W911SA-19-Q-3074_Solicitation.docx

DOCX document 149 KB Posted

Attached to
Protestant Musician Services Federal contract opportunity
Solicitation number
W911SA-19-Q-3074
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort McCoy

View the file

Other files for this federal contract opportunity

Other files attached to Protestant Musician Services, newest first.
File Type Posted
W911SA-19-Q-3074_Amendment_6.docx DOCX document
W911SA-19-Q-3074_Amendment_5.docx DOCX document
W911SA-19-Q-3074_Amendment_4.docx DOCX document
W911SA-19-Q-3074_Amendment_3.docx DOCX document
W911SA-19-Q-3074_Amendment_2.docx DOCX document
W911SA-19-Q-3074_Amendment_1.docx DOCX document
W911SA-19-Q-3074_Attachment_2_Musician_Evaluation_Sheet.docx DOCX document
W911SA-19-Q-3074_Attachment_1_AT_OPSEC_Signed_Cover_sheet.pdf PDF
W911SA-19-Q-3074_Attachment_4_SUS_Trifold.pdf PDF
W911SA-19-Q-3074_Attachment_3_Technical_Exhibit.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911SA19Q3074

Section SF 1449 - CONTINUATION SHEET

SUPPLEMENTAL INFORMATION

1) In accordance with FAR 52.232-18; Availability of Fund: FY19 funds are not presently available for this solicitation and resultant contract.

2) Non-Personal Service to provide all labor, transportation, equipment, materials, supervision and other items or services necessary to perform Musician for Protestant Services located at Fort McCoy, WI; in accordance with the Performance Work Statement and the term and conditions of the solicitation and resultant contract. The period of performance is 1 June 2019 (or subsequent date) to 31 May 2020 with four (4) option periods and six (6) months option to extend services.

3) Place of Performance;

Chapel 1 Bldg. 2672 South F Street Fort McCoy, WI 54656

4) ALL DISCOURSE CONCERNING THIS SOLICITATION AND ITS REQUIREMENT SHALL BE DIRECTED TO THE FORT MCCOY CONTRACTING OFFICE. ANY REMARKS, EXPLANATIONS, OR ANSWERS PROVIDED BY ANY OTHER GOVERNMENT REPRESENTATIVE SHALL NOT CHANGE OR QUALIFY ANY OF THE TERMS OR CONDITIONS OF THE SOLICITATION. THE SOLICITATION SHALL ONLY BE CHANGED BY A WRITTEN AMENDMENT ISSUED BY THE FORT MCCOY CONTRACTING OFFICE.

5) ABILITYONE DESIGNATED ITEMS: In accordance with 52.208-9, contractors are referred to the web site of the Committee for Purchase from People Who Are Blind or Severely Disabled, the independent federal agency that administers the AbilityOne (formerly Javits-Wagner-O'Day or JWOD) Program for the lists of designated products and services http://abilityone.org/work_with_us/procurement.html.

6) This procurement is Set Aside as Small Business under the NAICS Code 711130 with a size standard of $11.0 Million.

7) Quotes will only be submitted by email to Jana Knapp, EMAIL: jana.l.knapp.civ@mail.mil

8) Quotes are due to the Government on or before the time listed above in CENTRAL TIME.

9) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers.

10) Site Visit/Live Auditions A live audition is required as part of the evaluation for award. CD’s, Video or Audio tapes are not allowed in lieu of a live audition. Information for evaluation is included in Attachment 2 “Musician Evaluation Sheet”. Auditions will be held:

Location: Fort McCoy, WI ; Building 2672 (Protestant Chapel)
Date: 21 May 2019
Time: 2:00 PM (All auditioned shall have 15-30 minutes to audition)
POC: Mr. Ryan Pritchett

For Site Visit information, see Site Visit clause 52.237-1, unless you already have a permanent vehicle pass, you will be required to obtain a one-day vehicle pass. You will be required to present the following information: (1) vehicle registration, (2) valid driver’s license, (3) or car rental agreement (if applicable). Attendees at the pre-proposal conference/site visit are cautioned that the Government will not wait for anyone who is late or lost and will not hold another pre-proposal conference/site visit. Remarks, explanations and answers provided by Government representatives before, during and after the site visit shall not change or qualify any of the terms or conditions of the solicitation. The solicitation can only be changed by a formal written amendment issued by the Fort McCoy Contracting Office.

11) Written questions must be furnished to the Government no later 22 May 2019 @ 2:00pm. (CST); in order to ensure a timely response is provided by the solicitation closing date. All questions are to be submitted in writing at the time indicated in the solicitation or they may not be addressed before solicitation closing date; therefore, offerors are advised to submit questions as soon as possible. Please provide your company name, telephone, point of contact, e-mail address, and solicitation number on all questions. The Government will respond to questions via the issuance of an amendment which incorporates the question and the Government’s response.

12) Contract Administrator: TBD at time of award.

If you have questions pertaining to this contract after contract award (i.e. questions regarding delivery, invoice procedures, etc.), please request assistance from the Contract Administrator. Be sure to include the contract number in your request for assistance. Requesting contract administration assistance from any other individual could result in a delayed response.

13) Contracting Officer: TBD at time of award.

14) Contracting Officer’s Representative (COR): To Be Determined at the time of Award.

15) Postaward Conference: In the event the Contracting Officer decides to conduct a Postaward Conference in accordance with DFARS 242.5, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.

16) This requirement is eligible for payment through the GFEBS Supplier Self-Services (SUS) Program. Information on this program can be found in Attachment 4 “SUS Trifold.” Please indicate if you will participate in this program, if your company receives award.

Yes___________ No ___________

17) DUNS NUMBER ______________________________.

18) TAXPAYER ID #______________________________.

19) SYSTEM for AWARD MANAGEMENT (SAM) REGISTRATION: An Active SAM Registration is required of all Department of Defense contractors. SAM registration enables electronic funds transfer of contract payments. If your company is not already actively registered, please register in the SAM database at www.sam.gov. If your company is currently registered and close to expiring, begin/complete the process for SAM registration renewal.

1. A DUNS number is required for SAM registration. If your company does not have a DUNS #, obtain one by calling 800-333-0505.

1. Whether your company is a current or new registrant in the SAM database, your registration must indicate that you are a provider of NAICS 711130, or a NAICS of similar business size, under the Goods – Services section of the registration to be eligible to receive a contract for this solicitation.

1. If the prospective awardee for this request for quotes is not actively registered in the SAM database by close of solicitation, including NAICS 711130, or a NAICS of similar business size, under the Goods – Services section, depending on mission requirements, the government reserves the right to proceed to award to the next otherwise successful actively registered offeror.

20) In accordance with FAR 52.223-2, Affirmative Procurement of Bio-based Products under Services and Construction Contracts, contractors are required to submit annual bio-based reports to the reporting module in the System for Award Management (SAM) at https://www.sam.gov.

21) OFFEROR REPRESENTATIONS AND CERTIFICATIONS REQUIREMENT: Prospective contractors who have not completed electronic annual representations and certifications at http://www.sam.gov/ in conjunction with required registration in the SYSTEM for AWARD MANAGEMENT (SAM) database, shall complete and submit FAR 52.212-3 Alternative 1 Offeror Representations and Certifications - Commercial Items and DFARS Representations and Certifications in SAM to be eligible to receive an award for this solicitation.

22) If an offer is based on a teaming/partnering relationship or a joint venture, the offeror shall provide, with the proposal, all required solicitation information for all parties including a copy of the teaming/partnering or joint venture agreement. The agreement shall include information, which identifies the responsibilities for each entity under this contract. The agreement shall demonstrate the relationship between firms and identify contractual relationships and authorities to bind each entity of the teaming/partnering or joint venture relationship.

23) The “Equal Employment Opportunity Is The Law” notice (poster) referenced in FAR Clause 52.222-26(b)(3), Equal Opportunity, is located at http://www.dol.gov/ofccp/regs/compliance/posters/pdf/eeopost.pdf.

24) In accordance with FAR Clause 52.222-41(g), the contractor must notify each service employee working on this contract of the minimum wage and fringe benefits required to be paid pursuant to this contract, or shall post a copy of the wage determination and Department of Labor Form WH-1313 in a prominent place at the worksite. The applicable wage determination is incorporated into the contract. The WH-1313 poster is located at http://www.dol.gov/whd/regs/compliance/posters/sca.htm.

25) INFORMATION FOR EVALUATION

This section supplements clause 52.212-1 and 52.212-2 which is included elsewhere in this request for quotes. The Government intends to evaluate offer and award a contract without discussions. Therefore, the offeror’s initial offer should contain the offeror’s best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all offers if such action is in the public interest and waive informalities and minor irregularities in offers received.

This solicitation shall be evaluated by awarding to the quote that is technically acceptable and the lowest price.

TECHNICAL FACTOR:

Evaluation –Each item in Technical Requirements Table will receive one of the adjectival ratings defined below. Any criterion that receives “U” rating will result in an overall unacceptable rating for the factor and are not eligible for award.

ADJECTIVAL RATING
DEFINITION
Acceptable (A)
Quote clearly meets the minimum requirements of the solicitation.
Unacceptable (U)
Quote does not clearly meet the minimum requirements of the solicitation.
TECHNICAL CRITERIA
A or U

The offeror has no active or inactive exclusions listed in their Entity Record on the System for Award Management (SAM).

In accordance with FAR 42.15, the offeror does not have any relevant Past Performance rated at “Marginal” or “Unsatisfactory”.

The offeror has to receive a PSS rating at the required live audition.

PRICE FACTOR:
Submission Instructions – Offeror shall submit a fully completed SF 1449, Pricing Schedule, or acceptablealternative as identified in 52.212-1 or elsewhere in the RFQ.

The agreed upon items and quantities will be multiplied times their respective unit prices found in the RFQ.

As part of price evaluation, the Government will evaluate its option to extend services (see FAR Clause 52.217-8) by adding six (6) months of the offeror's final option period price to the offeror's total price. Offerors are required only to price the base and option periods. Offerors shall not submit a price for the potential six month extension of services period. The Government may choose to exercise the Extension of Services at the end of any performance period (base or option periods), utilizing the rates of that performance of period.

As part of its proposal, the offeror must provide the estimated total cost (if any) incurred to comply with the enterprise Contractor Manpower Reporting Application (eCMRA) requirement. Offeror will determine to price or not separately price the CMRA requirement. CMR CLIN(s) is the CLIN(s) under which the Contractor shall bill for all costs associated with the CMRA requirement.

Evaluation – Price will not be assigned an adjectival rating; and will be evaluated to determine if the offeror quoted price is fair, reasonable, and balanced. The government may determine that an offer is unacceptable if prices are significantly unbalanced. Price shall be evaluated at estimated quantities multiplied times their respective unit price.

Unrealistically Low Prices: Prices quoted may be reviewed to determine whether they reflect a lack of technical understanding of the requirements and to assess the risk inherent in an offeror’s quoted prices. Unrealistically low quoted prices, initially or subsequently, may be grounds for rejection for this solicitation.

Unbalanced Pricing: Offeror is cautioned against submitting quote that contains unbalance pricing. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly over or understated as indicated by the application of cost or price analysis techniques. The Government shall analyze offers to determine whether they are unbalanced with respect to separately priced line items or subline items. Quotes that are determined to be unbalanced may be rejected if the contracting officer determines that the lack of balance poses an unacceptable risk to the Government.

26) ALTERNATE DISPUTES RESOLUTION: In furtherance of Federal policy and the Administrative Dispute Resolution Act of 1990 (ADR Act), Public Law 101-552 and FAR Clause 52.233-1, Subparagraph (d) (2) (1) (B) (2), the Contracting Officer will try to resolve all post award acquisition issues in controversy by mutual agreement of both parties. Interested parties are encouraged to use alternative dispute resolution procedures to the maximum extent practicable, in accordance with the authority and requirements of the ADR Act.

27) CONTRACT PERFORMANCE:

Purpose. IAW with FAR Subpart 42.1500 contractor past performance information (PPI) is relevant information for future source selection purposes regarding a contractor’s actions under previously awarded contracts. It includes, for example, the contractor's record of conforming to contract requirements and to standards of good workmanship; the contractor's record of forecasting and controlling costs; the contractor's adherence to contract schedules, including the administrative aspects of performance; the contractor's history of reasonable and cooperative behavior and commitment to customer satisfaction; and generally, the contractor's business-like concern for the interest of the customer. Contractor past performance information is one of the tools that support Army efforts to acquire best value and is used to evaluate performance risk in source selection. The feedback provided by the government to the contractor in collecting PPI, and the knowledge that PPI will be used in future source selection decisions, should result in improved performance and a greater contractor focus on customer satisfaction.

Assessment Period. Performance Assessment Reports (PAR) shall be prepared IAW AFARS Subpart 42 upon physical completion of the contract. If the period of performance will exceed 18 months, an “interim” assessment report shall be prepared at the completion of 12 months performance and annually thereafter until the contract is physically complete. An out-of-cycle or “addendum” report may be prepared if there is a need to record an extraordinary event prior to the next regularly scheduled evaluation or if it is necessary to report a meaningful occurrence during the period between physical completion of the contract and contract closeout. Additionally, addendum reports may be prepared to record contractor’s performance relative to contract closeout and other administrative requirements (e.g. final indirect cost proposals, technical data, etc.).

Completion Due Date. The government will complete the PAR within 60 days after the end of the assessment rating period.

Evaluators. The Contracting Officer and the Contracting Officer’s Representative will jointly complete the performance assessment.

Contracts Performance Elements. The contractor’s performance shall be assessed in accordance with elements and rating system set forth in AFARS Subpart 42.

Contractor Review. The Contracting Officer will furnish a copy of the PAR to the contractor requesting that the contractor submit comments, rebutting statements, or additional information to the Contracting Officer within 30 calendar days of receipt. Failure to respond within the designated timeframe will be taken as agreement with the assessment.

Contract Concurrence. Where a contractor concurs with, or takes no exception to a PAR, such report shall be considered final and releasable for use in source selection and other deliberative purposes.

Contractor Rebuttal. Where a contractor takes exception to a performance report, the Contracting Officer will review the contractor’s rebuttal or comments and make appropriate changes. If the Contracting Officer makes changes, the changed rating will be reflected in the narrative. The Contracting Officer will make all reasonable efforts to reconcile the report and the contractor’s comments. However, it is not necessary that they reach agreement on the report where such is clearly impracticable. The contractor’s rebuttal or comments shall be made part of the PAR.

Resolving Disagreements between the Government and the Contractor. In the event disagreements between the parties regarding the PAR occur, the Contracting Officer will review the rebuttal and make appropriate changes. If no agreement is reached, the PAR is forwarded to the Reviewing Official (Director of Contracting) along with the Contracting Officer’s Findings and Recommendation and supporting documentation. The decision of the Reviewing Official is final. Copies of the PAR and the contractor’s response and review comments, if any, shall be retained as part of the evaluation.

Release of Contractor Performance Evaluation Information. The evaluation will not be released to other than government personnel and the contractor whose performance is evaluated. The performance evaluation information will be input into the applicable module within Contractor Performance Assessment Reporting System (CPARS) database (or Government system in use at time of the evaluation).

Source Selection Information. Departments and agencies will electronically access the PAR information to support future award decisions.

28) REQUIRED INSURANCE:

In accordance with FAR clause 52.228-5 entitled, “Insurance--Work on a Government Installation” the following minimum amounts of insurance are required.

Workmen’s Compensation
As required by state laws

29) Federal Holidays are as follows:

New Year’s Day 1st day of January Martin Luther King Jr.'s Birthday 3rd Monday of January Presidents Day 3rd Monday of February Memorial Day Last Monday of May Independence Day 4th day of July Labor Day 1st Monday of September Columbus Day 2nd Monday of October Veterans Day 11th day of November Thanksgiving Day 4th Thursday of November Christmas Day 25th day of December

When a holiday falls on a Sunday, the following Monday will be observed as a holiday and when a holiday falls on a Saturday, the proceeding Friday is observed as a holiday by U.S. Government Agencies. Any other Congressional or Presidential imposed Federal Holiday.

If the Contractor for his convenience desires to perform work during other than normal working hours or on other than normal work days, or if the Contractor is required to perform work at such times, the Contractor shall reimburse the Government for any additional expense occasioned the Government, thereby, such as, but not limited to, overtime pay for Government Inspectors, utilities service, etc.

Unless otherwise specified in these provisions, services will be performed during normal duty hours.

When required services occur on holidays, work will be performed on either the previous or the following work day, unless specified otherwise.

30) LEGAL COMPLIANCE: The Contractor shall comply with all Federal, State, and Local Laws, codes and regulations applicable to his performance under this contract, and shall be solely responsible for all costs associated with said compliance.

31) In accordance with FAR 52.222-42, the classes of service employees expected to be employed under the contract states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.

This Statement is for Information Only:

It is not a Wage Determination

Employee Class
Monetary Wage -- Fringe Benefits
Laborer
WG-3

32) Attachments:

Attachment 1: AT OPSEC Attachment 2: Musician Evaluation Sheet Attachment 3: Historical Data Attachment 4: SUS Trifold

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

Civilian Musician Services (Protestant) Religious Support Office

PART 1

GENERAL INFORMATION

1. General: This is a non-personnel services contract to provide Civilian Musician Services (Protestant). The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Civilian Musician Services (Protestant) as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: The contractor shall provide distinctive professional support to the Protestant population by leading traditional and/or contemporary worship music at up to fifty-three (53) Sunday Worship Services and at up to eight (8) Holy Day or special services as determined by the Religious Support Office.

1.3 Objectives: Provide worship music services at Protestant Chapel.

1.4 Scope: The contractor shall provide distinctive professional support to the Protestant population by ensuring worship music selections are performed and led at Worship Services, and that a minimum of one practice session be conducted prior to each service. Practice times will be coordinated with the COR prior to practice. The musician will choose a minimum of 3 songs for prior approval by the chaplain leading the service. The song selections will be sent no later than 2 business days prior to the service. This is a Non-Personal Services contract and the Contractor must avoid representing or allowing themselves to be represented as Chapel staff or government employees. All work shall be accomplished within the guidelines of Army Regulations AR 165-1, Army Pamphlet 165-18, and Installation Chaplain Policies. The Contractor shall abide by policies, rules, regulations and bylaws, as well as applicable Army regulations (ARs) governing these services.

0. Period of Performance: The period of performance shall be for one (1) Base Year of twelve (12) months and four (4) twelve (12) month option years.

1.6 General Information

1.6.1 Quality Assurance: The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is a Government only document primarily focused on what the Government must do to assure that the contractor has performed in accordance with the requirements of the contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. Non-conforming services shall be re-performed at no increase in contract price. If non-conforming services are recurring, cannot be re-performed, or the services fail to achieve the Performance Requirements Summary (PRS), the Government may reject the nonconforming service(s) and document the contractor’s performance record accordingly. The Government may also issue a Contract Discrepancy Report (CDR) in which the contractor will be required to respond with the development of a corrective action plan (CAP) which identifies the root cause, corrective action (CA) for the root cause, CA for the specific nonconformance, and the date the CAs will be complete. The Government may also reduce the payment to the contractor IAW the PRS, or reduce payment to reflect the value of the services performed, or may perform the services and charge the Contractor for any related cost incurred and/or may terminate this contract for cause.

1.6.1.1 Non-conforming Supplies or Services: When a contractor’s performance does not meet contract requirements and/or approved work schedules and/or timeframes it is considered non-conformance. Non-conformance shall be classified in one of three categories: level I (Minor), level II (Major) or level III (Critical). The Government may re-inspect work designated for re-performance or late performance.

1.6.1.1.1 Level I (Minor) non-conformance: is defined as a non-conformance that is not likely to materially reduce the usability of the supplies or services for their intended purpose, or is a departure from established standards having little bearing on the effective use or operation of the supplies or services. Minor non-conformance usually can be corrected on the spot, where no further corrective action (CA) response is necessary, and can be issued by the COR to the contractor either through a verbal or written non-conformance report. Minor non-conforming services shall be re-performed within a specified time frame at no increase in contract price. If minor non-conformances are recurring or re-performance is not completed in full and within the specified time a Level II non-conformance may be issued to the contractor by the Contracting Officer (KO).

1.6.1.1.2 Level II (Major) non-conformance: is defined as a non-conformance, other than critical, that is likely to result in failure of the supplies or services, or to materially reduce the usability of the supplies or services for their intended purpose. Recurring Minor non-conformances, or a non-responsive contractor, indicating a trend or failure of the contractor’s quality control, can also be classified as a Major non-conformance. Major non-conformance’s shall result in the issuance of a written CDR from the KO to the contractor requiring the development of a CAP by the contractor which identifies the root cause, CA for the root cause, CA for the specific non-conformance and the date CAs will be completed.

1.6.1.1.3 Level III (Critical) non-conformance: is defined as a non-conformance that is likely to result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the supplies or services; is likely to prevent performance of a vital agency mission; is for a repeated or uncorrected level II CDRs; or is for a non-responsive contractor to a level II CDR. Critical non-conformances shall result in the issuance of a written CDR to the contractor requiring the development of a CAP by the contractor which identifies the root cause, CA for the root cause, CA for the specific non-conformance and the date CAs will be completed.

1.6.1.1.4 Inspection Results: The contractor will be notified of Government inspection results. The contractor shall acknowledge receipt of the inspection results. The contractor may be notified of inspection results verbally. Verbal notifications of defective work will be confirmed in writing. When Government inspectors are unable to contact the contractor to notify the contractor of inspection results, acceptance or rejection of work will be made on the basis of the initial inspection.

1.6.2 Federal Government Holidays: The contractor is not required to perform services on the following Government Holidays.

Martin Luther King Jr.'s Birthday3rd Monday of January
Presidents Day3rd Monday of February
Memorial DayLast Monday of May
Labor Day1st Monday of September
Columbus Day2nd Monday of October
Veterans Day11th day of November
Thanksgiving Day4th Thursday of November

1.6.3 Hours of Operation: The contractor is responsible for conducting business, between the hours of 8:00 AM thru 8:00 PM Monday thru Friday and Sundays 8:00 AM-12:00 PM except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.4 Place of Performance: The work to be performed under this contract will be performed at Chapel 1, Bldg. 2672, South F. Street, Fort McCoy, WI.

1.6.5 Type of Contract: The government will award a Firm Fixed Price services contract.

1.6.6. Antiterrorism (AT) and Operations Security (OPSEC): The contractor shall comply with all Fort McCoy Force Protection Conditions (FPCON) when implemented by the Installation. This could include changes to the access control procedures and additional searches and inspections of vehicles. At the highest level of FPCON access to the Installation may be restricted to military and Government employees only. If the restriction is imposed the contractor shall contact the Contract Officers Representative (COR) for instructions.

1.6.6.1. Access and General Protection/Security Policy and Procedures: The contractor and all associated subcontractors' employees shall provide all information required for background checks to meet installation access requirements to be accomplished by Director of Emergency Services or Security Office. Contractors shall complete FM Form 451 and 452 within 5 calendar days after award of contract. They will submit to COR. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. The contractor and all associated subcontractors' employees shall also comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. The Government may require monthly participation in the Installation Random Antiterrorism Program

1.6.6.2. Contractors Requiring Common Access Card (CAC): Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled

NACI.

1.6.6.3 Antiterrorism Level I Awareness Training: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 60 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil. Classroom AT Level 1 Training can also be coordinated with the Fort McCoy Installation ATO at (608) 388-4719. This is an annual requirement. Submit training rosters to the COR and Contracting Office. COR will give a copy to the ATO."

1.6.6.4. iWATCH Training: The contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract performance start date and within 30 calendar days of new employees' commencing performance, with the results reported to the COR and DGR no later than 60 calendar days after contract award. This is an annual requirement. Submit training rosters to the COR and Contracting Office.

1.6.6.5. Operations Security Awareness Training: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete "OPSEC Awareness" (online course is called "OPSEC Awareness for Military Members, DoD Employees and Contractors" and is found at https://securityawareness.usalearning.gov/opsec/) within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 60 calendar days after completion of training by all employees and subcontractor personnel.

1.6.6.6. Contractor Employees Who Require Access to Government Information Systems: All contractors with access to government information technology systems must be registered in the Army Training Certification Tracking System (ATCTS) at commencement of services and must successfully complete the DoD Information Assurance Awareness training prior to access and then annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoD 8570.01, DoD 8570.01M and AR 25-2 within 6 months of employment. All contractor employees supporting IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01M must be completed upon contract start date. This is an annual requirement. (Submit training certificates to the DGR, COR, KO Contract Office and the Network Enterprise Center)

1.6.7. Key Control: The Contractor will not be issued a key for the Chapel, building 2672

1.6.8. Special Qualifications: None

1.6.8.1 Contractor Points of Contact: The Contractor shall provide the KO and the COR with the names of a primary and alternative point of contact within 5 calendar days after award of contract or as changes occur. To include: telephone numbers, email address and/or physical address in case of emergency.

1.6.8.2 The Contractor shall ensure that contract employees possess a current and valid driver’s license and current vehicle insurance is maintained before operating any type of vehicle or equipment on the installation.

1.6.8.3 All individuals who perform work under this contract shall at all times be employees of the Contractor and/or employees of an approved sub-Contractor.

1.6.9. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5, Post Award Orientation. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the Contracting Officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.6.10. Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property; and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.11. Supervision of Contractor Employees: The Government will not exercise any supervision or control over Contractor or subcontractor employees while performing work under the contract. Such employees shall be accountable solely to the Contractor, not the Government. The Contractor, in turn, shall be accountable to the Government for Contractor or subcontractor employees.

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS

2.1.1. SUNDAY WORSHIP SERVICE: A gathering of individuals whose primary purpose is the worship of God.

2.1.2. CONTRACT ADMINISTRATOR. The official Government representative delegated authority by the Contracting Officer to administer a contract. This individual is normally a member of the appropriate Contracting/Procurement career field and advises on all technical contractual matters.

2.1.3. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or services to the government. The term used in this contract refers to the prime.

2.1.4. CONTRACTING OFFICER. A person with authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.5. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.6. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.7. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.8. GOVERNMENT-FURNISHED PROPERTY (GFP) OR GOVERNMENT PROPERTY (GP). Property in the possession of, or directly acquired by, the Government and subsequently made available to the Contractor.

2.1.9. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.10. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.11. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are acceptable in accordance with established standards and requirements of this contract.

2.1.12. QUALITY ASSURANCE SPECIALIST. An official Government representative concerned with matters pertaining to the contract administration process and quality assurance/quality control. Acts as technical advisor to the Contracting Officer in these areas.

2.1.13. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.14. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.15. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.16. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.17. WORK WEEK. Monday through Friday, except for Federal holidays unless specified otherwise.

2.2. ACRONYMS:

ACORAlternate Contracting Officer's Representative
AFARSArmy Federal Acquisition Regulation Supplement
ARArmy Regulation
CFRCode of Federal Regulations
CMRContract Manpower Reporting
CONUSContinental United States (excludes Alaska and Hawaii)
CORContracting Officer Representative
COTSCommercial-Off-the-Shelf
DADepartment of the Army
DD250Department of Defense Form 250 (Receiving Report)
DD254Department of Defense Contract Security Requirement List
DFARSDefense Federal Acquisition Regulation Supplement
DMDCDefense Manpower Data Center
DODDepartment of Defense
FARFederal Acquisition Regulation
HIPAAHealth Insurance Portability and Accountability Act of 1996
KOContracting Officer
NLTNo later than
OCIOrganizational Conflict of Interest
OCONUSOutside Continental United States (includes Alaska and Hawaii)
ODCOther Direct Costs
PIPOPhase In/Phase Out
POCPoint of Contact
PRSPerformance Requirements Summary
PWSPerformance Work Statement
QAQuality Assurance
QAPQuality Assurance Program
QASPQuality Assurance Surveillance Plan
QCQuality Control
QCPQuality Control Program
TETechnical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1 Facilities: The Government will provide office space in building 2672 with appropriate office furnishings and equipment for the support of the contractor only in actual performance of products and services. Said office is not permanent or dedicated solely to the use of the contractor. Appropriate office furniture and equipment includes: desk, chair and lamp.

3.3 Utilities: The Government will provide all utilities, such as electrical, heat and water, to perform the services required by the contract at the site of delivery of the services on Federal property. The Government will not make any modifications to utility outlets to accommodate contractor equipment. The Contractor (to include subcontractors) shall instruct contractor employees in utilities conservation practices.

3.4 Equipment: The Government will provide piano, piano bench, lighting and sound equipment in building 2672 for the support of the contractor only in actual performance of services outlined in the PWS. Government Furnished equipment is not dedicated solely to the use of the contractor.

3.5 Materials: The Government will provide all music sheets/books for the support of the contractor only in actual performance of services outlined in the PWS.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 Transportation: The Contractor shall furnish his own transportation to and from the work site.

4.2 Equipment: The Contractor may use personal ecclesiastical and liturgical items of equipment to conduct Protestant Music Services. The Government will not be liable for loss, damage, theft, or maintenance of personal ecclesiastical equipment. The Contractor shall ensure that personal property is clearly marked and identified to preclude misidentification as Government property.

4.3 The Contractor shall not be required to furnish any office, ecclesiastical, or liturgical supplies to accomplish the requirements of this contract except as specifically noted.

PART 5

SPECIFIC TASKS

5. SPECIFIC TASKS:

5.1. Basic Services. The contractor shall perform Protestant worship music at Sunday Services, Holy Day services, and special services.

5.2. Practice Times: The contractor shall conduct practice sessions for a minimum of 1 hour prior to each performance at Chapel building 2672. The chapel shall be available for practice from 8:00AM- 8:00PM Monday-Friday and Sunday 8:00AM-9:00AM and 11:00AM-12:00PM. Practice times will be coordinated with the COR prior to practice.

5.3 Duty Times: The contractor shall perform at Chapel, building 2672 from 0900-1100 on Sundays, and as required by Holy Day or special service schedules as determined by the Religious Support Office.

5.4. Invoices: Invoices shall be submitted on a weekly basis for services rendered. The Contractor shall enter the invoice into WAWF for payment. Only invoices for services rendered will be accepted and paid.

5.5. CONTRACTOR MANAGEMENT REPORTING (CMR): The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for Civilian Protestant Music services via secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/, and then click on "Department of the Army CMRA" or the icon of the DoD organization that is receiving or benefitting from the contracted services. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2018. Contractors may direct questions to the help desk by clicking on "Send an email" which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component's CMR website.

The required data fields include: (1) Contracting Office, Contracting Officer, or also known as the Contracting Officer’s Representative (COR); (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data; (5) Estimated direct labor hours (including sub-Contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-Contractors); (7) Total payments (including sub-Contractors); (8) Predominant Product Service Code (PSC) reflecting services provided by Contractor (and separate predominant PSC for each sub-Contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information); (11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement.

As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement.

PART 6

TECHNICAL EXHIBITS AND ATTACHMENTS

6. Technical Exhibits and Attachments: The following documents are a part of the contract award and will be uploaded as separate attachments:

6.1 Attachment 1- AT OPSEC

6.2 Attachment 2- Musician Evaluation Sheet

6.3 Attachment 3 – Historical Data

6.4 Attachment 4 – SUS Trifold

PRS

Performance Requirements Summary (PRS)

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance thresholds provided below describe the minimum acceptable levels of service required for each requirement.

Note: Government surveillance of contractor performance is not limited to the Performance Objectives as outlined in this PRS. The Government reserves the right to conduct compliance surveillance of any contractual requirement of this acquisition.

PRS #
Performance

Objective Performance Standard

AQL
Workload

Indicator(s) Lot Size Method of Surveillance Consequence

1.
PWS para 5.4
Invoice
Reported

100% of the time Weekly

100% Surveillance CDR. Results of this performance objective, along with justification, will be documented in monthly metric and used for reporting contractor past performance

2.
PWS Para 5.5. Report ALL Contractor manpower required for performance of this contract.
Reported NLT the 31st of October each year. Reporting period shall be the Period of Performance, not to exceed 12 months, ending September 30 of each government fiscal year.
Reported 100% of the time
Annual completed CMR
100% Surveillance
1% reduction in payment (RIP) of contract cost within CMR contract year

PRS Description of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.