W911SA-24-Q-3094 SOL 6.4.24.pdf

PDF 1020 KB Posted

Attached to
Custodial Services at CA012 Marina, CA Federal contract opportunity
Solicitation number
W911SA24Q3094
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort McCoy

About this file

This document is a Request for Quotes (RFQ) for custodial services at the CA012 Marina Army Reserve Center located in Marina, CA. The government is seeking a contractor to provide all labor, personnel, equipment, tools, chemicals, supplies, transportation, materials, supervision, and other items or services necessary to perform janitorial/custodial services as defined in the Performance Work Statement (PWS).

The period of performance is anticipated to be 1 July 2024 to 30 June 2025, with four (4) one (1) year option periods, and a six (6) month option to extend services. This procurement is 100% set aside for small businesses under NAICS code 561720. Quotes are due by 10:00 AM local time on 19 June 2024. The government intends to evaluate quotes and award a contract without discussions. A site visit is scheduled for 12 June 2024. The incumbent contractor is Nascence Group LLC, with a total contract value of $131,550.

View the file

Other files for this federal contract opportunity

Other files attached to Custodial Services at CA012 Marina, CA, newest first.
File Type Posted
W911SA-24-Q-3094 - Attachment 1 - Price Schedule CUI.xlsx XLSX spreadsheet
W911SA-24-Q-3094 - Attachment 3 - AT OPSEC.pdf PDF
W911SA-24-Q-3094 - Attachment 4 -Task and Frequencies.pdf PDF
W911SA-24-Q-3094 - Attachment 5 - Sample Service Ticket.pdf PDF
W911SA-24-Q-3094 - Attachment 2 - Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W911SA24Q3094 04-Jun-2024

b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME

10:00 AM 19 Jun 2024

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W911SA9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

JESSILYN S SANBORN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

0012033127

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

W6QM MICC FT MCCOY (RC)

KO DIRECTORATE OF CONTRACTIN

BLDG 1108 SOUTH R STREET

FORT MCCOY WI 54656-5142

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W90XCV 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

W8YL 63 AR REGIONAL SPT CMD

63D READINESS DIVISION (USAR)

230 RT JONES ROAD

MOUNTAIN VIEW CA 94035-0000

TEL: 910-570-9422 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$22,000,000

NAICS:

561720

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF84

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W911SA24Q3094

Section SF 1449 - CONTINUATION SHEET

SUPPLEMENTAL INFORMATION

1. An Award for this requirement will be made pursuant to FAR 13.5, Simplified Procedures for Certain Commercial Items.

2. The period of performance is anticipated to be 1 July 2024 to 30 June 2025 (or subsequent date), with four

(4) one (1) year options periods, and a six (6) month option to extend services.

3. Quotes shall be emailed to jessilyn.s.sanborn.civ@army.mil. Quotes are due to the Government on or before the date/time listed on the solicitation in central time. It is the contractor’s responsibility to ensure their quote is received by the due date and time. As an Addendum to FAR 52.212-1, contractor shall submit all items in accordance with the Supplemental Information by the solicitation closing date and time. The contractor SHALL provide all required documents with submission of quotes.

Signed SF 1449 Completed information from the Supplemental Information section of the solicitation Completed Price Schedule Attachment Signed Amendments (if applicable)

If all required documents are not provided with the quote submission, your quote MAY NOT be considered for award.

4. If a quote is based on a teaming/partnering relationship or a joint venture, the contractor shall provide, with the quote, all required solicitation information for all parties including a copy of the teaming/partnering or joint venture agreement. The agreement shall include information, which identifies the responsibilities for each entity under this contract. The agreement shall demonstrate the relationship between firms and identify contractual relationships and authorities to bind each entity of the teaming/partnering or joint venture relationship.

5. This procurement is 100% Small Business under NAICS Code 561720 with a size standard of $22 Million.

IAW FAR 6.302-5(b)(2).

6. Prior Contract Information

Previous Contract Number: W911SA-19-P-3019 Incumbent Contractor: Nascence Group LLC Total Contract Value (TCV): $131,550.00* *TCV calculated with base, all options and a six (6) month option to extend services.

7. Period for acceptance of quotes. The contractor agrees to hold the prices in its quote firm for 90 calendar days from the date specified for receipt of quotes.

8. Site visit: ***A site visit will be held on Wednesday, 12 June 2024 at 10:00 AM ***

The POC for the site visit is Deborah Delgado, phone: (719) 516-6802, email:

deborah.l.delgado4.civ@army.mil

For Site Visit information, see Site Visit clause 52.237-1. Unless you already have a permanent vehicle pass, you will be required to obtain a one-day vehicle pass. You will be required to present the following information: (1) vehicle registration, (2) valid driver’s license, (3) or car rental agreement (if applicable).

Attendees at the pre-proposal conference/site visit are cautioned that the Government will not wait for anyone who is late or lost and will not hold another pre-proposal conference/site visit. Remarks, explanations and answers provided by Government representatives before, during and after the site visit shall not change or qualify any of the terms or conditions of the solicitation. The solicitation can only be changed by a formal written amendment issued by the Fort McCoy Contracting Office.

9. Written questions must be furnished to the Government no later 10:00 a.m. local time on 13 June 2024 in order to ensure a timely response is provided by the solicitation closing date. All questions are to be submitted in writing at the time indicated in the solicitation or they may not be addressed before solicitation closing date; therefore, contractors are advised to submit questions as soon as possible. Please provide your company name, telephone, point of contact, e-mail address, and solicitation number on all questions.

The Government will respond to questions via the issuance of an amendment which incorporates the question and the Government’s response.

10. SAM Unique Entity ID: ______________________________.

11. TAXPAYER ID #______________________________.

12. CAGE CODE __________________________________.

13. SYSTEM for AWARD MANAGEMENT (SAM) REGISTRATION: An Active SAM Registration is required of all Department of Defense contractors. SAM registration enables electronic funds transfer of contract payments. If your company is not already actively registered, please register in the SAM database at www.sam.gov. If your company is currently registered and close to expiring, begin/complete the process for SAM registration renewal.

a. A SAM Unique Entity ID is required for SAM registration. If your company does not have a DUNS #, obtain one by calling 800-333-0505.

b. Whether your company is a current or new registrant in the SAM database, your registration must indicate that you are a provider of NAICS 561720, or a NAICS of similar business size, under the Goods – Services section of the registration to be eligible to receive a contract for this solicitation.

c. If the prospective awardee for this request for quotes is not actively registered in the SAM database by close of solicitation, including NAICS 561720, or a NAICS of similar business size, under the Goods – Services section, depending on mission requirements, the government reserves the right to proceed to award to the next otherwise successful actively registered contractor.

d. Within the SAM Representations and Certifications, please ensure you company has selected that you wish to bid on, or currently hold Department of Defense (DoD) issued or DoD funded Contracts. The DFARS provisions in SAM must also be completed by solicitation closing date and time.

e. Prospective contractors who have not completed electronic annual representations and certifications at http://www.sam.gov/ in conjunction with required registration in the System for Award Management (SAM) database, shall complete and submit FAR 52.212-3 Alternative 1 Offeror Representations and Certifications - Commercial Items and DFARS Representations and Certifications in SAM to be eligible to receive an award for this solicitation.

14. Contract Administrator: TBD at time of award.

If you have questions pertaining to this contract after contract award (i.e. questions regarding delivery, invoice procedures, etc.), please request assistance from the Contract Administrator. Be sure to include the contract number in your request for assistance. Requesting contract administration assistance from any other individual could result in a delayed response.

15. Contracting Officer: TBD at time of award.

16. Contracting Officer’s Representative (COR): TBD at the time of Award.

17. The Government intends to evaluate quotes and award a contract without discussions. Therefore, the contractor’s initial offer should contain the contractor’s best terms from a price and technical standpoint.

However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all quotes if such action is in the public interest and waive informalities and minor irregularities in quotes received.

18. Service Contract Reporting (SCR): Contractors will report manpower data relating to the performance of service contracts into the system for Award Management (SAM) (https://sam.gov) consistent with existing service contract reporting requirement under the federal acquisition regulation subpart 4.17- Service Contracts Inventory. SAM will only enable reporting for entities with contract that meet the SCR threshold at FAR 4.1703. As part of its quote, the vendor must include the estimated total cost (if any) incurred to comply with the Service Contract Reporting requirement.

19. Post Award Conference: In the event the Contracting Officer decides to conduct a Post Award Conference in accordance with DFARS 242.5, the awardee will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.

20. ABILITYONE DESIGNATED ITEMS: In accordance with 52.208-9, contractors are referred to the web site of the Committee for Purchase from People Who Are Blind or Severely Disabled, the independent federal agency that administers the AbilityOne (formerly Javits-Wagner-O'Day or JWOD) Program for the lists of designated products and services http://abilityone.gov/procurement_list/product_buy.html

21. In accordance with FAR 52.223-2, Affirmative Procurement of Bio-based Products under Services and Construction Contracts, contractors are required to submit annual bio-based reports to the reporting module in the System for Award Management (SAM) at https://www.sam.gov.

22. The “Equal Employment Opportunity Is The Law” notice (poster) referenced in FAR Clause 52.222-

26(b)(3), is located at http://www.dol.gov/ofccp/regs/compliance/posters/pdf/eeopost.pdf .

23. In accordance with FAR Clause 52.222-41(g), the contractor must notify each service employee working on this contract of the minimum wage and fringe benefits required to be paid pursuant to this contract, or shall post a copy of the wage determination and Department of Labor Form WH-1313 in a prominent place at the worksite. The applicable wage determination is incorporated into the contract. The WH-1313 poster is located at http://www.dol.gov/whd/regs/compliance/posters/sca.htm.

24. In accordance with FAR 52.222-42, In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR part 4), this clause identifies the classes of service employees expected to be employed under the contract states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5 332.

This Statement is for Information Only. It is not a Wage Determination.

Employee Class Monetary Wage -- Fringe Benefits Laborer--Grounds Maintenance WG-3; Step 2

25. Required insurance:

The contractor shall provide, within ten (10) calendar days after contract award. The Contractor shall provide the Certificate of Insurance (COI) via email to the Post Award Contracting Officer and Post Award Contract Specialist. The COI shall be updated and sent to the Post Award Team on an annual basis.

In accordance with FAR clause 52.228-5 entitled, “Insurance--Work on a Government Installation” the following minimum amounts of insurance are required.

Workmen’s Compensation As required by state laws

Employer’s Liability Insurance $100,000 per accident General Liability Insurance - Bodily Injury Liability $500,000 per occurrence

Auto Liability Insurance $200,000 per person

Bodily Injury $500,000 per occurrence

Property Damage $20,000 per occurrence Contractor shall require the insurance company to specify contract number in the Description of Operation block of the Certificate of Insurance (COI) and the below statement.

"The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective- (1) For such period as the laws of the State in which this contract is to be performed prescribe; or (2) Until 30 days after the Insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer."

26. Legal compliance: The Contractor shall comply with all Federal, State, and Local Laws, codes and regulations applicable to his performance under this contract, and shall be solely responsible for all costs associated with said compliance.

27. Contract performance:

Purpose. IAW with FAR Subpart 42.1500 contractor past performance information (PPI) is relevant information for future source selection purposes regarding a contractor’s actions under previously awarded contracts. It includes, for example, the contractor's record of conforming to contract requirements and to standards of good workmanship; the contractor's record of forecasting and controlling costs; the contractor's adherence to contract schedules, including the administrative aspects of performance; the contractor's history of reasonable and cooperative behavior and commitment to customer satisfaction; and generally, the contractor's business-like concern for the interest of the customer. Contractor past performance information is one of the tools that support Army efforts to acquire best value and is used to evaluate performance risk in source selection. The feedback provided by the government to the contractor in collecting PPI, and the knowledge that PPI will be used in future source selection decisions, should result in improved performance and a greater contractor focus on customer satisfaction.

Contractor Performance Assessment Reports System (CPARS): CPARS shall be prepared IAW AFARS Subpart 42 upon physical completion of the contract. If the period of performance will exceed 18 months, an “interim” assessment report shall be prepared at the completion of 12 months performance and annually thereafter until the contract is physically complete. An out-of-cycle or “addendum” report may be prepared if there is a need to record an extraordinary event prior to the next regularly scheduled evaluation or if it is necessary to report a meaningful occurrence during the period between physical completion of the contract and contract closeout. Additionally, addendum reports may be prepared to record contractor’s performance relative to contract closeout and other administrative requirements (e.g.

final indirect cost proposals, technical data, etc.).

Completion Due Date. The government will complete the CPARS within 60 days after the end of the assessment rating period (if applicable).

Evaluators. The Contracting Officer and the Contracting Officer’s Representative will jointly complete the performance assessment.

Contracts Performance Elements. The contractor’s performance shall be assessed in accordance with elements and rating system set forth in AFARS Subpart 42.

Contractor Review. The Contracting Officer will furnish a copy of the CPARS to the contractor requesting that the contractor submit comments, rebutting statements, and/or additional information to the Contracting Officer within 30 calendar days of receipt. Failure to respond within the designated timeframe will be taken as agreement with the assessment.

Contract Concurrence. Where a contractor concurs with, or takes no exception to a CPARS, such report shall be considered final and releasable for use in source selection and other deliberative purposes.

Contractor Rebuttal. Where a contractor takes exception to a performance report, the Contracting Officer will review the contractor’s rebuttal or comments and make appropriate changes. If the Contracting Officer makes changes, the changed rating will be reflected in the narrative. The Contracting Officer will make all reasonable efforts to reconcile the report and the contractor’s comments. However, it is not necessary that they reach agreement on the report where such is clearly impracticable. The contractor’s rebuttal or comments shall be made part of the CPARS.

Resolving Disagreements between the Government and the Contractor. In the event disagreements between the parties regarding the CPARS occur, the Contracting Officer will review the rebuttal and make appropriate changes. If no agreement is reached, the CPARS is forwarded to the Reviewing Official (Director of Contracting) along with the Contracting Officer’s Findings and Recommendation and supporting documentation. The decision of the Reviewing Official is final. Copies of the CPARS and the contractor’s response and review comments, if any, shall be retained as part of the evaluation.

Release of Contractor Performance Evaluation Information. The evaluation will not be released to other than government personnel and the contractor whose performance is evaluated. The performance evaluation information will be input into the applicable module within Contractor Performance Assessment Reporting System (CPARS) database (or Government system in use at time of the evaluation).

Source Selection Information. Departments and agencies will electronically access the CPARS information to support future award decisions.

28. Alternate disputes resolution: In furtherance of Federal policy and the Administrative Dispute Resolution Act of 1990 (ADR Act), Public Law 101-552 and FAR Clause 52.233-1, Subparagraph (d) (2) (1) (B) (2), the Contracting Officer will try to resolve all post award acquisition issues in controversy by mutual agreement of both parties. Interested parties are encouraged to use alternative dispute resolution procedures to the maximum extent practicable, in accordance with the authority and requirements of the ADR Act.

PWS

PERFORMANCE WORK STATEMENT (PWS)

Version 1.4; 21 September 2023

CA012 CUSTODIAL SERVICES

PART 1

GENERAL INFORMATION

1. This is a non-personal services contract to provide janitorial/custodial services as defined in this Performance Work Statement (PWS) at the following Army Reserve facility: CA012 Marina ARC/OMS/AMSA 12 S-S located at 17425 Imjin Rd, Marina, CA 93933-6100 The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The Contractor shall provide all personnel, labor, equipment, supplies, chemicals, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform janitorial/custodial services as defined in the Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: The 63d Readiness Division supports Soldiers in seven (7) states to provide the best-in-class base operations support for Soldiers in the Southwest Region.

1.3 Objectives: The objective of this contract is for the contractor to perform necessary janitorial/custodial services in a manner that will maintain a satisfactory facility condition and present a clean, sanitary, neat, and professional appearance as defined in the PWS.

1.4 Scope: The Contractor shall provide all labor, personnel, equipment, tools, chemicals, supplies, transportation, materials, supervision, and other items or services necessary to perform janitorial/custodial services as defined in this PWS. Note that any drawings or maps provided to the Contractor, either before or after the contract is awarded, are for reference purposes only and may not be to scale. Any square footage, or other measurement provided, may be an approximation. It is the sole responsibility of the Contractor to determine or verify the actual site conditions and measurements.

1.5 Period of Performance: The period of performance shall be for one (1) 12-month Base Period and four (4) 12-month option periods with an option to extend services up to six (6) months.

1.6 General Information

1.6.1 Quality Control: Quality Control is the responsibility of the contractor. The contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.212-4, Contractor Inspection Requirements). A formal Quality Control Plan (QCP) is not required for this commercial service. However, the contractor shall maintain an inspection system commensurate with commercial practices to ensure the Contractor only tenders for acceptance those items or services that conform to the requirements of this contract.

1.6.2 Quality Assurance: The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is a government only document primarily focused on what the Government must do to assure that the contractor has performed in accordance with the requirements of the contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. Non-conforming services shall be re-performed at no increase in contract price.

If non-conforming services are recurring, cannot be re-performed, or the services fail to achieve the performance standards in the PWS and referenced in Section 7, the Government may reject the nonconforming service(s) and document the contractor’s performance record accordingly. The Government may also issue a Contract Discrepancy Report (CDR) in which the contractor will be required to respond with the development of a Corrective Action Plan (CAP) which identifies the root cause, corrective action for the root cause, corrective action for the specific nonconformance, and the date the corrective action(s) will be complete. The Government may also reduce the payment to the contractor in accordance with (IAW) the Performance Requirements Summary (PRS) or reduce payment to reflect the value of the services performed or may perform the services and charge the Contractor for any related cost incurred, or may terminate this contract for default.

1.6.2.1 Contractual Nonconforming Performance. CARs (formerly Nonconformance Reports) are used for managing contractual nonconformances on ACC administered contracts. Nonconformance occurs when a contractor fails to meet contract or task order terms, conditions and/or specifications. The COR will notify the contractor, in person, each time an unacceptable observation has been recorded and ask the contractor to correct the problem or re-accomplish the service. Resolution of nonconformance discovered at the subcontractor level shall be addressed with the prime contractor. CARs are issued, overseen and closed IAW ACC Acquisition Instruction (AI) and FAR subpart 46.407 nonconforming supplies or services.

Level I: A Level I CAR describes a deficiency on a product or service and is not a systemic breakdown of a process or system. It includes those nonconformances that are minor in nature and can be promptly corrected by the contractor, present no need for root cause analysis, no determination if other contract requirements are affected, present no need for further preventive action, and do not materially reduce the usability of the supplies, services, construction, or deliverables. While the Government must document the nonconformance and the contractor must correct the nonconformance, further actions and Government follow-up are not required, and no written response from the contractor is needed. Level I CARs are considered closed immediately upon issuance.

Level II: A Level II CAR describes deficiencies in a contractor’s processes or systems but are not significant deficiencies. Level II CARs shall require the contractor to correct the nonconformance, perform root cause, and develop and provide a Corrective Action Plan (CAP) acceptable to the government. Some examples of systems affected may be quality inspection/management systems, and CBS identified in DFARS 242.70, or issues such as:

Multiple deficiencies on products or services indicating a systemic issue throughout the process, or, An escalation of repetitive Level I CARs for the same or similar nonconformance demonstrating the contractor is failing to institute effective corrective action and/or failing to implement effective quality and/or internal control(s).

Level III: A Level III CAR describes deficiencies in a contractor’s system that is affecting a contract’s or program’s ability to meet cost, schedule or performance requirements, or are:

A significant deficiency pursuant to DFARS 252.242-7005(b), “Contractor Business Systems” (CBS), or, A failure to respond to Level II CARs, or to remedy a recurring nonconformance.

The contractor shall be required to provide a CAP that is acceptable to the government.

Level IV: A Level IV CAR documents a critical nonconformance of such serious nature that is issued to the contractor’s business segment or corporate management for their attention to both the nonconforming condition and the company’s corrective action, or when a Level III CAR has been ineffective. A Level IV CAR will result in a mandatory review of available contractual remedies, such as cost disallowance, reduction or suspension of payments, revocation of government assumption of risk of loss, CBS disapproval, or suspension of all product and service acceptance activities. Contractual remedies will be implemented IAW applicable FAR/DFARS clauses and/or ACC Acquisition Instructions if applicable. Action to suspend product or service acceptance will be accomplished via a Level IV CAR. The contractor shall be required to provide a CAP that is acceptable to the government.

1.6.2.1.4 The contractor will be notified of Government inspection results within 5 business days. The Contractor shall acknowledge receipt of the inspection results via email or letter within 2 business days. The contractor may be notified of inspection results verbally or via email. Verbal notifications of defective work will be confirmed in writing. When Government inspectors are unable to contact the contractor to notify the contractor of inspection results, acceptance or rejection of work will be made on the basis of the initial inspection.

1.6.2.1.5 Performance Evaluation Meetings: The Contractor Point of Contact (POC) shall meet with the COR prior to start of the contract. However, meetings may be held whenever deficiencies are noted by the COR. A mutual effort shall be made to resolve all problems identified.

1.6.3 Federal Government Holidays: Except as noted in the PWS, work shall not be performed on the following holidays or on holidays observed in lieu thereof.

New Year’s Day 1st day of January Martin Luther King Jr.'s Birthday 3rd Monday of January Presidents Day 3rd Monday of February Memorial Day Last Monday of May Juneteenth Day 19th day of June

Independence Day 4th day of July Labor Day 1st Monday of September Columbus Day 2nd Monday of October Veterans Day 11th day of November Thanksgiving Day 4th Thursday of November Christmas Day 25th day of December

1.6.4 Unforeseen Installation Closures: When the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closing; the Contractor will be notified by the COR of an installation closure. The Contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. When an unforeseen installation closure occurs on a regularly scheduled day of work, the Government shall have the following options:

1.6.4.1 To require the Contractor to perform the work on the following day unless the following day is a Saturday or Sunday and routine work is not scheduled for Saturday or Sunday.

1.6.4.2 To reschedule the work on any day satisfactory to both parties.

1.6.5 Hours of Operation: The Contractor shall normally perform work during normal duty hours, 7:30a.m. to 4:00p.m. Periodic work, such as stripping/waxing and carpet shampooing may be performed other than normal duty hours. Arrangements for work performed during other than normal duty hours shall be made with the COR or Designated Representative.

1.6.6 Key Control: The Contractor shall establish and implement methods of ensuring that all keys issued to the Contractor by the Government are not lost, or misplaced, and are not used by unauthorized persons. No keys issued to the Contractor by the Government shall be duplicated. NOTE: All references to keys include key cards.

1.6.6.1 In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the KO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.6.6.2 The Contractor may be required to replace, re-key, or reimburse the Government for replacement of locks or re-keying as a result of Contractor losing keys. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due.

1.6.6.3 The Contractor shall report the occurrences of a lost key immediately to the COR no later than the next business day.

1.6.6.4 It is the responsibility of the Contractor to prohibit the use of keys issued by the Government by any persons other than the Contractor’s employees. It is also the responsibility of the Contractor to prohibit the opening of locked areas by the Contractor’s employees to permit entrance of persons other than Contractor’s employees engaged in the performance of assigned work in those areas.

1.6.6.5 Lock Combinations; the Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.

1.6.7 Conservation of Utilities: The Contractor shall be directly responsible for instructing employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions, which preclude the waste of utilities, which shall include but shall not necessarily be limited to:

1.6.7.1 Lights shall be used only in areas where and at the time when work is actually being performed.

1.6.7.2 Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by contracted workers.

1.6.7.3 Water faucets or valves shall be turned off after the required usage has been accomplished.

1.6.7.4 Government telephones shall be used by Contractor employees only for emergencies.

1.6.8 Damages Caused by the Contractor: The Contractor shall be held accountable and liable to the Government for any damages to Government facilities, furnishings, equipment or grounds caused by the Contractor or his employees. The Contractor shall instruct his employees to immediately inform the building manager of any damages to property resulting from the performance of their duties.

1.6.9 Parking for Contractor’s Employees & Contractor Vehicles: Contractor employees shall park their personal and Contractor’s vehicles during the times and in the area designated by the COR or Designated Representative.

1.6.10 Circumstances to Be Reported: The Contractor or the Contractor’s employees shall report any circumstances of needed repair of the facility or unusual soiling of an area which may affect the performance of the work, present unhealthy or hazardous conditions, or create any delays or interference with the work caused by the employees of the Government. Such report shall be made immediately upon discovery by the Contractor to the COR or Designated Representative.

1.6.11 Hazardous Materials: The Contractor shall provide and post an inventory listing of all hazardous materials used and stored onsite. Safety Data Sheets (SDS) will be maintained in the same location as stored cleaning materials and chemicals. It is the Contractor’s responsibility to properly train his personnel on the existence and safe use and storage of hazardous materials. When readily available the Contractor shall use environmentally safe products in the performance of the contract. Products containing chlorofluorocarbons shall not be used. The Contractor shall be responsible for the proper disposal of all their cleaning supplies and containers.

1.6.12 Loss of Contractor Property: The Contractor shall be responsible to retain supplies and equipment within each building, in a safe and secure manner. Storage rooms shall be kept clean. The Government will not be held liable for any loss of supplies or equipment owned by the Contractor; nor the loss of any personal property belonging to employees of the Contractor.

1.6.13 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5, Post Award Orientation. The KO, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the KO, COR, or Designated Representative, will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.6.14 Contracting Officer Representative (COR): The COR will be identified by separate letter and within the Supplemental Information of the contract. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.15 Key Personnel: The following personnel are considered key personnel by the Government: designated Point of Contact (POC) and an alternate POC. The Contractor shall provide a designated POC and an alternate, who shall be responsible for the competent performance of the work required under the specifications of this contract NLT five

(5) business days after contract award and as changes occur. The name and contact information of the POC and an alternate, who shall act for the contractor when the POC is absent, shall be designated in writing to the KO and COR. The POC or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The POC or alternate shall be available between 7:30 a.m. to 4:00 p.m. Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. The POC(s) and alternates shall be able to read, write, speak, and understand English.

1.6.15.1 The POC or their alternate shall meet with COR to discuss immediate problems areas. The POC shall respond by phone or email to the COR within two (2) hours after notification of deficiencies and correct the deficiency(s) the next business day. The Contractor shall provide the telephone number and email of the POC to the

COR.

1.6.16 Identification of Contractor Employees: The Contractor (to include subcontractors) shall provide each employee an Identification (ID) Badge, which includes at a minimum, the Company Name, Employee Name and a recent color photo of the employee, prior to them entering Government facilities. ID Badges for Key Personnel shall also indicate their job title. ID Badges shall be worn at all times during which the employee is performing work under this contract. Each Contractor (to include subcontractors) employee shall wear the ID Badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit. The Contractor (to include subcontractors) shall be responsible for collection of ID Badges upon completion of the contract or termination of employee. A listing of issued identification cards shall be furnished to the COR prior to the listed employees entering Government facilities and updated as needed to reflect Contractor and Subcontractor personnel changes. All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials.

They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.6.17 Supervision of Contractor Employees: The Government will not exercise any supervision or control over Contractor or subcontractor employees while performing work under the contract. Such employees shall be accountable solely to the Contractor, not the Government. The Contractor, in turn, shall be accountable to the Government for Contractor or Subcontractor employees.

1.6.18 Access and General Protection / Policy and Procedures. For standard installations, the contractor and all associated sub-contractor employees shall provide all information required for background checks necessary to meet installation access requirements. These checks will be accomplished by the installation Provost Marshal Office, Director of Emergency Services or Security Office. For non-standard installations, such as most Army Reserve Centers, the contractor and all associated sub-contractors shall obtain background checks per 1.6.6.3.1 when unescorted access is required for employees without a CAC and associated background investigation. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

1.6.18.1 For Contractors that do not require CAC, but require access to a DoD facility or installation. The contractor shall obtain a background check for all contractor employees, including subcontractor employees, requiring unescorted access to government facilities. The background checks must include a check of the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB). In cases where obtaining an NCIC-III/TSDB background check is not possible, the contractor may submit background checks conducted by a third party entity. If third party checks are used, they must include a national criminal records check (including felonies and misdemeanors), Department of Motor Vehicles records check, and a check of the national sex offender registry. These checks must be completed on applicable employees within 6 months from the Notice to Proceed date. Background check reports will be provided to the COR by the third party or through the contractor. Under no circumstance will reports obtained by the employee be provided to the COR. These background checks will cover the previous ten years and include all states of previous residence during that time period.

1.6.18.1.1 Documentation of background checks, including the reports, will be sent to the COR by either the contractor or third party for each employee prior to the employee entering Army-controlled installations or facilities.

1.6.18.1.2 If adverse information is contained in the background check, unescorted access may be denied in accordance with Army Directive 2014-05 (Policy Implementation Procedures for Common Access Card Credentialing and Installation Access for Uncleared Contractors).

1.6.18.1.3 Contractor employees who will be entering Army-controlled installations or facilities and who do not possess a valid CAC, including subcontractor employees, must present a Federal personal identity verification card or authorized identification issued by state, or local governments.

1.6.18.2 AT Level I Training. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 90 calendar days after contract start date, new employee hire, or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 90 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil

Per AR 530‐1, Operations Security, the contractor employees must complete Level I OPSEC Awareness training.

New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.

If secure telecommunication requirements apply, include clause 252.239-7016 and follow guidance at 239.74.

1.6.18.3 The Contractor will submit the list of employee's requesting unescorted access, along with their background checks, 20 business days prior to needing access. Upon receipt of this list, the COR will review the list of employees and create an Access Control Roster (ACR) that identifies those personnel authorized unescorted access.

The COR will return the ACR to the contractor when review is complete.

1.6.18.4 Individuals may be denied unescorted access if derogatory information includes, but is not limited to, the following:

1.6.18.4.1 The background check contains criminal arrest information about the individual that causes the Senior Commander to determine that the individual presents a potential threat to the good order, discipline, or health and safety of the organization.

1.6.18.4.2 The installation is unable to verify the individual's claimed identity based on the reasonable belief that the individual has submitted fraudulent information concerning his or her identity in the attempt to gain access.

1.6.18.4.3 The individual has a current arrest warrant in NCIC, regardless of the offense or violation.

1.6.18.4.4 The individual is currently barred from entry or access to a Federal installation or facility.

1.6.18.4.5 The individual has been convicted of crimes encompassing sexual assault, armed robbery, rape, child molestation, production or possession of child pornography, trafficking in humans, drug possession with intent to sell or drug distribution.

1.6.18.4.6 The individual has a U.S. conviction for espionage, sabotage, treason, terrorism, or murder.

1.6.18.4.7 The individual is a registered sex offender.

1.6.18.4.8 The individual has a felony conviction within the past 10 years, regardless of the offense or violation.

1.6.18.4.9 The individual has been convicted of a felony firearms or explosives violation.

1.6.18.4.10 The individual has engaged in acts or activities designed to overthrow the U.S. Government by force.

1.6.18.4.11 The individual is identified in the TSDB as known to be suspected of being a terrorist or belonging to an organization with known links to terrorism or support of terrorist activity.

1.6.18.5 In cases where an uncleared Contractor employee, including any subcontractor employee, is denied access based on derogatory information, the individual may request a waiver.

1.6.18.6 The contractor and all associated sub‐contractors shall brief all employees on the local iWATCH Army program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within calendar days of contract award and within calendar days of new employees commencing performance with the results reported to the COR NLT calendar days after contract award.

1.6.18.7 Activity Regulations for Contractor Access and Use of Premises:

1.6.18.7.1 Follow all current Army Security Regulations concerning strict visitor control and preservation of all Government assets. Immediately report all security concerns to the Contracting Officer, who will notify the Security Office.

1.6.18.7.2 The Contractor shall adhere to requirements as directed in Federal Acquisition Regulation – 52.222-54;

Employment Eligibility Verification. Contractors shall be enrolled in the Department of Homeland Security E- Verify Program. Information on registration for and use of the E-Verify program can be obtained via the Internet at the Department of Homeland Security Web site: http://www.dhs.gov/E-Verify.

1.6.18.7.3 The Contractor shall ensure that its employees entering Army-controlled installations or facilities have obtained access badges and passes in accordance with facility regulations and that these badges and passes are obtained in advance so as not to delay the accomplishment of contracted services.

1.6.18.7.4 The Contractor shall return within two business days all issued U.S. Government Common Access Cards, installation badges, and/or access passes to the COR when the contract is completed or when a Contractor employee no longer…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .