Attachment_2_-_Plans.pdf
PDF 7 MB Posted
- Attached to
- Locks and Dam Branch Office Paving Federal contract opportunity
- Solicitation number
- W911WN18T8002
About this file
Attachment 2 - Plans
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_1_-_Specifications_.pdf | ||
| Attachment_3_-_Price_Schedule.XLS | XLS spreadsheet | |
| RFQ_W911WN18T8002_-_L&D_Paving.pdf | ||
| Attachment_4_-_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G-0001
®of Engineers
US Army Corps
Pittsburgh District
APPROVED BY:
BRANCH CHIEF
CONSTRUCTION DIVISION
CHIEF, ENGINEERING AND
THEIR EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.
APPEAR ON THESE PROJECT DOCUMENTS WITHIN THE SCOPE OF
DESIGNATIONS OF U.S. ARMY CORPS OF ENGINEERS INDIVIDUALS
THIS SHEET. THE INITIALS OR SIGNATURES AND REGISTRATION
U.S. ARMY CORPS OF ENGINEERS AND THE A/E FIRMS IDENTIFIED ON
THIS PROJECT WAS DESIGNED BY THE PITTSBURGH DISTRICT OF THE
DATE
DATE
SUBMITTED BY:
AND APPROVAL OF ALL DRAWINGS LISTED ON THE INDEX SHEET.
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION
SECTION CHIEF
APPROVAL RECOMMENDED BY:
DATE
B
C R
A T
T Y
C O
V E
R S
H E
E T
NEVILLE ISLAND, ALLEGHENY COUNTY, PA
FY18 PARKING LOT PAVING PROJECT
LOCKS AND DAMS BRANCH OFFICE
PITTSBURGH ENGINEER WAREHOUSE
LOCATION
PROJECT
J .C
W
IL
L
IA
M S
J
R U
S N
A K
/s J
A M
E S T S
H
IB
A T
A P .E
CERTIFIED FINAL DOCUMENTS
ISSUE DATE: MARCH 2018
CONTRACT NO.: W911WN-XX-X-XXXX
SOLICITATION NO.: W911WN-18-T-8002
M A
R C
H
13 MAR 2018
15 MAR 2018
15 MAR 2018
/s/ STEPHEN R. STOLTZ, P.E.
/s/ JAMES T. SHIBATA, P.E.
/s/ JEFFREY E. FRITZ, P.E.
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G
H4TSDBAC
P E
W L
D B
O
G -0
.d g n
-M
A Y -2
:3
0.083333:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
W
W N -1
-T -8
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
P
IT
T S
B U
R G
H E
N G
IN
E E
R W
A R
E H
O U
S E
L O
C K
S A
N D D
A M B
R A
N C
H O
F F
IC
E
F Y P
A R
K
IN
G L
O T P
A V
IN
G P
R O J E
C T
N E
V
IL
L E I S
L A
N
CERTIFIED FINAL DOCUMENTS
G-0002
B
C R
A T
J .C
W
IL
L
IA
M S
P R
O J E
C T L
O C
A T
IO
N M
A P A
N D
G E
N E
R A
L S
IT
E P
L A
N S
H E
E T
PROJECT LOCATION MAP
NTS
LOCATION
PROJECT
ICE BREAKERS
N
FLOW
OHIO RIVER (MAIN CHANNEL)
DOCK FRONT
CORPS PROPERTY
AND WAREHOUSE)
(REPAIR SHOP
BUILDING NO. 4
BRANCH OFFICE
LOCKS AND DAMS
OFFICE
ENGINEER
RESIDENT
GENERAL SITE PLAN
NTS
BUILDING
SECURITY
BUILDING
UNOCCUPIED
HELIPAD
J
R U
S N
A K
WORK AREA
/s J
A M
E S T S
H
IB
A T
A P .E
M A
R C
H
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G
H4TSDBAC
P E
W L
D B
O
G -0
.d g n
-M
A Y -2
:3
1.000002:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
W
W N -1
-T -8
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
P
IT
T S
B U
R G
H E
N G
IN
E E
R W
A R
E H
O U
S E
L O
C K
S A
N D D
A M B
R A
N C
H O
F F
IC
E
F Y P
A R
K
IN
G L
O T P
A V
IN
G P
R O J E
C T
N E
V
IL
L E I S
L A
N
CERTIFIED FINAL DOCUMENTS
G-0003
C R
A T
R
A W
IN
G I
N D
E X
A B
B R
E V
IA
T
IO
N S A
N D
L E
G E
N D S
H E
E
Date:
POCS Serial NO.:
PENNSYLVANIA ONE CALL SYSTEM, INC.
www.pa1call.org
1-800-242-1776 or 811
CALL 3 BUSINESS DAYS BEFORE YOU DIG!
J .C
W
IL
L
IA
M S
ABBREVIATIONS
UNITED STATES ARMY CORPS OF ENGINEERSUSACE
TYPICALTYP
SQUARE YARDSY
POLYVINYL CHLORIDE PIPEPVC
NOT TO SCALENTS, N.T.S.
MISCELLANEOUSMISC
MINIMUMMIN
MAXIMUMMAX
LOCKS AND DAMSL/D
GALLONGAL
EQUIPMENTEQPT
DIAMETERDIM
CENTERLINECL
GENERAL NOTES
REPRESENT EXISTING FEATURES.
1. ITEMS CALLED OUT IN ITALICS AND/OR DISPLAYED IN GRAYSCALE
DRAWINGSCONTRACT
NAMEFILE
NO.
ID
SHEET
TITLEDRAWING
GENERAL
PEW_LDBO_100_G-0001 G-0001 SHEETCOVER
PEW_LDBO_203_G-0002 G-0002 MAPS VICINITY AND LOCATIONPROJECT
PEW_LDBO_100_G-0003 G-0003 SHEET LEGEND AND ABBREVIATIONS INDEX,DRAWING
CIVIL
PEW_LDBO_668_C-1001 C-1001 PLAN PREPARATION SITE ANDDEMOLITION
PEW_LDBO_668_C-1002 C-1002 PLAN IMPROVEMENTS SITEPROPOSED
PEW_LDBO_668_C-5003 C-5003 SHEET DETAILSPAVING
J
R U
S N
A K
/s J
A M
E S T S
H
IB
A T
A P .E
M A
R C
H
CONCRETECONC
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G
H4TSDBAC
P E
W L
D B
O
G -0
.d g n
-M
A Y -2
:3
1.000002:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
W
W N -1
-T -8
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
P
IT
T S
B U
R G
H E
N G
IN
E E
R W
A R
E H
O U
S E
L O
C K
S A
N D D
A M B
R A
N C
H O
F F
IC
E
F Y P
A R
K
IN
G L
O T P
A V
IN
G P
R O J E
C T
N E
V
IL
L E I S
L A
N D
CERTIFIED FINAL DOCUMENTS
WV
CONTRACTOR WORK LIMITS
FENCE (EXISTING)
GUIDE RAIL (EXISTING)
UTILITY POLE (EXISTING)
WATER SUPPLY VALVE (EXISTING)
POLE-MOUNTED LIGHT (EXISTING)
CONTRACTOR LAYDOWN AREA LIMITS
TREES/SHRUBS (EXISTING)
CONCRETE JERSEY BARRIER (EXISTING)
PIPE BOLLARD (EXISTING)
AREA (SHEET C-1001)
EXISTING ASPHALT REMOVAL
AREA (SHEET C-1001)
EXISTING CONCRETE REMOVAL
LEGEND
LIMITS OF SITE PREPARATION (BID OPTION ITEMS)
LIMITS OF SITE PREPARATION (BASE BID ITEMS)
(SHEET C-1002)
NEW ASPHALT PAVEMENT AREA (BASE BID ITEMS)
(SHEET C-1002)
NEW GRAVEL SURFACE AREA (BASE BID ITEMS)
(SHEET C-1002)
NEW ASPHALT PAVEMENT AREA (BID OPTION ITEMS)
(SHEET C-1002)
NEW GRAVEL SURFACE AREA (BID OPTION ITEMS)
A GRADING REFERENCE POINT (SHEET C-1002)
5' -0
WV
WVWV
GRAVEL
GRAVEL
CONC
POLE
FLAG
S
ID
E W
A L
K
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
CONC
CONCCONC
CONC
(NOT IN USE)
BUILDING
BUILDING
BRANCH OFFICE
LOCKS AND DAMS
BUILDING
SECURITY
(SLIDING)
GATE
ASPHALT SIGN
USACE
ASPHALT
ASPHALT
ASPHALT
ASPHALT
GAS METER
GRAND AVENUE
INLET
BARRIER
JERSEY
CONCRETE
(TYP)
BOLLARD
PIPE
ROLL-UP DOOR
MAIN ENTRANCE
GRASS
CONC
CONC
CONCRETE
GRAVEL
GRAVEL
CONCRETE
ASPHALT
PARKING LOT
ON CONCRETE PAD
HVAC EQUIPMENT
STEP
CONCRETE
E Q
P T
E Q P T
ENTRANCE ROAD
ROAD APRON
ENTRANCE
DRIVEWAY
ACCESS
AREA
PARKING
BOLLARDS
EQUIPMENT
ELECTRICAL
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G
H4TSDBAC
P E
W L
D B
O
C -1
.d g n
-M
A Y -2
:3
20:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
W
W N -1
-T -8
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
P
IT
T S
B U
R G
H E
N G
IN
E E
R W
A R
E H
O U
S E
L O
C K
S A
N D D
A M B
R A
N C
H O
F F
IC
E
F Y P
A R
K
IN
G L
O T P
A V
IN
G P
R O J E
C T
N E
V
IL
L E I S
L A
N D
CERTIFIED FINAL DOCUMENTS
WORK LIMITS
CONTRACTOR
SEE NOTE 11
SEE NOTE 12
SEE NOTE 10
SEE NOTE 9
AREA
LAYDOWN
CONTRACTOR
WORK LIMITS
CONTRACTOR
SEE NOTE 1
B
C R
A T
C-1001
M O
L
IT
IO
N A
N D S
IT
E P
R E
P A
R A
T
IO
N P
L A
N
W
IL
L
IA
M S
DEMOLITION AND SITE PREPARATION NOTES
N
20' 40'0
SCALE: 1"=20'
PLAN - SITE PREPARATION AND DEMOLITION
SCALE: 1" = 20'-0"
SEE NOTE 8
LEGEND SYMBOLS, SEE SHEET G-0003.
1. FOR GENERAL NOTES, A LIST OF ABBREVIATIONS, AND ADDITIONAL
AND 13
SEE NOTES 2
J
R U
S N
A K
/s J
A M
E S T S
H
IB
A T
A P .E
M A
R C
H
(BID OPTION ITEM).
MATERIAL PLACEMENT AND DRAINAGE CONSIDERATIONS
MATERIAL TO A DEPTH OF 4" TO ACCOMMODATE NEW ROAD
13. REMOVE AND DISPOSE OF EXISTING ENTRANCE ROAD
PICNIC TABLE TO ACCOMMODATE CONSTRUCTION.
12. REMOVE, TEMPORARILY STORE, AND RE-INSTALL EXISTING
CONTRACTING OFFICER PRIOR TO REMOVAL.
TO ACCOMMODATE CONSTRUCTION. COORDINATE WITH THE
STRUCTURE AND ROOF DOWNSPOUT PIPING AS NECESSARY
11. REMOVE AND RE-INSTALL EXISTING WOOD FLOWER PLANTER
AROUND WOOD POSTS TO PREVENT WATER INTRUSION.
EXISTING CONCRETE PAD. BITUMINOUSLY SEAL ON AND
10. CUT EXISTING 6"x6" WOOD POSTS FLUSH WITH TOP OF
BACKFILL TO GRADE WITH PENNDOT 2A STONE.
9. REMOVE AND DISPOSE OF EXISTING 6'x9' CONCRETE RAMP.
DEMOLITION.
MINIMUM OF 72 HOURS PRIOR TO PROPOSED CONCRETE SLAB
REPLACEMENT. NOTIFY THE CONTRACTING OFFICER A
DEPTH, CONTRACTOR GRADING PLAN, AND MANHOLE FRAME
SLAB TO ACCOMMODATE PROPOSED ASPHALT SURFACING
8. SAW-CUT AND SELECTIVELY DEMOLISH EXISTING CONCRETE
MATERIAL TO A DEPTH OF 12".
7. REMOVE AND DISPOSE OF EXISTING ENTRANCE APRON
PRIOR TO PROPOSED CLOSING TIME.
WITH THE CONTRACTING OFFICER A MINIMUM OF 72 HOURS
6. COORDINATE PARKING LOT AND ENTRANCE DRIVE CLOSURE
UTILITIES ARE ENCOUNTERED DURING CONSTRUCTION.
IMMEDIATELY NOTIFY THE CONTRACTING OFFICER IF ANY
UTILITIES DURING CONSTRUCTION. CONTRACTOR SHALL
RESPONSIBLE FOR LOCATING AND AVOIDING EXISTING
5. LOCATION OF BURIED UTILITIES IS UNKNOWN. CONTRACTOR IS
SPECIFICATION SECTION 32 11 23.
SITE PREPARATION AREA. PREPARE SUBGRADE AND BASE PER
4. REMOVE AND DISPOSE OF UNSUITABLE BASE MATERIAL WITHIN
MATERIAL WITHIN SITE PREPARATION AREA.
3. REMOVE AND DISPOSE OF EXISTING BITUMINOUS SURFACING
2. LIMITS OF SITE PREPARATION AREA (BID OPTION ITEMS).
1. LIMITS OF SITE PREPARATION AREAS (BASE BID ITEMS).
SEE NOTE 7
CONTRACTOR WORK LIMITS
CONTRACTOR LAYDOWN AREA LIMITS
EXISTING ASPHALT REMOVAL AREA
EXISTING CONCRETE REMOVAL AREA
LIMITS OF SITE PREPARATION (BASE BID ITEMS)
LIMITS OF SITE PREPARATION (BID OPTION ITEMS)
NOTE
25'
18'±
45'-0"
140'-0"
12'-0"
16'-0"
12'-0"
5' -0
108'-0" 17'-0"
WV
WVWV
E Q
P T
E Q P T
CONC
POLE
FLAG
S
ID
E W
A L
K
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
CONC
CONCCONC
CONC
(NOT IN USE)
BUILDING
BUILDING
BRANCH OFFICE
LOCKS AND DAMS
BUILDING
SECURITY
(SLIDING)
GATE
ASPHALT SIGN
USACE
ASPHALT
ASPHALT
GAS METER
GRAND AVENUE
INLET
BARRIER
JERSEY
CONCRETE
(TYP)
BOLLARD
PIPE
ROLL-UP DOOR
MAIN ENTRANCE
GRASS
CONC
CONC
GRAVEL
ASPHALT
PARKING LOT
ON CONCRETE PAD
HVAC EQUIPMENT
STEP
CONCRETE
ENTRANCE ROAD
AREA
PARKING
EQUIPMENT
ELECTRICAL
BOLLARDS
DRIVEWAY
ACCESS
BOLLARD
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G
H4TSDBAC
P E
W L
D B
O
C -1
.d g n
-M
A Y -2
:3
20:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
W
W N -1
-T -8
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
P
IT
T S
B U
R G
H E
N G
IN
E E
R W
A R
E H
O U
S E
L O
C K
S A
N D D
A M B
R A
N C
H O
F F
IC
E
F Y P
A R
K
IN
G L
O T P
A V
IN
G P
R O J E
C T
N E
V
IL
L E I S
L A
N D
CERTIFIED FINAL DOCUMENTS
WORK LIMITS
CONTRACTOR
WORK LIMITS
CONTRACTOR
B
C R
A T
C-1002
W
IL
L
IA
M S
N
20' 40'0
SCALE: 1"=20'
PLAN - PROPOSED SITE IMPROVEMENTS
SCALE: 1" = 20'-0"
P R
O P
O S
E D S
IT
E I
M P
R O
V E
M E
N T S P
L A
N
S L
O P
E
SEE NOTE 4
H
GF
I
S
LO
P E
J
SLOPE
SLOPE
S L
O P
E
SEE NOTE 7
C
B E
D
A
SLOPE
SLOPE
.9
G
R A
D E
SEE NOTE 3
SEE NOTE 6
SEE NOTE 5
A C-5003
CONSTRUCTION NOTES
PROPOSED GRADING NOTES
LEGEND SYMBOLS, SEE SHEET G-0003.
1. FOR GENERAL NOTES, A LIST OF ABBREVIATIONS, AND ADDITIONAL
AREA (SEE NOTE 20)
DRAINAGE TRANSITION
SEE NOTE 19
B C-5003
AREA (SEE NOTE 20)
DRAINAGE TRANSITION
SEE NOTE 2
S L O P E
S L O P E
SEE NOTE 13
SEE NOTE 2
.8
G
R A
D E
M
IN
J
R U
S N
A K
SEE NOTE 12
POINT (TYP A THRU J)
GRADING REFERENCE
S L O P E
S L O P E
KEY-IN
PAVEMENT1
C-5003
KEY-IN
PAVEMENT 1
C-5003
C-5003
(SEE NOTE 1)
ROAD APRON
NEW ENTRANCE
/s J
A M
E S T S
H
IB
A T
A P .E
M A
R C
H
13. (BID OPTION ITEM) PLACE AND COMPACT 4" GRAVEL SURFACING (PENNDOT 2A).
FOR ADDITIONAL INFORMATION.
12. (BID OPTION ITEM) PLACE AND COMPACT 4" HOT MIX ASPHALT. SEE SECTION B, SHEET C-5003
TAPERING FROM TOP OF NEW ASPHALT TO BLEND INTO EXISTING GRADE.
OTHERWISE, CONTRACTOR SHALL DRESS SHOULDERS WITH STONE (PENNDOT 2A), SMOOTHLY
11. RESTORE ALL SURFACES DISTURBED DURING CONSTRUCTION. GRASS AREAS SHALL BE SEEDED;
COURSE PER SPECIFICATION SECTION 32 12 13.
ASPHALT; ALSO TACK-COAT THE TOP OF BINDER COURSE PRIOR TO PLACEMENT OF WEARING
10. APPLY TACK-COAT ALONG INTERFACE OF NEW ASPHALT WITH ALL EXISTING CONCRETE AND
OF NEW AGGREGATE AND/OR ASPHALT.
9. PREPARE SUBGRADE AND BASE PER SPECIFICATION SECTION 32 11 23 PRIOR TO PLACEMENT
A MINIMUM OF 72 HOURS PRIOR TO PROPOSED CLOSING TIME.
8. COORDINATE PARKING LOT AND ENTRANCE APRON CLOSING WITH THE CONTRACTING OFFICER
PARKING AREA PAVEMENT.
7. PLACE 6' x 12' ASPHALT EXTENSION FOR DUMPSTER PAD ON PREPARED SURFACE INTEGRAL TO
SITE GRADING.
6. RAISE EXISTING WATER VALVE BOXES (3 EACH) AS NECESSARY TO ACCOMMODATE IMPROVED
ACCOMODATE IMPROVED SITE GRADING. EXISTING MANHOLE FRAME AND LID TO REMAIN.
5. FURNISH AND INSTALL MANHOLE ADJUSTMENT RING (NOMINAL 32" DIA X 2" RISE) TO
HEAVY-DUTY H-20 TRAFFIC-RATED MANHOLE FRAME AND SOLID LID.
4. REMOVE AND DISPOSE OF EXISTING MANHOLE FRAME AND LID. FURNISH AND INSTALL NEW
GRAVEL SURFACING.
3. PLACE AND COMPACT 4" GRAVEL SURFACING (PENNDOT 2A). GRADE TO DRAIN AWAY FROM
INFORMATION. END BASE BID PARKING LOT ASPHALT PAVING AT EXISTING BOLLARD.
2. PLACE AND COMPACT 4" HOT-MIX ASPHALT. SEE SECTION A, SHEET C-5003 FOR ADDITIONAL
SEE DETAIL 2, SHEET C-5003 FOR ADDITIONAL INFORMATION.
1. PLACE AND COMPACT GEOTEXTILE MAT, 6" AGGREGATE BASE COURSE, AND 6" HOT-MIX ASPHALT.
21. FILL UTILIZED UNDER ROAD AND PARKING AREAS SHALL BE PENNDOT 2A STONE.
WATER.
FROM PAVEMENT, ENSURE POSITIVE SITE DRAINAGE, AND MINIMIZE POTENTIAL FOR STANDING
ENTRANCE ROAD CROSS-SECTION SHALL BE ADJUSTED TO SHEET FLOW STORMWATER AWAY
20. DRAINAGE TRANSITION AREAS SHALL BE COORDINATED IN THE FIELD BY THE CONTRACTOR.
ASPHALT DRIVE AT TIE-IN. SLOPE NEW PAVEMENT TO DRAIN TO EXISTING DROP INLET.
19. NEW ENTRANCE APRON TOP OF PAVEMENT ELEVATION SHALL MATCH THAT OF EXISTING
CONCRETE PAD ELEVATIONS.
18. GRADING POINT "I" - MATCH NEW TOP OF PAVEMENT ELEVATION WITH TOP OF EXISTING
ACCOMMODATE REQUIRED SLOPE.
17. GRADING POINTS "D", "E", "F" AND "G" - ADJUST PROPOSED TOP OF PAVEMENT ELEVATION TO
ASPHALT PAVEMENT. GRADE TO ACCOMMODATE INCREASED PAVEMENT DEPTH.
OF PAVEMENT ELEVATION TO TIE FLUSH INTO EXISTING CONCRETE WALK, ACCESS DOORS, AND
16. GRADING POINTS "A" AND "B" - MATCH NEW TOP OF PAVEMENT ELEVATION WITH EXISTING TOP
15. ALL GRADING SHALL DRAIN AWAY FROM EXISTING BUILDINGS.
SLAB REMOVAL AND COMPLETE MEASUREMENTS NECESSARY FOR MANHOLE ADJUSTMENTS.
GRADING PLAN SUBMISSION, CONTRACTOR SHALL INVESTIGATE FEASIBILITY OF CONCRETE
WORKING DAYS PRIOR TO CONSTRUCTION, PER SPECIFICATION SECTION 31 00 00. PRIOR TO
14. SUBMIT A SITE GRADING PLAN TO THE CONTRACTING OFFICER FOR APPROVAL A MINIMUM OF 10
CONTRACTOR WORK LIMITS
NEW ASPHALT PAVEMENT AREA (BASE BID ITEMS)
NEW GRAVEL SURFACE AREA (BASE BID ITEMS)
NEW ASPHALT PAVEMENT AREA (BID OPTION ITEMS)
NEW GRAVEL SURFACE AREA (BID OPTION ITEMS)
A GRADING REFERENCE POINT
NOTE
(TYP)
6"
NEW PAVEMENTEXISTING PAVEMENT (TO REMAIN)
1'-0" 1'-0"
18'-0"
C-5003
C R
A T
P A
V
IN
G D
E T
A
IL
S
H E
W
IL
L
IA
M S
TYPICAL PAVEMENT KEY-IN DETAIL
C-1002 NTS
DETAIL
C-1002 NTS
DETAIL
A
C-1002 NTS
SECTION
ENTRANCE ROAD APRON DETAIL
B
C-1002 NTS
SECTION
NOTES:
2. SECTION B PERTAINS TO A BID OPTION ITEM.
LEGEND SYMBOLS, SEE SHEET G-0003.
1. FOR GENERAL NOTES, A LIST OF ABBREVIATIONS, AND ADDITIONAL
J
R U
S N
A K
/s J
A M
E S T S
H
IB
A T
A P .E
M A
R C
H
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G
H4TSDBAC
P E
W L
D B
O
C -5
.d g n
-M
A Y -2
:3
1.000002:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
W
W N -1
-T -8
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
P
IT
T S
B U
R G
H E
N G
IN
E E
R W
A R
E H
O U
S E
L O
C K
S A
N D D
A M B
R A
N C
H O
F F
IC
E
F Y P
A R
K
IN
G L
O T P
A V
IN
G P
R O J E
C T
N E
V
IL
L E I S
L A
N D
CERTIFIED FINAL DOCUMENTS
SAWCUT EXISTING BITUMINOUS PAVEMENT SEALANT (SEE NOTE 2)
EXISTING ASPHALT
TACK-COAT EDGE OF
PAVEMENT KEY-IN NOTES:
AT A RATE OF 0.25 GAL/SY.
BITUMINOUS LIQUID PAVEMENT SEALANT, 12" WIDE,
2. ALL COLD JOINTS SHALL BE SEALED WITH A HOT
STRUCTURE.
TACK-COATED PRIOR TO PLACEMENT OF NEW ROAD
1. PAVEMENT KEYS SHALL BE SAWCUT, CLEANED AND
GROUND
EXISTING
INLET
DROP
EXISTING
(TYP BOTH SHOULDERS)
WITH PENNDOT 2A
DRESS SHOULDER
DRAIN
EXISTING DROP INLET
SLOPE TO DRAIN TO
PLACING GEOTEXTILE
SUBGRADE PRIOR TO
COMPACT EXISTING
COURSE (PENNDOT 2A)
6" AGGREGATE BASE
GEOTEXTILE
SLOPE
1.00%±
BINDER COURSE (25mm)
4 1/2" BITUMINOUS
WEARING COURSE (9.5mm)
1 1/2" BITUMINOUS
TACK COAT
ENTRANCE ROAD APRON NOTES:
6. EXTEND AGGREGATE BASE COURSE 1'-0" BEYOND PROPOSED EDGE OF PAVEMENT.
UTILIZE PENNDOT 2A AGGREGATE FOR DRESSING GRADING ADJUSTMENTS.
5. GRADE DOWN-SLOPE SHOULDER AND DITCH TO DRAIN TO EXISTING DROP INLET.
4. INSTALL GEOTEXTILE PER SPECIFICATION SECTION 31 05 19.
COURSE PER SPECIFICATION SECTION 32 12 13.
3. APPLY TACK-COAT TO TOP OF BINDER COURSE PRIOR TO PLACEMENT OF WEARING
2. PREPARE SUBGRADE PER SPECIFICATION SECTION 32 11 23.
1. REMOVE AND DISPOSE OF EXISTING ROAD MATERIAL DOWN TO A DEPTH OF 12".
LC DRIVEWAY
SLOPE
2.00%±
SLOPE
2.00%±
BUILDING
EXISTING
FACE OF
MANHOLE
SEPARATOR
EXISTING GRIT
6" PVC
WEARING COURSE (9.5mm)
1 1/2" BITUMINOUS
BINDER COURSE (19.0mm)
2 1/2" BITUMINOUS
SUBGRADE
COMPACTED
GRADE TO DRAIN
F G
H
POINT (TYP)
REFERENCE
GRADING
SEE NOTE 2
GROUND
EXISTING
MANHOLE FRAME AND LID
REMOVE AND REPLACE
AND EXISTING BUILDING
PROPOSED PAVEMENT
SEAL INTERFACE OF
TACK COAT
PARKING AREA PAVING NOTES:
SPECIFICATION SECTION 32 12 13.
4. APPLY TACK-COAT TO TOP OF BINDER COURSE PRIOR TO PLACEMENT OF WEARING COURSE PER
3. PREPARE SUBGRADE PER SPECIFICATION SECTION 32 11 23.
2. BOTTOM OF PROPOSED BINDER COURSE SHALL BE ABOVE CONCRETE MANHOLE STRUCTURE.
ON THIS SECTIONAL VIEW.
SHALL INCLUDE PROPOSED RELATIVE ELEVATIONS OF GRADING REFERENCE POINTS INDICATED
1. A GRADING PLAN SHALL BE SUBMITTED PER SPECIFICATION SECTION 31 00 00. GRADING PLAN
GROUND
EXISTING
SLOPE
2.00%±
BINDER COURSE (19mm)
2 1/2" BITUMINOUS
WEARING COURSE (9.5mm)
1 1/2" BITUMINOUS
COMPACTED SUBGRADE
(TYP BOTH SHOULDERS)
STONE TO ACCOMODATE DRAINAGE
DRESS SHOULDER WITH PENNDOT 2A
TACK COAT
ENTRANCE ROAD PAVING NOTES:
WEARING COURSE PER SPECIFICATION SECTION 32 12 13.
3. APPLY TACK-COAT TO TOP OF BINDER COURSE PRIOR TO PLACEMENT OF
2. PREPARE SUBGRADE PER SPECIFICATION SECTION 32 11 23.
1. REMOVE SUFFICIENT ROAD MATERIAL TO ACCOMODATE NEW PAVEMENT DEPTH.
| G-0001 |
| G-0002 |
| G-0003 |
| C-1001 |
| C-1002 |
| C-5003 |
File details come from the government source that posted it.