W911SD-21-R-01230001.pdf

PDF 333 KB Posted

Attached to
3 ROLL FLAT IRONER- SOLICITATION Federal contract opportunity
Solicitation number
W911SD-21-R-0123
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis

About this file

This sources sought notice requests capability information from small businesses for a new steam heated, three roll ironer equal to a Jensen 336-CF-153 model. Respondents are asked to provide company information, interest as a prime or subcontractor, experience on similar requirements, pricing and availability for the ironer, and recommendations to improve competition. The Army seeks this information to determine if the ironer requirement can be set aside for small businesses on a competitive basis. Responses are due to Maureen Flanagan at the MICC-West Point by the date specified in the notice. Interested parties are also invited to identify any conditions unnecessarily restricting competition.

View the file

Other files for this federal contract opportunity

Other files attached to 3 ROLL FLAT IRONER- SOLICITATION, newest first.
File Type Posted
SPECS-Three Roller Flatwork Ironer.docx DOCX document
W911SD-21-R-0123- 3-ROLL STEAM FLAT IRON.pdf PDF
3RollFlatIroner.JPG JPG image
FLAT IRON PWS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MICC - WEST POINT PCO

681 HARDEE PLACE

PH: 845-938-4490

MAUREEN.A.FLANAGAN2.CIV@MAIL.MIL

WEST POINT NY 10996

0011493285

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

THE PURPOSE OF THIS AMENDMENT IS TO POST RFI"S.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Jun-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911SD21R0123

X 9B. DATED (SEE ITEM 11)

04-Jun-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Jun-2021

CODE

MICC - WEST POINT

681 HARDEE PLACE

WEST POINT NY 10996-1514

W911SD 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W911SD

FACILITY CODECODE

EMAIL:TEL:

W911SD21R0123

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been added by full text:

RFI'S

RFI’s SUBMITTED ON Wednesday, June 23, 2021 6:15 AM

Q. On page 88 of the solicitation document the SPECS for the ironer reference a “Minimum 120” working width” specification for the equipment. On Page 89 of the solicitation document under the Three Roll Steam Heated Ironer description it lists a “Minimum of 150” finishing width capacity”.

1. Please validate if the intended Minimum working width of this ironer is to be 120” (vs.

150”).

A. The minimum working width of this ironer is to be 120”

Q. During the mandatory site visit it was discussed that the ironer to be replaced is the Ironer #1 with the existing Chicago Folder/Cross-Folder. Please validate if the following scope is accurate with respect to the successful offeror:

1. After the Ironer #1 is installed the existing Braun Spreader/Feeder and existing Braun Folder/Cross-Folder on Ironer #2 are to be relocated and connected to Ironer #1.

A. The new ironer will be placed exactly where the old ironer is removed from. It will be connected to the Braun brand Spreader/Feeder that is currently not in use and is the one located closest to the dryers.

2. The existing Chicago Folder/Cross-Folder will be relocated to Ironer #2 that previously had the Braun Spreader/Feeder and Braun Folder/Cross-Folder attached. After relocation, the existing Chicago Folder/Cross-Folder will be connected to Ironer #2.

A. The new ironer will be place exactly where the old ironer is removed from. It will be connected to the Chicago brand Auto Folder that is not currently in use and is located closest to the dryers.

(End of Summary of Changes)

W911SD21R0123

File details come from the government source that posted it. Updated .