W911SG22B0032 0002 SOLICITATION AMENDMENT MOD COPY.pdf
PDF 1 MB Posted
- Attached to
- Roof Replacement BLDGs 643 and 746 Federal contract opportunity
- Solicitation number
- W911SG22B0032
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF 1419 B0032.pdf | ||
| OF 1419A B0032.pdf | ||
| OF 1419A2 B0032.pdf | ||
| Sign in Roster 643 and 746.pdf | ||
| W911SG22B0032 0002 SOLICITATION AMENDMENT CONFORM COPY.pdf | ||
| Conform W911SG22B0032 0001.pdf | ||
| MOD W911SG22B0032 0001.pdf | ||
| Wage Determination DBA.pdf | ||
| 100 DWG FY22 Replace Damaged and Leaking Roofs_643 746_042822.pdf | ||
| Solicitation W911SG22B0032.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011785115-0001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment is to:
1. Update Special Contract Requirements;
2. Update Statement of w ork 1.2 NTP; and
3. Incorporate the RFI questions and answ ers.
All other terms and conditions remain unchanged
1. CONTRACT ID CODE PAGE OF PAGES
J 1 35
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Sep-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911SG22B0032
X 9B. DATED (SEE ITEM 11)
19-Aug-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Sep-2022
CODE
MICC - FORT BLISS
111 PERSHING RD
FT BLISS TX 79916
W911SG 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911SG22B0032
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
RFI QUESTIONS AND ANSWERS
RFI QUESTIONS AND ANSWERS
W911SG22B0032
Building 643 and 746 Roof Repair
1. Is there any asbestos or lead abating testing report?
Response: There is no Asbestos reported other than what has been provided.
2. Are there any core samples?
Response: No core samples available.
3. Are the units connected to a control data base out of the building?
Response: Should there be a need to disconnect mechanical units, connectivity will be tested before disconnection of mechanical units if the connections are to be restored.
4. Please indicate what type of deck is on the building.
Response: Contractor to field verify.
BUILDING 643
BUILDING 746
The following have been modified:
SPECIAL CONTRACT INSTRUCTIONS
SPECIAL CONTRACT INSTRUCTIONS
SPECIAL CONTRACT REQUIREMENTS
1. PERFORMANCE AND PAYMENT BONDS FOR CONSTRUCTION CONTRACTS AND
MODIFICATIONS
The Contractor shall provide Performance and Payment Bonds identified in FAR 52.228-15 (DEV), Performance and Payment Bonds within the time specified in Block 12b of the SF 1442 (Far 28.102-1(b)(1)). Failure to provide executable documents within the stipulated timeframe may result in a payment delay or a termination action.
FAR 52.228-2, Additional Bonds Security, requires the Contractor to promptly furnish additional security if (a) Any surety upon any bond, or issuing financial institution for other security, furnished with this contract becomes unacceptable to the Government;(b) Any surety fails to furnish reports on its financial condition as required by the Government; (c) The contract price is increased so that the penal sum of any bond becomes inadequate in the opinion of the Contracting Officer; or (d) An irrevocable letter of credit (ILC) used as security will expire before the end of the period of required security. If the Contractor does not furnish an acceptable extension or replacement ILC, or other acceptable substitute, at least 30 days before an ILC’s scheduled expiration, the Contracting officer has the right to Immediately draw on the ILC.
2. AWARD OF CONTRACT AND NOTICE TO PROCEED (NTP)
A Notice to Proceed will be given only after approval of required payment protection submitted in accordance with FAR Subpart 28. Standard Forms 25 and 25A are available at http://www.gsa.gov/Portal/gsa/ep/formslibrary. No billable work shall commence under this contract/ modification until after the contractor receives the NTP.
Work shall commence no later than the 5 calendar days following the date of Notice to Proceed,, and all construction and contractual requirements shall be completed no later than the ending date of the period of performance cited in this contract.
3. CONSTRUCTION CONTRACT PROGRESS PAYMENT REQUESTS
The Contractor shall read and be familiar with FAR Clause 52.232-5, Payments Under Fixed Price Construction Contracts, and 52.232-27, Prompt Payment for Construction Contracts. FAR Clause 52.232-5 stipulates that the Government shall make progress payments monthly as work proceeds. Each progress payment request shall include all of the elements delineated at subparagraph (b)(1)(i)-(v). Failure to comply with the minimum requirements in this reference will result in immediate rejection of the invoice until corrected. Further sub-paragraph (e), Retainage, will be enforced. Relating back to the requirements for an appropriately detailed progress schedule, progress reports and progress payment requests shall be prepared in the same format as the approved progress schedule. Every definable element of work will be shown on every progress report and every payment request. For every element of work not completed by the approved time (late performance), the Contracting Officer will retain the maximum 10% of the amount of the payment of each incident of late performance until the work is satisfactorily completed and inspected in accordance with instructions and standards identified elsewhere in this contract. Further, sub-paragraph (g), Reimbursement for bond premiums, will be enforced. The contractor shall provide evidence of payment of bond premiums paid to the surety (including coinsurance and reinsurance) before being allowed to submit for reimbursement of those expenditures in a progress payment request.
FAR Clause 52.232-27 (a)(i)(A) discusses the due date for making progress payments as 14 days after the designated billing office receives a PROPER payment request (see discussion above). The Contracting Officer will date/time stamp receipt of each progress payment request package when it is delivered. That date/time will mark day one of the 14-day period for payment IF there is no disagreement over quantity, quality, or contractor compliance with contract requirements. If there is a disagreement in quantity, quality, or contractor compliance with any aspects of the contract at the time of delivery of the invoice, the invoice date/time stamp will be stricken through, initialed and returned to the contractor for correction. This effectively stops the clock and it will start over when a properly executed invoice is delivered to the Contracting Officer.
In accordance with DFARS 252.232-7003, the Contracting Officer hereby determines that the following process is in compliance with DFARS: Once the invoice has been certified by the Contracting Officer, AND the contractor receives a signed copy, the contractor shall initiate a Construction Payment Invoice in WAWF, and route it directly to the COR identified in this contract.
The DODAAC that will be used in preparing the WAWF invoice is “W91VB1”. When the COR receives the WAWF invoice, he/she will verify the information submitted with the (local progress payment request form) approved invoice; if all information between the two documents is verified as correct and appropriate, the COR will perform the role of Acceptor, and approve the invoice forward to the DFAS for processing of the payment. For contracts with a period of performance of 60 days or less the Contracting Officer has determined that no progress payment will be authorized. The Contractor shall be entitled to bill the Government for such projects only after completing a final inspection (and clearing any punch list generated), completion of any applicable O&M classes (to be coordinated with the COR), submission of final paperwork (i.e., as built drawings, DD 1354), and after confirming all certified payroll records have been submitted to the Government.
For projects negotiated with a longer performance period, progress payments are authorized one time each month, up to 90% of the project cost, but only after approval of a construction progress schedule, and only in the amounts verified on subsequently approved progress reports. Progress payment invoices will not be processed in the same week as the progress report is submitted. No progress payments are authorized above 90% of the contract value.
4. AVAILABILITY AND USE OF UTILITY SERVICES
a.) In accordance with FAR Clause 52.236-14, Availability and Use of Utility Services, water and electricity are furnished by the Government for the Contractor's use at no charge and in the performance of construction work at the job site, but only to the extent that their use is necessary to complete the work and the utilities are readily available at the site. Any usage of these utilities beyond what is needed to complete construction work at the job site or exceeds that which is readily available at the job site, and approved for use by the Contracting Officer, shall be furnished by the Contractor at its own expense. These utilities are provided provisionally and only to the extent that is necessary to facilitate the work This authority can be revoked if the Government witnesses that utilities are being wasted; e.g., lights being left on when no work is being done or water is being left on unattended for any extended amount of time. Failure of the Contractor to comply with this request to conserve and preserve these utilities will result in the Contractor entering into individual metering agreements at the job site and paying for the use of these utilities.
b.) In reference to FAR Clause 52.236-10, Operations and Storage Areas, SHOULD the Contractor be AUTHORIZED to establish a field operations office or a temporary staging area under this contract, it shall be responsible for consumption of available utilities. Prior to commencement of work under the contract, the contractor shall sign a utility metering agreement with the installation Directorate of Public Works Utilities Section. Prior to final payment under the contract, the contractor shall pay any outstanding utility charges and provide a copy of the paid invoice to the Contracting Officer as evidence of compliance. If the solicitation does not provide for such arrangements, and the contractor did not receive separate approval for the establishment of such facilities/space from the Contracting Officer, no such authorization is assumed. Any costs incurred for the establishment of field operations facilities after contract award are made solely at the contractor’s cost, and without compensation by the Government. There shall be no squatting on the job site.
5. WRITTEN GUARANTEES AND GUARANTOR'S REPRESENTATIVE
The Government is entitled to all standard commercially offered warranties/guarantees. The Contractor shall obtain all warranties, have them executed in writing, and furnish them to the Contracting Officer prior to final inspection.
Additionally, the documentation shall include the name, address, and telephone number of the guarantor's representative responsible for the guarantee during the warranted period, and who will provide warranty related services covered by the warranty/guarantee. The existence of any commercial manufacturer’s warranties does not relieve the contractor of responsibilities identified in FAR clause 52.246-21.
6. DOCUMENTATION TO SUPPORT SUBCONTRACT AWARDS
a) Within five calendar days after the award of any subcontract, the Contractor shall deliver a completed SF Form 1413 (Statement and Acknowledgment) to the Contracting Officer. Each subcontract shall contain, as a minimum, the Contract Number, Task Order Number (if applicable), and Title. The subcontract must clearly identify what the subcontractor will be performing in relation to other trades on the job. All subcontracts shall contain the anticipated period of performance that correlates with the approved Progress Schedule for that Division of work. A sample format shall be submitted for Contracting Officer approval prior to commencement of work under this contract.
b) FAR Clause 52.222-11, entitled "Subcontracts (Labor Standards)", requires that the clauses listed therein be physically inserted in all subcontracts. However, if the Contractor subcontracts by means of purchase orders or other informal types of contractual situations, compliance will be considered provided if clauses are attached to the subcontract form. Written acknowledgement by the subcontractor of these Labor Standards is required. Incorporation by reference does not constitute compliance.
7. RELATIONSHIP BETWEEN GOVERNMENT, CONTRACTOR AND CONTRACTOR PERSONNEL
a) The Government and the Contractor understand and agree that the services to be delivered under this contract are non-personal services and that no employer-employee or master-servant relationship exists or will exist under the contract between the Government and the Contractor or between the Government and the Contractor's personnel.
Further, the Contractor is not the Government's agent.
b) The Government will not exercise any supervision or control over Contractor personnel performing services under this contract. Contractor personnel shall not become an integrated part of the Government organization in connection with performance under this contract.
c) The work required under this contract does not require or authorize the Contractor or his employees to exercise personal judgment and discretion on behalf of the Government, but rather, the Contractor's employees shall act and exercise personal judgment and discretion on behalf of the Contractor.
d) Contractor personnel shall not be eligible, by virtue of performance under this contract, for payment by the Government of entitlements and benefits accorded federal employees. The entire consideration to the Contractor for performance of this contract is contained in the provisions for payment set forth in this contract.
8. INSURANCE
In accordance with FAR Part 28.301 and Clause 52.228-5, Insurance – Work on a Government Installation, the following types of insurance and “minimum” amounts are required for this contract:
TYPE AMOUNTS
Workmen’s Compensation $100,000 (see 8.1 below) Comprehensive General Liability $500,000 per occurrence for bodily injury Comprehensive Automobile Liability $200,000 per person $500,000 per accident for bodily injury $20,000 for property damage
8.1 Worker’s Compensation will be provided as regulated by the Division of Worker’s Compensation, issued by Texas Office of Superintendent of Insurance (OSI), regulated by the OSI and guaranteed by the Texas Property and Casualty Insurance Guaranty Association.
NOTE: Before commencing work under this contract, the Contractor shall certify to the Contracting Officer, in writing, that the required insurance has been obtained. The policies referenced in the certification (s) shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government’s interest shall not be effective (1) for such period as the laws of the state in which this contract is to be performed/prescribed or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer. The Contractor shall maintain a copy of proofs of required insurance, and shall make copies available to the Contracting Officer upon request. The Contractor shall maintain a copy of all subcontractors’ proofs of required insurance, and shall make copies available to the Contracting Officer upon request.
ATTACHMENTS
List of attachments to be provided separately:
1. 100%_DWG_FY22_Replace Damaged amd Leaking Roofs_643&746_042822
2. Wage Determination
STATEMENT OF WORK
Directorate of Public Works
Engineering Services Division Fort Bliss, Texas
STATEMENT OF WORK
Replace Damaged and Leaking Roofs
28 APRIL 2022
Building 00643 Building 00746
FE 00499 5J
FE 00497 5J
Table of Contents
PART 1 - DESCRIPTION OF WORK
1.1. Objectives
1.2. Period of Performance
1.3. Place of Performance
1.3.1. Occupancy:
1.4. Specific Work Requirements
1.4.1. Civil
1.4.2. Architectural
1.4.3. Structural
1.4.4. Fire Protection
1.4.5. Electrical
1.4.6. Telecommunications
1.4.7. Mechanical/Plumbing/HVAC
1.5. Attachments
PART 2 - GENERAL REQUIREMENTS
2.1. Basic Guidelines
2.1.1. Preconstruction Conference
2.1.2. Post Regulations
2.1.4. Contractor Furnished Items
2.1.5. Installation Property
2.1.6. Contractor Vehicles
2.1.7. Buy American Act. Construction Materials
2.2. Key Personnel
2.2.1. Project Manager
2.2.2. Superintendent
2.2.3. Site Safety and Health Officer (SSHO)
2.2.4. Quality Control Manager (QCM)
2.3. Utilities
2.3.1. Utilities Cutovers and Interruptions
2.3.2. Portable Latrines
2.4. Hours of Operation
2.4.1. Normal Work Hours
2.4.1.1. Federal Government Holidays
2.4.2. Approval of Work Outside Normal Work Hours
2.6. Historical Properties
2.7. Environmental
2.7.1. Permits
2.7.3. Products
2.7.5. Construction Waste Management and Disposal
2.7.5.1. Salvage, Waste, and Disposal
2.7.5.9. Archaeology
2.7.6. Natural Resources Program
2.7.7. Pollution Prevention Act (PPA)
2.7.8. Noise Control
2.8. Safety
2.8.1. Accident Prevention Plan (APP)/Safety Plan
2.8.2. Activity Hazard Analysis (AHA)
2.8.3. Army Radiation Permit
2.8.4. Federal Aviation Administration (FAA) Notice Requirements
2.9. Quality Control (QC)
2.9.1. QC Program Requirements
2.9.2. Quality Control Manager
2.9.3. Contractor Quality Control (CQC) Plan
2.9.4. Contractor Quality Control Meetings
2.9.5. Contractor Quality Control Inspections
2.10. Security
2.10.1. Security Requirements
2.10.2. Physical Security
2.10.3. Key Control
2.10.4. Security of Classified Items, Systems and Information
2.10.5. Security of Staging Area
2.10.6. Antiterrorism / Operations Security (AT-OPSEC)
2.11. Submittals/ Deliverable Requirements
2.11.1. Pre-Construction Submittals / Deliverables Package
2.11.2. Construction Submittals/Deliverables Package
2.11.2.7. Close-out Submittals / Deliverables Package
PART 3 - APPLICABLE PUBLICATIONS AND FORMS
3.1. Applicable Publications
PART 1 - DESCRIPTION OF WORK
1.1. Objectives. The roofs of Buildings 643 & 746 exhibit signs of failure and deterioration, requiring the roof replacement conforming to historic, energy, master planning, life, health, and safety requirements.
The Contractor must provide all work, labor, materials, and related services for construction requested herein until completion and acceptance of the entire work, except for any completed unit of work, which may have been accepted under the contract, by the Government in a professional and collaborative environment to sustain mission requirements. Construction services and finished products shall be delivered on schedule, safely, and compliant with regulatory codes and standards.
1.2. Period of Performance. The period of performance shall be hundred eighty (180) calendar days after issuance of Notice to Proceed (NTP). Work shall commence no later than the 5 calendar days following the date of Notice to Proceed.
1.2.1. The Contractor shall not commence work unless authorized by the Contracting Officer. All technical questions shall be addressed to the Contracting Officer’s Representative (COR) for resolution and clarification.
1.3. Place of Performance. The work to be performed under this contract will be performed at Fort Bliss
Military Installation, Fort Bliss TX, 79916.
1.3.1. Occupancy: Facility will be occupied during construction. Do not enter the facility without prior approval of the Contracting Officer.
1.4. Specific Work Requirements.
1.4.1. Civil. Not applicable
1.4.2. Architectural. – The contractor shall be responsible for:
1.4.2.1. Contractor shall verify all dimensions/amounts before providing proposal to KO. Disconnection, removal, and reinstallation of roof-mounted equipment and supports. Removed items to be protected from elements, infestation, contamination, and foreign debris while stored. All equipment and assemblies shall be cleaned by the Contractor prior to reinstallation and commissioning.
1.4.2.2. Demolition, deconstruction, and disposal of existing roof systems, accessories, and sub-assemblies.
1.4.2.3. Furnishing and Installation of new roofing system – Furnishing and Installation of new roofing system
- See attached drawings.
1.4.2.4. Installation of new roofing accessories and sub-assemblies, e.g. underlayment, walkway pads, waterproofing, fire stopping, felts, decking, sealants, expansion and control joints, internal and external gutter systems, downspouts, roof drains, fascia, eaves, racks, soffits, vents, baffles, hatches, flashings and insulation shall be comply with the 30 year warranty from manufacture.
1.4.2.5. New prefinished metal gutter, straps, and support brackets. All sheet metal including coping, gutters, flashing, trim, leader boxes and leaders are to be supplied by metal roofing manufacturer and installed in accordance with manufacturer’s instructions. All gauges of sheet metal shall be in accordance with manufacturer’s recommendations.
1.4.2.6. Gutters and rain leaders pipe shall be removed and disposed prior the installation of the new gutter system and reinforced concrete splashblock.
1.4.2.7. Furnish non-prorated full system warranty with "No Dollar Limit" (NDL), covering full system water-tightness, from a single source manufacturer. All roof curbs and penetration flashings integrated into the drainage system shall be covered under the warranty. Warranty period of coverage shall last thirty
(30) years with 130-mph peak gust wind speed coverage. Manufacturers’ warranties that require periodic inspections or repairs at the Government’s expense to maintain the warranty are not permitted.
Building 643 Historic Building 643 will be occupied, located at Taylor Rd, Fort Bliss TX, 79916. Remove the existing shingle roof system entirely down to the structural deck. Provide and install new asphalt shingle “Duration Series’ Shingles, “Onyx Black” color from Owens Corning” system with 130 mph wind speed coverage or approved equal. Prime and paint (two coats) all existing, exposed wood deck soffit, face, back and underside of all roof overhangs, eaves, and fascia boards matching existing.
Install new metal edge drip at perimeter of building. Install new fall protection roof anchor posts.
Building 746 Historic Building 746 will be occupied, located at Carter Rd, Fort Bliss TX, 79916. Remove the existing shingle roof system entirely down to the structural deck. Provide and install new asphalt shingle “Duration Series’ Shingles, “Onyx Black” color from Owens Corning” system with 130 mph wind speed coverage or approved equal. Prime and paint (two coats) all existing, exposed wood deck soffit, face, back and underside of all roof overhangs, eaves, and fascia boards matching existing.
Remove existing gutters and downspout and install new metal gutters and downspouts, and provide reinforced concrete splashblocks. Install new fall protection roof anchor posts.
1.4.3. Structural. Not applicable
1.4.4. Fire Protection. Not applicable.
1.4.5. Electrical. Not applicable.
1.4.6. Telecommunications. Not applicable.
1.4.6.1. Furnish incidental work and materials to disconnect, remove, store, secure, protect, and reinstall applicable roof telecommunication equipment, connections, and features. Protect temporary terminations. Any communication cable either Fiber or Copper coming in aerially into the building will need to be decommissioned, prevented from being damaged, and re-installed per the current I3A and UFC Army regulations and standards. Any damage or cut cables will be reported to The Project Manager Network Enterprise Center (NEC). Operations & Plans Branch via the COR.
1.4.7. Mechanical/Plumbing/HVAC. All gas pipes on rooftops shall be painted yellow.
1.5. Attachments.
A. AHA Template B. APP Checklist C. As-built requirements-Memo D. Contractor Requirements Document E. CX-Log F. DPW-RFI Template G. Drawing sets: DWG_643 & 746_Replace Damaged and Leaking Roofs H. Eng_Form_4025-R I. ESD CB Submittal-log Template J. Fort Bliss Energy, Water, & Waste Program K. iWatch Training for Contractors L. TRADOC Form 928-R-E
M. Specifications
PART 2 - GENERAL REQUIREMENTS.
2.1. Basic Guidelines.
2.1.1. Preconstruction Conference. Prior to the start of any construction work an authorized representative of the Contracting Officer will schedule and conduct a preconstruction conference. The notification will include specific details regarding the date, time, and location of the conference, any need for attendance by sub-contractors, and information regarding the items to be discussed.
2.1.1.1. The Contractor's Project Manager, Superintendent, and Quality Control Manager will attend this meeting. Minutes of the meeting will be prepared and signed by the Contractor. The minutes shall be sent to the COR for review and approval no later than 24hrs after the meeting.
2.1.2. Post Regulations. All activities of the Contractor, and respective employees, while on Government-controlled property shall be conducted in strict accordance with all Post Regulations. The Contractor shall acquaint themselves with all Post Regulations in advance. Compliance with the provisions of this paragraph by the Contractor's subcontractors and their employees shall be the responsibility of the Contractor.
2.1.3. Licenses and Permits. The Contractor shall verify all dimensions and investigate existing site conditions prior to submitting proposal. The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits. The Contractor shall comply with all applicable laws and regulations, including but not limited to Building Codes, Federal Law, Texas State Law, Occupational Safety and Health Administration (OSHA) regulations, Army and installation regulations.
2.1.4. Contractor Furnished Items. Everything included in this paragraph and its subparagraphs is basic to the contract and should be included in the contract price.
2.1.4.1. The Contractor shall provide all labor, supervision, transportation, vehicles, supplies, equipment, and materials required to perform work under this contract. The Contractor shall, as necessary, provide all equipment needed to perform the Scope of Work safely and to the requirements of the SOW.
2.1.5. Installation Property. Contractor shall exercise extreme caution to protect building finishes, private property, military property, historic material, cultural resources, etc., from damage during the performance of these contract requirements. Contractor shall be responsible for all loss or damage to Government and private property while executing contract requirements as a result of negligence on behalf of the Contractor, subcontractors, or any representatives of the Contractor or subcontractors.”
2.1.6. Contractor Vehicles. Contractor’s personnel, whose tasks involve operation of any vehicles, shall possess a valid U.S. state driver’s license, certificates and permits, applicable for the type and class of vehicle being operated.
2.1.6.1. Limited Access. The Contractor shall only use existing roadways when transporting personnel and/or material during the execution of the contract. The Contractor shall strictly adhere to the foregoing and shall not develop new ingress or egress roads.
2.1.6.2. Parking. The Contractor shall ensure that its personnel use designated parking areas only. Personal and non-construction related vehicles shall not be parked on grassy, gravel, or landscaped areas (unless identified as acceptable in drawings).
2.1.7. Buy American Act. Construction Materials. Applying to contracts for the construction, alteration, or repair of any public building or public work in the United States, the contractor shall utilize commercially available off-the-shelf (COTS) construction materials in accordance with Executive Order 10582 and 41 U.S.C. chapter 83, Buy American.
2.2. Key Personnel. The personnel listed below are considered essential to the work being performed under this contract. Prior to substituting, removing, replacing, or diverting any of the specified individuals, the Contractor shall notify the KO fifteen (15) working days in advance and shall submit a written request and justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on this Contract. The proposed substitution of personnel must meet or exceed the experience and other technical requirements of the personnel being replaced. No change in personnel shall be made by the Contractor without the prior written consent of the KO. However, in urgent situations, as determined or agreed to by the KO, an oral request to substitute key personnel may be approved and subsequently ratified by the KO in writing. Such ratification shall constitute the consent of the KO required by this paragraph. The KO will notify the Contractor within ten (10) working days after receipt of all required information of the decision on the substitution(s). In the event the proposed substitution of key personnel does not meet or exceed the experience and other technical requirements of the personnel being replaced, substitution of acceptable replacements for the individuals as specified below. The key personnel listed below may, with the consent of the contracting parties, be amended during the course of the Contract to either add or remove personnel as necessary.
Project Manager (PM) Superintendent Site Safety and Health Officer / Quality Control Manager
2.2.1. Project Manager. The Contractor shall provide a Project Manager (PM) and Alternate Project Manager (APM), both under the Contractor’s employ.
2.2.1.1. The role of the Construction PM is to be the Government’s Point of Contact (POC) for projects and administration of construction. The Project Manager is accountable for:
2.2.1.1.1. Management of performance of all trade contractors, review and analysis of SOW, architectural and engineering drawings and specifications; ensuring contract documents and regulations are comprehended and followed; supervision of Construction Superintendent(s), reviewing and approving their reports, submittals, monitor reported difficulties, and correcting safety violations/ deficiencies;
developing, tracking, updating and controlling construction schedule; project management plan, and associated costs to achieve completion of project; coordinating the closure of a project.
2.2.1.2. The Project Manager shall possess the following:
2.2.1.2.1. Language. Full professional working proficiency at speaking, listening, reading, and writing in English.
2.2.1.2.2. Experience. Five (5) years experience (within the last ten (10) years) working as a Construction PM (or in a position with equivalent responsibilities) managing multiple construction projects simultaneously related to the project.
2.2.2. Superintendent. The Contractor shall assign one competent superintendent for each project. The superintendent shall be accountable for overall supervision and management of job site coordination, day-to-day operations, schedule adherence, enforcement of safety and quality, managing subcontractors, has authority to act for the Contractor, and shall be on site at all times during Construction. The superintendent is required to attend facility turnover meetings (Red Zone meetings), partnering meetings, and quality control meetings. The qualification requirements for the alternate superintendent are the same as for the superintendent.
2.2.2.1. The Superintendent shall possess the following:
2.2.2.1.1. Language. Full Professional working proficiency at speaking, listening, reading, and writing in English.
2.2.2.1.2. Experience. Five (5) years’ experience (within the last ten (10) years) working as a Construction
Superintendent (or in a position with equivalent responsibilities), managing multiple construction projects simultaneously related to the project. The superintendent must be familiar with the requirements of Engineering Manual (EM) 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. The Contracting Officer may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.
2.2.3. Site Safety and Health Officer (SSHO). The SSHO shall be accountable for overall supervision and management of the Contractor’s safety program(s) and plan(s). Contractor shall assign one SSHO for each project who will work simultaneously as the SSHO and Quality Control Manager. The SSHO shall be on site at all times during construction to implement and administer the Contractor's safety program and Government-accepted Accident Prevention Plan. An alternate shall be identified in the Construction Safety Plan to serve in the event of the SSHO’s absence. The requirements for the alternate are the same as the SSHO. The SSHO shall meet the requirements of EM 385-1-1 Section 1. The SSHO must ensure that the requirements of 29 CFR 1926.16 are met for the project. It is responsibility of the Contractor to express to the KO in the event that due to the complexity of the project, one employee will be required for each position.
2.2.3.1. The SSHO shall be the Government’s POC for all aspects relating to safety. The SSHO responsibilities include, but are not limited to facilitating and ensuring the completion of facility safety assessments/investigations of reportable and non-reportable mishaps involving personal injury accidents, property damage, and cases of occupational illnesses; recording accident reports in an accurate, complete, and timely manner; assuring that claims for injuries and illnesses are posted in the Occupational Safety and Health Administration log; promoting and furnishing applicable safety and health, accident prevention, and investigation training for Contractor’s employees; assessing and evaluating work environment, identifying potential hazards, and aiding Contractor, Construction Project Manager, and Construction Superintendent during work place inspections; supporting Contractor, Construction Project Manager(s), and Construction Superintendents in investigating accidents and developing measures to prevent recurrences.
2.2.3.2. The Safety Manager shall possess the following:
2.2.3.2.1. Language. Full professional working proficiency at speaking, listening, reading, and writing in English.
2.2.3.2.2. Experience. Five (5) years’ experience (within the last ten (10) years) working as a Safety Manager (or in a position with equivalent responsibilities), identifying potential risks and hazards, investigating accidents, and promote occupational safety on multiple construction projects, simultaneously, related to the project.
2.2.3.2.3. Certification. SSHO shall possess active credentials as a Certified Safety and Health Official (CSHO) in construction or Master Certification (MC) from an OSHA Training Institute Education Centers.
2.2.4. Quality Control Manager (QCM). The QCM shall be accountable for overall supervision and management of the construction’s quality control and management program(s) and plan(s). Contractor shall assign one QCM for each project who will work simultaneously as SSHO and CQCM. The QCM shall be on site at all times during construction and alternate shall be identified in the Construction Quality Control Plan to serve in the event of the QCM’s absence. The requirements for the alternate are the same as the QCM. It is the responsibility of the Contractor to express to the KO in the event that due to the complexity of the project, one employee will be required for each position.
2.2.4.1. The QCM is to be the Government’s POC for all aspects relating to quality control. the QCM responsibilities include but are not limited to the supervision and management of the Contractor’s quality control and management program(s) and plan(s) in accordance with specifications; inspecting work for conformance to project plans and specifications identifying issues arising during construction and verifying that deficiencies have been corrected; recording and notifying the PM and/or Superintendent of problems on a timely basis so that corrections can be made without impact to the project schedule;
creating, updating and maintaining the project submittal log and all other project specific quality control reports; reviewing shop drawings and submittals for conformance with project specifications by direct review and by leveraging the knowledge and experience of others in the project team when necessary;
scheduling, reviewing, certifying, and managing submittals, including those of subcontractors, designers of record, consultants, manufacturers, offsite fabricators, suppliers, and purchasing agents; tracking preparatory, initial, and follow-up control phases and control, verification, and acceptance tests including documentation; continuing development of the project Quality Control Plan to address the specific needs of task orders, as required; examining the work area to assure that all required preliminary work has been completed and is in compliance with the contract; reviewing drawings and each paragraph of applicable specifications, reference codes, and standards applicable to work being performed in the field.
2.2.4.2. The QCM shall possess the following:
2.2.4.2.1. Language. Full professional working proficiency at speaking, listening, reading, and writing in English.
2.2.4.2.2. Experience. Five (5) years’ experience (within the last ten (10) years) working as a CQM (or in a position with equivalent responsibilities), managing multiple construction projects simultaneously related to the project.
2.3. Utilities. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities. Contractor shall meter all utilities used and report them to Sustainability & Energy and Engineering Services Division. To coordinate the use of utilities please contact the COR. The Contractor shall provide its own sources of utilities (water, electricity, etc.) needed to complete the work in the SOW at locations where Government utilities are not available.
2.3.1. Utilities Cutovers and Interruptions. All anticipated utility outages shall be coordinated with DPW through the COR. A minimum advance notice of fourteen (14) calendar days shall be provided by the Contractor. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise. Conform to procedures required in paragraph Work Outside Regular Hours.
2.3.2. Portable Latrines. The Contractor shall be responsible for furnishing portable latrines as required by OSHA and ANSI, for the use of employees at such locations as designated by the KO or COR.
2.4. Hours of Operation.
2.4.1. Normal Work Hours. The Contractor shall perform all work during normal work hours. Normal work hours are defined as the time period from 07:30 hours (7:30AM) to 16:30 hours (04:30 PM) MDT/MST, Mondays through Fridays except on Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
The Contractor shall not be reimbursed when the Government facility is closed for the above reasons.
2.4.1.1. Federal Government Holidays. For government holidays visit https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=Overview .
2.4.1.2. This list of holidays relates to Government duty days and is not intended to supplement or otherwise alter the provisions of any Wage Determination regarding applicable paid holidays.
2.4.1.3. It is understood and agreed between the Government and the Contractor that observance of such days by Government personnel will not be a reason for an additional period of performance, or entitlement of compensation except as set forth within the contract. In the event the Contractor’s personnel work during the holiday, the Contractor may reimburse them; however, no form of holiday or other premium compensation will be reimbursed either as a direct or indirect cost, other than their normal compensation for the time worked, unless stipulated otherwise. This provision does not preclude reimbursement for authorized overtime work if applicable.
2.4.1.3.1. When the Department of Defense grants excused absence to its employees, the Contractor agrees to continue to provide sufficient personnel to perform critical tasks already in operation or scheduled, and shall be guided by the instructions issued by the KO or the Contracting Officer Representative (COR).
2.4.1.4. If Government personnel are furloughed, the Contractor shall contact the KO or the COR to receive direction. It is the Government’s decision as to whether the contract price/cost will be affected as a result of Government shutdown and/or furloughed Government employees. In the event that Government shutdown and/or furloughed Government employee does impact contract price/cost, a negotiated settlement will be reached as deemed appropriate by the KO.
2.4.2. Approval of Work Outside Normal Work Hours. Work outside regular working hours requires Contracting Officer approval. Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.
2.5. Approval of work other than normal work-hours of the military reservation will be based upon the requirements of the task, technical or safety factors and not for the convenience of the Contractor. This is not intended to restrict the Contractor to an 8-hour day if the segment of project requires continuous work until completed because of mission requirements, the technical nature thereof, in the interest of safety, or to prevent damage to the project or other property. The Contractor shall give prior notice of such requirements to the KO. The KO may authorize the Contractor to perform work outside of normal working hours and/or working days. When the Government requires the Contractor to work outside normal hours, the Contractor will be notified at the onset of the project, but not less than 24 hours in advance.
2.6. Historical Properties. All work performed on historical properties, or within historical districts and view sheds, shall be approved by the historical architecture staff or Cultural Resource Manager (CRM) prior to disturbance or alternation to materials or property. All coordination shall be done through the
COR.
2.6.1. Work performed on any Historic Property shall meet the standards set forth in AR 200-1, the Programmatic Agreement for the Management, Operation, and Development of Historic Properties on Fort Bliss, the Fort Bliss Garrison’s ICRMP, and all associated regulations. The work shall be performed according to The Secretary of Interior’s Standards for the Treatment of Historic Properties.
2.6.2. The Contractor shall comply with all of the laws, regulations, orders, and procedures governing historic preservation, including the following documents: National Historic Preservation Act of 1966 (NHPA) as amended, and the Integrated Cultural Resource Management Plan (ICRMP) for Fort Bliss. All work done on historic properties, or properties within the view shed of a historic district must be reviewed and approved by Cultural Resource Manager (CRM) Staff prior to start of work. Contact Fort Bliss Historic Architect, for details and requirements. Coordinate with Fort Bliss Historic Architect POC via COR.
2.6.3. The Contractor shall provide maximum protection, take every reasonable means, and exercise care to prevent unnecessary damage to exiting historic structures, contemporary structures, landscape plantings, natural features, roads, utilities, and other public or private facilities. Special attention shall be given to historic structures, natural and landscape features of the areas to protect these elements and their surroundings. In addition, Contractor shall remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain and Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the KO. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
2.7. Environmental. The Contractor shall perform all work in such a manner as to minimize the polluting of air, water, or land and shall, within reasonable limits, control noise and the disposal of solid waste material, as well as other pollutants. The Contractor shall comply with AR-420-47 Solid & Hazardous Waste Management, Title 40 CFR Part 260 through 273 and with all Federal, State, and local laws and regulations concerning environmental pollution control. Compliance by Subcontractors shall be the responsibility of the Contractor.
2.7.1. Permits.
2.7.1.1. Hazardous Material Abatement. The Directorate of Public Works-Environmental Division (DPW-ED) has an asbestos containing material (ACM) and lead based paint (LBP) survey for Bldgs. 643 and 746, of which no samples were collected of roofing materials. Therefore, roofing materials (shingles, roofing felt, caulking, penetration sealant, transite piping, flashing, mastics, coatings, adhesives, vapor retardants, and underlayment) will be considered suspect ACM and shall be sampled or considered ACM and abated as such unless sample results indicate otherwise. Any painted surface that was not sampled in the attached survey should be considered positive for LBP and treated as such unless sampling shows otherwise.
No work can proceed until a hazardous substance (i.e. asbestos and lead) survey is completed on the area(s) the proposed work is performed and completed in accordance with the Clean Air Act, 40 Code of Federal Regulations (CFR) 63.145(a) and Toxic Substance Control Act, 40 CFR 745. The asbestos survey shall be performed by licensed personnel, and tested by an accredited laboratory. A copy of the survey shall be provided to DPW-ED for review and assessment of the work order project against the survey. If hazardous substances surveys are not performed, the materials shall be presumed to contain asbestos and lead, and shall be handled and abated appropriately in accordance with federal and state rules. When a rotating blade (RB) roof cutter or equipment that similarly damages the roofing material is used to remove Category I non-friable asbestos-containing roofing material, the removal of 5580 ft2 or more of asbestos-containing roofing material will create at least 160 ft2 of RACM and is subject to the NESHAP. If the removed material is less than 5580 ft2 then the removal is not subject to the NESHAP, except that notification is always required for demolitions. When the total asbestos-containing roof area undergoing renovation is less than 160 ft2, the NESHAP does not apply, regardless of the removal method to be used, the type of material (Category I or II), or its condition (friable versus non-friable), except that notification is always required for demolitions. Category I ACM includes asphalt roofing products containing more than one percent asbestos. Asphalt roofing products, which may contain asbestos, include built-up roofing; asphalt-containing single ply membrane systems; asphalt shingles; asphalt-containing underlayment felts; asphalt-containing roof coatings and mastics; and asphalt-containing base flashings.