W911SA23Q3082 Solicitation.pdf

PDF 1 MB Posted

Attached to
Refuse, Fort McCoy, WI Federal contract opportunity
Solicitation number
W911SA23Q3082
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort McCoy

View the file

Other files for this federal contract opportunity

Other files attached to Refuse, Fort McCoy, WI, newest first.
File Type Posted
W911SA23Q3082 Attachment 1 Price Schedule CUI.xlsx XLSX spreadsheet
W911SA23Q3082 Attachment 3 AFH Tote Locations and Service Schedule.xlsx XLSX spreadsheet
W911SA23Q3082 Attachment 2 AT OPSEC.pdf PDF
W911SA23Q3082 Attachment 4 AFH Historical Tonnage.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W911SA23Q3082 22-May-2023

b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME

10:00 AM 06 Jun 2023

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W911SA9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

LESLIE A KOENIG

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

0011939046

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

W6QM MICC FT MCCOY (RC)

KO DIRECTORATE OF CONTRACTIN

BLDG 1108 SOUTH R STREET

FORT MCCOY WI 54656-5142

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W5CD3E 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

DIRECTORATE OF PUBLIC WORKS

DIRECTORATE OF PUBLIC WORKS

2171 SOUTH 8TH AVENUE

FORT MCCOY, WI WI 54656

TEL: FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$47,000,000

NAICS:

562111

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF81

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W911SA23Q3082

Section SF 1449 - CONTINUATION SHEET

SUPPLEMENTAL INFORMATION

1. An Award for this requirement will be made pursuant to FAR 13, Simplified Acquisition Procedures.

2. The period of performance is anticipated to be 1 July 2023 to 30 June 2024 (or subsequent date), with one

(1) one (1) year option period to extend services.

3. Quotes shall be emailed to leslie.a.koenig2.civ@army.mil. Quotes are due to the Government on or before the date/time listed on the solicitation in central time. It is the contractor’s responsibility to ensure their quote is received by the due date and time. As an Addendum to FAR 52.212-1, contractor shall submit all items in accordance with the Supplemental Information by the solicitation closing date and time. The contractor SHALL provide all required documents with submission of quotes.

Signed SF 1449 Completed information from the Supplemental Information section of the solicitation Completed Price Schedule Attachment Signed Amendments (if applicable)

If all required documents are not provided with the quote submission, your quote MAY NOT be considered for award.

4. If a quote is based on a teaming/partnering relationship or a joint venture, the contractor shall provide, with the quote, all required solicitation information for all parties including a copy of the teaming/partnering or joint venture agreement. The agreement shall include information, which identifies the responsibilities for each entity under this contract. The agreement shall demonstrate the relationship between firms and identify contractual relationships and authorities to bind each entity of the teaming/partnering or joint venture relationship.

5. This procurement is Set Aside as 100% Total Small Business NAICS Code 562111 with a size standard of $47 Million.

6. Prior Contract Information: New requirement, No prior contract information avalible.

7. Period for acceptance of quotes. The contractor agrees to hold the prices in its quote firm for 90 calendar days from the date specified for receipt of quotes.

8. Site visit: No site visit will be held.

9. Written questions must be furnished to the Government no later 10:00 a.m. central time on 1 June 2023 in order to ensure a timely response is provided by the solicitation closing date. All questions are to be submitted in writing at the time indicated in the solicitation or they may not be addressed before solicitation closing date; therefore, contractors are advised to submit questions as soon as possible. Please provide your company name, telephone, point of contact, e-mail address, and solicitation number on all questions.

The Government will respond to questions via the issuance of an amendment which incorporates the question and the Government’s response.

10. SAM Unique Entity ID: ______________________________.

11. TAXPAYER ID #______________________________.

12. CAGE CODE __________________________________.

13. SYSTEM for AWARD MANAGEMENT (SAM) REGISTRATION: An Active SAM Registration is required of all Department of Defense contractors. SAM registration enables electronic funds transfer of contract payments. If your company is not already actively registered, please register in the SAM database at www.sam.gov. If your company is currently registered and close to expiring, begin/complete the process for SAM registration renewal.

a. A SAM Unique Entity ID is required for SAM registration. If your company does not have a DUNS #, obtain one by calling 800-333-0505.

b. Whether your company is a current or new registrant in the SAM database, your registration must indicate that you are a provider of NAICS 562111, or a NAICS of similar business size, under the Goods – Services section of the registration to be eligible to receive a contract for this solicitation.

c. If the prospective awardee for this request for quotes is not actively registered in the SAM database by close of solicitation, including NAICS 562111, or a NAICS of similar business size, under the Goods – Services section, depending on mission requirements, the government reserves the right to proceed to award to the next otherwise successful actively registered contractor.

d. Within the SAM Representations and Certifications, please ensure you company has selected that you wish to bid on, or currently hold Department of Defense (DoD) issued or DoD funded Contracts. The DFARS provisions in SAM must also be completed by solicitation closing date and time.

e. Prospective contractors who have not completed electronic annual representations and certifications at http://www.sam.gov/ in conjunction with required registration in the System for Award Management (SAM) database, shall complete and submit FAR 52.212-3 Alternative 1 Offeror Representations and Certifications - Commercial Items and DFARS Representations and Certifications in SAM to be eligible to receive an award for this solicitation.

14. Contract Administrator: TBD at time of award.

If you have questions pertaining to this contract after contract award (i.e. questions regarding delivery, invoice procedures, etc.), please request assistance from the Contract Administrator. Be sure to include the contract number in your request for assistance. Requesting contract administration assistance from any other individual could result in a delayed response.

15. Contracting Officer: TBD at time of award.

16. Contracting Officer’s Representative (COR): TBD at the time of Award.

17. The Government intends to evaluate quotes and award a contract without discussions. Therefore, the contractor’s initial offer should contain the contractor’s best terms from a price and technical standpoint.

However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all quotes if such action is in the public interest and waive informalities and minor irregularities in quotes received.

18. Service Contract Reporting (SCR): Contractors will report manpower data relating to the performance of service contracts into the system for Award Management (SAM) (https://sam.gov) consistent with existing service contract reporting requirement under the federal acquisition regulation subpart 4.17- Service Contracts Inventory. SAM will only enable reporting for entities with contract that meet the SCR threshold at FAR 4.1703. As part of its quote, the vendor must include the estimated total cost (if any) incurred to comply with the Service Contract Reporting requirement.

19. Post Award Conference: In the event the Contracting Officer decides to conduct a Post Award Conference in accordance with DFARS 242.5, the awardee will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.

20. ABILITYONE DESIGNATED ITEMS: In accordance with 52.208-9, contractors are referred to the web site of the Committee for Purchase from People Who Are Blind or Severely Disabled, the independent federal agency that administers the AbilityOne (formerly Javits-Wagner-O'Day or JWOD) Program for the lists of designated products and services http://abilityone.gov/procurement_list/product_buy.html

21. In accordance with FAR 52.223-2, Affirmative Procurement of Bio-based Products under Services and Construction Contracts, contractors are required to submit annual bio-based reports to the reporting module in the System for Award Management (SAM) at https://www.sam.gov.

22. The “Equal Employment Opportunity Is The Law” notice (poster) referenced in FAR Clause 52.222-

26(b)(3), is located at http://www.dol.gov/ofccp/regs/compliance/posters/pdf/eeopost.pdf .

23. In accordance with FAR Clause 52.222-41(g), the contractor must notify each service employee working on this contract of the minimum wage and fringe benefits required to be paid pursuant to this contract, or shall post a copy of the wage determination and Department of Labor Form WH-1313 in a prominent place at the worksite. The applicable wage determination is incorporated into the contract. The WH-1313 poster is located at http://www.dol.gov/whd/regs/compliance/posters/sca.htm.

24. In accordance with FAR 52.222-42, In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR part 4), this clause identifies the classes of service employees expected to be employed under the contract states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5 332.

This Statement is for Information Only. It is not a Wage Determination.

Employee Class Monetary Wage -- Fringe Benefits 99730 -- Refuse Collector WG-2; Step 2

25. Required insurance:

The contractor shall provide, within ten (10) calendar days after contract award. The Contractor shall provide the Certificate of Insurance (COI) via email to the Post Award Contracting Officer and Post Award Contract Specialist. The COI shall be updated and sent to the Post Award Team on an annual basis.

In accordance with FAR clause 52.228-5 entitled, “Insurance--Work on a Government Installation” the following minimum amounts of insurance are required.

Workmen’s Compensation As required by state laws

Employer’s Liability Insurance $100,000 per accident General Liability Insurance - Bodily Injury Liability $500,000 per occurrence

Auto Liability Insurance $200,000 per person

Bodily Injury $500,000 per occurrence

Property Damage $20,000 per occurrence Contractor shall require the insurance company to specify contract number in the Description of Operation block of the Certificate of Insurance (COI) and the below statement.

"The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective- (1) For such period as the laws of the State in which this contract is to be performed prescribe; or (2) Until 30 days after the Insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer."

26. Legal compliance: The Contractor shall comply with all Federal, State, and Local Laws, codes and regulations applicable to his performance under this contract, and shall be solely responsible for all costs associated with said compliance.

27. Contract performance:

Purpose. IAW with FAR Subpart 42.1500 contractor past performance information (PPI) is relevant information for future source selection purposes regarding a contractor’s actions under previously awarded contracts. It includes, for example, the contractor's record of conforming to contract requirements and to standards of good workmanship; the contractor's record of forecasting and controlling costs; the contractor's adherence to contract schedules, including the administrative aspects of performance; the contractor's history of reasonable and cooperative behavior and commitment to customer satisfaction; and generally, the contractor's business-like concern for the interest of the customer. Contractor past performance information is one of the tools that support Army efforts to acquire best value and is used to evaluate performance risk in source selection. The feedback provided by the government to the contractor in collecting PPI, and the knowledge that PPI will be used in future source selection decisions, should result in improved performance and a greater contractor focus on customer satisfaction.

Contractor Performance Assessment Reports System (CPARS): CPARS shall be prepared IAW AFARS Subpart 42 upon physical completion of the contract. If the period of performance will exceed 18 months, an “interim” assessment report shall be prepared at the completion of 12 months performance and annually thereafter until the contract is physically complete. An out-of-cycle or “addendum” report may be prepared if there is a need to record an extraordinary event prior to the next regularly scheduled evaluation or if it is necessary to report a meaningful occurrence during the period between physical completion of the contract and contract closeout. Additionally, addendum reports may be prepared to record contractor’s performance relative to contract closeout and other administrative requirements (e.g.

final indirect cost proposals, technical data, etc.).

Completion Due Date. The government will complete the CPARS within 60 days after the end of the assessment rating period (if applicable).

Evaluators. The Contracting Officer and the Contracting Officer’s Representative will jointly complete the performance assessment.

Contracts Performance Elements. The contractor’s performance shall be assessed in accordance with elements and rating system set forth in AFARS Subpart 42.

Contractor Review. The Contracting Officer will furnish a copy of the CPARS to the contractor requesting that the contractor submit comments, rebutting statements, and/or additional information to the Contracting Officer within 30 calendar days of receipt. Failure to respond within the designated timeframe will be taken as agreement with the assessment.

Contract Concurrence. Where a contractor concurs with, or takes no exception to a CPARS, such report shall be considered final and releasable for use in source selection and other deliberative purposes.

Contractor Rebuttal. Where a contractor takes exception to a performance report, the Contracting Officer will review the contractor’s rebuttal or comments and make appropriate changes. If the Contracting Officer makes changes, the changed rating will be reflected in the narrative. The Contracting Officer will make all reasonable efforts to reconcile the report and the contractor’s comments. However, it is not necessary that they reach agreement on the report where such is clearly impracticable. The contractor’s rebuttal or comments shall be made part of the CPARS.

Resolving Disagreements between the Government and the Contractor. In the event disagreements between the parties regarding the CPARS occur, the Contracting Officer will review the rebuttal and make appropriate changes. If no agreement is reached, the CPARS is forwarded to the Reviewing Official (Director of Contracting) along with the Contracting Officer’s Findings and Recommendation and supporting documentation. The decision of the Reviewing Official is final. Copies of the CPARS and the contractor’s response and review comments, if any, shall be retained as part of the evaluation.

Release of Contractor Performance Evaluation Information. The evaluation will not be released to other than government personnel and the contractor whose performance is evaluated. The performance evaluation information will be input into the applicable module within Contractor Performance Assessment Reporting System (CPARS) database (or Government system in use at time of the evaluation).

Source Selection Information. Departments and agencies will electronically access the CPARS information to support future award decisions.

28. Alternate disputes resolution: In furtherance of Federal policy and the Administrative Dispute Resolution Act of 1990 (ADR Act), Public Law 101-552 and FAR Clause 52.233-1, Subparagraph (d) (2) (1) (B) (2), the Contracting Officer will try to resolve all post award acquisition issues in controversy by mutual agreement of both parties. Interested parties are encouraged to use alternative dispute resolution procedures to the maximum extent practicable, in accordance with the authority and requirements of the ADR Act.

PWS

PERFORMANCE WORK STATEMENT (PWS)

Directorate of Public Works (DPW)

Army Family Housing Residential Solid Waste Service Fort McCoy, WI

PART 1

GENERAL INFORMATION

1 GENERAL: This is a non-personal services contract to provide residential solid waste services at Army Family Housing, Fort McCoy, Wisconsin. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all contractor planning, programming, administration, management, personnel, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Army Family Housing (AFH) Residential Solid Waste Services for Fort McCoy, Wisconsin (WI) as defined in this PWS except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract and all applicable Federal, State, and local laws, regulations, and directives. All equipment utilized by the contractor in the performance of this contract shall be maintained and operated IAW applicable technical/operator manuals, warranties, safety procedures, licensing/certification requirements and Federal and State laws. The contractor shall maintain accurate and complete records and files and shall maintain or have access to libraries of documents to include Federal, State, and local regulations, codes, laws, technical manuals, and manufacturer's instructions and recommendations, which are necessary and related to the functions being performed.

1.2 Background: Fort McCoy is situated on approximately 60,000 acres in the Coulee Region of West Central Wisconsin. It is located on Hwy 21 between Sparta and Tomah. Fort McCoy’s primary mission is to underpin readiness of force by serving as the premier reserve force training center, and when called upon, to support power projection missions. As a Total Force Training Center, Fort McCoy’s primary responsibility is providing quality training facilities for military forces, which include requiring solid waste services.

1.3 Objectives: Maintain the proper operation for curbside collection and disposal/treatment of solid waste at AFH located on the Installations South Post. The Performance Work Statement (PWS) is written to define "what" is required and leaves it to the contractor, the decision on "how" to perform the work. This approach is intended to allow the contractor to determine the best and most cost-effective ways to fulfill needs, emphasizing innovation and best practices. Applicable regulations and other references are provided to assist the contractor in understanding "what" is required. Unless law or regulation specifically requires a particular process, the contractor is free to determine "how" to do the work, subject to the overall expectation that the contractor will use the most cost-effective methods appropriate to satisfy the Installation needs. The nature of the work requires the contractor to use flexible employment and scheduling techniques to minimize cost and maximize performance outcomes, to adapt to varying workload requirements. The contractor shall comply with all applicable Federal, State, and local laws, regulations, and directives.

1.3.1 Net Zero Objective: This contract supports the Installation’s initiative to adopt the Net Zero hierarchy, and progressively increase the solid waste diversion rates until achieving zero landfill waste disposal. This goal is also identical to the Army’s Net Zero Waste program goal. The contractor shall work to reduce quantities of material disposed of in landfills by increasing diversion by any legal process that avoids landfill disposal. The contractor is encouraged to utilize best management practices, innovation, and partnering with the Installation and offer the most cost-effective service to the government in the performance of this contract to maximize diversion. The contractor shall provide recycle program support to the Installation. The contractor is encouraged to utilize environmentally sound best management practices, innovation, and partnering with the Installation and offer the most cost effective and environmentally sound service to the government in the performance of this contract to maximize diversion.

The contractor shall recycle or divert from landfill all materials required by Federal, State, Army, or local regulations. The contractor shall comply with EO 13693 by diverting, at a minimum, 50% of solid waste.

1.4 Scope: The contractor shall provide all management, labor, tools, supplies, equipment, supervision, permits, licenses, fees (to include disposal, treatment, tipping), and other items or services necessary to preform operations associated with solid waste services throughout the Installation’s AFH. The contractor shall provide totes for solid waste collection, service those totes in a timely manner, monthly curbside bulky pick-up, and off installation disposal/treatment of collected material.

1.4.1 Workload: It is anticipated that during this contract workload will remain the same. Although the amount of solid waste will fluctuate with increases and decreases. The workload information displayed in the attached documents is extrapolated based on historical information to represent estimated future projected workload. This workload is provided to assist offerors in proposal preparation and shall not be a limiting factor on the contractor’s obligation to perform all services described in this contract to the required level of effort. The projected workload data is to be used in the preparation of the initial proposal. The contractor has the responsibility to adjust their workforce for the workload at any given time during the life of the contract.

1.5 Period of Performance: The period of performance shall be for one (1) Base Period of 12 months and one (1) 12-month option period.

1.6 General Information:

1.6.1 Hours of Operation: Unless otherwise specified, the regular duty hours shall be 7:00AM to 4:30PM, Monday through Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The contractor shall minimize overtime requirements through the use of alternate work schedules to meet mission requirements.

1.6.2 Federal Holidays: The contractor is not required to provide services on Federal holidays. Federal holidays are established by Federal Law and are currently as follows.

New Year’s Day 1 January (see note) Martin Luther King Jr. Day 3rd Monday in January Presidents Day 3rd Monday in February Memorial Day Last Monday in May Juneteenth 19 June (see note) Independence Day 4 July (see note) Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veterans Day 11 November (see note) Thanksgiving Day 4th Thursday in November Christmas Day 25 December (see note)

NOTE: If these holidays fall on Saturday, the preceding Friday will be observed. If these holidays fall on Sunday, the following Monday will be observed. If a holiday falls on a regular business day, routine services shall be rescheduled to ensure mission requirements are met.

1.6.3 Type of Contract: The Government will award a Firm Fixed Price service contract. The quantity shown on CLIN X001 is a monthly payment CLIN for the performance of the collection service. CLIN X001 shall cover all costs priced monthly to include all totes, placement and removal of totes, materials, administrative costs, overhead, and processing fees to provide the required service. CLIN X002 is a cost reimbursable CLIN for actual disposal and tipping fees. CLIN X0002 shall not include any Contractor overhead or processing fees applied outside of the direct disposal fees. Any. An estimate of expected disposal costs for the 12-month period have been applied to CLIN X002 and shall not be exceeded without prior approval in the form of a contract modification from the Contracting Officer (KO). The quantities shown per CLIN X002 is not guaranteed; and any unused quantities may be removed by contract modification at the end of the date range covered by the CLIN. The Government pays only for the actual quantities ordered and received. The contractor shall not provide services exceeding the funded value of the CLINs.

1.6.4 Performance Requirements Summary (PRS) Description: Performance Requirements Summary will be used by the Government to inspect contractor’s performance. Government quality assurance surveillance of contractor performance is not limited to the task requirements as outlined in the PRS. The Government reserves the right to conduct surveillance of any contract requirement. The Government reserves the right to make adjustments to the performance standards with no corresponding adjustment to contract price, as approved by the KO.

1.6.5 Quality Control: Quality Control is the responsibility of the contractor. The contractor is responsible for the delivery of quality services/supplies to the Government. The contractor shall develop, implement, and maintain an effective Quality Control System capturing 100% of the performance requirements of the contract. A written Quality Control Plan (QCP) is not required to be submitted to the Government. The contractor shall, upon written request, provide to the COR their quality control documentation within 48 hours of request.

1.6.6 Quality Assurance: The Government may use a variety of surveillance methods to evaluate the Contractor’s performance. The Government will evaluate the Contractor’s performance under the contract IAW the Government’s Quality Assurance Surveillance Plan (QASP). QASPs are considered to be "living documents," dynamic, adaptable, and subject to modification based on Contractor performance surveillance results. This plan is a government developed document for the systematic surveillance of the Contractor’s performance in accordance with the requirements of the contract. The QASP is not part of the PWS and will not be issued with the solicitation.

The QASP focuses on the procedures and processes the Government will implement to assure the Contractor is performing IAW the performance standards within the PWS. The Government plan defines the criteria of how the Contractor’s performance will be evaluated, the frequency of surveillance, and the items to be inspected. Although the Government will develop a QASP, Government surveillance of Contractor performance is not limited to the QASP, or the performance objectives, outlined in the Performance Requirements Summary (PRS). The Government retains the right to evaluate all services required by the contract. The Government will perform inspections and tests in a manner that will not unduly delay the work. Non-conforming services shall be re-performed at no increase in contract price. If non-conforming services are recurring, cannot be re-performed, or the services fail to achieve the PRS, the Government may reject the nonconforming service(s) and document the Contractor’s performance record accordingly. The Government may also issue a Non-Conformance Report (NCR) in which the Contractor will be required to respond with the development of a corrective action plan (CAP) which identifies the root cause, corrective action (CA) for the root cause, CA for the specific nonconformance, and the date the CAs will be complete. The Government may also reduce the payment to the Contractor in accordance with the PRS or reduce payment to reflect the value of the services performed or may perform the services and charge the Contractor for any related cost incurred and/or may terminate this contract for cause.

1.6.6.1 Non-conforming Supplies or Services: When a contractor’s performance does not meet contract requirements and/or approved work schedules and/or timeframes it is considered non-conformance. Non-conformance shall be classified in one of three categories: level I (Minor), level II (Major) or level III (Critical).

The Government may re-inspect work designated for re-performance or late performance.

1.6.6.2 Level I (Minor) non-conformance: is defined as a non-conformance that is a departure from established standards having little bearing on the effective use or operation of the services. Minor non-conformance usually can be corrected by the contractor within a short timeframe, where no further corrective action (CA) response is necessary and can be issued by the COR to the contractor either through a verbal or written NCR. Minor nonconforming services shall be re-performed within a specified time frame at no increase in contract price. If minor non-conformances are recurring or re-performance is not completed in full and within the specified time a Level II non-conformance may be issued to the contractor by the KO.

1.6.6.3 Level II (Major) non-conformance: s defined as a non-conformance, other than critical, that is likely to result in failure of services, or to materially reduce the usability of the services for their intended purpose, or it is a recurring Minor non-conformance, or a non-responsive contractor indicating a trend or failure of the contractor’s quality control. Major non-conformances shall result in the issuance of a written NCR from the KO to the contractor requiring a response by the contractor by a specified timeframe identifying the reasons for the unsatisfactory performance, corrective action(s) taken, and date resolution has/will occur, and procedures to preclude recurrence of unsatisfactory performance. The KO may also reduce the payment to the contractor in accordance with (IAW) the performance requirements summary (PRS) or reduce payment to reflect the value of the services performed if re-performance is not possible or may have the identified non-conforming service performed and charge the contractor for any related cost incurred.

1.6.6.4 Level III (Critical) non-conformance: is defined as a non-conformance that is likely to result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the services; is likely to prevent performance of a vital agency mission; is for a repeated or uncorrected level II NCR’s; or is for a non-responsive contractor to a level II NCR. Critical non-conformances shall result in the issuance of a written NCR from the KO to the contractor requiring a response by the contractor by a specified timeframe identifying the reasons for the unsatisfactory performance, corrective action(s) taken, and date resolution has/will occur, and procedures to preclude recurrence of unsatisfactory performance. The KO may also reduce the payment to the contractor IAW the PRS or reduce payment to reflect the value of the services performed if re-performance is not possible or may have the identified non-conforming service performed and charge the contractor for any related cost incurred.

1.6.6.5 Inspection Results: The contractor will be notified of Government non-conformance inspection results.

The contractor shall acknowledge receipt of the non-conformance inspection results. The contractor may be notified of non-conformance inspection results verbally. Verbal notifications of defective work will be confirmed in writing by the Government. When Government inspectors are unable to contact the contractor to notify the contractor of non-conformance inspection results, notification to the contractor will be made by E-mail.

1.6.7 Installation Access and General Protection/Security Policy and Procedures: The contractor and all associated subcontractors’ employees shall provide all information required for background checks to meet installation access requirements to be accomplished by Director of Emergency Services or Security Office.

Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by the Department of Defense (DOD), Head

Quarters Department of the Army (HQDA), and/or local policy. The contractor and all associated subcontractors’ employees shall also comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014- 05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. The Government may require monthly participation in the Installation Random Antiterrorism Program.

1.6.7.1 Installation Access and Control:

1.6.7.1.1 Installation/Gate Closure: Unscheduled gate closures may occur at any time and personnel entering or exiting the Installation may experience a delay. Privately owned vehicles are subject to search upon entry, exit, and at any time while on the Installation. Refusal to comply with a request to search a vehicle could result in access to the Installation being denied. Delays in entering or leaving the Installation due to gate closures or vehicle searches shall not be compensated for in any form by the Government.

1.6.7.1.2 Search and Seizure: Contractor personnel and property shall be subject to search and seizure upon entering the confines of Fort McCoy, Wisconsin and upon leaving the confines of Fort McCoy, Wisconsin IAW AR 190-22 (Search, Seizure, and Disposition of Property).

1.6.7.1.3 Controlled Substances: Contractor personnel shall not perform PWS work while in possession of, or while under the influence of, alcohol or any controlled substance.

1.6.7.1.4 Weapons: Contractor personnel shall comply with all Fort McCoy regulations governing possession and transport of privately owned weapons on the Installation, including all forms of firearms, tasers, bow and arrow, switchblade or automatic blade knives, knives with blades in excess of three inches, ammunition and pyrotechnics, fireworks, bludgeons, brass knuckles, shooting pens or similar devices IAW Fort McCoy Regulation 190-12.

1.6.7.2 Identification of Contractor Employees: The Contractor (to include subcontractors) shall provide each employee an Identification (ID) Badge, which includes at a minimum, the Company Name, Employee Name, and a color photo of the employee. ID Badges shall be worn at all times during which the employee is performing work under this contract. Each Contractor (to include subcontractors) employees shall wear the ID Badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit. The Contractor (to include subcontractors) shall be responsible for collection of ID Badges upon completion of the contract or termination of employee. All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.6.7.3 Government and Personal Property: The contractor shall conduct work so that Government property, personnel and work areas shall be protected at all times from inconvenience, damage, or injury. In the event of loss or damage of any nature, caused by contractor operations or employees, due to improper protection, precaution or safety measures, such damages shall be repaired, or such property shall be replaced by the contractor at their expense. In the event the contractor does not satisfactorily repair or replace such damages, the Government reserves the right to make necessary correction and the contractor shall reimburse the Government for all labor and materials costs associated with repairs or replacement.

1.6.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the contracting activity or contract administration office IAW Federal Acquisition Regulation Subpart 42.5, Post Award Orientation. The KO, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the KO will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the

Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.

These meetings shall be at no additional cost to the Government.

1.6.9 Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the contractor performs the technical requirements of the contract;

perform inspections necessary in connection with contract performance; maintain written and oral communications with the contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor contractor's performance and notify both the KO and contractor of any deficiencies; coordinate availability of government furnished property; and provide site entry of contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.10 Contractor Employees: For the purpose of this contract, the term “contractor employee(s)” applies to all contractor employees and subcontractor employees performing work in support of this contract. The contractor shall provide supervisory, technical, administrative, and clerical personnel qualified to accomplish all requirements specified by this PWS and with the qualifications listed below. The contractor shall maintain current personnel and job qualification records to demonstrate compliance with the above. The selection, assignment and management of contractor employees is the responsibility of the contractor; however, the Government reserves the right to restrict the employment under this contract of any contractor employee, or prospective contractor employee who is identified as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population. The contractor will immediately remove any personnel who fail to meet/maintain required qualifications or fail to conduct themselves within the constraints identified herein. The contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest or is in violation of Department of Army policies or procedures. Contractor employees shall present a neat appearance and be easily recognized and represent themselves as contractor employees. This shall be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges containing the company name and the employee’s picture and name.

1.6.10.1 Legal Qualifications: Employers are required to abide by the immigration laws of the United States and to employ in the United States only individuals who are eligible to work in the United States. Government rules, regulations, laws, directives, and requirements, in place or issued during the performance period, shall apply to all contractor personnel. The contractor shall be solely responsible for any costs resulting from contractor employee violations.

1.6.10.2 Conduct: The contractor is fully responsible for the conduct of its employees at all times while employees are performing work on this contract. All personnel employed by the contractor in the performance of this contract, or any representative of the contractor entering the Government reservation, shall abide by all regulations of the installation. The contractor is responsible for ensuring that any contractor employees providing services under this contract conduct themselves in a professional manner at all times. Revocation of contractor personnel access to the Installation shall not relieve the contractor from the requirement to meet all the terms and conditions of the contract.

Contractor personnel shall comply with the following while performing work under this PWS.

1.6.10.3 Standards of Conduct: In accordance with DOD Directive 5500.7-R, “Joint Ethics Regulation”, contractor employees must avoid being improperly influenced in the execution of their duties under the contract.

Particular attention will be paid to acceptance of gifts/gratuities, and on non-disclosure of sensitive or classified information. The contractor shall ensure employee conduct complies with 41 U.S.C 423 relative to release of acquisition related information or actions or discussions which may prejudice future competitions.

Contractor personnel shall obey all regulations and the orders of competent authorities, including without limitation orders and regulations pertaining to physical and national security and the good order and discipline of Fort McCoy.

The contractor shall ensure that the contractor employees comply with the letter and spirit of current applicable Government laws, regulations, directives, policies, and requirements (hereafter referred to as Government rules), to include in particular those pertaining to Army values, alcohol, and controlled substances. This includes Government rules that are revised or issued during the contract term. The contractor shall be responsible for violations of these Government rules. The contractor shall maintain a pro-active, efficient, and effective working relationship with all Installation activities, units, and offices, as well as with off post organizations and activities within the requirements stipulated in this PWS.

The contractor shall comply with all Department of Defense (DoD) and local requirements that establish uniform policies governing smoking in and around Government-owned buildings and vehicles. The contractor shall comply with Federal drug-free workplace and requirements.

Government rules, regulations, laws, directives, and requirements which are issued during the contract term relating to law and order, Installation administration, and security on the Installation shall be applicable to all contractor employees or representatives who enter the Installation. Violation of such rules, regulations, laws, directives, or requirements shall be grounds for removal (permanently or temporarily as the Government determines) from the work site. Removal of employees does not relieve the contractor from the responsibility for the work defined in this

PWS.

Removal by Garrison Commander. The Garrison Commander may, at his discretion, bar an individual from the Installation under the authority of 18 USC 1382 (1972), AR 210-10 (Administration), and the National Industrial Security Program Operating Manual (NISPOM) for conduct determined contrary to good order, discipline, or Installation security.

Removal by KO. The KO may require the contractor to remove any employee, working under this contract, for reason of misconduct or security. Contractor employees shall be subject to dismissal from the premises upon determination by the KO that such action is necessary in the interest of the Government.

Removal by Installation Police. Contractor employees may be denied entry to the Installation by Military Police if it is determined that such entry may be contrary to good order, discipline, or the security of the Installation. Military Police may remove any contractor employee from the Installation for reason of misconduct or security.

1.6.10.4 Interference: Contractor personnel shall not interfere with or impede Government activities.

1.6.10.5 E-Mail Addresses: Employees shall include a signature block on all emails that includes their name, title, company name, and contact information.

1.6.10.6 Language Qualifications: The contractor shall employ only persons able to speak, read, write, and understand English for those positions interacting with Government and other personnel in the performance of this contract, and/or where English is used or essential to provide the product, record, data, information, or service.

Contractor employees working under this contract shall be able to communicate to accurately report fire and other emergency conditions as required, and be able to assist, direct, or be directed by emergency responders.

1.6.10.7 Physical Qualifications: Contractor personnel shall be physically capable of performing their assigned work under normally anticipated climatic conditions, such as extreme weather conditions (snow, sleet, rain, heat, humidity, etc.).

1.6.10.8 Key Personnel: The contractor shall designate a Project Manager (PM) and an Alternate Project Manager (APM) who shall serve as the central contractor point of contacts with the Government and who shall be responsible for the performance of the work. The name of these persons shall be designated in writing to the COR no later than one (1) day prior to contract period of performance (POP) start date, if award notification is received prior to POP start date. Changes to the Project Manager shall be submitted to the Government within five (5) workdays of the change.

The Project Manager shall have full authority to act for the contractor on all contract matters relating to daily operations of this contract. The Project Manager or Alternate Project Manager shall be available between the hours of 7:30AM to 4:30PM, Monday through Friday except Federal holidays or when the Government facility is closed for administrative reasons.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .