Drawings.pdf
PDF 18 MB Posted
- Attached to
- Berlin Waterline Replacement - Elevated Water Storage Tank Federal contract opportunity
- Solicitation number
- W911WN18T8001
About this file
Drawings - Berlin Waterline Replacement
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Specification_Revision_to_Section_26_20_00_Amend_1.pdf | ||
| W911WN18T8001_0001_-_Berlin_Waterline_Repair.pdf | ||
| W911WN18T8001_-_Berlin_Waterline_Repair.pdf | ||
| Specifications.pdf | ||
| Wage_Rates.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G-0035
C O
V E
R S
H E
E T
J L
O W
E
E L E
IS
U R
E
C L
IC
H T
Y
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
of Engineers
US Army Corps
AND APPROVAL OF ALL DRAWINGS LISTED ON THE INDEX SHEET.
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION
SUBMITTED BY:
SECTION CHIEF
APPROVAL RECOMMENDED BY:
BRANCH CHIEF
APPROVED BY:
CONSTRUCTION DIVISION
CHIEF, ENGINEERING AND
DATE
DATE
DATE
THEIR EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.
APPEAR ON THESE PROJECT DOCUMENTS WITHIN THE SCOPE OF
DESIGNATIONS OF U.S. ARMY CORPS OF ENGINEERS INDIVIDUALS
THIS SHEET. THE INITIALS OR SIGNATURES AND REGISTRATION
U.S. ARMY CORPS OF ENGINEERS AND THE A/E FIRMS IDENTIFIED ON
THIS PROJECT WAS DESIGNED BY THE PITTSBURGH DISTRICT OF THE
Pittsburgh District
BEAVER RIVER BASIN
BERLIN LAKE RESERVOIR
MARCH 2018
MILL CREEK WATERLINE REPLACEMENT
ELEVATED WATER STORAGE TANK
MAHONING COUNTY, OHIO
CERTIFIED FINAL DOCUMENTS
W911WN18T8001
28 MARCH 2018
28 MARCH 2018
28 MARCH 2018
M
A R
C H
/s T
H O
M A
S E
A N
D R
E P .E
/s/ JEFF E. FRITZ, P.E.
/s/ STEPHEN R. STOLTZ, P.E.
/s/ THOMAS E. ANDRE, P.E.
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G h4ecnerl
B O b
G -0
.d g n
-M
A R -2
:0
0.083333:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S I
D
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
B E
A V
E R R
IV
E R B
A S
IN
B E
R L
IN
L
A K
E R
E S
E R
V O
IR
M
IL
L C
R E
E K W
A T
E R
L
IN
E R
E P
L A
C E
M E
N T
E L E
V A
T E
D W
A T
E R S
T O
R A
G E T
A N
K
CERTIFIED FINAL DOCUMENTS
W
W N
T
G-0036
L
O W
E
E L E
IS
U R
E
C L
IC
H T
Y
A B
B R
E V
IA
T
IO
N S S
Y M
B O
L S
A N
D G
E N
E R
A L N
O T
E S
C O
N T
R A
C T R
E F
E R
E N
C E D
R A
W
IN
G S I
N D
E X
E S
ABBREVIATIONS
LC
SYMBOLS:
PLUS/MINUS±
DIAMETER
CENTERLINE
VALVE VAULT.
EXISTING PIPING TO PREVENT SEPERATION OF WATERLINE OUTSIDE THE
MODIFICATIONS WITHIN VALVE PIT THE CONTRACTOR SHALL RESTRAIN
IF DISTRIBUTION SYSTEM IS UNDER PRESSURE DURING PIPING5.
ELECTRICAL CODE.
ALL ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH THE NATIONAL4.
AND EQUAL TO US PIPE FLANGE-TYPE GASKETS.
ALL FLANGED JOINTS SHALL BE PROVIDED WITH RIBBED GASKETS SIMILAR3.
POLYETHELENE ENCASEMENT.
ALL BURIED UNDERGROUND DUCTILE IRON PIPE TO BE PROVIDED WITH2.
NOTED OTHERWISE.
ALL MATERIALS INSTALLED UNDER THIS CONTRACT SHALL BE NEW UNLESS1.
GENERAL NOTES:
REFERENCE DRAWINGS INDEX
FILE NAME DRAWING TITLE
O35b-U1-12/101.1 MILL CREEK RECREATION AREA - PUBLIC USE FACILITIES-PHASE VI - WATER STORAGE TANK AND VALVE PIT
F1 OF F1 FOUNDATION DETAILS 50,000 GALLON SPHERE
SHEET 1 OF 8 ERECTION DRAWING 50,000 GALLON UNI-SPHERE
SHEET 2 OF 8 BASE CONE DETAILS 50,000 GALLON UNI-SPHERE
SHEET 3 OF 8 DOORWAY 50,000 GALLON UNI-SPHERE
SHEET 4 OF 8 SUPPORT DETAILS 50,000 GALLON UNI-SPHERE
SHEET 5 OF 8 UPPER CONE DETAILS 50,000 GALLON UNI-SPHERE
SHEET 6 OF 8 SPHEPICAL CAP & GORE SEGMENTS 50,000 GALLON UNI-SPHERE
SHEET 7 OF 8 PIPING DETAILS 50,000 GALLON UNI-SPHERE
SHEET 8 OF 8 LADDER DETAILS 50,000 GALLON UNI-SPHERE
CONTRACT DRAWINGS INDEX
SHEET
DRAWING TITLE
ID NO.
GENERAL
G-0035 COVER SHEET
G-0036 CONTRACT & REFERENCE DRAWING INDEXES, ABBREVIATIONS, SYMBOLS, AND GENERAL NOTES
G-1037 GENERAL SITE PLAN WITH CONTRACTOR ACCESS PATHWAY
G-1038 CONTRACTOR WORK LIMITS PLAN
SURVEY
V-1005 SURVEY CONTROL PLAN
EROSION
X-1005 EROSION AND SEDIMENT CONTROL PLAN
X-5006 EROSION AND SEDIMENT CONTROL DETAILS
X-0007 EROSION AND SEDIMENT CONTROL NOTES
MECHANICAL
MD1020 OVERALL SITE DEMOLITION PLAN
MD4021 VALVE VAULT DEMOLITION PLAN
M-1022 OVERALL SITE PLAN
M-4023 VALVE VAULT PLAN
M-3024 SECTIONS
M-5025 MECHANICAL DETAILS
STRUCTURAL
S-5030 STRUCTURAL DETAILS
AASHTO AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
AWWA AMERICAN WATER WORKS ASSOCIATION
BMP BEST MANAGEMENT PRACTICE
BS, B.S. BLACK STEEL
DI, D.I. DUCTILE IRON
DIA DIAMETER
EL ELEVATION
GNSS GLOBAL NAVIGATION SATELITE SYSTEM
H HEIGHT
I.D. INSIDE DIAMETER
LBS POUNDS
MAX MAXIMUM
MIN MINIMUM
MJ MECHANICAL JOINT
N NORTH
NAD83 NORTH AMERICAN DATUM OF 1983
NAVD88 NORTH AMERICAN VERTICAL DATUM OF 1988
NO. NUMBER
NPT NATIONAL PIPE THREAD
NRS NON RISING STEM
NTS NOT TO SCALE
O.D. OUTSIDE DIAMETER
PSI POUNDS PER SQUARE INCH
R RADIUS
SCH SCHEDULE
SPCS STATE PLANE COORDINATE SYSTEM
TYP TYPICAL
V VERTICAL
M
A R
C H
/s T
H O
M A
S E
A N
D R
E P .E
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G h4ecnerl
B O b
G -0
.d g n
-M
A R -2
:0
0.083333:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
B E
A V
E R R
IV
E R B
A S
IN
B E
R L
IN
L
A K
E R
E S
E R
V O
IR
M
IL
L C
R E
E K W
A T
E R
L
IN
E R
E P
L A
C E
M E
N T
E L E
V A
T E
D W
A T
E R S
T O
R A
G E T
A N
K
CERTIFIED FINAL DOCUMENTS
W
W N
T
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G h4ecnerl
B O b
G -1
.d g n
-M
A R -2
:0
200:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
B E
A V
E R R
IV
E R B
A S
IN
B E
R L
IN
L
A K
E R
E S
E R
V O
IR
M
IL
L C
R E
E K W
A T
E R
L
IN
E R
E P
L A
C E
M E
N T
E L E
V A
T E
D W
A T
E R S
T O
R A
G E T
A N
K
CERTIFIED FINAL DOCUMENTS
W
W N
T
LAKE
BERLIN
LAKE
BERLIN
CREEK
MILL
CREEK
MILL
ENTRANCE
CAMPGROUND
MILL CREEK
ENTRANCE
DAY USE AREA
MILL CREEK
AREA
DAY USE
MILL CREEK
ROAD "A"ROAD "A"
ROAD "A"
B E
D E
L L R
O A
D (M
A H
O N
IN
G C
O U
N T
Y R
O A
D C
(MAHONING COUNTY ROAD C90)
BERLIN STATION ROAD
R O
A D
Q
R O
A D
Q
DUMP STATION
SANITARY TRAILER
R O
A D N
RO
AD
"M
R O
A D
M
ROAD "H"
P O
N D
THIS GATE
ROAD AT
FROM BEDELL
NO ACCESS
STATION
DUMP
TRAILER
SANITARY
R O
A D "H
ACCESS ROAD
ONLY"
VEHICLES
"AUTHORIZED
"ASPEN" CAMP AREA
"OAK" CAMP AREA
CAMP AREA
"HICKORY"
CAMP AREA
"MAPLEWOOD"
ROAD "H"
COMPLEX
MAINTENANCE
R O
A D
H
COMPLEX
WATER TANK
CREEK
MILL
CAMP AREA
"BUCKEYE"
G-1037
G E
N E
R A
L S
IT
E P
L A
N W
IT
H
B
C R
A T
T Y
N
C O
N T
R A
C T
O R A
C C
E S
S P
A T
H W
A Y
BETWEEN ROAD "Q" AND ROAD "M".
