W911XK21R0001 Amendment 0010.pdf

PDF 442 KB Posted

Attached to
New Lock at the Soo, New Third Lock Federal contract opportunity
Solicitation number
W911XK21R0001
Issued by
Department of the Army Corps of Engineers Engineering District Detroit

About this file

This document provides details for the solicitation of a construction contract for the New Lock at the Soo project located in Sault Ste. Marie, Michigan. The contract includes a base bid for mobilization, cofferdam construction, relocations, water control, construction of a new power plant bridge and shaft, and includes seven optional items related to completion of the lock chamber, pump well, electrical and mooring systems installation. The total value of the contract is over $500 million and funds are contingent on appropriations. The response due date is not specified. The contract duration for the base bid is 1642 calendar days with options extending the period up to an additional 730 days. The solicitation materials will be provided through a secure DoD site to firms certified in the Joint Certification Program. A pre-proposal conference will be held on July 13, 2021, an organized site visit on July 14, 2021, and core viewing will be available July 13-14, 2021; registration is due by July 8, 2021.

View the file

Other files for this federal contract opportunity

Other files attached to New Lock at the Soo, New Third Lock, newest first.
File Type Posted
W911XK21R0001 Amendment 0011.pdf PDF
W911XK21R0001 Amendment 0009.pdf PDF
W911XK21R0001 0008.pdf PDF
W911XK21R0001 0005.pdf PDF
W911XK21R0001 Amendment 0004 (003).pdf PDF
W911XK21R0001 00007.pdf PDF
W911XK21R0001 0006.pdf PDF
W911XK21R0001 Amendment 0003.pdf PDF
W911XK21R0001 0002.pdf PDF
7-13-21_Pre-Proposal Conference Meeting Minutes.pdf PDF
New Soo Lock Site Visit Attendance List.pdf PDF
Redacted_Soo Lock - NLC - Pre-Proposal Conference Presentation - 13 Jul 21_003.pdf PDF
Pre-Proposal Conference Attendance List - W911XK21R0001 13 July 2021.pdf PDF
W911XK21R0001 0001 (Amendment 0001).pdf PDF
J A Pelco.pdf PDF
W911XK21R0001 - Solicitation .pdf PDF
J A Software House.pdf PDF
J A Schweitzer Engineering Lab.pdf PDF
J A Russellstoll .pdf PDF
J A Cavatoc.pdf PDF
J A Rockwell.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W56MES91578281

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE: New Lock at the Soo, (New Third Lock) Sault Ste. Marie, MI.

This amendment is issued to:

- Modify INSTRUCTONS TO OFFERORS

- Modify Section 00 21 16 - Instruction to Proposers - Proposal Content & Evaluation

- Modify the type of contract in 52.216-1

- Modify the type of contract in Block 10 of SF 1442

- Update the Wage Determination for MI 0033

1. CONTRACT ID CODE PAGE OF PAGES

J 1 48

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Nov-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK21R0001

X 9B. DATED (SEE ITEM 11)

02-Jul-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Nov-2021

CODE

U.S.ARMY ENGINEER DISTRICT, DETROIT

477 MICHIGAN AVENUE, 7TH FLOOR

DETROIT MI 48226-4523

W911XK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911XK21R0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required performance has changed from PROJECT TITLE: New Lock at the Soo, (New Third Lock) Sault Ste. Marie, MI.TYPE OF CONTRACT: Firm Fixed Price Construction ContractFunds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.DISCLOSURE OF MAGNITUDE OF THE PROPOSED CONSTRUCTION PROJECT: Over $500,000,000NAICS: 237990 - Other Heavy and Civil Engineering Construction SIZE STANDARD: $39.5 MillionTYPE OF SET ASIDE: This is a full and open procurement. In accordance with Federal Acquisition Regulation 19.1307, this project requires the HUBZone 10% price evaluation. Central Contractor Registration and ORCA are now available through the System for Award Management (SAM), available at www.sam.gov Offerors must comply w ith the requirements of 52.204-7, 52.204-8, 52.232-33, and any other CCR/ORCA requirements in this solicitation through SAM. to PROJECT TITLE: New Lock at the Soo, (New Third Lock) Sault Ste. Marie, MI.TYPE OF CONTRACT: Fixed Price with Economic Price Adjustment Construction ContractFunds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.DISCLOSURE OF MAGNITUDE OF THE PROPOSED CONSTRUCTION PROJECT: Over $500,000,000NAICS: 237990 - Other Heavy and Civil Engineering Construction SIZE STANDARD: $39.5 MillionTYPE OF SET ASIDE: This is a full and open procurement. In accordance with Federal Acquisition Regulation 19.1307, this project requires the HUBZone 10% price evaluation. Central Contractor Registration and ORCA are now available through the System for Award Management (SAM), available at www.sam.gov Offerors must comply w ith the requirements of 52.204-7, 52.204-8, 52.232-33, and any other CCR/ORCA requirements in this solicitation through SAM..

SECTION 00 21 00 - INSTRUCTIONS

The following have been added by full text:

INSTRUCTION TO OFFERORS UPDATE

INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS

1.0 INTENT

This solicitation is to select one (1) contractor for the construction of the New Lock at the Soo (New Third Lock) located at the Soo Lock Complex, Sault Ste. Marie, MI.

1.1 TYPE OF CONTRACT

The Government intends to award one (1) Fixed Price with Economical Price Adjustment Construction Contract.

1.2 AVAILABILITY OF DRAWINGS, TECHNICAL SPECIFICATIONS AND ADDITIONAL

DOCUMENTS

All drawings, technical specifications, and additional documents relating to this Request for Proposal (RFP) are controlled unclassified documents. Although provided as separate attachments, those documents are considered an official part of the solicitation.

a. The technical documents that are issued with amendment 0004 supersede any documents that were issued prior to that amendment. All technical documents will be available to any contractor that provides a copy of the approved JCP certification (DD 2345) to Sandra M. Kenzie at Sandra.M.Kenzie@usace.army.mil and LRE-Proposal@usace.army.mil, Subject Line: Request for Contract Documents, W9111XK21R0001, New Lock at the Soo. Those documents will be transferred through the DoD Safe Website (https://safe.apps.mil/). Prime contractors are required to comply with the conditions of the approved JCP certification (DD2345) when providing the information to subcontractors.

1.3 BASIS OF AWARD

This is a “Best Value-Tradeoff” solicitation utilizing - Request for Proposal (RFP) Procurement Process, as it may be in the best interest of the Government to consider award to other than the lowest priced Offeror or other than the highest technically rated Offeror.

1.4 WHO MAY SUBMIT

This procurement is unrestricted to obtain full and open competition. Proposals from firms organized as joint ventures (JV) that have associated specifically for this project must include a copy of the legal joint venture agreement in the proposal submission.

1.5 North American Industry Classification System (NAICS) and Small Business Size Standard

The NAICS code for this project is 237990, entitled “Other Heavy and Civil Engineering Construction”, which has a Small Business Administration (SBA) size standard of $39.5 Million.

1.6 SYSTEM FOR AWARD MANAGEMENT (SAM) REGISTRATION

As mandated by law, this agency cannot award a contract to a contractor who is not registered in the SAM database (www.sam.gov). If submitting as a joint venture, ensure that the joint venture business name is registered in like manner in the SAM database (www.sam.gov).

In accordance with FAR 52.204-7 System for Award Management, An Offeror is required to be registered in SAM when submitting an offer or quotation and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation. Any offeror not registered in the System for Award Management (SAM) when submitting a proposal will be considered not incompliance with the solicitation and may not be considered for evaluation or award.

1.7 PRE-PROPOSAL CONFERENCE, SITE VISIT, GEOTECHNICAL CORE VIEWING

A pre-proposal conference, an organized site visit and an opportunity to view the cores that were taken during the geotechnical investigation has been scheduled during the solicitation period.

PRE-PROPOSAL CONFERENCE CONTENT: The intent is for USACE to present the Evaluation Criteria and Submittal Requirement, the Plans and Specifications, discuss site access and security, construction sequencing, coordination with other contractors on site, diversion and care of water, concrete, cold weather/winter work, New Pump well overview, Power Plant Access Bridge overview, Shaft 6 overview, and the break down between base and options. Intent is for USACE to present information and for contractors to have opportunity to ask questions. The pre-proposal conference will be held on July 13, 2021 at 1:00 PM Eastern Time at the Superior Room in the Walker Cisler Center at Lake Superior State University located at 650 W. Easterday Ave. Sault Ste. Marie, MI 49783. Face coverings will be required for unvaccinated individuals. If you are unable to physically attend the conference, you can remotely attend by the following:

Join by WebEx https://usace1.webex.com/meet/DetroitPublicAffairs Meeting #: 1995059302

Join by phone +1-844-800-2712 US Toll Free +1-669-234-1177 US Toll Access code: 199 505 9302

PRE-PROPOSAL CONFERENCE REGISTRATION: Registration required for physical and remote attendance:

Submit (1) all planned attendees full name(s), (2) Company Name, (3) CAGE and/or Unique Entity Identifier number, (4) primary point-of-contact’s (a) name, (b) position title, (c) telephone number, and (d) email address. The above information must be submitted via email to Esther Proulx (Esther.L.Proulx@usace.army.mil) no later than 5:00 PM Eastern on July 8, 2021.

SITE VISIT CONTENT: As stated in 52.236-27 Alt I of this solicitation, an organized site visit has been scheduled to occur on 14 July 2021. Site visit participants shall be prepared to walk roughly 10 miles. The Government assumes no responsibility for any understanding or representations concerning conditions made by any of its officers, agents, or employees, unless included in the solicitation, the specifications, or related documents.

Visitors to the site will have to provide their own Personal Protective Equipment including steel-toe footwear, hard hats, safety glasses, reflective vests, personal floatation device, hearing protection, and face covering will be required for unvaccinated individuals. Contractors who do not have these items present at the Site Visit may not be able to participate in the visit. There will be the only site visit for this project. If you miss the scheduled site visit, no other arrangements will be made due to personnel and time restrictions.

As stated in 52.236-27, updated in Amendment 0006, Site visits may be arranged during normal duty hours by contacting Esther Proulx at Esther.L.Proulx@usace.army.mil or 906-360-7592

ORGANIZED SITE VISIT REGISTRATION: Only registered persons will be permitted to attend the organized site visit. To register, individuals interested in attending the site visit must submit (1) all planned attendees full name(s),

(2) Company Name, (3) CAGE and/or Unique Entity Identifier number, (4) primary point-of-contact’s (a) name, (b) position title, (c) telephone number, and (d) email address. The above information shall be submitted via email to Esther Proulx (Esther.L.Proulx@usace.army.mil) no later than 5:00 PM Eastern on July 8, 2021

GEOTECH CORE VIEWING: The Government is providing an opportunity for the contractors to view the geotechnical cores collected in the vicinity of the New Lock construction. Due to space limitations, no more than 2 contractor representatives will be permitted to attend, no exceptions. Due to time constraints, viewings will be scheduled for 30 minutes. Viewing can be schedule between 8:00 AM to 11:30 AM ET on July 13, 2021 and between 1:00 PM to 5:00 PM ET on July 14, 2021. Face coverings will be required for unvaccinated individuals.

GEOTECH CORE REGISTRATION: To schedule an individual meeting with USACE, Contact Esther Proulx via email (Esther.L.Proulx@usace.army.mil) by 5:00PM Eastern on 6 July 2021. Please provide (1) Company Name,

(2) CAGE and/or Unique Entity Identifier number, (3) primary point-of-contact’s (a) name, (b) position title, (c) telephone number, and (d) email address. You will receive an email confirmation with your scheduled meeting time no later than 5:00 PM on 8 July 2021.

1.8 OFFEROR'S QUESTIONS AND COMMENTS

Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet.

Offerors shall submit their proposals in accordance with the provisions stated in the solicitation.

To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system.

The Solicitation Number is: W911XK21R0001

The Bidder Inquiry Key is: E9EZI9-WW7UCU

Specific Instructions for ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Select Continue. A page will then open asking you to enter the answer to your Secret Question.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

From this page you may view all bidder inquiries or add an inquiry.

Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

NOTES:

1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.

2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment.

Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.

3. Questions can be submitted for this solicitation until noon (local time) on October 28, 2021.

The following have been modified:

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Fixed Price with Economic Price Adjustment contract resulting from this solicitation.

(End of provision)

The following have been deleted:

INSTRUCTIONS TO OFFERORS

SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS

The following have been added by full text:

PROPOSAL CONTENT & EVALUATION

A. BASIS FOR AWARD

The award will be made based on the best overall (i.e., best value) proposal that is determined to be the most beneficial to the Government. The proposals that will be required to be submitted and evaluated is Technical Management, Technical Approach, Past Performance, Small Business Participation Proposal and Price. The proposals will be evaluated as described in Subsection C, Evaluation Approach and Proposal Submission.

B. FACTORS TO BE EVALUATED

The following evaluation factors will be used to evaluate each proposal: Award will be made to the Offeror whose proposal is most advantageous to the Government based upon an integrated assessment of the evaluation factors described below.

Factor I: Technical Management: Each Offeror’s technical management will be reviewed to determine the risk associated with the team, the quality control measures and the safety program along with the structure of the organization.

Factor II: Technical Approach: Each Offeror’s technical approach will be reviewed to determine a clear understanding of key technical complexities and constraints of the requirement, including schedule, site plan, concrete work, and water diversion, and how that Offeror intends on managing those during contract performance.

Factor III: Past Performance: Each Offeror’s past performance will be evaluated to determine the level of confidence the Government has in the Offeror completing the solicited work.

Factor IV: Small Business Participation Plan: Each Offeror’s proposal will be evaluated to ensure proper utilization of small business concerns during the course of contract performance

Factor V: Price: The resulting award will be a FFP contract. Price reasonableness will be utilized in the evaluation of the FFP effort.

A detailed explanation of the criteria for the evaluation is set forth in the “Evaluation Approach”, Paragraph C of this section. During evaluations of each proposal, the Government will assign each offeror’s past performance and technical factors an adjectival rating and write a narrative evaluation reflecting the identified findings. Small Business Participation Plan will be evaluated as acceptable or unacceptable.

C. EVALUATION APPROACH AND PROPOSAL SUBMISSION

PROCEDURES FOR SUBMITTAL OF OFFERS AND PROPOSAL EVALUATION CRITERIA

1. Overview.

1.1 The intent of this solicitation is to select one (1) contractor for the construction of the New 3rd Soo Lock located in Sault Ste. Marie, Michigan. The basis of award is the Best Value Tradeoff (BVTO) Request for Proposal (RFP) Process. The Government will evaluate the proposals in accordance with the criteria described herein. The Contracting Officer will award one (1) firm fixed price construction contract to the responsible offeror whom the Source Selection Authority (SSA) determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, all factors considered. The Government reserves the right to accept other than the lowest priced offer or to reject all offers.

1.2 Request for Proposal (RFP) Procurement Process: The acquisition approach for this project will be a Best Value RFP following FAR Part 15. The initial solicitation will include a draft bid schedule (for information purposes) draft (95% completed) Plans and Specifications. During the solicitation period, an amendment will be issued that will consist of the final bid schedule, the 100% certified Plans and Specification.

2. Submittal of offers.

2.1 Offerors submitting proposals for this project will be encouraged to limit submissions to data essential for evaluation of proposals. However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the Offeror's technical management, technical approach, past performance, and small business participation plan necessary for successful completion of the project.

Requirements stated in this RFP are minimums. Innovative, creative or cost-saving proposals that meet or exceed the requirements are encouraged and will be rated accordingly.

2.2 The Offerors will be required to submit their proposal electronically to Detroit District. The RFP will provide proposal submission instructions and receipt date for proposal submittal. The Offeror’s proposal shall not contain classified data. For the purposes of establishing whether a proposal submission is considered timely, the Government considers the date and time the submission is completely uploaded into the SAFE website. The Government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive proposals. Offerors will be responsible for ensuring that proposals are submitted so as to reach the designated recipient. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided. The Government shall not reimburse any costs related to proposal preparation.

NOTE: The only authorized transmission method for proposals in response to this solicitation is electronically via SAFE online submission. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.

The Offeror’s proposal must be received by the Government by the date/time specified in the solicitation.

Offerors shall email their proposals through the DoD SAFE site using the following link:

https://safe.apps.mil/

Please send proposals using the link above to Contract Specialist, Sandra M. Kenzie, at Sandra.M.Kenzie@usace.army.mil, Contracting Officer Travis Specht at Travis.J.Specht@usace.army.mil AND to LRE-Proposal@usace.army.mil. Only proposals submitted via the above link will be considered for award.

INSTRUCTIONS FOR SUBMITTING ELECTRONIC PROPOSALS:

Submission shall be in Adobe PDF format. You are limited to twenty-five (25) maximum files per upload (total size cannot exceed 8GB). If you have a large number of files, recommend that you combine or ZIP your files before uploading to the SAFE site. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

REQUEST FOR UPLOAD CODE: Offerors must email Contract Specialist, Sandra M. Kenzie, at Sandra.M.Kenzie@usace.army.mil, Contracting Officer Travis Specht at Travis.J.Specht@usace.army.mil AND to LRE-Proposal@usace.army.mil no later than five (5) working days prior to the proposal due date to receive a request code which will allow for file uploads via the SAFE site. Offerors that fail to email for request a code five (5) working days before proposal submission date may not be able to receive a request code in time to upload their submission. THIS MUST BE DONE FOR THIS PROCUREMENT.

FILE DESCRIPTION: Include a “File Description” for each file(s) you upload. The “File Description” will be included in the email notice to each of the recipients you choose to have access your file(s). NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII)) in the File Description.)

INSTRUCTIONS TO FOLLOW ON THE SAFE WEBSITE:

Once at the SAFE website select the “Drop-off” icon. This allows users without a Common Access Card (CAC) or users whose computer is not configured to read a CAC the option to access the SAFE site as a guest.

After selecting the “Click Here” link you will be prompted to add your personal information, file information, recipient (Government representative) information and email settings.

When completing your file information for transmittal via the SAFE website, you will be required to enter the email address for all recipients. For this solicitation, the recipients are the Contract Specialist, Sandra M. Kenzie, at Sandra.M.Kenzie@usace.army.mil, Contracting Officer Travis Specht at Travis.J.Specht@usace.army.mil AND to LRE-Proposal@usace.army.mil. The email address of the government employee who initiated the request code will be automatically entered. The Offeror must enter the email address for both the Contract Specialist and the Contracting Group Email. The Offeror can enter an additional email address if desired. After entering the email address, click the ADD button to add the person(s) email to the “Recipients List” of your response. When your proposal is submitted, a notification will be sent to the recipients you added.

NOTE: Do NOT send the SAFE site packages to group email accounts.

Even if you successfully upload your proposal to the SAFE site, notification will not be sent to the government recipients until you verify your email address. Entering an incorrect email may result in the rejection of your submission for lateness. An Offeror can confirm proper submission by the ‘Drop-Off Completed” screen which generates based on proper file submission.

NOTE: It has been reported that documents are more quickly uploaded into the SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Offerors will have more success utilizing any particular browser.

RECEIPT OF SUBMISSIONS:

For the purposes of establishing whether a proposal submission is considered timely, the Government considers the date and time the submission is completely uploaded into the SAFE website. For proposals larger than the 8GB capacity of the SAFE website and require multiple submissions, the Government will consider the date and time the last submission is completely uploaded into the SAFE website. Do not assume that electronic communication is instantaneous. It can take several minutes or, in some cases, hours.

The Government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive proposals. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided. The Government shall not reimburse any costs related to proposal preparation.

2.3 The Detroit District will allow the proposals for all Factors to be submitted on the proposal due date.

If a contractor had previous provided a proposal prior to the Detroit District issuing amendment 0009 and that proposal is still valid, the contractor will not be required to resubmit a revised proposal. All proposal materials, submitted via the SAFE website, will be required to conform to the solicitation requirements.

2.4 Unless previously submitted, the final proposal submissions must include the following:

Volume I – Factor I – Technical Management Volume I – Factor II – Technical Approach Volume I – Factor III – Past Performance Volume I – Factor IV – Small Business Participation Plan Volume II – Tab A – Standard Form 1442, Acknowledged Amendments, Final Breakout

Pricing Schedule, Economic Price Adjustment Clause – Unit Price Table and Bid Bond Volume II – Tab B- Joint Venture Agreements Volume II – Tab D – Pre-Award Information Volume II – Tab C- Evidence of Ability to Obtain Performance and Payment Bonds and

Proof of Financial Capability Volume II – Tab E – Small Business Subcontracting Plan

3. Proposal Evaluation Process.

3.1. A Source Selection Evaluation Board (SSEB) consisting of representatives of the Corps of Engineers, User/Customer, and other required personnel, will evaluate and rate the proposals in strict confidence. The proposals of the non-price factors (technical, past performance and small business participation) will be reviewed and rated without knowledge of the price offered. The number and identities of Offerors are not revealed to anyone who is not involved in the evaluation and award process or to other Offerors. Proposals will be evaluated based on the factors described herein, and the basis of award is the Best Value Tradeoff Process.

3.2 The evaluation process essentially consists of four (4) parts: proposal compliance review and responsibility determination, non-price factors evaluation, price evaluation, and cost/technical trade-off analysis.

3.2.1 Proposal Compliance Review: This is an initial review to ensure that all required forms and certifications are complete and that both a technical and proposal were received.

3.2.2 Technical Evaluation: The SSEB will evaluate and rate the technical proposals (technical management and approach) against the RFP requirements. The technical will be rated using the combined technical/risk rating adjectival-based system as defined below.

3.2.3 Past Performance Evaluation: The SSEB will evaluate and rate relevancy and confidence of the Past Performance using the definitions that are described in the two tables below.

3.2.4 Small Business Participation Evaluation: The Small Business Participation Proposal, which will be submitted as part of the Stagger Two Proposal, will be evaluated by the SSEB with assistance from advisors in Contracting and the Detroit District’s Small Business Deputy and will be evaluated using an acceptable/unacceptable rating.

3.2.5 Price Evaluation: The SSEB, Cost Engineering, and Contracting Officer/SSA will evaluate price proposals independent of the technical/quality evaluation in accordance with FAR 15.305. The Price Proposal must include the Unit Price Table included in the Economic Price Adjustment (EPA) Clause. Prices will be evaluated inclusive of the maximum 25% increase in commodity costs based on an application of unit price to estimated quantities that are included in the EPA Unit Price Table. The Government may use any price evaluation techniques identified in FAR Part 15 determined to be appropriate. The SSEB will not have access to price information until completion of the technical/quality and past performance evaluation.

3.2.6 Best Value Decision: After all of the above evaluations are complete, the SSA will compare the strengths, weaknesses, and the cost/price of the competing proposals to determine which proposal represents the best value to the Government.

4. Proposal Information and Related Evaluation Factors.

4.1 Relative Importance of Factors: Small Business is evaluated on an Acceptable/Unacceptable basis while Technical Management, Technical Approach and Past Performance are each equal to each other. All Evaluation Factors other than price, when combined, are considered approximately equal to cost or price. Offerors will be reminded to include their best proposals in their initial offers since the Government intends to make award of a conforming proposal without discussions.

4.2 Volume I – Non-Price Proposal

4.2.1 Volume I – Factor I Technical Management

4.2.2 Volume I – Factor II Technical Approach

4.2.3 Volume I – Factor III – Past Performance

4.2.4 Volume I – Factor IV – Small Business Participation Plan

4.3. Volume II – Price and Pro Forma Information

Tab A Standard Form 1442, Acknowledge Amendments, Not Rated Pricing Schedule, Unit Price Table from EPA Clause, and Proposal Data Sheet Tab B Joint Venture Agreement, if applicable Not Rated Tab C Evidence to Obtain Bonding and Proof of Financial Not Rated Capability Tab D Pre-Award Information Not Rated Tab E Small Business Subcontracting Plan Acceptable/Unacceptable

4.4 NOTE: Offeror is responsible for ensuring the SAFE site documents submitted are consistent throughout the proposal.

4.5 Ratings

Evaluators will apply the adjectival rating for the definition that most closely matches the evaluation.

Combined Technical/Risk Rating Color Rating Description

Blue Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.

Purple Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.

Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Red Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable

Past Performance Confidence Assessments Rating Definition

Substantial Confidence Based on the offerors recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence Based on the Offerors recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Neutral Confidence

No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.

Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

No Confidence Based on the Offerors recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.

Past Performance Relevancy Ratings

Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

Small Business Participation Plan Ratings

Acceptable

Proposal indicates an adequate approach and understanding of small business objectives.

Unacceptable Proposal does not meet small business objectives.

4.6 Definitions

1. Adverse Past Performance. Past performance information that supports a less than satisfactory rating from sources where the information is from other than formal rating systems such as “CPARS” or

“FAPIIS.”

2. Clarification. Limited exchanges between the Government and Offerors that may occur when award without discussions is contemplated. See FAR 15.306(a)(1).

3. Communications. Exchanges, between the Government and Offerors, after receipt of proposals, leading to establishment of the competitive range.

4. Competitive Range. Based on the ratings of each proposal against all evaluation criteria, the contracting officer shall establish a competitive range comprised of all of the most highly rated proposals, unless the range is reduced for purposes of efficiency. See FAR 15.306(c)

5. Deficiency. A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.

6. Discussions. Negotiations conducted in a competitive acquisition. Discussions take place after establishment of the competitive range.

7. Evaluation Notice (EN). A written notification to the Offeror for purposes of clarifications, communications, or in support of discussions.

8. Performance Confidence Assessment. An evaluation of the likelihood (or Government’s confidence) that the Offeror will successfully perform the solicitation’s requirements; the evaluation is based upon past performance information.

9. Recency. As it pertains to Past Performance information, is a measure of the time that has elapsed since the past performance reference occurred. Recency is generally expressed as a time period during which past performance references are considered relevant.

10. Relevancy. As it pertains to Past Performance information, is a measure of the extent of similarity between the service/support effort, complexity, dollar value, contract type, and subcontract/teaming or other comparable attributes of past performance examples and the source solicitation requirements; and a measure of the likelihood that the past performance is an indicator of future performance.

11. Risk. As it pertains to source selection, is the potential for unsuccessful contract performance. The consideration of risk assesses the degree to which an Offeror’s proposed approach to achieving the technical factor may involve risk of disruption of schedule, increased cost of degradation of performance, the need for increased Government oversight, and the likelihood of unsuccessful contract performance.

12. Significant Weakness. A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.

13. Strength. An aspect of an Offerors’ proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

14. Uncertainty. Any aspect of a non-cost/price factor proposal for which the intent of the Offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission or mistake).

15. Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance. See

FAR 15.001.

5.0 Volume I – Factor I – Technical Management

5.1 Submission Requirements:

There is a combined page limit for Factors I and II of fifty (50) single sided, 8.5” x 11” pages (except when other page sizes are specified), using a minimum font size of 11 and a minimum margin of one-half inch on all sides for the Technical factors. Drawings, sketches, charts or tables do not count in the 50-page count.

50 pages is the total limitation for both factors and information provided after the fiftieth page will not be considered for evaluation.

5.1.1 MANAGEMENT TEAM: Describe in detail how the contractor’s management team will be structured and the approach to working multiple areas and shifts. Provide an organization chart of the key personnel (as a minimum) to include Project Manager, Superintendent, CQC Systems Manager, Site Safety Health Officer as defined in the specifications. The organization chart shall also include the Quality Control and Safety Teams including their relationship and reporting within the overall organization. The chart can be provided on a 11” X 17” size paper and will not be counted with the combined page limit.

Contractor should also provide here any agreements or procedures in place to ensure an adequate labor force, if any (project labor agreements, existing available labor pools, etc…).

5.1.2 QUALITY CONTROL: Describe your ability to control quality throughout the construction process including testing and inspection. Provide an overview of your plan for quality control during this project.

At a minimum this overview shall include:

• A narrative explaining the testing and inspection process utilizing three-phase inspection system

• Concrete testing

5.1.3 SAFETY: Describe how you will manage your on-site safety program for this project. Provide an overview of your plan for the safety program during this project. At a minimum this overview shall include:

• An explanation of how high hazard activities will be completed in a safe manner. This narrative shall encompass both the Contractor Work Limit (CWL) and Limited Work Limit (LWL). At a minimum the high hazards to be addressed will include:

o Electrical o Diving o Load handling o Fall protection o Blasting o Confined Space o Concrete Delivery o Adverse Weather (EM 385-1-1 section 06.J.04 and section B)

5.2 Evaluation Criteria:

5.2.1 The contractor’s management team will be evaluated on its structure and approach to meet project requirements. The organization chart will be evaluated on project requirements and relationship to other entities within the management team. Organizational charts must demonstrate clear and effective lines of internal and external communication and authority among key personnel and subcontractors. Offerors who propose a work approach/shift work that demonstrate a strong likelihood for overcoming the environmental/geographic constraints associated with the work site, including space and weather limitations, may receive additional consideration. Offers that include a thorough approach to ensuring a consistent and stable labor force may also receive additional consideration.

5.2.2 The offeror’s quality control plan will be evaluated on the ability to control quality throughout construction and understanding of the quality control requirements for the project. Proposals must demonstrate an understanding of the three-phase inspection system. Offerors that demonstrate past experience with the three-phase inspection system may receive additional consideration.

5.2.3 The offeror’s safety plan will be evaluated based on overall approach and proposed implementation of the safety program. Offerors that demonstrate past experience in the use of EM-385-1-1 may also receive additional consideration.

6.0 Volume I – Factor II – Technical Approach

6.1 Submission Requirements:

There is a combined page limit for Factors I and II of fifty (50) single sided, 8.5” x 11” pages (except when other page sizes are specified), using a minimum font size of 11 and a minimum margin of one-half inch on all sides for the Technical factors. Drawings, sketches, or tables do not count in the 50-page count. 50 pages is the total limitation for both factors and information provided after the fiftieth page will not be considered for evaluation.

6.1.1 SCHEDULE: Provide a brief narrative (maximum 5 pages) that describes your ability to create, implement and maintain a project schedule. Offeror must demonstrate the capability and flexibility to plan and schedule the complete project to meet the proposed contract completion period. Clearly identify any constraints on the schedule presented (e.g.: labor or material, weather, etc.) .

Provide a schedule for this project that consists of a Gantt chart on a single American National Standard Institute (ANSI) D sheet. Font size shall be a minimum of 8 and legible. The proposed schedule shall include all major milestones as listed below and must provide a logical, reasonable, and well thought out plan on how to execute the project within that schedule.

The layout of the schedule shall include the following columns on the left side of the Gantt Chart:

• Activity ID

• Activity Name

• Original Duration

• Total Float

The schedule shall be task oriented, indicating the number of calendar days after Notice to Proceed (NTP), that each milestone will be achieved. Offeror shall clearly show/highlight the critical path and the schedules shall be graphically represented. The proposed project schedule shall reflect the proposed contract duration. The proposed schedule shall include at least 75 activities and should not include more than 150 activities. The schedule must, at a minimum, include the following construction activities and milestones. When considering options assume the latest date for exercising of that option listed in the Contract (reference specifically clause 52.217-7 (Option For Increased Quantity)) . (dates below are provided for planning purposes and do not necessary reflect contractual requirements):

• Contract Award Date (28 Feb 2022)

• Notice To Proceed - Base (21 Mar 2022)

• Options (See 52.217-7)

• Pre-Construction Submittals

• Mobilization

• Start and completion of Shaft 6

• Start and Completion of Unit 10 Relocation

• Start and Completion of NPP Bridge

• Damming Surface Complete

• Start of Dewatering Sabin and Davis Locks

• New Pumpwell Operational

• In the Dry Commissioning

• Lock Chamber Operational (ready to receive vessels)

• Demobilization

• Construction Completion Date

6.1.2 SITE CONSTRAINTS: Describe your approach for accessing the work site with personnel, equipment, materials, etc. Address any constraints such as existing Contractors on-site, security, and crossing two active

Locks (Poe and MacArthur). If the approach includes transportation over water, describe access during the harsh winter months when ice is on the St. Mary’s River. In addition, describe your proposed utilization of the site to accomplish the work. Include proposed office facilities, carpenter shop, equipment maintenance shop, form and miscellaneous metals laydown area, employee parking, batch plant and any other proposed plant and facilities. Provide a site plan drawing (22”x34”maximum).

6.1.3 CONCRETE: Describe how concrete production and delivery will be developed and implemented in order to meet the project schedule. Proposals shall, at a minimum, address aggregate delivery and handling, batch plant location, method of delivery (to include rational for selection of delivery method), and any measures for hot and cold weather placement. Offerors should include a description of any past experience with mass concrete production and placement.

6.1.4 DIVERSION AND CARE OF WATER: Describe the plan for diversion and care of water.

• The Offeror shall describe the details of how water will be controlled from the following sources:

o surface water, o groundwater, o point source (ex. Rock joints), o Lock Drainage Tunnels – Poe, MacArthur, Crossover, Sabin, Davis o Pumpwell Discharge Pipes

• These details shall include how the Contractor intends to discharge controlled and contained water into the St.

Mary’s River. Ensure that the narrative includes how water will be controlled during the winter.

6.2 Evaluation Criteria:

6.2.1 The schedule will be evaluated based on the understanding of contract requirements, work site geography, and events identified in paragraph 6.1.1 above and the offeror’s capability to complete the schedule within the contract duration as well as the Offeror’s consideration for seasonal/weather limitations. The schedule must also show reasonable and logical relationship between activities. The SSEB will evaluate the offeror’s schedule using calendar days, not dates.

6.2.2 The offeror’s site plan drawing will be evaluated based on the level of understanding of requirements to complete the work, site organization, conditions and constraints, and workflow. Novel or innovative approaches to bypass or mitigate site constraints may be a basis for additional consideration.

6.2.3 Concrete will be evaluated based on the level of understanding of contract requirements and overall approach concerning producing, delivering, and placing concrete. Demonstrated past experience with mass concrete may receive additional consideration.

6.2.4 Diversion and Care of Water will be evaluated on the overall approach to control water throughout the construction of the project, including adjustments based on fluctuating seasonal and site conditions as well as the interaction of various excavation and placement activities as well as contract requirements for discharge of water into the St. Mary’s river. Plans that demonstrate methodologies to minimize the amount of water requiring diversion may receive additional consideration. Additionally, plans that identify means to minimize discharge and/or environmental impact of water may receive additional consideration.

7.0 Volume I – Factor III – Past Performance

7.1 Submission Requirements:

Each Offeror shall provide descriptions of at least two (2) but no more than five (5), of their past or current construction projects completed, or substantially complete (50% or more), within the last fifteen (15) years (from the solicitation issue date) that are similar to this project in scope. Detailed project information shall be provided using the Project Detail Sheet format described at the end of this section.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .