UPDATED.pdf
PDF 29 KB Posted
- Attached to
- Pike Island - Motor Control Center Upgrade Federal contract opportunity
- Solicitation number
- W911WN-16-B-8002
About this file
Solicitation Revision I
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Results.doc | DOC document | |
| Amendment_0003.pdf | ||
| Questions_-_Updated.pdf | ||
| Amendment_0003.pdf | ||
| Questions_-_Updated.pdf | ||
| Revised_Specifications_-_18_May_2016.pdf | ||
| Contractor_Questions_18_May_2016.pdf | ||
| Drawings.pdf | ||
| SOLICITATION_-_AMENDMENT_18_May_2016.doc | DOC document | |
| Site_Visit.pdf | ||
| Drawings.pdf | ||
| SOLICITATION.pdf | ||
| Certified_Final_RTA_-_Revised.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81ET460614564
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
RE: Pike Island Motor Control Center
This amendment is issued to add the date for questions to be submitted under 00100-11 and include the pre-bid conference attendees list.
See Summary of Changes for details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-May-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-16-B-8002
X 9B. DATED (SEE ITEM 11)
21-Apr-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-May-2016
CODE
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CELRP-RC-P
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2203
PITTSBURGH PA 15222-4186
W911WN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911WN-16-B-8002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Technical Specifications 163 31-MAR-2016 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Technical Specifications 163 31-MAR-2016 Attachment 2 SITE VISIT
ATTENDEES
1 09-MAY-2016
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
ADDENDUM TO 00100
ADDENDUM TO SECTION 00100 – INSTRUCTIONS TO BIDDERS
00100-1 POINT OF CONTACT (FEB 2006)
Inquiries may be made by writing this office, or by calling (collect calls not accepted), the following individuals:
Michael J. Ostrosky 412-395-7138 for Technical Information
Matthew Reed 412-395-7157 for Contracting Questions
Requests for hardcopies of the specifications will not be honored by telephone. Vendors must register at http://www.fbo.gov/. This site is also used for obtaining bid results and award information.
00100-2 AMENDMENTS PRIOR TO DATE SET FOR OPENING BIDS
The right is reserved as the interest of the Government may require, to revise or amend the specifications or drawings or both prior to the date set for opening bids. Such revisions and amendments, if any, will be announced by an amendment or amendments to this Invitation for Bids. If the revisions and amendments are of a nature which require material changes in the quantities or prices bid or both, the date set for opening bids may be postponed by such number of days as in the opinion of the Issuing Office will enable bidders to revise their bids. In such cases, the amendment will include an announcement of the new date for opening bids.
00100-3 POSTPONEMENT OF BID OPENINGS
a. Bid openings may be postponed up to or even after the time scheduled for bid opening under the following circumstances:
(i) when the Contracting Officer has reason to believe that the bids of an important segment of bidders have been delayed in the mails for causes beyond their control and without their fault or negligence (such as, but not limited to, flood, fire, accident, weather conditions or strikes); or
(ii) when emergency or unanticipated events interrupt normal Government processes so that the conduct of bid openings as scheduled is impracticable.
b. At the time a determination is made to postpone a bid opening under a(i) above, an announcement of the determination shall be publicly posted and, if practicable before issuance of formal amendment of the invitation, otherwise communicated to prospective bidders likely to attend the scheduled bid opening.
c. In the case of a(ii) above, when urgent Government requirements preclude amendment of the solicitation, the time specified for opening of bids will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume. In such case, the time of actual bid opening shall be deemed to be the time set for bid opening for the purpose of determining "late bids" under FAR 14-304.
00100-4 BID BOND REQUIREMENTS
Each bidder shall submit with his bid, a Bid Bond (Std. Form 24) with good and sufficient surety or sureties acceptable to the Government in the penal sum of twenty percent (20%) of the bid price or $3,000,000.00 whichever is lesser. In order to be considered an acceptable surety, a corporate surety must appear on the list contained in the Department of Treasury Circular 570, "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and Acceptable Reinsuring Companies". The bid bond penalty may be expressed in terms of a percentage of the bid price or may be expressed in dollars and cents. A valid Power of Attorney for an individual acting as agent for surety shall accompany the bond.
FAILURE TO FURNISH A BID BOND OR A VALID POWER OF ATTORNEY, AS
SPECIFIED, WITH BID MAY RESULT IN REJECTION OF BID FOR NON-COMPLIANCE.
Standard Form 24 (Bid Bond) is furnished for information of bidders.
00100-5 CERTIFIED OR CASHIER'S CHECKS, BANK DRAFTS, MONEY ORDERS
OR CURRENCY
When a certified or cashier's check, bank draft, money order, or currency is furnished in lieu of furnishing a surety or sureties on a bond, the regular form of bond must be utilized and signed by the bidder. In the space provided for the insertion of the surety a statement shall be made substantially as follows:
“In lieu of surety (Insert here a description of the negotiable instrument or currency. Description to include where appropriate, date and number of negotiable instrument, bank on which drawn and amount) was furnished. The (check, sum, etc.) was deposited with the Finance and Accounting Officer, Corps of Engineers, Department of the Army, (insert address).”
00100-6 AWARD
Award will be made as a whole to one bidder.
00100-7 ESTIMATED COST OF THE WORK
The estimated cost of the proposed work is between $250,000 and $500,000.
00100-8 LOCATION AND DESCRIPTION OF WORK
Location. The work is located at Pike Island Locks and Dam, Ohio River Mile 84.2 near Wheeling in Ohio County, West Virginia.
Description of Work. The work consists of removing the existing Motor Control Center in the Middle Wall Operations Building and furnishing and installing a new Motor Control Center and appurtenant work.
00100-9 SCOPE OF EMPLOYMENT OF PROFESSIONAL REGISTRANTS
This project was designed by the Pittsburgh District of the U. S. Army Corps of Engineers.
The initials or signatures and registration designations of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152.
00100-10 ACCESS TO SITE
The site of the work may be reached from state highways and local roads and streets as indicated on the drawings.
00100-11 SUBMISSION OF QUESTIONS
All questions must be submitted in writing and shall be emailed to:
Matthew.w.reed@usace.army.mil or faxed to 412-395-7110 with the SUBJECT identified as “W911WN-16-B-8002 – QUESTION” by 10:00 am, Monday, May 16, 2016. Any questions received after the above date will be answered at the discretion of the Contracting Officer.
00100-12 MINIMUM RATES
The wage rates specified in these specifications represent the minimum rates to be paid on the work and are not intended to represent the actual rates that the Contractor may have to pay. The Government does not guarantee that a sufficient supply of qualified labor can be obtained at the minimum rates specified.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .