Exhibit_A_-_Specifications.pdf
PDF 469 KB Posted
- Attached to
- Access Roads Pavement Improvements Federal contract opportunity
- Solicitation number
- W911WN-17-T-8001
About this file
Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911WN-17-T-8001-0001_Amendment.pdf | ||
| W911WN-17-T-8001-0001_Amdmt_Conformed_Copy.pdf | ||
| Pre-Quote_Solicitation_Information.pdf | ||
| Pre-Quote_Site_Visit_Agenda.pdf | ||
| Pre-Quote_Attendee_Sign-in.pdf | ||
| W911WN-17-T-8001.pdf | ||
| Exhibit_B_-Plans.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IFB W911WN-17-T-8001
Emsworth Locks and Dams, Ohio River and West View Continuity of Operations (Coop) Site Allegheny County, Pennsylvania
Access Road Pavement Improvements
Certified Final Documents Technical Specifications July 2017
Emsworth L/D and West View Coop Site Paving
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 22 00.00 10 MEASUREMENT AND PAYMENT
01 32 17 CONSTRUCTION PROGRESS SCHEDULE
01 32 33 DIGITAL PROGRESS IMAGES
01 33 00 SUBMITTAL PROCEDURES
01 35 00.00 08 SPECIAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 45 01.00 08 USACE QUALITY CONTROL
01 57 20.00 10 ENVIRONMENTAL PROTECTION
DIVISION 02 - EXISTING CONDITIONS
02 42 00.00 08 DISPOSAL OF MATERIALS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 17.61 SEALING CRACKS IN ASPHALT PAVING
32 11 23.00 08 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE
32 12 16.00 08 BITUMINOUS PAVEMENT CONSTRUCTION
32 12 36.13 ASPHALTIC SEAL AND FOG COATS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1 W911WN-17-T-8001 - Certified Final Submittal
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
1.1.1 General
1.1.2 Reimbursement For Actual Performance And Payment Bond Premiums
1.1.2.1 Unit of Measure
1.1.2.2 Payment Items
1.1.3 Protection and Maintenance of Traffic During Construction
1.1.3.1 Unit of Measure
1.1.3.2 Payment Items
1.2 UNIT PRICE PAYMENT ITEMS
1.2.1 General
1.2.2 Digital Progress Images
1.2.2.1 Payment
1.2.2.2 Measurement
1.2.2.3 Unit of Measure
1.2.2.4 Payment Item
1.2.3 Removal of Existing Surfacing
1.2.3.1 Payment
1.2.3.2 Measurement
1.2.3.3 Unit of Measure
1.2.3.4 Payment Item
1.2.4 Bituminous Pavement
1.2.4.1 Payment
1.2.4.2 Measurement
1.2.4.3 Unit of Measure
1.2.4.4 Payment Items
1.2.5 Crack Filling
1.2.5.1 Payment
1.2.5.2 Measurement
1.2.5.3 Unit of Measure
1.2.5.4 Payment Items
1.2.6 Sealing Pavement
1.2.6.1 Payment
1.2.6.2 Measurement
1.2.6.3 Unit of Measure
1.2.6.4 Payment Items
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 22 00.00 10 Page 1
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
1.1.1 General
Payment items for the work of this contract for which contract lump sum payments will be made are listed in the PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, shall be included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1.2 Reimbursement For Actual Performance And Payment Bond Premiums
Payment for reimbursement for actual performance and payment bond premiums will be made as specified in 00800 SPECIAL CONTRACT REQUIREMENTS, clause
PAYMENT FOR PERFORMANCE AND PAYMENT BONDS.
1.1.2.1 Unit of Measure
Unit of Measure: Job
1.1.2.2 Payment Items
0001 REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BONDS PREMIUMS
0007 REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BONDS PREMIUMS
1.1.3 Protection and Maintenance of Traffic During Construction
Payment will be made for costs associated with developing and implementing traffic control maintenance and protection measures (signing, lighting, channelization devices, etc.), in accordance with Section 01 35 00.00 08 SPECIAL PROCEDURES, including provisions for protecting and accommodating vehicular and pedestrian traffic, and any additional requirements necessary to maintain traffic within the project area, as required throughout the life of the contract. Price shall include all materials, labor, and equipment, and supplies associated with this work.
