W09B0013_0003.pdf
PDF 23 KB Posted
- Attached to
- RECOVERY - MAINTENANCE DREDGING LYNNHAVEN INLET Federal contract opportunity
- Solicitation number
- W91236-09-B-0013
About this file
Amendment 0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ABSTRACT.pdf | ||
| W09B0013_0002.pdf | ||
| W09B0013_0001.pdf | ||
| amendment.zip | ZIP file | |
| W91236-09-B-0013.pdf | ||
| PLANS.zip | ZIP file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W26GLG91536869
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
MAINTENANCE DREDGING, LYNNHAVEN INLET, VIRGINIA BEACH, VA
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Jul-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91236-09-B-0013
X 9B. DATED (SEE ITEM 11)
18-Jun-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Jul-2009
CODE
USA ENGINEER DISTRICT, NORFOLK
CONTRACTING OFFICE
803 FRONT STREET
NORFOLK VA 23510-1096
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91236-09-B-0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
AMENDMENT 0003
1. SOLICITATION, OFFIER, AND AWARD
a. Page 1, item 10(e) size standard is changed:
From: $31,000,000.00 To: $20,000,000.00. All small business firms must perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern.
b. Page 1, item 13(A) is changed:
From: 02:00 PM local time 23 July 2009 To: 02:00 PM local time 28 July 2009
2. SECTION 00010 – Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
ARRA 09 LYNNHAVEN INLET MAINTENANCE DRED
Begin performance within 15 calendar days and complete all work within 75 calendar days of receipt of Notice to Proceed (NTP). --- PROJECT NO.: 107528
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 JOB LS ____________
Mobilization and Demobilization
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 139,300 CY ___________ ___________
Dredging Entrance Channel and Turning Basin to a required depth of 11 feet, Channel to Broad Bay (Stations 105+00 to 93+50) to a depth of 10 feet, and the Long Creek Side Channel to a depth of 9 feet, all with 1-foot of allowable Overdepth, complete, including all associated work as indicated and specified.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 5,700 CY ___________ ___________
Dredging Channel to Broad Bay (Stations 93+50 to 0+00) to a depth of 10 feet, with 1-foot of allowable Overdepth, complete, including all associated work as indicated and specified.
TOTAL ESTIMATED AMOUNT OF BID ITEMS ________________
W91236-09-B-0013
3. SECTION 01 22 00
Page 1 and Page 3, delete paragraph title 1.4.1 in its’ entirety and substitute therefore the following new paragraph title:
“1.4.1 Payment Items No. 0002 and 0003 Dredging”
4. SECTION 35 20 23:
a. Page 3, delete paragraph 1.3.1 in its’ entirety and substitute therefore the following new paragraphs:
“1.3.1 Minimum Plant Requirement
Due to the safety and environmental concerns related to performing the scheduled work in dangerous and open bay/ocean waters; and the required necessary production rate to complete the project within the contract time. The hydraulic pipeline dredge must have a minimum plant weight of 150,000 pounds and a minimum of 1,000 horsepower continuous to the pump. The Dredge must be capable of safely and efficiently dredging to depths indicated and in open bay/ocean conditions.
The Government will conduct a Pre-Award Survey to verify the Contractors plant to be used on the specified work meets weight and horsepower requirements, and is capable of accomplishing the work within the contract time. As part of the pre-award survey, the Contractor must provide documentation that indicates on which projects his plant has been used to dredge similar material in a bay/ocean environment and at a production rate sufficient to accomplish the work as scheduled for this contract. Additionally, the Contractor must make all intended plant available for inspection and approval. Inadequate documentation and/or insufficient plant capability will be cause for rejection of the bid.”
b. Page 4, paragraph 3.1.1, at the end of the paragraph, change the referenced dredging and required placement area locations in their entirety and substitute therefore the following:
(a) Entrance Channel - Cape Henry Beach Placement Area
(b) Mooring and Turning Basin - Cape Henry Beach Placement Area
(c) Long Creek Side Channel - Cape Henry Beach Placement Area
(d) Channel to Broad Bay Stations 105+00 to 93+50 - Cape Henry Beach Placement Area
(e) Channel to Broad Bay Stations 93+50 to 0+00 – Maple Street Upland Placement Area.
File details come from the government source that posted it. Updated .