Subject Action W91236-16-B-0004, Maintenance Dredging, Quinby Creek, Viriginia is hereby Amended as follow s:
Specifications:
a. Clarify that all questions and/or comments should reach the above reference Contracting Office via ProjNet not later than 15 days prior to the bid opening w hich is 19September2016.
b. Remove Item "j" in section 01 32 01; paragraph 3.3.2.3 "Critical Activities"
Permits:
c. Add: VADEQ Approval of Minor Modification, Permit Number 02-2103 dated February 20,2015.
Contracting POC: Stormie Wicks, (757)201.7215, Stormie.B.Wicks@usace.army.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91236-16-B-0004
X 9B. DATED (SEE ITEM 11)
18-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Aug-2016
CODE
USA ENGINEER DISTRICT, NORFOLK
803 FRONT STREET
NORFOLK VA 23510-1096
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91236-16-B-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE
SUMMARY OF CHANGES
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS
The following have been modified:
1. PROJECT DESCRIPTION
The Quinby Creek Channel and Harbor Turning Basin are located in Accomack County, Virginia near the town of Quinby. A total of 7,200 feet of channel comprises this project which includes the reach into the turning basin. The Federal Navigation Channel begins in Upsher Bay and continues to within approximately 600 feet of Quinby Landing. The channel geometry along this reach is 8 feet deep and 80 feet wide. The next reach of the channel narrows to 60 feet wide. This reach is defined from a point 600 feet out of the harbor / turning basin and terminates at Quinby Landing. The harbor / turning basin’s surface dimensions are 200 feet wide by 400 feet long. The dredging work consists of dredging to a required depth of 6 feet; one additional foot of overdepth dredging will be allowed. It is estimated that approximately 143,000 cubic yards of maintenance dredged material, to include allowable overdepth, will be removed. All dredging depths are referenced to Mean Lower Low Water. Hydraulic pipeline dredging will be required to complete the project. Dredged material will be placed at a near shore and overboard placement area adjacent to the channel. One United States Coast Guard Tri-leg warning beacon will be removed. All superstructure and pilings will be removed and properly disposed of. Piles will NOT be permitted to be cut-off.
The Contractor shall comply with the provisions of EM 385-1-1. If the Contractor is a currently accepted participant in the Dredging Contractors of America (DCA)/United States Army Corps of Engineers (USACE) Dredging Safety Management Program (DSMP), as determined by the DCA/USACE Joint Committee, and holds a current valid Certificate of Compliance for both the Contractor Program and the Dredge(s) to be used to perform the work under this contract, the Contractor may, in lieu of the submission of an Accident Prevention Plan (APP),
(1) make available for review, upon request, the Contractor’s current Safety Management System (SMS) documentation,
(2) submit to the Contracting Officer the current valid Company Certificate of Compliance for its SMS,
(3) Submit the current dredge(s) Certificate of Compliance based on third party audit, and submit for review and acceptance, site-specific addenda to the SMS as specified in the solicitation.
The full text of EM 385-1-1 can be accessed at:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
2. RESTRICTIONS
Due to the safety and environmental concerns related to performing the scheduled work in dangerous and open bay and ocean waters; and the required necessary production rate to complete the project as scheduled, the Contractor shall submit to the Government, prior to award, signed and notarized certificates that verify the plant that will be utilized on this project meets all of the weight, horsepower, and open bay/ocean operating requirements as specified. The signed and notarized certifications shall be accompanied by US Coast Guard certified documentation or other recognized authority indicating the weight and horsepower of the plant and verification documentation that indicates on which projects the plant has been used to dredge similar material in an ocean environment and at a production rate sufficient to accomplish the work as scheduled for this contract. The plant to be employed on the work in the Quinby Channel must meet, as a minimum, the following requirements:
A. Hydraulic pipeline dredge with a minimum plant weight of 150,000 pounds and a minimum of 1,000 horsepower continuous to the pump.
B. Capable of safely and efficiently dredging to depths indicated and in open bay / ocean conditions. The contracting officer will award a firm fixed price contract to the lowest priced, technically acceptable
3. CONSTRUCTION TIME
Begin performance within 7 calendar days and complete all work within 75 calendar days of receipt of Notice-to-Proceed (NTP). Dredging restrictions for this project are effective from July 1 – September 30.
No dredging may occur during this period. The contractor is expected to plan their work to accommodate this restriction.
4. BIDDER QUESTIONS AND COMMENTS
All questions and/or comments should reach the above referenced Contracting Office via ProjNet no later than 02 September 2016, in order that they may be given consideration or actions taken prior to receipt of offers.
Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue. From this page you may view all bidder inquiries or add inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
The Solicitation Number is : W91236-16-B-0004 The Bidder Inquiry Key is: 88MJN5-D3SG8T
The Bidder Inquiry System will be unavailable for new inquires 15 days prior to bid opening in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
5. BID EVALUATION AND AWARD
The Government will evaluate bids in response to this solicitation based upon the Total Evaluated Price without discussions and will award a contract to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the Government considering only price and the price-related factors specified elsewhere in the solicitation. The Government may reject any or all bids and/or waive informalities or minor irregularities in bids received.
The Government will evaluate offers for award purposes by adding the total price for all optional items to the total price for the basic requirement.
6. AWARD TO RESPONSIBLE OFFEROR
To be determined responsible, a bidder must –
a) Have adequate financial resources to perform the contract, or the ability to obtain them;
b) Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments;
c) Have a satisfactory performance record. A prospective contractor shall not be determined responsible or non-responsible solely on the basis of a lack of relevant performance history;
d) Have a satisfactory record of integrity and business ethics;
e) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors);
f) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them; and
g) Be otherwise qualified and eligible to receive an award under applicable laws and regulations
In accordance with FAR Part 9.1, responsibility will be determined, prior to award, by the Contracting Officer through the performance of a pre-award survey or utilizing information from a previous pre-award survey and/or any performance data available. The apparent low bidder may be required to show that he has the necessary capital, experience, and owns or can procure the necessary plant or other resources to commence the work at the time prescribed in the specifications and thereafter to prosecute and complete the work safely and satisfactorily within the time specified. The below information will be requested of the apparent low offeror. This information is not required to be responsive to the invitation for bid.
a) Banking Information to include Branch/Location, Point of Contact and Telephone
Number. Please insure the Bank is prepared to provide necessary information regarding average balances in your operating accounts, lines of credit and credit history.
b) Current commitments and expected dates of completion
7. EVIDENCE OF AUTHORITY TO SIGN OFFERS
Evidence of the authority of individuals signing offers to submit firm offers on behalf of the offeror is required except where the offer is signed, and shows that it is so signed, by: the President, Vice- President, or Secretary of an incorporated offeror; a partner in the case of a partnership; or the owner in the case of a sole proprietorship. Failure to submit with the offer satisfactory evidence of the authority of all other persons may be cause for rejection of the offer as invalid or nonresponsive.
8. PREAWARD SAFETY CONFERENCE
a. Where an apparent low bidder, in performance of contracts during the previous three-year period, incurred one or more accidents, or where, in the opinion of the Contracting Officer, there is any question regarding this compliance with any safety or accident prevention requirement, such bidder, on request of the Contracting Officer prior to any award under this solicitation, shall attend a conference with representatives of the Contracting Officer to discuss any such accidents or non-compliance, the reason for their occurrence, and measures which will be taken to preclude any recurrence thereof.
b. Information elicited at this conference will be used by the Contracting Officer, in conjunction with other information obtained in a preaward survey, in determining the bidder's responsibility.
c. The items discussed, the preventive measures considered, and any conclusions reached in this conference shall be recorded in minutes of the meeting, which shall be authenticated by the signatures of representatives of the bidder and the Contracting Officer, and any procedures noted therein as agreed upon shall become an obligation of the bidder, along with all other safety and accident prevention requirements of the contract, if award is made to him.
9. INSPECTION OF THE SITE
Prospective bidders are invited to visit the site of the work in order to acquaint themselves as to site conditions and other problems incident to the prosecution of the work. Arrangements for inspection of the site shall be made through the Office the Area Engineer identified in the clause 52.236-27, entitled
"SITE VISIT (CONSTRUCTION)."
10. SUBCONTRACTING PLAN (CONSTRUCTION)
If the offeror is a large business and the offer amount exceeds $1,000,000.00, he shall submit a subcontracting plan within three (3) working days of being notified (either verbally or in writing) that he is the apparent low bidder or is otherwise in line for award. The subcontracting plan shall be reviewed and approved by the Contracting Officer prior to award.
11. INCURRING COSTS
The Government is not liable for any costs incurred by the offeror submitting an offer in response to this solicitation.
12. AGENTS
Offers signed by an Agent must be made in the name of the Principal and must be accompanied by evidence of said Agent’s authority to act on behalf of its Principal.
13. UNBALANCED BIDS
Any offer which is materially unbalanced as to prices for the Base Items and the Optional Items may be rejected as non-responsive or otherwise not considered for award. An unbalanced offer is one which is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
14. UNAUTHORIZED INSTRUCTIONS FROM GOVERNMENT OR OTHER PERSONNEL
The contractor shall not accept instructions issued by any person, employed by the U.S. Government or otherwise, other than the Contracting Officer or the Authorized Representative of the Contracting Officer acting within the limits of his/her authority as defined in the Designation of Authority letter. A copy of the Designation of Authority letter will be furnished to the contractor at time of contract award.
(End of Summary of Changes)