1.1.3.1 Unit of Measure
Unit of Measure: Job
SECTION 01 22 00.00 10 Page 2
1.1.3.2 Payment Items
0003 PROTECTION AND MAINTENANCE OF TRAFFIC DURING CONSTRUCTION
1.2 UNIT PRICE PAYMENT ITEMS
1.2.1 General
Payment items for the work of this contract on which the contract progress payments will be based are listed in the PRICE SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
1.2.2 Digital Progress Images
1.2.2.1 Payment
This work is specified in Section 01 32 33 DIGITAL PROGRESS IMAGES.
Payment will be made for costs associated with taking, processing, labeling, and delivering the images.
1.2.2.2 Measurement
Measurement will be made of the number of sets of photographs taken and delivered to the Contracting Officer as approved or directed by the Contracting Officer. Each set shall consist of all specified prints and slides for each photographic session as specified.
1.2.2.3 Unit of Measure
Unit of measure: Set.
1.2.2.4 Payment Item
0002 DIGITAL PROGRESS IMAGES
0008 DIGITAL PROGRESS IMAGES
1.2.3 Removal of Existing Surfacing
1.2.3.1 Payment
This work is specified in Section 32 12 16.00 08 BITUMINOUS PAVEMENT CONSTRUCTION. Payment will be made for costs associated with removal and disposal of existing bituminous concrete as specified and as shown on the drawings. The price shall include the cost of all labor, materials, and the use of all equipment and tools required to complete the work.
1.2.3.2 Measurement
Measurement for removal of existing bituminous pavement and aggregate base course will be by the square yard of bituminous pavement and aggregate material removed. Measurement will be based on the area of the existing bituminous pavement upon completion of removal.
SECTION 01 22 00.00 10 Page 3
1.2.3.3 Unit of Measure
Unit of measure: Square Yard.
1.2.3.4 Payment Item
0004 REMOVE AND DISPOSE OF EXISTING BITUMINOUS MATERIAL
1.2.4 Bituminous Pavement
1.2.4.1 Payment
This work is specified in Section 32 12 16.00 08 BITUMINOUS PAVEMENT CONSTRUCTION. Payments for bituminous binder course and bituminous wearing course shall constitute full compensation for furnishing all materials, equipment, plant, and tools; and for labor and other incidentals necessary to complete the work required as specified, including, but not limited to, base preparation (aggregate) and joint treatment at the interfaces of new paving with existing paving. No separate payment will be made for bituminous tack coat, and all costs in connection therewith shall be included in the applicable pavement to which the work applies.
1.2.4.2 Measurement
The volume of bituminous binder or wearing course in place and accepted will be determined by a two-dimensional measurement of the actual area of pavement. The Contracting Officer shall approve all methods and procedures for quantity surveys. Quantities shall be calculated in square yards in place.
1.2.4.3 Unit of Measure
Unit of measure: Square Yards.
1.2.4.4 Payment Items
0005 BITUMINOUS BINDER COURSE, 2-1/2" THICK (SUPERPAVE 19.0 MM)
0006 BITUMINOUS WEARING COURSE, 1-1/2" THICK (SUPERPAVE 9.5 MM)
0009 FILL POTHOLES (SUPERPAVE 9.5 MM)
1.2.5 Crack Filling
1.2.5.1 Payment
This work is specified in Section 32 12 36.13 ASPHALTIC SEAL AND FOG COATS. Payment for asphaltic seal and fog coats shall constitute full compensation for furnishing all labor, materials, equipment, plant, and tools, and other incidentals necessary to complete the work required as specified.
1.2.5.2 Measurement
Measurement for crack filling will be determined by a measurement of the actual length of filler material. The Contracting Officer shall approve all methods and procedures for quantity surveys.
1.2.5.3 Unit of Measure
Unit of measure: Linear Foot
SECTION 01 22 00.00 10 Page 4
1.2.5.4 Payment Items
0010 ASPHALT CRACK REPAIR
1.2.6 Sealing Pavement
1.2.6.1 Payment
This work is specified in Section 32 01 17.61 SEALING CRACKS IN ASPHALT PAVEMENT. Payment for sealing cracks in asphalt pavement shall constitute full compensation for furnishing all labor, materials, equipment, plant, and tools, and other incidentals necessary to complete the work required as specified.
1.2.6.2 Measurement
Measurement for sealing pavement will be determined by a two-dimensional measurement of the actual area of pavement. The Contracting Officer shall approve all methods and procedures for quantity surveys. Quantities shall be calculated in square yards in place.
1.2.6.3 Unit of Measure
Unit of measure: Square Yards
1.2.6.4 Payment Items
0011 FOG SEAL PAVEMENT
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 22 00.00 10 Page 5
DIVISION 01 - GENERAL REQUIREMENTS
01 32 17
CONSTRUCTION PROGRESS SCHEDULE
PART 1 GENERAL
1.1 SUBMITTALS
1.2 QUALIFICATIONS
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.2 MONITORING CONSTRUCTION PROGRESS
3.3 PROGRESS SCHEDULE - BAR CHART
-- End of Section Table of Contents --
SECTION 01 32 17 Page 1
01 32 17
CONSTRUCTION PROGRESS SCHEDULE
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Bar Chart Schedule; G, RO
1.2 QUALIFICATIONS
The Contractor shall designate an authorized representative who shall be responsible for the preparation of all required project schedule reports.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
Pursuant to Section 00700 CONTRACT CLAUSES, FAR 52.236-15 SCHEDULE FOR CONSTRUCTION CONTRACTS, a Project Schedule as described below shall be prepared. The scheduling of construction shall be the responsibility of the Contractor. Contractor management personnel shall actively participate in its development. Subcontractors and suppliers working on the project shall also contribute in developing and maintaining an accurate Project Schedule. A bar chart shall be prepared in accordance with paragraph PROGRESS SCHEDULE - BAR CHART. The schedule shall be submitted within 20 days after receipt of Notice to Proceed.
3.2 MONITORING CONSTRUCTION PROGRESS
The schedule shall be the basis for measuring Contractor progress. Lack of an approved schedule or scheduling personnel will result in an inability of the Contracting Officer to evaluate Contractor's progress. Failure of the Contractor to provide all information, as specified below, shall result in the disapproval of the entire Project Schedule submission and the inability of the Contracting Officer to evaluate Contractor progress for payment purposes. In the case where Project Schedule revisions have been directed by the Contracting Officer and those revisions have not been included in the Project Schedule, the Contracting Officer may hold retainage up to the maximum allowed by contract, each payment period, until revisions to the Project Schedule have been made.
3.3 PROGRESS SCHEDULE - BAR CHART
The progress chart to be prepared by the Contractor pursuant to Section
SECTION 01 32 17 Page 2
00700 CONTRACT CLAUSE, 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS shall consist of a bar chart as described herein. In preparing this schedule, the scheduling of construction is the responsibility of the Contractor and contractor management personnel shall actively participate in its development. The chart may be prepared in a format proposed by the Contractor and approved by the Contracting Officer. Each activity shall include the applicable Price Schedule item number and show the estimated cost. The chart shall be prepared in sufficient detail to clearly show the Contractor's planned progress and the relationship of the various items of work. Larger activities shall be broken down into smaller activities with clearly defined limits (i.e. Excavation between STA xx and STA yy). In general, the estimated cost of any individual activity should not exceed $50,000. The selection and number of activities shall be subject to the Contracting Officer's approval. The chart shall be updated monthly to show actual progress and percentage of work completed for each activity. The Contractor shall submit, as part of his monthly request for payment, updated copies of his progress schedule identifying the work completed during the reporting period. If the Government issues changes to the existing work or adds additional work items to the contract, the Contractor shall revise his progress schedule accordingly. All costs associated with revising the schedule shall be included as part of the modification of the contract. If the Contractor's progress falls behind his planned work effort, a revised schedule shall be furnished to show how the Contractor proposes to complete the remaining work within the contract time. If the Contractor fails to submit updates as required, the Contracting Officer may withhold approval of partial payment estimates, until such submittals are made.
-- End of Section --
SECTION 01 32 17 Page 3
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 32 33
DIGITAL PROGRESS IMAGES
PART 1 GENERAL
1.1 SCOPE
1.2 SUBMITTALS
1.3 GENERAL REQUIREMENTS
1.3.1 Description
1.3.2 Digital Photographs
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION
3.1 EQUIPMENT
3.2 PHOTOGRAPHY
-- End of Section Table of Contents --
SECTION 01 32 33 Page 1
SECTION 01 32 33
DIGITAL PROGRESS IMAGES
PART 1 GENERAL
1.1 SCOPE
The work under this section includes furnishing digital photographs showing the progress of the construction operations throughout the contract period.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having an "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-11 Closeout Submittals
Thumbnail Hard Copy Prints of Progress Images; G, RO Glossy Prints of Selected Official Progress Images; G, RO Electronic Copy of Selected Official Progress Images; G, RO Electronic Copy of All Other Progress Images; G, RO
Copies of digital progress images in electronic form and hard copy form shall be submitted monthly for approval in accordance with paragraph PHOTOGRAPHY. Progress images shall be submitted in a timely manner as coordinated with the Contracting Officer.