USE THE DESIGNATED DETOUR ROUTE, AS SHOWN ON THIS DRAWING, TO TRAVEL
ROAD "M" DUE TO CONSTRUCTION ACTIVITIES IN THAT AREA, THE CONTRACTOR SHALL
IF THE CONTRACTOR IS UNABLE TO TRAVEL ALONG ROAD "A" BETWEEN ROAD "Q" AND
REACH THE WORK SITE.
CONTRACTOR SHALL USE THE DESIGNATED TRAVEL PATH SHOWN ON THIS DRAWING TO
CONTRACTING OFFICER AND/OR APPROPRIATE PARK PERSONNEL.
TRAFFIC DELIVERING EQUIPMENT, MATERIALS, ETC., TO THE WORK SITE WITH THE
A ONE-WAY ROAD WITH OUTBOUND TRAFFIC LEAVING THE DAY USE AREA) FOR INBOUND
AREA PARKING LOT AND THE MILL CREEK CAMPGROUND ENTRANCE STATION (NORMALLY
CONTRACTOR SHALL COORDINATE USE OF ROAD "Q" BETWEEN THE MILL CREEK DAY USE
MILL CREEK DAY USE AREA ENTRANCE.
CONTRACTOR SHALL ENTER AND EXIT THE MILL CREEK RECREATION AREA THROUGH THE
AREA, SEE SHEET G-1038
ENLARGED PLAN OF THIS
PROJECT LOCATION - FOR
CONTRACTOR WORK SITE TRAVEL PATH
DETOUR (FOR USE AS NEEDED)
CONTRACTOR WORK SITE TRAVEL PATH
EDGE OF WATER
(ONE-WAY TRAFFIC ONLY)
TRAVEL DIRECTION INDICATOR
(TWO-WAY TRAFFIC)
TRAVEL DIRECTION INDICATOR
ABBREVIATIONS.
LEGEND SYMBOLS, AND A LIST OF PROJECT-SPECIFIC
1. SEE SHEET G-0036 FOR GENERAL NOTES, ADDITIONAL
GENERAL SITE PLAN WITH CONTRACTOR ACCESS PATHWAY
SCALE: 1" = 200'-0"
400'0 200'
SCALE: 1"=200'
KEYNOTES:
NOTE:
3 4
LEGEND:
J
W
IL
L
IA
M S
J
R U
S N
A K
M
A R
C H
/s J
A M
E S T S
H
IB
A T
A P .E
(TYP)
5'-0"
(TYP)
5'-0"
RO
AD "N"
ONE WAY
(G R
A V
E L
T O
W E
R A
C C
E S
S R
O A
D
E X
IS
T
IN
G W
A T
E R
CAMPSITE
(TYP)
WATER TOWER
EXISTING
SECURITY FENCE
EXISTING CHAIN-LINK
POWER POLE
EXISTING
VALVE VAULT
EXISTING
STORM INLET
EXISTING
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G h4ecnerl
B O b
G -1
.d g n
-M
A R -2
:0
16:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
B E
A V
E R R
IV
E R B
A S
IN
B E
R L
IN
L
A K
E R
E S
E R
V O
IR
M
IL
L C
R E
E K W
A T
E R
L
IN
E R
E P
L A
C E
M E
N T
E L E
V A
T E
D W
A T
E R S
T O
R A
G E T
A N
K
CERTIFIED FINAL DOCUMENTS
W
W N
T
G-1038
O
N T
R A
C T
O R W
O R
K L
IM
IT
S
P L
A N
B
C R
A T
T Y
J
R U
S N
A K
WORK LIMITS
CONTRACTOR
CONTRACTOR WORK LIMITS
CONTRACTOR WORK LIMITS PLAN
SCALE: 1/16" = 1'-0"
0 8' 32'16'
SCALE: 1/16"=1'
N
NOTE:
AREA, SEE SHEET G-1037.
1. FOR CONTRACTOR ACCESS ROUTE TO PROJECT WORK
J
W
IL
L
IA
M S
EXISTING CHAIN-LINK SECURITY FENCE
EXISTING UNDERGROUND ELECTRICAL LINES
LEGEND: /s J
A M
E S T S
H
IB
A T
A P .E
M
A R
C H
CATCH BASIN
WATER TOWER
VAULT
VALVE
SECURITY FENCE
EXISTING CHAIN-LINK
EXISTING POWER POLE
# 602 # 603
# 604
# 605
B
B A
K
R
V-1005
U
R V
E Y C
O N
T R
O L P
L A
N
0 10' 20'
SCALE: 1"=10'
SURVEY CONTROL POINT
EXISTING CHAIN-LINK SECURITY FENCE
:LEGEND
B P
R
IC
E
SURVEY CONTROL PLAN
SCALE: 1"=10'-0"
A PUNCH MARK UNLESS STATED OTHERWISE.
MONUMENTS ARE 5/8"x30" IRON PINS WITH ALUMINUM CAPS WITH 5.
PROJECT IS 0.999895264.
THE AVERAGE COMBINED SCALE FACTOR (OH NORTH ZONE) FOR THE4.
GNSS SOLUTIONS FROM BRE-3 (NGS PID MB0815).
HORIZONTAL AND VERTICAL LOCATIONS BASED ON MULTIPLE3.
THE VERTICAL DATUM IS NAVD88. THE ELEVATION UNITS ARE FEET.2.
SURVEY FEET.
SYSTEM IS OHIO SPCS NORTH ZONE (FIPS 3401). THE UNITS ARE US
THE HORIZONTAL DATUM IS NAD83(2011). THE GRID COORDINATE1.
NOTES:
E
M C
C A
R T
Y
SURVEY CONTROL
STATION NAME GRID NORTHING GRID EASTING ELEVATION DESCRIPTION
# 602 493023.42 2383191.95 1042.51 IRON PIN
# 603 493038.13 2383318.82 1042.64 IRON PIN
# 604 492931.38 2383306.00 1042.77 IRON PIN
# 605 492958.25 2383236.69 1043.35 IRON PIN
/s
K R
IS
T E
N S
C O
T T P .E
M
A R
C H
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G h4ecnerl
B O b
V -1
.d g n
-M
A R -2
:0
10:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
B E
A V
E R R
IV
E R B
A S
IN
B E
R L
IN
L
A K
E R
E S
E R
V O
IR
M
IL
L C
R E
E K W
A T
E R
L
IN
E R
E P
L A
C E
M E
N T
E L E
V A
T E
D W
A T
E R S
T O
R A
G E T
A N
K
CERTIFIED FINAL DOCUMENTS
W
W N
T
X
RCE
F S -1
C F S -1
CFS-12
C
FS
-1
CFS-12
C F S -1
CFS-12
C F S -1
CFS-12
RCE
R O
A D "N
(GRAVEL)
TOWER ACCESS ROAD
EXISTING WATER
C A
M P S
IT
E (T
Y P
WATER TOWER
EXISTING
SECURITY FENCE
EXISTING CHAIN-LINK
O N
E W
A Y
VALVE VAULT
EXISTING
POWER POLE
EXISTING
STORM INLET
EXISTING
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G h4ecnerl
B O b
X -1
.d g n
-M
A R -2
:0
10:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
B E
A V
E R R
IV
E R B
A S
IN
B E
R L
IN
L
A K
E R
E S
E R
V O
IR
M
IL
L C
R E
E K W
A T
E R
L
IN
E R
E P
L A
C E
M E
N T
E L E
V A
T E
D W
A T
E R S
T O
R A
G E T
A N
K
CERTIFIED FINAL DOCUMENTS
W
W N
T
X-1005
P L
A N
B
C R
A T
T Y
J
R U
S N
A K
N
E R
O S
IO
N A
N D S
E D
IM
E N
T C
O N
T R
O L
EROSION AND SEDIMENT CONTROL PLAN
SCALE: 1" = 10'-0"
CONTRACTOR WORK LIMITS
LEGEND
0 10' 20'
SCALE: 1"=10'
J
W
IL
L
IA
M S
SOCK
INLET FILTER3
X-5006
X-5006
(TYP)
FILTER SOCK
12" COMPOST
X-5006
ENTRANCE
CONSTRUCTION
ROCK
FOR ADDITIONAL INFORMATION
NEW PIPING - SEE SHEET M-1022
12" COMPOST FILTER SOCK
EXISTING UNDERGROUND ELECTRIC LINES
EXISTING CHAIN-LINK SECURITY FENCE
INLET FILTER SOCK
SEE SHEET X-0007.
3. FOR EROSION AND SEDIMENT CONTROL PLAN NARRATIVE,
SEE SHEET X-5006.
2. FOR EROSION AND SEDIMENT CONTROL PLAN DETAILS,
AREA, SEE SHEET G-1037.
1. FOR CONTRACTOR ACCESS ROUTE TO PROJECT WORK
NOTES:
ROCK CONSTRUCTION ENTRANCE
/s J
A M
E S T S
H
IB
A T
A P .E
M
A R
C H
50'-0" (MIN)
(M
IN
3'
EARTH FILL
MOUNTABLE BERM USED TO PROVIDE PROPER COVER FOR PIPE
BERM (6" MIN)
MOUNTABLE
(8" MIN)
AASHTO #1
GRADE
EXISTING
GRADE
EXISTING
ROADWAY
EXISTING
ROADWAY
EXISTING
PROFILE
GEOTEXTILE
CLASS 4
CONSTRUCTION VEHICLES (TYPICAL EACH SIDE)
AS NEEDED TO ACCOMODATE TURNING RADII OF
PROVIDE APPROPRIATE TRANSITION (MIN 10'-0" R)
(AS NECESSARY)
DRAINAGE PIPE
DRAINAGE PIPE (AS NECESSARY)
PLAN
NOTES:
ACCEPTABLE.
DITCHES, SEWERS, CULVERTS OR OTHER DRAINAGE COURSES IS NOT
WASHING THE ROADWAY OR SWEEPING THE DEPOSITS INTO ROADWAY
INCREMENTS UNTIL CONDITION IS ALLEVIATED, OR INSTALL WASH RACK.
DEPOSITED ON THE ROADWAY, EXTEND LENGTH OF RCE BY 50-FOOT
IMMEDIATELY. IF EXCESSIVE AMOUNTS OF SEDIMENT ARE BEING
SHALL BE REMOVED AND RETURNED TO THE CONSTRUCTION SITE
10. ALL SEDIMENT DEPOSITED ON PAVED ROADWAY ADJACENT TO THE RCE
AND RETURN AREA TO PRE-CONSTRUCTION CONDITIONS.
9. WHEN CONSTRUCTION IS COMPLETED, REMOVE STONE AND GEOTEXTILE
THE ABILITY TO TRAP MATERIAL HAS BEEN LOST.
8. REPLACE ALL ROCK WHEN SURFACE BECOMES CLOGGED WITH SOIL AND
CONSTRUCTION.
REPAIR REQUIREMENTS. MAINTAIN THICKNESS OF ROCK THROUGHOUT
7. INSPECT RCE DAILY. STOCKPILE RCE STONE NEAR EACH RCE FOR DAILY
APPROPRIATELY FOR SIZE OF DITCH BEING CROSSED.
MANUFACTURER IS NOT OTHERWISE PROVIDED. PIPE SHALL BE SIZED
PIPE IS USED AND PROPER PIPE COVER AS SPECIFIED BY THE
6. MOUNTABLE BERM SHALL BE INSTALLED WHEREVER OPTIONAL CULVERT
REMOVAL BMP PRIOR TO ENTERING RCE.
5. RUNOFF SHALL BE DIVERTED FROM ROADWAY TO A SUITABLE SEDIMENT
WIDTH OF ENTRANCE.
4. PLACE RCE STONE AS SHOWN ON DRAWINGS. EXTEND ROCK OVER FULL
RECOMMENDATIONS.
3. ROLL OUT AND SECURE GEOTEXTILE ACCORDING TO MANUFACTURER'S
UNDER THE FOOTPRINT OF THE RCE PRIOR TO INSTALLATION OF THE RCE.
LOCATED OVER EXISTING PAVEMENT, THE PAVEMENT SHALL BE REMOVED
2. REMOVE TOPSOIL PRIOR TO INSTALLATION OF RCE. WHERE RCE(S) ARE
DETAIL.
SHOWN ON THE PLANS AND TO THE MINIMUM DIMENSIONS SHOWN ON THE
1. ROCK CONSTRUCTION ENTRANCE (RCE) SHALL BE CONSTRUCTED WHERE
AREA
DISTURBED
AREA
UNDISTURBED
F L
O W
F L
O W
FILTER SOCK
COMPOST
CENTERS (MAX)
STAKE ON 10'-0"
PLAN
INLET GRATE
W
ID
TH LENGTH
4'
2'
FROM INLET
BAG REMOVAL
1" REBAR FOR
ISOMETRIC
OVERLAP COMPOST FILTER SOCK SECTIONS 8' (MIN). 4.
MONTHS; PHOTODEGRADEABLE AFTER 12 MONTHS.
REPLACE BIODEGRADEABLE FILTER SOCK AFTER 6 3.
MAIN ALIGNMENT.
AT LEAST 8'-0" UPSLOPE AT 45 DEGREES TO THE
EXTEND BOTH ENDS OF THE COMPOST FILTER SOCK
PLACE COMPOST FILTER SOCK ON LEVEL GRADE. 2.
FILTER SOCK.
IS ONE-HALF THE HEIGHT OF THE EXPOSED COMPOST
REMOVE DEPOSITS WHEN SEDIMENT ACCUMULATION 1.
NOTES:
2" x 2" WOOD STAKE
FILTER SOCK
24" COMPOST
12", 18", OR
COMPOST
LOOSE
FLOW
AREA
UNDISTURBEDAREA
DISTURBED
SECTION
INSTALLATION DETAIL
" NYLON ROPE)1/4(
EXPANSION RESTRAINT
RUBBER BLOCK
2" X 2" X 1/4"
6" MIN HEIGHT
3:1 3:1
BERM
2 (MIN):1
FLOW
PLAN VIEW
TEMPORARY OR PERMANENT VEGETATION
EARTHEN BERM TO BE STABILIZED WITH
STORM INLET FILTER BAG
2 MIN
(TYP)
FLOW
SECTION
DO NOT USE ON MAJOR PAVED ROADWAYS WHERE PONDING MAY CAUSE TRAFFIC HAZARDS
AS WELL AS ALL USED BAGS, ACCORDING TO THE PLAN NOTES.
INITIATED IMMEDIATELY AFTER THE INSPECTION. DISPOSE OF ACCUMULATED SEDIMENT,
MAINTAINED ON SITE FOR REPLACEMENT OF BAGS. ALL NEEDED REPAIRS SHALL BE
THE INLET. DAMAGED OR CLOGGED BAGS SHALL BE REPLACED. A SUPPLY SHALL BE
FLOW CAPACITY HAS BEEN REDUCED SO AS TO CAUSE FLOODING OR BYPASSING OF
EVENT. BAGS SHALL BE EMPTIED AND RINSED OR REPLACED WHEN HALF-FULL OR WHEN
5. INLET FILTER BAGS SHALL BE INSPECTED ON A WEEKLY BASIS, AND AFTER EACH RUNOFF
A NO. 40 SIEVE.
OF 50 LBS. FILTER BAGS SHALL BE CAPABLE OF TRAPPING ALL PARTICLES NOT PASSING
A MINIMUM BURST STRENGTH OF 200 PSI, AND A MINIMUM TRAPEZOIDAL TEAR STRENGTH
4. AT A MINIMUM, THE FABRIC SHALL HAVE A MINIMUM GRAB TENSILE STRENGTH OF 120 LBS, COMPLETED OR REMAIN PERMANENTLY.
EARTHEN BERM IN CHANNEL SHALL BE MAINTAINED UNTIL PERMANENT STABILIZATION IS
ROAD SUBBASE BERM ON ROADWAY SHALL BE MAINTAINED UNTIL ROADWAY IS PAVED.
3. ROLLED EARTHEN BERM IN ROADWAY SHALL BE MAINTAINED UNTIL ROADWAY IS STONED.
OR TRAP. BERMS SHALL BE REQUIRED FOR ALL INSTALLATIONS.
2. INLET PROTECTION SHALL NOT BE REQUIRED FOR INLET TRIBUTARY TO SEDIMENT BASIN
1. MAXIMUM DRAINAGE AREA = ONE-HALF ACRE.
NOTES:
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G h4ecnerl
B O b
X -5
.d g n
-M
A R -2
:0
0.083333:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
B E
A V
E R R
IV
E R B
A S
IN
B E
R L
IN
L
A K
E R
E S
E R
V O
IR
M
IL
L C
R E
E K W
A T
E R
L
IN
E R
E P
L A
C E
M E
N T
E L E
V A
T E
D W
A T
E R S
T O
R A
G E T
A N
K
CERTIFIED FINAL DOCUMENTS
W
W N
T
X-5006
B
C R
A T
T Y
J
R U
S N
A K
ROCK CONSTRUCTION ENTRANCE
COMPOST FILTER SOCK
INLET FILTER SOCK (FOR TYPE "M" INLET)
J
W
IL
L
IA
M S
E R
O S
IO
N A
N D S
E D
IM
E N
T C
O N
T R
O L
D E
T A
IL
S
X-1005 NTS
DETAIL
X-1005 NTS
DETAIL
X-1005 NTS
DETAIL
/s J
A M
E S T S
H
IB
A T
A P .E
M
A R
C H
EROSION AND SEDIMENT POLLUTION CONTROL PLAN NARRATIVE
BY THE WATERING EQUIPMENT.
DUE TO APPLICATION OF EXCESS QUANTITIES, AND WILL NOT DAMAGE FINISHED SURFACES
IN A MANNER THAT WILL PROVIDE UNIFORM COVERAGE THAT WILL NOT CAUSE EROSION
DEPTH OF THREE (3) INCHES TO ASSURE CONTINUED GROWTH. WATERING SHALL BE DONE
SEEDED AREAS ON WHICH GROWTH HAS STARTED SHALL BE WATERED TO A MINIMUM
OPERATION ARE COMPLETED AND SUBSEQUENTLY DURING THE ESTABLISHMENT PERIOD.
SEEDED AREAS SHALL BE WATERED WITHIN TWO DAYS AFTER SEEDING AND MULCHING5.
FOR DRIVEWAYS, CONCRETE SURFACES) HAS BEEN PLACED.
CONSIDERED PERMANENTLY STABILIZED ONCE THE IMPERVIOUS SURFACE (I.E., GRAVEL
70% ACROSS THE ENTIRE DISTURBED AREA. PROPOSED IMPERVIOUS AREAS WILL BE
STANDARD FOR THIS VEGETATIVE COVER WILL BE A UNIFORM COVERAGE OR DENSITY OF
CHARACTERISTICS ARE SUFFICIENT TO RESIST SLIDING AND OTHER MOVEMENTS. THE
SOIL IS CAPABLE OF RESISTING EROSION DURING RUNOFF EVENTS AND SUBSURFACE
RESISTANT PERENNIAL VEGETATION ESTABLISHED TO THE POINT WHERE THE SURFACE
PERMANENT STABILIZATION OF LAWN AREAS IS CONSIDERED TO BE A UNIFORM EROSION4.
MAXIMUM APPLIED BINDER NOT EXCEEDING TEN GALLONS PER 1,000 SQUARE FEET.
MULCH AS NEEDED TO SECURE IT FIRMLY SHALL NOT EXCEED THREE PASSES WITH
ASPHALTIC EMULSION MULCH BINDER IS USED, THE NUMBER OF PASSES OVER THE
EMULSION MULCH BINDER IMMEDIATELY FOLLOWING MULCH SPREADING. IF A NON-
MULCH SHALL BE ANCHORED BY USE OF CRIMPING, NETTING, OR A NON-ASPHALTICB.
MACHINES WHICH CUT MULCH INTO SHORT PIECES WILL NOT BE PERMITTED.
MULCH MAY BE SPREAD BY HAND OR WITH AN ACCEPTABLE MECHANICAL BLOWER.A.
PER ACRE).
IN A CONTINUOUS BLANKET AT A RATE OF 1,240 POUNDS PER 1,000 SQUARE YARDS (3 TONS
IMMEDIATELY AFTER SEEDING, PROVIDE AN ANCHORED STRAW MULCH SPREAD UNIFORMLY3.
A. SPREAD SEED FROM MARCH 15 TO JUNE 1 AND FROM AUGUST 1 TO OCTOBER 15.
SPECIFICATION.
DISTURBED AREA. ESTABLISH PERMANENT VEGETATIVE COVER IN ACCORDANCE WITH THE
STABILIZATION IS OBTAINED BY ESTABLISHING A VEGETATIVE COVER ACROSS THE
WILL PREVENT EROSION AND ELIMINATE OFF-SITE SEDIMENTATION. TYPICAL PERMANENT
INVOLVES THE STABILIZATION AND PROTECTION OF THE SOIL SURFACE TO AN EXTENT THAT
PERMANENT STABILIZATION OF VEGETATED AREAS, AS REFERRED TO IN THIS NARRATIVE,2.
AND ROCK FILLS NEED NOT BE VEGETATED.
STABILIZATION MEASURES IMMEDIATELY APPLIED. CUT SLOPES IN COMPETENT BEDROCK
THAT WILL NOT BE WORKED WITHIN ONE YEARS TIME, SHALL HAVE PERMANENT
ALL AREAS THAT HAVE BEEN BROUGHT TO FINAL GRADE AND THOSE DISTURBED AREAS1.
PERMANENT STABILIZATION NOTES:
PERMANENT STABILIZATION SHALL BE IMMEDIATELY APPLIED.
DISTURBED AREAS CREATED BY THIS ACTIVITY SHALL BE BROUGHT TO FINAL GRADE AND
TEMPORARY OR UNUSABLE CONTROL MEASURES AND FACILITIES SHALL BE REMOVED, THE
PERMANENT STABILIZATION AND UPON APPROVAL FROM THE CONSERVATION DISTRICT, ALL
STABILIZATION OF THE CONTRIBUTING DRAINAGE AREA IS COMPLETED. UPON COMPLETION OF
FROM EROSION DURING THE STABILIZATION PERIOD SHALL BE MAINTAINED UNTIL PERMANENT
EROSION AND SEDIMENT CONTROL FACILITIES REQUIRED OR NECESSARY TO PROTECT AREAS6.
IMPLEMENTING SAID MEASURES. SEE GENERAL EROSION CONTROL NOTE 11.
TO THE APPROVED EROSION CONTROL PLAN SHALL BE REVIEWED AND APPROVED PRIOR TO
INSTALLED MEASURES ARE TO BE IMPLEMENTED AT NO ADDITIONAL COST. ALL MODIFICATIONS
LEAVES THE SITE, ADDITIONAL EROSION CONTROL MEASURES OR MODIFICATIONS TO THE
SEDIMENT AND SEDIMENT-LADEN RUNOFF IS NOT BEING CONTROLLED AND FILTERED BEFORE IT
CONSTRUCTION PROCEDURES, ETC., ALTER THE EROSION CONTROL PLAN TO THE POINT WHERE
WITHOUT FIRST PASSING THROUGH A SEDIMENT FILTERING DEVICE. SHOULD SITE CONDITIONS, AT NO TIME WILL SEDIMENT OR SEDIMENT-LADEN RUNOFF BE ALLOWED TO LEAVE THE SITE5.
START OF CONSTRUCTION, INCLUDING CLEARING AND GRUBBING OPERATIONS.
THE LIMIT OF EARTH DISTURBANCE SHALL BE CLEARLY MARKED IN THE FIELD PRIOR TO THE
NOT BE ALLOWED BELOW THE LOCATION OF THE PERIMETER EROSION CONTROL FACILITIES.
EARTH DISTURBANCE ACTIVITIES, INCLUDING MOVEMENT OF CONSTRUCTION VEHICLES, SHALL4.
THOSE FACILITIES.
EROSION CONTROL FACILITIES AND FOR GRADING AND ACQUIRING BORROW TO CONSTRUCT
ONLY LIMITED DISTURBANCE WILL BE PERMITTED TO PROVIDE ACCESS FOR CONSTRUCTING3.
WITHIN THE TRIBUTARY AREAS OF THOSE FACILITIES.
FUNCTIONAL, BEFORE SITE DISTURBANCE BEGINS, INCLUDING CLEARING AND GRUBBING,
EROSION AND SEDIMENT CONTROL FACILITIES SHALL BE CONSTRUCTED, STABILIZED, AND2.
BE CONTROLLED BY SAID FACILITY.
BE AVAILABLE ON SITE PRIOR TO THE ANTICIPATED DISTURBANCE OF THE DRAINAGE AREA TO
ALL MATERIALS NEEDED TO COMPLETELY CONSTRUCT AN EROSION CONTROL FACILITY SHALL1.
GENERAL E&S INSTALLATION PROCEDURES:
LOCAL ENVIRONMENTAL LAWS.
SITE, PROVIDED THE SITE AND DISPOSAL COMPLIES WITH ALL APPLICABLE FEDERAL, STATE AND
PROPERLY PERMITTED, COMMERCIALLY AVAILABLE DISPOSAL FACILITY OR A CORPS ACQUIRED
ANY DISPOSAL MATERIAL GENERATED DURING THE PROJECT MUST BE DISPOSED OF AT A6.
SATURATED OR FROZEN SURFACES.
MATERIALS SHALL NOT BE INCORPORATED INTO FILLS. FILL SHALL NOT BE PLACED ON
OF SATISFACTORY FILLS. FROZEN MATERIAL OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE
OBJECTIONABLE MATERIAL THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION
FILL MATERIAL SHALL BE FREE OF FROZEN PARTICLES, ORGANIC MATERIAL OR OTHER5.
MUST BE DISPOSED OF AT AN APPROVED WASTE SITE.
WASTE GENERATED ONSITE DURING THIS PROJECT. ALL WASTE MATERIAL NOT RECYCLED,
THE CONTRACTOR AND PERMITTEE MUST ATTEMPT, WHENEVER POSSIBLE, TO RECYCLE ALL4.
SOIL STOCKPILE OR DISPOSED OF IN AN APPROVED OFFSITE SPOIL AREA.
OR DRAINAGE SWALES. REMOVED SEDIMENTS MAY ALSO BE PLACED IN AN APPROVED TOPSOIL/
STABILIZED. REMOVED SEDIMENTS SHALL NOT BE PLACED ON STEEP SLOPES, IN WETLANDS,
SCAPED OR LAWN AREAS LOCATED UPSLOPE OF SAID FACILITIES AND SHALL BE IMMEDIATELY
SEDIMENT REMOVED FROM EROSION CONTROL FACILITIES SHALL BE DISPOSED OF IN LAND-3.
A REGULATED SUBSTANCE BUT QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING.
RETAINED BY THE PROPERTY OWNER FOR FILL MATERIAL AFFECTED BY A SPILL OR RELEASE OF
ANALYTICAL TESTING, ENVIRONMENTAL ASSESSMENTS OR AUDITS. FORM FP-001 SHALL BE
USE HISTORY, SANBORN MAPS, ENVIRONMENTAL QUESTIONNAIRES, TRANSACTION SCREENS,
ELECTRONIC DATA BASE SEARCHES, REVIEW OF PROPERTY OWNERSHIP, REVIEW OF PROPERTY
INVESTIGATIVE TECHNIQUES, INCLUDING, BUT NOT LIMITED TO, VISUAL PROPERTY INSPECTIONS, DECOMPOSABLE, INERT, SOLID MATERIAL. ENVIRONMENTAL DUE DILIGENCE SHALL INCLUDE
FILL. CLEAN FILL IS DEFINED AS UNCONTAMINATED, NON-WATER SOLUBLE, NON-
PERFORMING ENVIRONMENTAL DUE DILIGENCE AND DETERMINING IF SAID MATERIAL IS CLEAN
IF FILL MATERIAL IS BROUGHT ONTO THE SITE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR2.
ACCUMULATION WILL BE PROPERLY DISPOSED OF IN A LAWFUL MANNER.
ALL CLEAN FILL DEMOLITION MATERIAL INCLUDING CLEARING AND GRUBBING DEBRIS1.
FILL/DISPOSAL OF MATERIAL NOTES:
PROJECT.
INSPECTION ON THE CONSTRUCTION SITE AT ALL TIMES THROUGHOUT THE TERM OF THE
EROSION AND SEDIMENT POLLUTION CONTROL PLAN SHALL BE KEPT AVAILABLE FOR
SHALL BE DONE IN ACCORDANCE WITH THE APPROVED PLAN. A COPY OF THE APPROVED
ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS12.
ASSOCIATED WITH SAID APPROVALS (I.E., ENGINEER'S DESIGN COSTS, APPLICATION FEES, ETC.).
INITIATING SAID REVISIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS
APPROVALS FOR THE MODIFICATION FROM THE REVIEWING AGENCY AS APPROPRIATE, PRIOR TO
POLLUTION CONTROL PLAN, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL
SHOULD THE CONTRACTOR CHOOSE TO DEVIATE FROM THE APPROVED EROSION AND SEDIMENT11.
ONCE WITHIN THE ALLOWABLE SEEDING DATES.
OR AN ANCHORED MULCH. PERMANENT STABILIZATION SHALL BE APPLIED TO THESE AREAS
DISTURBED AREAS TO BE VEGETATED SHALL BE STABILIZED WITH EROSION CONTROL MATTING
SHOULD SITE STABILIZATION OCCUR OUTSIDE OF THE ALLOWABLE SEEDING DATES, ALL10.
CONTROL MATTING.
ENGINEER. SEEDED AREAS WITHIN 50 FEET OF A SURFACE WATER SHALL RECEIVE EROSION
BE PROTECTED WITH EROSION CONTROL MATTING OR ROCK RIPRAP AS SPECIFIED BY THE
ADDITIONAL DISTURBED SLOPES THAT ARE STEEPER THAN 3H:1V, THESE SLOPES SHALL ALSO
CONSTRUCTION PROCEDURES AND/OR LOCALIZED SITE CONDITIONS DISTURB AND/OR CREATE
ARE STEEPER THAN 3H:1V AS SPECIFIED WITHIN THE CONTRACT DOCUMENTS. SHOULD
EROSION CONTROL MATTING OR ROCK RIPRAP SHALL BE PLACED ON DISTURBED SLOPES THAT9.
IMPLEMENTING OTHER METHODS AS APPROVED BY THE COUNTY CONSERVATION DISTRICT.
CONTRACTOR SHALL CONTROL DUST FROM THE PROJECT AREA BY APPLYING WATER OR8.
IMMEDIATELY WITH EMERGENCY PROBLEMS OF EROSION.
BALES, CRUSHED STONE AND OTHER MULCHES SHALL BE HELD IN READINESS TO DEAL
ACCELERATED EROSION AND/OR SEDIMENT POLLUTION. STOCKPILES OF WOOD CHIPS, HAY
APPROPRIATE BEST MANAGEMENT PRACTICES (BMP'S) TO ELIMINATE THE POTENTIAL FOR
EROSION AND/OR SEDIMENT POLLUTION, THE CONTRACTOR SHALL IMMEDIATELY IMPLEMENT
SHOULD UNFORESEEN CIRCUMSTANCES ARISE POSING THE POTENTIAL FOR ACCELERATED7.
TO THE TEMPORARY AND PERMANENT STABILIZATION NOTES THIS SHEET.
DISTURBED AREAS AND BY KEEPING THE AMOUNT OF DISTURBED AREA TO A MINIMUM. REFER
ACCELERATED EROSION AND SEDIMENTATION WILL BE LIMITED BY IMMEDIATELY STABILIZING6.
TYPE OF COVER AND GRADE, AS PER THE DESIGN DRAWINGS AND SPECIFICATIONS.
BACKFILLED EXCAVATIONS SHALL BE IMMEDIATELY RESTORED TO ORIGINAL OR PROPOSED
INSPECT ALL UNDERGROUND FACILITIES IN ACCORDANCE WITH APPLICABLE SPECIFICATIONS.
UTILITY EXCAVATIONS SHALL BE OPEN ONLY LONG ENOUGH TO PROPERLY INSTALL AND5.
INTERVALS AS THE SLOPE IS BEING CONSTRUCTED.
EXCAVATION SLOPES SHALL RECEIVE PERMANENT STABILIZATION AT REGULAR 10 FOOT
PERMANENT FILL/EXCAVATION SLOPES SHALL RECEIVE PERMANENT STABILIZATION. FILL/4.
OTHERWISE BY THE CONTRACTING OFFICER/PROFESSIONAL.
SLOPES OF 2H:1V OR FLATTER AND SHALL NOT EXCEED 35 FEET IN HEIGHT UNLESS APPROVED
FLOW PATH OF A NATURAL OR CONSTRUCTED WATERWAY. STOCKPILES ARE TO HAVE SIDE
NOT INTERFERE WITH CONSTRUCTION ACTIVITIES AND ARE NOT TO BE LOCATED WITHIN THE
MIXTURE) AND MULCHED. STOCKPILES ARE TO BE PLACED IN A LOCATION WHERE THEY WILL
TEMPORARY SOIL/TOPSOIL STOCKPILES SHALL BE IMMEDIATELY SEEDED (TEMPORARY SEED3.
RESULT IN INCREASED LOADING ON STRUCTURAL RETAINING WALLS.
TO SOIL PILE LOCATIONS. SOIL PILES SHALL NOT BE LOCATED IN AREAS WHERE THE PILE WILL
SOIL PILE. CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER WITH REGARDS
CONTROL FACILITY, SILT SOCKS SHALL BE INSTALLED ALONG THE DOWN SLOPE TOE OF SAID
EXCAVATION THAT IS NOT LOCATED WITHIN THE DRAINAGE AREA OF A PERIMETER EROSION
THE EXCAVATION WHENEVER POSSIBLE. SHOULD A SOIL PILE BE CREATED FROM THE
EXCAVATED MATERIAL FROM UTILITY TRENCH EXCAVATIONS SHALL BE PLACED UP SLOPE FROM2.
IN ALL CASES, THE SMALLEST PRACTICAL AREA OF STABLE LAND SURFACE WILL BE DISTURBED.1.
GENERAL EROSION CONTROL NOTES:
DATES.
APPLY TEMPORARY OR PERMANENT SEED MIXTURES ONCE WITHIN THE ALLOWABLE SEEDING
AN ANCHORED MULCH OR EROSION CONTROL MATTING IS TO BE PLACED WITHOUT SEEDING.
IF TEMPORARY STABILIZATION ACTIVITIES FALL OUTSIDE OF THE ALLOWABLE SEEDING DATES,3.
ESTABLISH TEMPORARY VEGETATIVE COVER IN ACCORDANCE WITH THE SPECIFICATIONS.
OBTAINED BY ESTABLISHING A VEGETATIVE COVER ACROSS THE DISTURBED AREA.
EROSION AND ELIMINATE OFFSITE SEDIMENTATION. TYPICAL TEMPORARY STABILIZATION IS
STABILIZATION AND PROTECTION OF THE SOIL SURFACE TO AN EXTENT THAT WILL PREVENT
TEMPORARY STABILIZATION, AS REFERRED TO IN THIS NARRATIVE, INVOLVES THE2.
CEASE, TEMPORARY STABILIZATION MEASURES SHALL BE IMMEDIATELY IMPLEMENTED.
AFTER FINAL EARTHMOVING HAS BEEN COMPLETED OR WHERE CONSTRUCTION ACTIVITIES
WHERE IT IS NOT POSSIBLE TO PERMANENTLY STABILIZE A DISTURBED AREA WITHIN 14 DAYS1.
TEMPORARY STABILIZATION NOTES:
B
C R
A T
T Y
J
W
IL
L
IA
M
X-0007
O
T E
S
J
R U
S N
A K
/s J
A M
E S T S
H
IB
A T
A P .E
E R
O S
IO
N A
N D S
E D
IM
E N
T C
O N
T R
O L
M
A R
C H
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G h4ecnerl
B O b
X -0
.D
G N
-M
A R -2
:0
0.083333:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
B E
A V
E R R
IV
E R B
A S
IN
B E
R L
IN
L
A K
E R
E S
E R
V O
IR
M
IL
L C
R E
E K W
A T
E R
L
IN
E R
E P
L A
C E
M E
N T
E L E
V A
T E
D W
A T
E R S
T O
R A
G E T
A N
K
CERTIFIED FINAL DOCUMENTS
W
W N
T
VALVE TO REMAIN
EXISTING FLANGED GATE
EL. 1044.08±
CONCRETE FLOOR
INSULATION TO REMAIN
WITH HEAT TRACE AND
FILL/WITHDRAW PIPE
EXISTING 4" SCH 40 B.S.
REMAIN
OVERFLOW PIPE TO
EXISTING 4" SCH 40 B.S.
CONCRETE
REPLACE WITH 3" OF
REMOVE GRAVEL AND
CUT EXISTING 4" PIPE
REMOVE TEE AND ASSOCIATED PIPING
CUT PIPE FOR INSTALLATION OF NEW PIPE FLANGE
ON MD4021
SEE DETAIL 1
VALVE VAULT
EXISTING CHAIN-LINK SECURITY FENCE
THRUST BLOCK
FOR INSTALLATION OF CONCRETE
SQUARE OF CONCRETE FLOOR
SAW CUT AND REMOVE 4'-0" X 4'-0"
SAVE FOR REINSTALLATION
REMOVE STRUCTURAL FILL AND
OPEN POSITION
HATCH SHOWN IN
BY OTHERS ROUTED ALONG GRADE
WATER SUPPLY SYSTEM. PROVIDED
CONNECTION TO TEMPORARY
EXISTING 3" SCH 40 PVC PIPE FOR
EXISTING POWER POLE
EXISTING CATCH BASIN
EXISTING OVERFLOW PIPE
EXISTING WATER TOWER
HATCH
EXISTING ACCESS
LC
TO CATCH BASIN
EL. 1046.10
O V
E R
A L L S
IT
L
O W
E
E L E
IS
U R
E
OVERALL SITE DEMOLITION PLAN
SCALE: 1/4"=1'-0" D
E M
O L
IT
IO
N P
L A
N
MD1020
C L
IC
H T
Y
N
A
A
- SCALE: 3/4"=1'-0"
SECTION
2'0 1' 4'
SCALE: 3/4"=1'
0 4' 8'2'
SCALE: 1/4"=1'
PROVIDE NEW PIPE INSULATION.
TO PERFORM WORK. STORE HEAT TRACE FOR INSTALLATION ON NEW PIPE.
REMOVE EXISTING PIPE INSULATION AND HEAT TRACING AS NECESSARY
NOTE:
CONTROLS
TO WELL PUMP
SYSTEM
TO DISTRIBUTION
/s T
H O
M A
S E
A N
D R
E P .E
M
A R
C H
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G h4ecnerl
B O b
M D
.d g n
-M
A R -2
:0
0.083333:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
B E
A V
E R R
IV
E R B
A S
IN
B E
R L
IN
L
A K
E R
E S
E R
V O
IR
M
IL
L C
R E
E K W
A T
E R
L
IN
E R
E P
L A
C E
M E
N T
E L E
V A
T E
D W
A T
E R S
T O
R A
G E T
A N
K
CERTIFIED FINAL DOCUMENTS
W
W N
T
STEEL PIPE
REMOVE 1/2" GALVANIZED
BE ABANDONED
EXISTING D.I. PIPE TO
EXISTING 4" FLANGED TEE TO REMAIN
TO REMAIN
EXISTING 4" DI PIPE
ELBOW TO REMAIN
EXISTING 4" FLANGED 90°
EXISTING CONCRETE VALVE VAULT
EXISTING TELEMETERING PANEL
SEE NOTE 1
REMOVE 4" DI PIPE
WATER SYSTEM CONNECTION
HATCH FOR TEMPORARY
EXTENDING UP THRU ACCESS
EXISTING 4" SCH 40 B.S. PIPE
TO REMAIN
GATE VALVES
EXISTING 4" PIPE TRUST SEE NOTE 1
EXISTING BLOCKING TO RESTRAIN
TO REMAIN
EXISTING 4" DI PIPE
SENSING LINE
EXISTING PRESSURE
1'-3 1/2 "8"
10'-3"
L
O W
E
E L E
IS
U R
E
D E
M O
L
IT
IO
N P
L A
N
LC
LC
LC
0 1' 2'6"
SCALE: 1"=1'
MD4021
V A
L V
E V
A U
L T
MD1020 SCALE: 1"=1'-0"
VALVE VAULT DEMOLITION PLAN
C L
IC
H T
Y
N
SYSTEM
TO DISTRIBUTION
TO STORAGE TANK
OUTSIDE OF VALVE VAULT.
BLOCKING TO PREVENT PIPE SEPARATION
PIPING PRIOR TO REMOVING 4" PIPING OR
CONTRACTOR SHALL RESTRAIN EXISTING1.
NOTES:
/s T
H O
M A
S E
A N
D R
E P .E
M
A R
C H
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G h4ecnerl
B O b
M D
.d g n
-M
A R -2
:0
0.083333:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
B E
A V
E R R
IV
E R B
A S
IN
B E
R L
IN
L
A K
E R
E S
E R
V O
IR
M
IL
L C
R E
E K W
A T
E R
L
IN
E R
E P
L A
C E
M E
N T
E L E
V A
T E
D W
A T
E R S
T O
R A
G E T
A N
K
CERTIFIED FINAL DOCUMENTS
W
W N
T
TRENCH EXCAVATION.
PROTECT ELECTRICAL LINE DURING
PRIOR TO TRENCH EXCAVATION.
VERIFY LOCATION OF ELECTRICAL LINE
EXISTING CHAIN-LINK SECURITY FENCE
'-0
PIPE
NEW 4" SCH 80 B.S.
NEW 4" D.I. PIPE
APPROVED EQUAL
MEGA LUG RESTRAINT OR
NEW 4" D.I. MJ 90° BEND WITH
ANCHOR BOLTS
CENTER PIPE BETWEEN
MODIFICATIONS
VAULT PIPING
FOR DETAILS OF VALVE
SEE DETAIL 1 ON M-4023
BETWEEN SAWCUTS AND AROUND THRUST BLOCK
PROVIDE NEW 3" THICK CONCRETE FLOOR
REINSTALL EXISTING FILL MATERIAL AND COMPACT.
CONCRETE TO PROVIDE STRAIGHT EDGES.
APPROXIMATELY 30" DEEP. SAW CUT EDGES OF
EXISTING TRENCH THROUGH CONCRETE FLOOREXISTING VALVE VAULT EXISTING ELECTRICAL PANEL
ACCESS DOOR
EXISTING 30" X 60"
BE ABANDONED
TO WATER TANK TO
EXISTING FILL LINE
EXISTING CONCRETE STEP
EXISTING ACCESS HATCHES
EXISTING ELEVATED WATER TANK PEDESTAL
EXISTING FOUNDATION WALL
EXISTING FOUNDATION SPREAD FOOTER
EXISTING LADDER UP TO SECOND LEVEL
(TYP)
EXISTING ANCHOR BOLTS
(TYP)
EXISTING STIFFNERS
EXISTING 4" FILL/WITHDRAW PIPE
EXISTING 4" GATE VALVE FOR BYPASS
RISER
EXISTING OVERFLOWEXISTING OVERFLOW PIPE
INSULATION
EXISTING
CONDUIT
EXISTING
EXISTING POWER POLE
EXISTING CATCH BASIN
WATERLINE
EXISTING VALVE VAULT FOR NEW
CORE DRILL 8" HOLE THROUGH
W E
L L P
IT
T O W
A T
E R
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G h4ecnerl
B O b
M -1
.d g n
-M
A R -2
:0
0.083333:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
B E
A V
E R R
IV
E R B
A S
IN
B E
R L
IN
L
A K
E R
E S
E R
V O
IR
M
IL
L C
R E
E K W
A T
E R
L
IN
E R
E P
L A
C E
M E
N T
E L E
V A
T E
D W
A T
E R S
T O
R A
G E T
A N
K
CERTIFIED FINAL DOCUMENTS
W
W N
T
O V
E R
A L L S
IT
L
O W
E
E L E
IS
U R
E
4'0 2' 8'
SCALE: 3/8"=1'
M-1022
OVERALL SITE PLAN
SCALE: 3/8"=1'-0"
P L
A N
C L
IC
H T
Y
A M -3
N
M -3
B
LC
LC
LC
SEE DRAWING M-5025 FOR WATERLINE TRENCH DETAILS.5.
BE DETERMINED IN THE FIELD WITH THE CONTRACTING OFFICER.
BE ROUTED THROUGH CONDUIT. ROUTING FOR CONDUIT SHALL
ELECTRICAL CONDUCTORS FOR HEAT TRACE CIRCUIT SHALL4.
OF INSULATION AND HEAT TRACE.
ALL STEEL PIPING SHALL BE PAINTED PRIOR TO INSTALLATION3.
PROVIDED WITH THRUST RESTRAINTS.
ALL MECHANICAL JOINT PIPE AND FITTINGS TO BE2.
WITH FLAT FACE.
FLANGES FOR 4" STEEL PIPE SHALL BE SOCKET WELD TYPE1.
NOTES:
/s T
H O
M A
S E
A N
D R
E P .E
M
A R
C H
EL. 1038.26
E L .2
E L .7
1'-6"
1'-3 1/2 "8"
10'-3"
" 8"
PROVIDE 4" PIPE PLUG
TELEMETERING PANEL
FLEXIBLE LINE FROM
RECONNECT EXISTING
PIPE
PIPE SUPPORT UNDER
PROVIDE ADJUSTABLE
NEW 4" D.I. PIPE
NEW FLANGED D.I. 90° BEND
NEW 4" D.I. PIPE
WATER TIGHT SEAL.
AND CONCRETE TO PROVIDE A
SEAL OR EQUAL) BETWEEN PIPE
PROVIDE MECHANICAL SEAL (LINK
IF NECESSARY
PIPE. RELOCATE EXISTING HEATERS
EXISTING VALVE VAULT FOR 4" D.I.
CORE DRILL 8" DIA HOLE THROUGH
THREADED 90° BEND
NEW 1/2" SCH 40 GALVANIZED STEEL
TELEMETERING LINE
PROVIDE PIPE ADAPTOR FOR
OF PIPING
DETAIL 4 ON M-5025 FOR ELEVATION
TELEMETRY PRESSURE LINE. SEE
PROVIDE 4" D.I. TAPPING SADDLE FOR
90° ELBOW
EXISTING 4" FLANGED
EXISTING 4" FLANGED TEE
EXISTING TELEMETERING PANEL
EXISTING 4" DI PIPE
EXISTING 4" DI PIPE
GATE VALVE
EXISTING 4" FLANGED
AWWA NRS GATE VALVE
EXISTING 4" FLANGED
DI PIPE
EXISTING 4" FLANGED
PIPE TO EXISTING GATE VALVE
ATTACH NEW 4" FLANGED D.I.
VERTICAL PIPE SUPPORTS ARE SIMILAR.
VALVE PIT STANDON MODEL S92 OR EQUAL.
PIPE SUPPORT MOUNTED ON WALL OF
PROVIDE GALVANIZED STEEL ADJUSTABLE
L
O W
E
E L E
IS
U R
E
LC
LC
LC
LC
0 1' 2'6"
SCALE: 1"=1'
M-4023
V A
L V
E V
A U
L T
P L
A N
M-1022 SCALE: 1"=1'-0"
VALVE VAULT PLAN
C L
IC
H T
Y
N
SYSTEM
TO DISTRIBUTION
/s T
H O
M A
S E
A N
D R
E P .E
M
A R
C H
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G h4ecnerl
B O b
M -4
.d g n
-M
A R -2
:0
0.083333:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
B E
A V
E R R
IV
E R B
A S
IN
B E
R L
IN
L
A K
E R
E S
E R
V O
IR
M
IL
L C
R E
E K W
A T
E R
L
IN
E R
E P
L A
C E
M E
N T
E L E
V A
T E
D W
A T
E R S
T O
R A
G E T
A N
K
CERTIFIED FINAL DOCUMENTS
W
W N
T
1'-3"
AND CONCRETE THRUST BLOCK
PAD BETWEEN BASE BEND FOOT
PROVIDE 1" TO 2" THICK GROUT
NEW 4" SCH 80 B.S. PIPE
NEW FABRICATED 4" SCH 80 B.S. TEE
NEW 4" D.I. FLANGED BASE BEND
PROVIDE 1" CHAMFER ALL AROUND
THRUST BLOCK
MATERIAL ALL AROUND
PROVIDE 1/2" EXPANSION
THRUST BLOCK
NEW 2'-0"X2'-0" CONCRETE
NRS GATE VALVE
NEW 4" FLANGED AWWA
NRS GATE VALVE
NEW 4" FLANGED AWWA
PIPE SUPPORT
NEW ADJUSTABLE
FLANGE ON EXISTING PIPE
INSTALL SOCKET WELD
CUT EXISTING 4" PIPE AND
ON HORIZONTAL PIPE
PROVIDE GROUND CLAMP
AND TANK PEDESTAL
WATER TIGHT SEAL BETWEEN SHIELD
INSULATION SHIELD TO PROVIDE
PROVIDE SILICONE SEALANT AROUND
CLAMP
TO EXISTING WITH COMPRESSION
CONNECT NEW #6 GROUND WIRE
BE RATED 3500 LB LOADING
AND RISER PIPE CLAMP. RISER CLAMP TO
ADJUST HEAT TRACE TO CLEAR C6X8.2
INSULATION IN AREA OF SUPPORT AND
2" INSULATION AND HEAT TRACE. REMOVE
EXISTING 4" SCH 40 B.S. FILL PIPE WITH
NEW 4" D.I. PIPE
BLOCK
CONCRETE THRUST
PROVIDE 2'-0"X2'-0"
RESTRAINTS
NEW 4" MJ 90° BEND W/THRUST
INSTALLATION OF SUPPORT.
INSULATION TO REPLACE INSULATION REMOVED FOR
LUGS SHALL REMAIN ON THE TANK. PROVIDE NEW PIPE
PROVIDED TO THE PROJECT PERSONNEL. THE WELDED
BOLTS, AND RISER CLAMP SHALL BE REMOVED AND
PLATFORM. ONCE ALL PIPING IS COMPLETE THE (2) C6X8.2,
PROVIDE 6'-6" CLEARANCE FROM TOP OF CONDENSATE
INSTALL NEW PIPE SUPPORT C6X8.2 CHANNELS LEVEL TO
SEE DETAIL 4 ON S-5030
NEW PIPE SUPPORT ANCHORS
DETAIL 1 ON M-5025
SEE TANK CONE REPAIR
DETAIL 4 ON S-5030
PIPE SUPPORT ANCHORS
NEW ANCHOR BOLTS SEE
SEE DETAIL 2 ON M-5025
NEW OVERFLOW PIPE SUPPORT
CLAMP SEE, NOTE 6
WIRE TO NEW 4" GROUNDING
EXTEND NEW #6 GROUND
THROUGH WALL OF PEDESTAL
REQUIRED ALIGNMENT
ROTATE FLANGE TO PROVIDE
INSULATION
HEAT TRACE, AND PIPE
EXISTING 4" SCH 40 B.S. PIPE,
PEDESTAL CONE WALL
STIFFNER
5/8" BASE PLATE
CONCRETE FOUNDATION
EXISTING 4" BASE BEND
CONCRETE THRUST BLOCK
EXISTING 18"X18"X6"
EXISTING 4" FILL/WITHDRAW LINE
EXISTING CONDENSATE PLATFORM 1
OVERFLOW PIPE
EXISTING 4" SCH 40 B.S.
TO INSTALL THRUST BLOCK
CONDUIT AS NECESSARY
CUT EXISTING ELECTRICAL
EL. 1044.08±
CONCRETE FLOOR
OVERFLOW PIPE
EXISTING 4"
PLATFORM 2
TO CONDENSATE
EXISTING LADDER
EXISTING LADDER
VALVE
EXISTING FLANGED GATE
INSULATION
WITH HEAT TRACE AND
FILL/WITHDRAW PIPE
EXISTING 4" SCH 80 B.S.
2'-10 1/4"
NEW NON-SHRINK GROUT PAD
TANK PEDESTAL
ALIGNMENT THROUGH WALL OF
HOLES TO PROVIDE CORRECT
FLANGES. ALIGN BOTTOM FLANGE
SCH 80 B.S. TEE WITH SOCKET WELD
FLANGED TEE WITH NEW FABRICATED
REPLACE EXISTING 4" DIA. FABRICATED
CONDENSATE PLATFORM 1
ON TRENCH THRU FLOOR
FLOOR AROUND THRUST BLOCK AND
PROVIDE NEW 3" THICK CONCRETE
COMPACT FILL IN 4" LAYERS
FOR CONSTRUCTION OF THRUST BLOCK
REINSTALL STRUCTURAL FILL REMOVED
NEW 4" DI FLANGE BASE BEND
BLOCK
CONSTRUCTION OF THRUST
FLOWABLE GROUT PRIOR TO
PIPE TO VALVE VAULT WITH
CUT EXISTING 4" PIPE AND FILL
BLOCK
CONSTRUCTION OF THRUST
FLOWABLE GROUT PRIOR TO
PIPE TO VALVE VAULT WITH
EXISTING 4" PIPE AND FILL
EXISTING 4" FILL LINE. CUT
M-3024
L E
IS
U R
E
J L
O W
E
C L
IC
H T
Y
S E
C T
IO
N S
C6X8.2
C6X8.2
A
M-1022 SCALE: 1/2"=1'-0"
SECTION
0 2' 4'1'
SCALE: 1/2"=1'
LC
LC
C
C
- SCALE: 1"=1'-0"
STRUCTURAL SECTION
EL. 1041.53
EL. 1045.20
B
M-1022 SCALE: 1"=1'-0"
SECTION
0 1' 2'6"
SCALE: 1"=1'
EL. 1045.20
LC
S-5030
A S -5
PIPE INSULATION AND HEAT TRACE NOT SHOWN FOR CLARITY.7.
CLAMP.
ROUTE UP SIDE OF NEW THRUST BLOCK TO NEW GROUNDING
CONNECT NEW GROUND WIRE TO EXISTING GROUND WIRE AND6.
WITH SENSOR BULB ON EXTERIOR PIPING.
EXISTING ELECTRIC PANEL. PROVIDE THERMOSTAT AND INSTALL
PROVIDE ELECTRICAL CIRCUIT FOR NEW HEAT TRACING FROM5.
INSULATION SHIELD ON EXTERIOR PIPING.
4" TEE TO WHERE PIPE ENTERS THE GROUND. PROVIDE
NEW PIPING FROM THE GATE VALVE ABOVE THE FABRICATED
PROVIDE 2" THICK PIPE INSULATION AND HEAT TRACING ON4.
INSULATION WITH NEW.
AFTER INSTALLATION OF PIPING. REPLACE REMOVED
AS REQUIRED TO REPLACE PIPING. REINSTALL HEAT TRACE
REMOVE EXISTING PIPNG INSULATION AND HEAT TRACING3.
CONCRETE THRUST BLOCK OR FLOOR.
MANUALLY COMPACT FILL MATERIAL PRIOR TO PLACING2.
EXISTING PIPING.
TEMPORARY FILL PIPE SUPPORT PRIOR TO REMOVING
PROVIDE PIPING SUPPORTS FOR OVERFLOW PIPING AND1.
NOTES:
T O T
A N
K
CONCRETE FLOOREL. 1044.08
EL. 1044.50
EL. 1045.78
TO VALVE PIT
EL. 1044.00
APPROX. GRADE
TANK
EL. 1046.10
EL. 1041.53
TO CATCH BASIN
EL. 1038.26
PIT
TO VALVE
N
/s T
H O
M A
S E
A N
D R
E P .E
M
A R
C H
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G h4ecnerl
B O b
M -3
.d g n
-M
A R -2
:0
0.083333:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
B E
A V
E R R
IV
E R B
A S
IN
B E
R L
IN
L
A K
E R
E S
E R
V O
IR
M
IL
L C
R E
E K W
A T
E R
L
IN
E R
E P
L A
C E
M E
N T
E L E
V A
T E
D W
A T
E R S
T O
R A
G E T
A N
K
CERTIFIED FINAL DOCUMENTS
W
W N
T
NEW 4" SCH 80 B.S. PIPE
X 4-5/8" I.D. X 3/8" THICK
NEW PLATE 12" O.D.
WELD 90° BEND
CURVATURE OF EXISTING BUTT
COPE END OF PIPE TO MATCH
REQUIRED TO FIT FIELD REQUIREMENTS
NEW 4" SCH 40 B.S. PIPE LENGTH AS
NEW 7"X7"X1/2" STEEL PLATE
9" O.D.
7-1/2" BOLT CIRCLE
DRILL AND TAP FOR 1" NPT
(TYP 8 LOCATIONS)
5/8" HOLE THRU
V A
R
IE
S
GRADE4" TOP SOIL
IN 6" LAYERS
BACK FILL TO BE TAMPED
SUITABLE COMPACTED
ALL TRENCHES
ID MARKING TAPE TYP
6" WIDE DETECTABLE
(SELECT MATERIAL)
INTIAL BACK FILL
4.28" PIPE I.D.
STRUCTURAL FILL
BEDDING MATERIAL COMPACTED
BLIND FLANGE
PROVIDE NEW 4" D.I.
COLUMN WITH FLOWABLE GROUT
BASE BEND AND FILL VERTICAL
PROVIDE PLUG IN PIPE BEYOND
EXISTING 4" SCH 40 B.S. PIPE.
NEW CONCRETE
CONE PLATE
EXISTING 5/16" THICK
EXISTING STRUCTURAL FILL MATERIAL
CONDUIT
EXISTING ELECTRICAL
FLOOR. FLOOR EL. 1044.08
EXISTING 2-1/2" CONCRETE
BUTT WELD 90° BEND
EXISTING 4" SCH 40 B.S.
OVERFLOW PIPE
EXISTING 4" SCH 40 B.S.
BASIN
OVERFLOW PIPE TO CATCH
EXISTING 4" SCH 40 B.S.
TO BE INSTALLED AFTER WELDING
CENTERLINE FOR HEAT TRACE
BOTH PLATES ON VERTICAL
PROVIDE 5/8" DIA. HOLE THROUGH
NEW 1/2" HOSE BIB
THREADED TEE
NEW 1/2" GALVANIZED STEEL
STEEL PIPE
NEW 1/2" SCH 40 GALVANIZED
STEEL PIPE
NEW 1/2" SCH 40 GALVANIZED
NEW 1/2" BRONZE BALL VALVE
STEEL PIPE NIPPLE
NEW 3"X1/2" SCH 40 GALVANIZED
NEW 4" D.I. PIPE
WITH 1/2" NPT OUTLET
NEW DUCTILE IRON SERVICE SADDLE
/1
PIPE NIPPLE
NEW 1" DIA X 3" BRASS
WITH THREADED PLUG
NEW 1" BRONZE BALL VALVE
TAP FOR 1" NPT
NEW 4" BLIND FLANGE
M-5025
L E
IS
U R
E
6"0 3" 1'
SCALE: 3"=1'
1' 2'0 6"
SCALE: 1-1/2"=1'
LC
LC
J L
O W
E
C L
IC
H T
Y
3"0 6"1-1/2"
SCALE: 6"=1'
M-3024 SCALE: 3"=1'-0"
TANK CONE REPAIR DETAIL
1/4
1/4
M-3024 SCALE: 1-1/2"=1'-0"
OVERFLOW PIPE SUPPORT DETAIL
M-4023 SCALE: 6"=1'-0"
BLIND FLANGE DETAIL
M
IN
PIPE O.D. MAX
8"
MAX
8"
MIN.
6"
MIN.
6"
M E
C H
A N
IC
A L D
E T
A
IL
S
M-4023 SCALE: NTS
SERVICE SADDLE DETAIL WATERLINE TRENCH DETAIL
SCALE: NTS
INSTALLATION ONCE TEMPORARY WATER SYSTEM PIPING IS REMOVED.
CONTRACTOR TO FABRICATE, ASSEMBLE, AND PROVIDE TO GOVERNMENT FOR1.
NOTE:
PLAN
ELEVATION
EL. 1046.10
TO FILL PIPE
EL. 1046.94
TANK
STORAGE
FROM
1/4
3/16
3/16
/s T
H O
M A
S E
A N
D R
E P .E
M
A R
C H
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G h4ecnerl
B O b
M -5
.d g n
-M
A R -2
:0
0.083333:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
B E
A V
E R R
IV
E R B
A S
IN
B E
R L
IN
L
A K
E R
E S
E R
V O
IR
M
IL
L C
R E
E K W
A T
E R
L
IN
E R
E P
L A
C E
M E
N T
E L E
V A
T E
D W
A T
E R S
T O
R A
G E T
A N
K
CERTIFIED FINAL DOCUMENTS
W
W N
T
THRUST BLOCK
TOP OF CONCRETE
CIRCLE
ROD ON 4-3/4" DIA BOLT
CAST-IN-PLACE ANCHOR
GRADE 55 HEAVY HEX HEAD
PROVIDE (4) 5/8"DIA F1554
N O
N -S
H R
IN
K G
R O
U T
M
IN
T
O
M A
X
GROUT
BASE BEND ANCHOR PLATE
THRUST BLOCK, AND VERTICAL PIPING
CENTERLINE OF ANCHOR BOLTS,
3-3/8"
-3 /8
TANK SHELL
INSIDE DIA. OF
6"
3/8" PLATE
3"3"
TO CHANNEL WEB
AND GRIND FILLET FLUSH
CUT OUT FLANGE OF C6
TANK SHELL
INSIDE FACE OF
7/8 " 7/8 "
1'-0"
/4
/4
FOR 1/2" DIA. A325 BOLT (TYP)
9/16" DIA. HOLE CENTERED
PLATE 1/4"X1'-0"X2-1/2"
(TYP)
PLATE 1/4"X3-1/2"X2-1/2"
5"
1/2"
THIS SHEET
SEE DETAIL 2
6"X6"X3/8" PLATE
TANK SHELL
INSIDE OF
SEE DETAIL 3
C6X8.2 (TYP)
3-1/2"
2-1/2"3-1/2"
-1 /2
-1 /2
-1 /2
-1 /2
6-1/2"
A325 BOLTS
A325 BOLTS
SLOTTED HOLES 13/16"X1"
LC PLATE AND ANCHORS
E M
B E
D
B
S-5030
L E
IS
U R
E
6"0 3" 1'
SCALE: 3"=1'
3"0 6"1-1/2"
SCALE: 6"=1'
S T
R U
C T
U R
A L D
E T
A
IL
S
A
M-3024 SCALE: 6"=1'-0"
SECTION
- SCALE: 6"=1'-0"
DETAIL2
- SCALE: 6"=1'-0"
DETAIL
M-3024 SCALE: 3"=1'-0"
DETAIL
1/4"
1/4"
3/16"
TYP
3/16"
TEMPLATE
ANCHORS ARE TO BE CAST-IN-PLACE USING A4.
FROM PLATFORM BELOW.
BOTTOMS OF CHANNELS SHALL BE 6'-6" CLEAR3.
ABOVE.
EACH END) THAN DIMENSIONS TAKEN IN NOTE ONE
CHANNEL LENGTHS WILL BE CUT 1" LESS (1/2"2.
DIAMETER FOR EACH CHANNEL LOCATED ON PLAN.
MEASURE LENGTH INSIDE DIAMETER TO INSIDE1.
NOTES:
B
- SCALE: 3"=1'-0"
SECTION
3/16"
F
M O
R O
N E
R
K U
C
IN
S K I
/s
V
IN
C E
N T D
E C
A R
L O P .E
M
A R
C H
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
1 2 3 4 5 6 7 8 9 10
F
IL
E N
A M
E
P L
O T D
A T
E
A
B
C
D
E
F
G h4ecnerl
B O b S -5
.d g n
-M
A R -2
:0
0.083333:1
P
IT
T S
B U
R G
H D
IS
T R
IC
T
A N
S
L
IB
E R
T Y A
V E
N U
E
P
IT
T S
B U
R G
H P
A
B E
A V
E R R
IV
E R B
A S
IN
B E
R L
IN
L
A K
E R
E S
E R
V O
IR
M
IL
L C
R E
E K W
A T
E R
L
IN
E R
E P
L A
C E
M E
N T
E L E
V A
T E
D W
A T
E R S
T O
R A
G E T
A N
K
CERTIFIED FINAL DOCUMENTS
W
W N
T
M-3024 SCALE: 3"=1'-0"
PIPE SUPPORT ANCHORS DETAIL
thomas.e.andre Callout Replace ladder with new stainless steel ladder thomas.e.andre Callout Replace steel riser pipe, heating cables and insulation with new steel riser pipe, heating cables and insulation thomas.e.andre Callout Replace steel overflow line and reroute through side of pedestal thomas.e.andre Callout Replace existing fixtures with new fixtures of same type (Typ) thomas.e.andre Callout Replace existing Lighting Panel B with new lighting panel thomas.e.andre Callout Install new catch basin, connect to existing drain line and reroute tank overflow line through pedestal wall with screened elbow above catch basin thomas.e.andre Callout Replace hasps and gasaket on access hatch thomas.e.andre Callout Replace fixture with new fixture of same type thomas.e.andre Callout Replace ladder with new galvanized steel ladder thomas.e.andre Callout Extend overflow line through wall of pedestal to drain into new catch basin. Extend condensate drain line to existing drain line at floor and cap pipe throught floor thomas.e.andre Text Box
GENERAL NOTES FOR TANK REHABILITATION:
1 Replace fill and discharge pipe within the water tank.
2. Install water recirculation system in the tank bowl.
3. Replace seal on manhole at base of tank
4. Replace ladders in the pedestal and tank
5. Repair cathodic protection system access holes in top of tank
6. Replace overflow and condensate drain lines and reroute as specified.
7. Modify landing for proper drainage.
8. Replace tank vent.
9. Replace access hatch hasps
10. Replace access hatch gasket
11. Replace water control system, including wiring to Wells Nos. 2 and 3
12. Replace existing suspended cathodic protection system with new floating cathodic protection system
13. Clean and paint the interior and exterior of the tank.
thomas.e.andre Callout Extend overflow line through wall of pedestal to discharge into new catch basin thomas.e.andre Callout Replace seal on manhole
| Contract Drawings |
| BO35b_100_G-0035 |
| BO35b_100_G-0036 |
| BO35b_204_G-1037 |
| BO35b_204_G-1038 |
| BO35b_204_V-1005 |
| BO35b_993_X-1005 |
| BO35b_993_X-5006 |
| BO35b_993_X-0007 |
| BO35b_778_MD1020 |
| BO35b_778_MD4021 |
| BO35b_778_M-1022 |
| BO35b_778_M-4023 |
| BO35b_778_M-3024 |
| BO35b_778_M-5025 |
| BO35b_778_S-5030 |
| Reference Drawings |
| O35b-U1-12_101.1 |
| f1 of f1 |
| 1 of 8 |
| 2 of 8 |
| 3 of 8 |
| 4 of 8 |
| 5 of 8 |
| 6 of 8 |
| 7 of 8 |
| 8 of 8 |
File details come from the government source that posted it.