W911SA23B2014 Attachment 2 - Drawings - PREP GARRISON OPS SUP AREA SITE INSTL UTILITIES.pdf
PDF 7 MB Posted
- Attached to
- W911SA23B2014 Prepare Garrison Ops Support Area & Install Utilites Federal contract opportunity
- Solicitation number
- W911SA23B2014
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911SA23B2014 Bid Abstract OF1419.pdf | ||
| W911SA23B2014_ Site visit sign in sheet.pdf | ||
| W911SA23B2014 Attachment 4 - Wage Determination.pdf | ||
| W911SA23B2014 Attachment 1 - ATOPSEC - Prep Garrison Ops Support Area 700 Block.pdf | ||
| W911SA23B2014 Attachment 3 -Specs - PREP GARRISON OPS SUP AREA SITE AND INSTALL UTILITIES.pdf | ||
| W911SA23B2014 Attachment 5 - SF 24.pdf | ||
| W911SA23B2014 Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G0.1
Fort McCoy, Wisconsin
700 BLOCK
CANTONMENT
EXPANSION
NOTES
A. ANY UTILITIES AND STRUCTURES SHOWN ON PLAN
DRAWINGS ARE APPROXIMATE IN LOCATION AND
DESCRIPTION AND ARE BASED ON RECORDS AVAILABLE
TO THE GOVERNMENT OR ON SURFACE FEATURES
INDICATING THEIR EXISTENCE. THERE MAY BE OTHER
UTILITIES WITHIN THE PROJECT AREA WHICH ARE NOT
SHOWN. THE LACK OF UTILITIES ON PLAN DRAWINGS IS
NOT AN INDICATION OF A UTILITY-FREE PROJECT SITE.
B. NOTIFY ALL AFFECTED UTILITY COMPANIES OF
CONSTRUCTION OPERATIONS AT LEAST THREE
WORKING DAYS BEFORE BEGINNING WORK NEAR THEIR
FACILITIES. DO NOT BEGIN EXCAVATION WORK UNTIL
UNDERGROUND UTILITY LOCATIONS HAVE BEEN
MARKED OR THE UTILITY COMPANY HAS SENT NOTICE
THAT THE AREA IS CLEAR.
10/4/2022
FALLS
SPARTA
LYME
LAFAYETTE
ANGELO
GREENFIELD
ADRIAN
LINCOLN
McCOY
FORT
MILITARY
RESERVATION
Sparta
McCoyFort
Angelo
Kirby
Tunnel City27
94S
I
Q
IB
Q I
A T M
M
M
G
O
E
E
A
61 6
1 6
1 6
Cataract
Cr
R.
Sparta Cr.
Cr
Be av er C r.
Cr.
Stillwell Cr.
Tarr
R.
Silver
Cr.
La C ro ss e
Squ aw
Cr.
Sp en ce r
Cr
Soper
Cr.
Du sti n
Cr.
Rathbone
L.
Dell Hazel
Wood Alder
L.
Tomah L.
ley
Bai
1 6
Le m on w ei r
RIVER ST. TRAIL
ELROY
SPARTA
A
II
BC
AA
CM
ET
OO
G0.2
LOCATION MAP1
GENERAL NOTES2
C1.1EXISTING SITE PLAN1
C1.2REMOVAL PLAN1
C1.3EROSION CONTROL PLAN1
C1.4 Scale: 1:60
PROPOSED SITE PLAN1
INV. 908.5
C1.5GRADING PLAN1
ST
A
1+
.1
TC
8.
, 0.0'
PLAN AND PROFILE STA 100+50 - 117+501
C1.6
5+
.7
TC
2.
, 0.0'
ST
A
9+
.7
TC
3.
, 0.0'
C1.7
3+
.0
TC
4.
, 0.0'
ST
A
5+
.4
TC
2.
, 0.0'
C1.8
C1.10FUTURE SITE PLAN (FOR REFERENCE ONLY)1
C1.11FUTURE GRADING PLAN (FOR REFERENCE ONLY)1
C5.1
ROCK TRACKING PADA
SILT FENCEB
TEMPORARY DITCH CHECK (BIO ROLL)C
EROSION MAT AND SODE
INLET PROTECTION TYPE AD
C5.2
CLASS "B" BEDDINGF
RCP FLARED END SECTION J
WATER SERVICEH
FIRE HYDRANTI
GATE VALVE & BOXM
DRAIN TILE CLEANOUTL
P
-4" +
D
EP
TH
"D
8" MIN.
48"
58" 27"
K P
DIMENSIONS
W H
T 9"
GF
96" 9"
E
8" 84"
D
7" 72"
MANHOLE TYPE
27" 113" 27"
T
100" 27"
86" 27"
H
8" 8"
B
5"
K
8"
102"
119"
C 60" 6"
72" 27"
8" 10" 10"
2-4 2" THICK ADJUSTING RINGS
PAVEMENT OR
GROUND LINE
W
16" BARREL SECTION
PRECAST SECTIONS
W/WATER TIGHT
GASKETS AT ALL
JOINTS
STEEL REINFORCED
PLASTIC OR
ALUMINUM STEPS
MANHOLE CASTING
NEENAH R-2501 OR EQUAL
3/8" BELOW FINISHED GRADE
USE REDUCTION
SECTION FOR
MANHOLES 60"
DIAMETER OR
LARGER WHERE
DEPTH ALLOWS
STORM MANHOLEK
TRENCH INSTALLATIONG
2' SUMP
12" WIDE, 6" THICK
CONCRETE MAINTENANCE RING
C5.3
TYPICAL INVERT DETAILSN
GRADE
RISER WHEN REQUIRED.
SEE RISER DETAIL.
MAIN SEWER
WYE
1/8" TO 1/4" FALL PER FOOT
DEPTH AS REQUIRED
TO SERVE PROPERTY
PLUG W/ END CAP
(INCIDENTIAL TO SERVICE)
OR CONNECT TO EXISTING SERVICE
TRACER WIRE FROM WYE TO END OF NEW SERVICE
BRING TO SURFACE IN TEST BOX (SEE SPEC)
ALLOW 2' EXCESS WIRE COILED BENEATH BOX
(WIRE AND BOX INCIDENTAL TO SAN SERVICE)
NOTE:
INSTALL NEW RISER TO MAINTAIN
A MINIMUM 8' COVER OVER SANITARY
SEWER SERVICE PIPE. PROVIDE 4"
OF INSULATION OVER SANITARY SEWER
SERVICE IF LESS THEN 8' DEEP, AS
DIRECTED BY ENGINEER.
CONTRACTOR TO RECORD
TIES TO EACH SERVICE
CONNECTION. PROVIDE
TO ENGINEER
SANITARY SEWER SERVICEO
PLAN
27"
ECCENTRIC PRECAST
CONE SECTION
5"MIN.
SECTION
6" PRECAST
4'-0"
3/8" BELOW FINISHED GRADE
GASKET JOINTS
16" BARREL SECTION
INTEGRALLY
CAST BOOT
RUBBER GASKETS
ALL JOINTS, JOINTS
SHALL BE
WATERTIGHT
STEEL REINFORCED
PLASTIC OR
ALUMINUM STEPS
16" O.C. IN LINE
BASE TO BE CAST INTEGRALLY
WITH BOTTOM BARREL SECTION
GROUT BOTTOM �12 DIAMETER
OF PIPE, SLOPE UP 3" TO
MANHOLE WALL
4' -0
VA
R
IE
S
PRECAST INVERT
NOTE: ALL MANHOLES TO BE CL 3
RCP ASTM SPEC C 478
CASTING NEENAH R1642
OR EQUAL
2-4 2" THICK ADJUSTING RINGS
SANITARY MANHOLEP
BENDS AS
NECESSARY
SEE SERVICE
IMBED RISER IN TRENCH
45° BEND
3/4" MINUS ROCK
BEDDING
LE
N
G
TH
V
AR
IE
S
WALL, SLOPE VARIES
DETAIL
WYE
NOTE:
FOR SIZE AND TYPE OF
MATERIALS SEE SPECS.
TRACER
WIRE
CONNECT TO EXIST
SERVICE PIPE
SEWER SERVICE RISERQ
NTS
ROCK CUT DITCHR NTS
BIORETENTION BASIN TYPICAL CROSS SECTIONS NTS
TYPICAL GRAVEL SECTIONT
PROPOSED TREATED 8' 4"X4" MARKER BURIED AT 4'
AND PAINTED GREEN
12" WIDE, 6" THICK
CONCRETE MAINTENANCE RING
12" WIDE, 6" THICK
CONCRETE MAINTENANCE RING
C5.4
3 STRANDS 4 POINT
BARBED WIRE
TOP RAIL WITH
WIRE TIES
BRACE
BOTTOM RAIL
(WHEN SPECIFIED)
REINFORCING WIRE
38" TRUSS ROD
MINIMUM
CONCRETE
SEE NOTE 1
MULTIPLES OF 10'
WITH TOP RAIL
AND BOTTOM RAIL WHEN
SPECIFIED.
CONCRETE
SEE NOTE 1
GATE SINGLE OR DOUBLE SWING
SIZE AS REQUIRED
CONCRETE
SEE NOTE 1
34" X 10'-0" COPPER WELD GROUND ROD
WITH #2/0 BARE CONDUCTOR CLAMPED
TO POST AND ROD
NOTES:
1. CONCRETE DIA. SHALL BE 4 TIMES THE DIA. OF THE POST.
2. IF LINE POSTS IN CONCRETE ARE REQUIRED,
THEY WILL BE SPECIFIED IN EACH TASK ORDER.
3. IF BOTTOM RAILS ARE REQUIRED,
THEY WILL BE SPECIFIED IN EACH TASK ORDER.
NTS
SINGLE ARM, GATE, FENCE AND BARBED WIRE MOUNTING DETAILSU
NTS
FENCE SECTION ELEVATIONV NTS
PULL/CORNER POST ASSEMBLYW
| Sheets and Views |
| G0.1 COVER SHEET |
| G0.2 LOCATION AND GENERAL NOTES |
| C1.1 EXISTING SITE PLAN |
| C1.2 REMOVAL PLAN |
| C1.3 EROSION CONTROL PLAN |
| C1.4 PROPOSED SITE PLAN |
| C1.5 GRADING PLAN |
| C1.6 PLAN AND PROFILE-1 |
| C1.7 PLAN AND PROFILE-2 |
| C1.8 PLAN AND PROFILE-3 |
| C1.10 FUTURE SITE PLAN |
| C1.11 FUTURE GRADING PLAN |
| C5.1 CONSTRUCTION DETAILS-1 |
| C5.2 CONSTRUCTION DETAILS-2 |
| C5.3 CONSTRUCTION DETAILS-3 |
| C5.4 CONSTRUCTION DETAILS-4 |