W911SA23B2013 Grnd Pwr Rec B6058 Solicitation SF1442.pdf
PDF 314 KB Posted
- Attached to
- Replace Ground Power Receptacles B6058 Fort McCoy, Wisconsin Federal contract opportunity
- Solicitation number
- W911SA23B2013
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911SA23B2013 Bid Abstract OF1419 signed.pdf | ||
| W911SA23B2013 Amendment 1.pdf | ||
| W911SA23B2013 Attachment 1 Wage Determination 040723.pdf | ||
| W911SA23B2013 Replace Grournd Pwr Recep B6058 Attendance.pdf | ||
| W911SA23B2013 Attachment 3 B6058 Repair GPU - Drawings.pdf | ||
| W911SA23B2013 Attachment 1 Wage Determination.pdf | ||
| W911SA23B2013 Attachment 2 ATOPSEC GPU Hanger.pdf | ||
| W911SA23B2013 Attachment 4 B6058 Repair GPU - Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011909197
PROVIDE ALL PARTS, LABOR, TOOLS, EQUIPMENT, MATERIALS, TRANSPORTATION, AND SUPERVISION NECESSARY TO REPLACE
OBSOLETE GROUND POWER RECEPTACLES IN B6058 HANGER (WO 2687).
X
TODD A DEMPSEY (608) 388-1252
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
10-Apr-2023
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________180 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________24 May 2023 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
W6QM MICC FT MCCOY (RC)
KO DIRECTORATE OF CONTRACTIN
BLDG 1108 SOUTH R STREET
FORT MCCOY WI 54656-5142
W911SA
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
11:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W911SA23B2013 19
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W911SA23B2013
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
CLIN 0001-REPLACE GROUND POWER B6058
FFP
PROVIDE ALL PARTS, LABOR, TOOLS, EQUIPMENT, MATERIALS,
TRANSPORTATION, AND SUPERVISION NECESSARY TO REPLACE
OBSOLETE GROUND POWER RECEPTACLES IN B. 6058 HANGER (WO
2687) -CONSTRUCTION PORTION: AT FORT MCCOY, WISCONSIN IN
ACCORDANCE WITH THE SPECIFICATIONS, DRAWINGS, AND
CONTRACT DOCUMENTS.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011909197
PSC CD: Z2AA
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 180 dys. ANP 1 FORT MCCOY
FORT MCCOY
2171 8TH AVENUE
FORT MCCOY WI 54656
FOB: Destination
W81TMH
Section 00100 - Bidding Schedule/Instructions to Bidders
SUPPLEMENTAL INFORMATION
Contracting Officer: Vance Bickford Phone: 608-388-6077 Email: vance.c.bickford.civ@army.mil
Contract Administrator: Todd Dempsey Phone: 608-388-1252 Email: todd.a.dempsey.civ@army.mil
Period of Performance: 180 days after Notice to Proceed
In accordance with FAR 11.501(a)(1) and (2) that the use of liquidated damages is in the best interest of the Government. The Liquidated damages clause will be included in the resultant award.
Include the following within the quote package:
1) Completed SF1442 with acknowledgement of all amendments
2) Any additional verification documents
Contractor POC E-mail: ___________________________________ Unique Entity ID#: ________________________________________________
TAXPAYER ID #: _______________________________________
Magnitue is between $25,000 and $100,000
This solicitation is a 100% Service Disabled Veteran Owned Small Business set-aside under NAICS code 238210 with a size standard of $19.0 Million.
Bid guarantee is required if quote is $150,000 or greater IAW 52.228-1
BID SUBMISSION: Electronic bids submitted through DoD Secure Access File Exchange (SAFE) (https://safe.apps.mil) will be the only accepted method for submission of bids for this solicitation. Traditional paper bids will not be accepted. Non-CAC users will not have the capability to upload proposals or documents without a Drop-Off request. Offerors must send an email to the Contract Specialist at todd.a.dempsey.civ@army.mil to receive a Drop-Off request; please include the solicitation number in the subject line of the email. Once the Offeror receives the Drop-Off request, the Drop-Off can only be accessed for a period of 14 days to upload files. We request that you submit your request for a Drop-Off no sooner than two to three days prior to the submission due date because all uploaded files will be automatically deleted from DoD SAFE 7 days after upload. Offeror's are reminded to allow sufficient time for their submittals' files to upload, transmit, and timestamp.
Therefore, waiting until the last minute to attempt transmission of your proposal could result in your submittal being deemed late should the website encounter performance or technical issues.
Public Bid Openings: The Public Bid Opening for this solicitation will be conducted via teleconference. To attend the Public Bid Opening teleconference, any interested party must submit an email request to the Contract Specialist todd.a.dempsey.civ@army.mil prior to the Bid Opening time in order to access the teleconference. The Contract Specialist will provide you the phone number and attendee passcode for attendance. Once the teleconference has begun, no access information will be distributed, and no information will be repeated for late attendees.
The public bid opening will occur two hours after the due date and time specified for bids in order to facilitate the transfer bid submission via DoD SAFE to the MICC as well as set up the teleconference call.
Please note: The time the Bid is due is different from the time of the Public Bid Opening. This will allow time for bids to be downloaded from DoD SAFE in order to be read aloud during the Public Bid Opening teleconference.
Late Bids received after the Bid Due date/time will not be considered for award; even if they are received before the Public Bid Opening. Screen Shots of the DoD SAFE submission will be taken to confirm each contractor bid was received by the bid due date/time.
Bid abstracts and Screen Shots of the DoD SAFE submission will be posted on sam.gov at the conclusion of the Public Bid Opening Teleconference.
The bidder’s failure to include information required by this solicitation may result in the bid submission being found non-responsive and may therefore be ineligible for award.
SITE VISIT: A site visit is scheduled at 1108 South R Street, Fort McCoy WI 54656 on 3 May 2023 at 10:00 AM central time. The POC for this site visit is Todd Dempsey, Contracting Contract Specialist and he will only entertain questions regarding site visit access and accommodations. Email is todd.a.dempsey.civ@army.mil. All questions regarding this solicitation, scope, terms, etc. shall be submitted after the site visit and per instruction provided below. This will be the only site visit conducted and will begin promptly without considerations for late or lost proposals. Any requests for additional site visits will be denied.
Remarks, explanations and answers provided by Government representatives before, during and after the site visit shall not change or qualify any of the terms or conditions of the solicitation. The solicitation can only be changed by a formal written amendment issued by the MICC Fort McCoy Contracting Office.
QUESTIONS DEADLINE: All questions, concerns, verification or clarification of information regarding this solicitation, scope and any documents included in the solicitation package shall be submitted in writing to todd.a.dempsey.civ@army.mil no later than 10:00 AM central time on, 10 May 2023. Include in the subject line of the email the Government’s solicitation number; failure to do so will lessen the Government’s ability to ensure all questions are considered during the bidding process. Provide your company name, POC and contact information in the body of the email.
BIDS: Bids submitted after the established submission date may be rejected. Offers providing less than 90 calendar days for government acceptance after the date offers are due will not be considered and will be rejected.
The “Equal Employment Opportunity Is the Law” notice (poster) referenced in FAR clause 52.222-26(b) (3), Equal Opportunity, is located at http://www.dol.gov/ofccp/regs/compliance/posters/ofccpost.htm
In accordance with FAR 22.404-10, the contractor must post a copy of the wage determination and Department of Labor Form WH-1321 in a prominent place where employees working on federal construction contracts can easily see it. The applicable wage determination is incorporated into the contract at Section H. The WH-1321 poster is located at http://www.dol.gov/compliance/guide/index.htm
Contractors are referred to EPA’s list of EPA-designated products available at http://www.epa.gov providing products that contain recovered materials.
In accordance with DPAP changes to reporting requirements under FAR 52.223-2, Affirmative Procurement of Biobased Products under Service and Construction Contracts, contractors are now required to submit annual bio- based reports to the new reporting module in the System for Award Management (SAM). SAM can be accessed at https://www.sam.gov
SYSTEM for AWARD MANAGEMENT (SAM) REGISTRATION: An Active SAM Registration is required of all Department of Defense contractors. SAM registration enables electronic funds transfer of contract payments. If your company is not already actively registered, please register in the SAM database at http://www.sam.gov. If your company is currently registered and close to expiring, begin/complete the process for SAM registration renewal.
a. The unique entity identifier used in SAM.gov has changed.
On April 4, 2022, the unique entity identifier used across the federal government changed from the DUNS Number to the Unique Entity ID (generated by SAM.gov).
The Unique Entity ID is a 12-character alphanumeric ID assigned to an entity by SAM.gov.
As part of this transition, the DUNS Number has been removed from SAM.gov.
Entity registration, searching, and data entry in SAM.gov now require use of the new Unique Entity ID.
Existing registered entities can find their Unique Entity ID by following the steps here.
New entities can get their Unique Entity ID at SAM.gov and, if required, complete an entity registration.
b. Whether your company is a current or new registrant in the SAM database, your registration must indicate that you are a provider of NAICS 238210 or a NAICS of similar business size, under the Goods – Services section of the registration to be eligible to receive a contract for this solicitation.
c. If the prospective awardee for this request for quotes is not actively registered in the SAM database by close of solicitation, including NAICS 238210, or a NAICS of similar business size, under the Goods – Services section, depending on mission requirements, the government reserves the right to proceed to award to the next otherwise successful actively registered offeror.
SAM REQUIREMENT: Prospective contractors who have not completed electronic annual representations and certifications at www.sam.gov in conjunction with required registration in the SYSTEM for AWARD MANAGEMENT (SAM) database, shall complete and submit 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2019) and 252.204-7007 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JUN 2019) in SAM to be eligible to receive an award for this solicitation.
FAR 52.228-15 is applicable to this requirement. The Contractor shall submit performance and payment bonds if the award is at or above $150,000.00.
EVALUATION FACTORS:
The Government will evaluate bids received in response to this solicitation solely on the basis of price and price related factors. Bidders shall submit a price for each item specified in the solicitation. No bid for a quantity less than that specified in the solicitation will be accepted. Bids shall be evaluated using the quantities set forth in the solicitation. All prices bid in response to this solicitation must include all costs associated with work elements, applicable State sales taxes, permits, and licensure. And the overall project management, superintendence and quality control necessary for the planning and execution of multiple work requirements conducted simultaneously throughout the performance period.
BID GUARANTEE:
A Bid Bond/Guarantee is required for this contract if it exceeds $150,000. The Bid Bond amount shall be twenty percent (20%) of the bid price or $3 Million, whichever is less.
Bidders must use the Standard Form (SF) 24 if providing a bid bond as the bid guarantee.
WAGE DETERMINATIONS as listed in Attachment 1 are applicable to this project.
The contractor will notify the inspector (listed below) 5 working days prior to beginning work at the site.
The contractor shall submit weekly payrolls and 1413’s electronically. If progress payments will be requested, a schedule, progress reports, & invoices shall be submitted to the contract administrator electronically via email. In effort to pay invoices in a timely manner the Government requests invoices, for progress payments or final payments, be submitted on Monday of the first full week of the month. The Contacting Office will review invoices and either give written approval to submit in IRAPT (formerly WAWF) or return to the Contractor for corrections by Friday of that week. Not submitting invoices in accordance with this paragraph may cause a delay in payment.
ATTACHMENTS:
ATTACHMENT 1 - Wage Determinations ATTACHMENT 2 - AT Opsec ATTACHMENT 3 - B6058 Repair Ground Power Unit – Drawings ATTACHMENT 4 - B6058 Repair Ground Power Unit - Specifications
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.216-1 Type Of Contract APR 1984 52.222-5 Construction Wage Rate Requirements--Secondary Site of the
Work
MAY 2014
52.225-10 Notice of Buy American Requirement--Construction Materials
MAY 2014
CLAUSES INCORPORATED BY FULL TEXT
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for-- 3 May 2023, 10 am central time
(c) Participants will meet at-- MICC Fort McCoy 1108 South R Street, Conf Rm A Fort McCoy, WI 54656
(End of provision)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquisition.gov/
Section 00600 - Representations & Certifications
52.204-8 Annual Representations and Certifications MAR 2023 52.204-24 Representation Regarding Certain Telecommunications and
Video Surveillance Services or Equipment
NOV 2021
52.204-26 Covered Telecommunications Equipment or Services-- Representation.
OCT 2020
52.209-13 Violation of Arms Control Treaties or Agreements -- Certification
NOV 2021
252.203-7005 Representation Relating to Compensation of Former DoD Officials
SEP 2022
252.204-7007 Alternate A, Annual Representations and Certifications MAY 2021
Section 00700 - Contract Clauses
52.203-19 Prohibition on Requiring Certain Internal Confidentiality
Agreements or Statements
JAN 2017
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
JUN 2020
52.204-13 System for Award Management Maintenance OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities
NOV 2021
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
NOV 2021
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
NOV 2021
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.211-10 Commencement, Prosecution, and Completion of Work APR 1984
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION SEP 2005
52.213-4 Terms and Conditions--Simplified Acquisitions (Other Than
Commercial Products and Commercial Services)
MAR 2023
52.219-14 (Dev) Limitations on Subcontracting (DEVIATION 2021-O0008) FEB 2023 52.219-27 Notice of Service-Disabled Veteran-Owned Small Business
Set-Aside
OCT 2022
52.219-28 Post-Award Small Business Program Rerepresentation MAR 2023 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards - Overtime
Compensation
MAY 2018
52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records JUL 2021 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-50 Combating Trafficking in Persons NOV 2021 52.222-55 Minimum Wages for Contractor Workers Under Executive
Order 14026
JAN 2022
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
AUG 2018
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving
JUN 2020
52.225-9 Buy American--Construction Materials OCT 2022 52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.227-1 Authorization and Consent JUN 2020 52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
JUN 2020
52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-12 Prospective Subcontractor Requests for Bonds DEC 2022 52.228-13 Alternative Payment Protections JUL 2000 52.228-14 Irrevocable Letter of Credit NOV 2014 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
OCT 2018
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
MAR 2023
52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-1 Performance of Work by the Contractor APR 1984 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.242-14 Suspension of Work APR 1984 52.243-5 Changes and Changed Conditions APR 1984 52.244-6 Subcontracts for Commercial Products and Commercial
Services
MAR 2023
52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.249-1 Termination For Convenience Of The Government (Fixed
Price) (Short Form)
APR 1984
52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
JAN 2023
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
JAN 2023
252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials
SEP 2014
252.223-7008 Prohibition of Hexavalent Chromium JAN 2023 252.225-7048 Export-Controlled Items JUN 2013 252.227-7033 Rights in Shop Drawings APR 1966 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7001 Contract Drawings, and Specifications AUG 2000 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Products or Commercial
Services
JAN 2023
252.247-7023 Transportation of Supplies by Sea JAN 2023
CLAUSES INCORPORATED BY FULL TEXT
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be Twenty percent of the bid price or $3,000,000.00, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/
(End of clause)
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
Construction Invoice
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
N/A
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC HQ0490
Issue By DoDAAC W911SA
Admin DoDAAC** W911SA
Inspect By DoDAAC W81TMH
Ship To Code N/A
Ship From Code TBD
Mark For Code N/A
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) N/A
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) W81TMH
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
EMAIL: TBD
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section 00800 - Special Contract Requirements
ADDITIONAL INFORMATION
HOURS OF OPERATION
Contractor shall schedule working hours to coincide with the working hours of the military reservation. The normal working hours are 7:00 a.m. to 4:30 p.m. Monday through Friday excluding Federal Holidays. Federal Holidays are as follows:
January 1st 3rd Monday of January 3rd Monday of February Last Monday of May June 19th July 4th 1st Monday of September 2nd Monday of October November 11th 4th Thursday of November December 25th
When a Federal holiday falls on a Sunday, the following Monday will be considered the official observed holiday;
likewise, when a Federal holiday falls on a Saturday, the preceding Friday will be considered the official observed holiday. At no time will contractor personnel be excused from performing contracted work as a result of other Congressional or Presidential imposed excused absence of Department of Army civilians or uniformed military personnel.
Any and all work requested by the contractor outside the normal working hours identified above shall be approved no later than three business days in advance and in writing by the Contracting Officer. Work outside the normal workday will not be granted for the express convenience of the contractor to repair a failing performance schedule.
Re-scheduling of work prevented by weather conditions or other circumstances beyond the contractor’s control should be made through a written request for extension of the task order contract period under the authority of 52.236-2, Differing Site Conditions, or 52.249-10, Termination for Default (Fixed-Price Construction).
LEGAL COMPLIANCE
The Contractor shall comply with all Federal, State, and Local laws, codes, and regulations applicable to his performance under this contract, and shall be solely responsible for all costs associated with said compliance.
ACCESS
Access and General Protection/Security Policy and Procedures: Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. Should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. Contractor and all associated sub-contractors’ employees shall comply with AR 190-13 Physical Security requirements, applicable installation policy, facility, and area commander installation/facility access, local security policies and procedures.
The contractor shall also provide all information required on the Fort McCoy form 451 and 452 for background checks to meet installation access requirements (SEE Below) to be accomplished by installation Director of Emergency Services Physical Security Division. Contractor personnel performing work under this contract shall submit to a NCIC-III Criminal History Check before access will be granted to Fort McCoy. Once the individual has cleared the criminal history they will be issued an Installation Access Card (IAC). An un-favorable NCIC-III Criminal History Check will result in the contractor being denied access to the installation and a waiver request must be approved prior to gaining access. For waiver approval process coordinate with the installation physical security office.
Contractors must process all Fort McCoy forms 451 and 452 through their COR after award of resultant contract.
Information required for Criminal History Check Full Name, Including middle name(s) Sex Date of Birth Driver’s
License information Issuing State, Beginning and End date Access Hours Work location Company Name Position (i.e. Construction). For more information please contact the Installation Physical Security Section at 608-388- 8445/2010/4694 or 3794.
REAL ID Act implementation and how it impacts U.S. military installation access.
Federal agencies, including the Department of Defense, are prohibited from recognizing driver’s licenses and identification cards that are deemed non-compliant according to the REAL ID Act. Due to the pandemic, its disruption of states abilities to issue the Real ID-compliant driver’s licenses DHS has extended the deadline. The U.S Department of Homeland Security (DHS) will begin enforcing the Real ID law on May 3, 2023.
Wisconsin DMV issues REAL ID compliant products (marked with a *) in accordance with the federal Real ID Act of 2005. To get a Real ID, a driver needs to present documents to the DMV proving their age and identity, Social Security number and residence address. This generally means bringing a birth certificate or passport, a Social Security card or tax form such as a W-2, and two proofs of address.
Visitors at Gate20 and Main Gate requesting installation access who do not have a REAL ID Act-compliant form of identification and cannot provide supplemental identify-proofing documents must be escorted at all times while on Fort McCoy by a USAG or Tenant DOD ID card holder.
Supplemental identity-proofing forms of identification that the driver may use at Gate 20 or Main Gate in conjunction with a state driver’s license to request access to Fort McCoy are as below:
• Transportation Worker Identification Card (TWIC)
• United States Passport or United States Passport Card
• Birth Certificate or Document with a person's full name and address
• Veteran Health Identification Card (VHIC) Issued by the US Department of Veterans Affairs.
• Vehicle Registration with name and address
CONTRACT PROGRESS REPORTING
The Contract Progress Schedule, will be used to satisfy the submission requirements of FAR 52.236-15, “Schedules for Construction Contracts”. The Contractor shall, within ten (10) days after contact award, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment).
Work elements entered in column B of the progress schedule should be limited to those tasks which will indicate the progress of the work under the contract, and which can be identified and measured by personnel monitoring the Contractor’s progress.
Appropriate revisions will be made to the existing approved progress schedule whenever an approved change to the performance period is authorized by a contract modification.
No adjustments or extensions in the performance period will be authorized without a duly executed contract modification.
A “Contract Progress Report” shall be initiated weekly and delivered to the Contracting Officer and the COR simultaneously. Progress reports shall include both the percentage of work completed within the rated period and a cumulative total of work completed under the contract/task order to date. Progress reports shall be issued weekly;
submitted progress reports will be reviewed by the Contracting Officer (or designated representative) and returned for correction as necessary.
ENG FORM 4025-R
ENG Form 4025-R, Transmittal of Shop Drawings, Equipment Data, Material Samples, or Manufacturer’s Certifications, shall be used in satisfying the material approval requirements of FAR 52.236-5.
All material submittals shall be delivered to the Contracting Officer (or authorized representative) in electronic format (as much as is practicable). Only those submittal documents and samples not capable of being transported electronically are to be submitted in hard copy. Hard copy submittals shall be delivered to a designated location at the main entrance desk in Building 2171. Electronic submissions shall be sent to: Administrative POC and usarmy.mccoy.imcom-northeast.mail.dpw-inspections@mail.mil
Questions on the status of submittals shall be directed to the Contracting Officer (or authorized representative) via email. Questions sent to usarmy.mccoy.imcom-northeast.mail.dpw-inspections@mail.mil will not be answered.
Project schedules shall be submitted the same as all other submittals and shall be accompanied by a transmittal sheet.
Submittal/transmittal sheets with any incorrect or missing information will be rejected immediately without review.
Rejection of incorrectly completed transmittals shall not be a basis for consideration for a contract extension.
FINAL INSPECTION
When the Contractor considers the work complete, they shall request a final inspection 7 days prior to the desired date. Final inspection shall be performed with the Contractor, Government personnel and representatives of the using activity.
During the final inspection, any discrepancies identified by the Government team will be documented in the Government’s punch list and provided to the Contractor for correction and re-inspection within 10 days from the date of the joint inspection.
Final acceptance of the work occurs upon the Contracting Officer’s acceptance of the work subsequent to successful final inspection by the COR and receipt of all contract requirements. Final acceptance must occur prior to the established contract completion date or liquidated damages may be assessed for late performance.
Final invoicing can only occur after Final Acceptance is completed.
REQUIRED INSURANCE
In accordance with FAR clause 52.228-5 entitled, “Insurance--Work on a Government Installation” the following minimum amounts of insurance are required.
Workmen’s Compensation As required by state laws
Employer’s Liability Insurance $100,000
General Liability Insurance $500,000 per occurrence Bodily Injury Liability
Auto Liability Insurance $200,000 per person
Bodily Injury $500,000 per occurrence
Property Damage $20,000 per occurrence
CONSENT OF SURETY
In accordance with FAR 28.106-5, consent of surety will be required if
a. An additional bond is required to support a modification to the contract, and the bond obtained is from a surety different than the original surety;
b. The contract is modified, without any additional bond being required, and the modification changes the contract price (upward or downward) by more than 25% or $50,000; or
c. A novation agreement is requested by the Contractor.
BONA FIDE NEED
Defense Financial Management Regulation (Vol. 3, Ch. 8, para. 080303.C) requires that work obligated by funds in the current fiscal year commence prior to1 January of the following calendar year if obligation occurred near the end of the fiscal year. Commencement can be physical on-site work or documented evidence that costs have been incurred or materials have been ordered. It is anticipated that the notice to proceed or task order will be issued in sufficient time to comply with this regulation. However, the Contractor shall not commence work until after the date of receipt of the notice to proceed or task order.
File details come from the government source that posted it. Updated .