1.3 GENERAL REQUIREMENTS
1.3.1 Description
The Contractor shall, during the progress of the project (including progress of fabrication), furnish the Contracting Officer progress photographs to depict progress of construction throughout the life of the contract. The photographs shall be taken using digital photography equipment furnished by the Contractor. Electronic copies of approved photographs shall be furnished on CD-ROM or other storage media as approved by the Contracting Officer.
1.3.2 Digital Photographs
Digital photographs shall comply with the requirements of paragraph PHOTOGRAPHY. The Contractor shall furnish, using Microsoft Word 2003 or later version, a file with each set of photographs which lists the following identifying information for each photographic image:
Name and location of project Contract number Date taken Contractor (and subcontractor, if applicable) Orientation of view and brief description of work depicted
SECTION 01 32 33 Page 2
Each photograph shall be sequentially numbered. The identifying data shall be placed in the document accompanying the photographs. No identifying data, except the date stamp, shall appear on the photographs.
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION
3.1 EQUIPMENT
The Contractor shall be responsible for furnishing all photographic equipment to perform the work specified by this section. The camera shall have a CCD resolution no less than 7.0 million pixels per image (3072 by 2304) which will provide enough detail to print an 8" by 10" high-resolution photograph. The camera shall produce files that allows the user to download the images onto an IBM-compatible personal computer running Windows 7, and allow the images to be saved in one of the following graphic formats: JPG (Joint Photographic Experts Group), TIFF (Tagged Image File Format) or BMP (Windows Bitmap).
3.2 PHOTOGRAPHY
The Contractor shall, during the progress of the work, furnish the Contracting Officer digitally produced progress photographs to depict the progress of the work both on-site and off-site at fabrication facilities.
All progress images shall be taken at the camera's highest resolution. In coordination with the Contracting Officer, one set of progress photographs per month shall be taken over the full duration of this contract, except photographs will not be required for periods when no work is in progress.
Thumbnail Hard Copy Prints of Progress Images shall be submitted to the Contracting Officer for approval between the first and fifth day of each month. The Contracting Officer will select from the thumbnail views, unless directed otherwise, at least ten views to become official progress images. The selected official progress images shall be printed in color in 8" by 10" format, shall be identified on the back in accordance with paragraph Digital Photographs, and shall be submitted for approval. Glossy Prints of Selected Official Progress Images and Electronic Copy of Selected Official Progress Images shall be furnished within ten days of approval of the thumbnail images. Electronic copies shall be furnished on CD-ROM with file of required photographic information. Electronic Copy of All Other Progress Images (including those not selected) shall be furnished on separate CD-ROM with file of required photographic information with the selected official progress images. Digital photographs shall be taken continuously throughout each month in which work is in progress. Unless otherwise directed by the Contracting Officer, photographs will not be required for periods of time in which work is not being performed. One set of digital photographs shall be taken prior to beginning work, and one set shall be taken upon completion of the work. Additional sets of photographs shall be taken as directed by the Contracting Officer. Enough digital photographs shall be taken to adequately depict each phase of the work and shall show progress made during those phases and at the completion of the project. Digital photographs shall show work accomplished since the previous photographs. Progress photographs shall be submitted as specified herein and in paragraph SUBMITTALS.
-- End of Section --
SECTION 01 32 33 Page 3
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUMMARY
1.2 DEFINITIONS
1.2.1 Submittal Descriptions (SD)
1.2.2 Approving Authority
1.2.3 Work
1.3 MEASUREMENT AND PAYMENT
1.4 SUBMITTALS
1.5 SUBMITTAL CLASSIFICATION
1.5.1 Government Approved (G)
1.5.2 Information Only
1.6 PREPARATION OF CONSTRUCTION SUBMITTALS
1.6.1 Transmittal Form
1.6.2 Procedures
1.6.3 Transmittal Form
1.6.4 Electronic File Format
1.7 INFORMATION ONLY SUBMITTALS
1.8 VARIATIONS
1.8.1 Considering Variations
1.8.2 Proposing Variations
1.8.3 Warranting That Variations Are Compatible
1.8.4 Review Schedule Is Modified
1.9 SUBMITTAL REGISTER
1.9.1 Use of Submittal Register
1.9.2 Contractor Use of Submittal Register
1.9.3 Approving Authority Use of Submittal Register
1.9.4 Copies Delivered to the Government
1.10 SCHEDULING
1.11 GOVERNMENT APPROVING AUTHORITY
1.11.1 Review Notations
1.12 DISAPPROVED SUBMITTALS
1.13 APPROVED SUBMITTALS
1.14 APPROVED SAMPLES
1.15 WITHHOLDING OF PAYMENT
1.16 STAMPS
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 33 00 Page 1
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUMMARY
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.
Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.
Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements. Except as specified herein, the Contractor shall allow for 30 calendar days from date of receipt by the Contracting Officer for Government review of initial submission of submittals. If submittal is incomplete and requires resubmittal, each iteration requires 30 days from date of resubmission for comment and response from Government.
Contractor's Quality Control (CQC) System Manager shall check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as:
Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals.
Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.
All submittals shall be in English.
Section 00700 CONTRACT CLAUSES, FAR 52.236-5, Material and Workmanship, paragraph (b) and FAR 52.236-21, Specifications and Drawings for Construction, paragraphs (d), (e), and (f) apply to all submittals.
1.2 DEFINITIONS
1.2.1 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections.
Submittals are identified by Submittal Description (SD) numbers and titles as follows:
SD-01 Preconstruction Submittals
Submittals which are required prior to start of construction (work)
SECTION 01 33 00 Page 2 includes schedules, tabular list of data, or tabular list including location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work.
Certificates of insurance
Surety bonds
List of proposed Subcontractors
List of proposed products
Construction Progress Schedule
Network Analysis Schedule (NAS)
Submittal register
Schedule of prices
Accident Prevention Plan
Work plan
Quality Control(QC) plan
Environmental protection plan
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-04 Samples
Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified
SECTION 01 33 00 Page 3 requirements. (Testing must have been within three years of date of contract award for the project.)
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports.
Daily logs and checklists.
Final acceptance test and operational test procedure.
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.
Confined space entry permits.
Text of posted operating instructions.
SD-09 Manufacturer's Field Reports
Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and must state the test results; and indicate whether the material, product, or system has passed or failed the test.
Factory test reports.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.
SECTION 01 33 00 Page 4
1.2.2 Approving Authority
Office or designated person authorized to approve submittal.
1.2.3 Work
As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, except those SD-01 Pre-Construction Submittals noted above, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.3 MEASUREMENT AND PAYMENT
No separate payment will be made for the work covered under this section, and the cost of such work shall be included in the item to which the work pertains.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with this section.
SD-01 Preconstruction Submittals
Submittal Register; G, RO
1.5 SUBMITTAL CLASSIFICATION
Submittals are classified as follows:
1.5.1 Government Approved (G)
Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer.
Within the terms of Section 00700 CONTRACT CLAUSES FAR 52.236-21 Specifications and Drawings for Construction, they are considered to be "shop drawings."
1.5.2 Information Only
Submittals not requiring Government approval will be for information only.
They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.
1.6 PREPARATION OF CONSTRUCTION SUBMITTALS
1.6.1 Transmittal Form
Use the sample transmittal form (ENG Form 4025) for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms are included in the QCS software that the Contractor is required to use for this contract.
Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Exercise special care to ensure proper
SECTION 01 33 00 Page 5 listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.
1.6.2 Procedures
Five hard copies and one electronic Portable Document Format (PDF) copy on CD of all submittals shall be submitted to:
Resident Engineer Upper Ohio Area Office 3510 Grand Avenue Pittsburgh, PA 15225
1.6.3 Transmittal Form
Use the transmittal form (ENG Form 4025) for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms are included in the QCS software that the Contractor is required to use for this contract.
Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.
1.6.4 Electronic File Format
Provide submittals other than material samples in both hard copy (paper) and electronic formats. The electronic submittal file must be compiled as a single, complete document, to include the Transmittal Form described in Paragraph Transmittal Form. The electronic submittal file must be named specifically according to its contents (e.g. 01 45 00.00-1.2_Quality Control Plan.pdf).
Electronic files must be of sufficient quality that all information is legible. Electronic format shall be in Adobe.PDF format, unless otherwise specified or directed by the Contracting Officer. Whenever possible, PDF files shall be generated from original documents so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Resolution (OCR) routines are required. Files exceeding 30 pages shall be indexed and bookmarked to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature.
Email electronic submittal documents fewer than 10MB to an email address as directed by the Contracting Officer. Electronic documents over 10MB shall be provided on a CD/DVD, or through an electronic file sharing system such as the AMRDEC SAFE Web Application located at the following website:
https://safe.amrdec.army.mil/safe/
Provide hard copies of submittals as specified in this or other specification sections. Up to four additional hard copies of any submittal may be requested from the Contractor at the discretion of the Contracting Officer, at no additional cost to the Government.
1.7 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals.
SECTION 01 33 00 Page 6
The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract for Government approval. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.
1.8 VARIATIONS
Variations from contract requirements require Government approval pursuant to Section 00700 CONTRACT CLAUSES, FAR 52.236-21 Specifications and Drawings for Construction and will be considered where advantageous to Government.
1.8.1 Considering Variations
Discussion with Contracting Officer prior to submission will help ensure functional and quality requirements are met and minimize rejections and re-submittals. When contemplating a variation which results in lower cost, consider submission of the variation as a Value Engineering Change Proposal
(VECP).
Specifically point out variations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.
1.8.2 Proposing Variations
When proposing variation, deliver written request to the Contracting Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item. Clearly mark the proposed variation in all documentation.
Check the column "variation" of ENG Form 4025 for submittals which include proposed deviations requested by the Contractor. Set forth in writing the reason for any deviations and annotate such deviations on the submittal.
The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.
1.8.3 Warranting That Variations Are Compatible
When delivering a variation for approval, Contractor, warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.
1.8.4 Review Schedule Is Modified
In addition to normal submittal review period, a period of 10 working days will be allowed for consideration by the Government of submittals with variations.
SECTION 01 33 00 Page 7
1.9 SUBMITTAL REGISTER
Prepare and maintain submittal register, as the work progresses. Do not change data which is output in columns (c), (d), (e), and (f) as delivered by Government; retain data which is output in columns (a), (g), (h), and
(i) as approved. A submittal register showing items of equipment and materials for which submittals are required by the specifications is attached to these specifications. This list may not be all inclusive and additional submittals may be required. Maintain a submittal register for the project in accordance with Section 01 45 01.00 08.10 QUALITY CONTROL SYSTEM (QCS). The Government will provide the initial submittal register in electronic format with the following fields completed, to the extent that will be required by the Government during subsequent usage.
Column (c): Lists specification section in which submittal is required.
Column (d): Lists each submittal description (SD No. and type, e.g. SD-02 Shop Drawings) required in each specification section.
Column (e): Lists one principal paragraph in specification section where a material or product is specified. This listing is only to facilitate locating submitted requirements. Do not consider entries in column (e) as limiting project requirements.
Thereafter, the Contractor is to track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the Government.
1.9.1 Use of Submittal Register
Submit submittal register. Submit with QC plan and project schedule.
Verify that all submittals required for project are listed and add missing submittals. Coordinate and complete the following fields on the register submitted with the QC plan and the project schedule:
Column (a) Activity Number: Activity number from the project schedule.
Column (g) Contractor Submit Date: Scheduled date for approving authority to receive submittals.
Column (h) Contractor Approval Date: Date Contractor needs approval of submittal.
Column (i) Contractor Material: Date that Contractor needs material delivered to Contractor control.
1.9.2 Contractor Use of Submittal Register
Update the following fields in the Government-furnished submittal register program or equivalent fields in program utilized by Contractor with each submittal throughout contract.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (j) Action Code (k): Date of action used to record Contractor's review when forwarding submittals to QC.
SECTION 01 33 00 Page 8
Column (l) List date of submittal transmission.
Column (q) List date approval received.
1.9.3 Approving Authority Use of Submittal Register
Update the following fields in the Government-furnished submittal register program or equivalent fields in program utilized by Contractor.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (l) List date of submittal receipt.
Column (m) through (p) List Date related to review actions.
Column (q) List date returned to Contractor.
1.9.4 Copies Delivered to the Government
Deliver one copy of submittal register updated by Contractor to Government with each invoice request.
1.10 SCHEDULING
Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time. No delay damages or time extensions will be allowed for time lost in late submittals.
a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential resubmittal of requirements.
b. Submittals called for by the contract documents will be listed on the register. If a submittal is called for but does not pertain to the contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer does not relieve the Contractor of supplying submittals required by the contract documents but which have been omitted from the register or marked "N/A."
c. Re-submit register and annotate monthly by the Contractor with actual submission and approval dates. When all items on the register have been fully approved, no further re-submittal is required.
d. Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."
1.11 GOVERNMENT APPROVING AUTHORITY
When approving authority is Contracting Officer, the Government will:
a. Note date on which submittal was received.
b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with
SECTION 01 33 00 Page 9 contract documents.
c. Identify returned submittals with one of the actions defined in paragraph Review Notations of this section and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, stamp and date approved submittals. Four copies of the approved submittal will be retained by the Contracting Officer and one copy of the submittal will be returned to the Contractor.
1.11.1 Review Notations
Contracting Officer review will be completed within 30 calendar days after date of submission, except as specified in paragraph SUMMARY. Submittals will be returned to the Contractor with the following notations:
Code Description Status
A Approved as submitted. Completed B Approved, except as noted on drawings. Resubmission not required.
Completed C Approved, except as noted on drawings. Refer to attached comments.
Resubmission required. Resubmit D Will be returned by separate correspondence. Completed E Disapproved. Refer to attachments. Resubmit F Receipt Acknowledged Completed X Receipt acknowledged, does not comply with contract requirements, as noted. Resubmit G Other action required (Specify) Resubmit R Design submittal is acceptable for release for construction. (for D-B
Contracts) Completed K Government concurs with the Interim Design. (for D-B Contracts) Completed
a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered. (A Code)
b. Submittals marked "approved as noted" "or approved except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided he takes no exception to the corrections. (B Code)
c. Submittals marked "Approved, resubmission required" will be returned with comments noting that certain aspects are not approved.
Work may proceed on portions of the work not impacted by the Government's comments. The comments must be addressed by the Contractor and resubmittal is required before work can start for the work associated with the entire submittal. (C Code)
d. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until resubmittal is approved. (E Code)
e. Submittals marked "receipt acknowledged" indicate that the Government has received the submittal and work shall proceed for this item providing it meets contract requirements. This is used for "For Information Only" submittals. (F Code)
SECTION 01 33 00 Page 10
f. Submittals marked "receipt acknowledged, does not comply" indicate that the Government has reviewed the submittal and it does not comply with the contract requirements. Work associated with this submittal will not be accepted until the necessary corrections are made. This response is used for "For Information Only" submittals. The Contractor shall resubmit all non-complying "For Information Only" submittals for Government approval. (X code)
g. All other coded are as noted in the table above and will be returned with additional details from the Government.
1.12 DISAPPROVED SUBMITTALS
Contractor shall make corrections required by the Contracting Officer. The changes shall be made by the Contractor and submitted in accordance with paragraphs SUMMARY and PREPARATION. Any delay caused by iterations of submittals is the Contractor's to bear; unless such process can be shown to have made constructive changes to the contract - in which case the Contractor must notify the Government of such position in writing. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the Section 00700 CONTRACT CLAUSES, FAR 52.243-4 Changes, is to be given to the Contracting Officer. Contractor is responsible for the dimensions and design of connection details and construction of work.
Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense.
If changes are necessary to submittals, the Contractor shall make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.13 APPROVED SUBMITTALS
The Contracting Officer's approval or acceptance of submittals is not to be construed as a complete check, and indicates only that the general method of construction, materials, detailing and other information are satisfactory.
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory construction of all work.
After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
1.14 APPROVED SAMPLES
Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any contract requirements. Before submitting samples, the Contractor shall assure that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.
SECTION 01 33 00 Page 11
Match the approved samples for materials and equipment incorporated in the work. If requested, approved samples, including those which may be damaged in testing, will be returned to the Contractor, at his expense, upon completion of the contract. Samples not approved will also be returned to the Contractor at its expense, if so requested.
Failure of any materials to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. Government reserves the right to disapprove any material or equipment which previously has proved unsatisfactory in service.
Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet contract requirements will automatically void previous approvals.
Contractor to replace such materials or equipment to meet contract requirements.
Approval of the Contractor's samples by the Contracting Officer does not relieve the Contractor of his responsibilities under the contract.
1.15 WITHHOLDING OF PAYMENT
Payment for materials incorporated in the work will not be made if required approvals have not been obtained.
1.16 STAMPS
Stamps used by the Contractor on the submittal data to certify that the submittal meets contract requirements is to be similar to the following:
SECTION 01 33 00 Page 12
| CONTRACTOR |
| (Firm Name) | | _____ Approved | | _____ Approved with corrections as noted on submittal data and/or | | attached sheets(s) |
| SIGNATURE: __________________________________________________________|
| TITLE: ______________________________________________________________|
| DATE: _______________________________________________________________|
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 33 00 Page 13
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 35 00.00 08
SPECIAL PROCEDURES
PART 1 GENERAL
1.1 SUMMARY
1.2 REFERENCES
1.3 SUBMITTALS
1.4 DRAWINGS
1.4.1 Contract Drawings - General
1.5 ACCESS, WORK AREAS, AND RESTRICTIONS
1.5.1 Access Plan
1.5.2 Work Areas
1.5.3 General Work Area Restrictions
1.5.4 Protection of Existing Roads and Property
1.5.4.1 General
1.5.4.2 Hauling Permits
1.5.5 Utilities
1.6 PROTECTION AND MAINTENANCE OF ROAD TRAFFIC
1.7 MAINTENANCE AND PROTECTION OF RAILROAD TRAFFIC
1.7.1 Coordination with Railroad
1.7.1.1 Emsworth Locks and Dams (Norfolk Southern Railway Company
1.8 DAMAGE TO WORK
1.9 OPERATION OF GOVERNMENT FACILITY
1.9.1 Hours of Operation
1.9.2 Contractor's Work Hours
1.9.3 Coordination with Lock Operations
1.9.4 Government Access to the Site
1.9.5 Contractor Coordination and Scheduling
1.10 SAFETY AND HEALTH REQUIREMENTS
1.11 INSPECTIONS AND ACCEPTANCE OF WORK
1.11.1 General
1.11.2 Access to Work
PART 2 PRODUCTS
2.1 PRODUCTS AND PARTS OF STANDARD MANUFACTURE
PART 3 EXECUTION
3.1 SEQUENCE OF WORK
3.1.1 Sequence of Work
3.2 RECORDS AND REPORTS
3.3 ANTITERRORISM (AT) AND PROJECT SPECIFIC SECURITY REQUIREMENTS
3.3.1 Access and General Protection/Security Policy and Procedures
3.3.1.1 Contracting Not Requiring Common Access Card (CAC)
3.3.2 Suspicious Activity Reporting Training
3.3.3 OPSEC Training
3.3.4 Escort of Contractor Employees
3.3.5 Pre-screen candidates using E-Verify Program
3.3.6 Changes in Security Requirements
SECTION 01 35 00.00 08 Page 1
3.3.7 Identification Of Employees
-- End of Section Table of Contents --
SECTION 01 35 00.00 08 Page 2
SECTION 01 35 00.00 08
SPECIAL PROCEDURES
PART 1 GENERAL
1.1 SUMMARY
This section addresses the general requirements applicable to the performance of the work under this contract. These requirements are in addition to those specified in other sections of the contract.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. DEPARTMENT OF HOMELAND SECURITY (DHS)
HSPD-12 (2004) Homeland Security Presidential Directive 12: Policy for a Common Identification Standard for Federal Employees and Contractors
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having an "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Access Plan; G, RO
The Contractor shall submit an access plan to the Contracting Officer for Government lock operating personnel and inspectors, and for Contractor's proposed plan for accessing the site and performing the work the .
SD-07 Certificates
Suspicious Activity Reporting Training; G, RO OPSEC Training; G, RO
1.4 DRAWINGS
1.4.1 Contract Drawings - General
The contract drawings provided reflect the work to be performed under this
SECTION 01 35 00.00 08 Page 3 contract. The Contractor shall check all drawings immediately upon receipt, and verify the figures, dimensions, and representation of the work. The Contractor shall compare all drawings and verify the figures before laying out the work. Dimensions marked on drawings shall, in general, be followed. Use of scaled measurements shall not be permitted.
The Contractor shall promptly notify the Contracting Officer of any discrepancies, and shall be responsible for any errors which might have been avoided by complying with this paragraph.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .