W911SA-16-T-0008_Amendment_1.docx
DOCX document 28 KB Posted
- Attached to
- Custodial Services at MO024 Springfield, MO Federal contract opportunity
- Solicitation number
- W911SA-16-T-0008
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911SA-16-T-0008_Amendment_2.docx | DOCX document | |
| W911SA-16-T-0008_Attachment_3_Task_and_Frequency.xlsx | XLSX spreadsheet | |
| W911SA-16-T-0008_Attachment_1_TE_1_Deliverables.docx | DOCX document | |
| W911SA-16-T-0008_Attachment_2_PRS.docx | DOCX document | |
| W911SA-16-T-0008_Attachment_5_ATOPSEC.pdf | ||
| W911SA-16-T-0008_Attachment_4_MO024_DWGS.docx | DOCX document | |
| W911SA-16-T-0008_solicitation.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911SA-16-T-0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by full text:
QUESTIONS AND ANSWERS
1. Q: PWS 3.1 Facilities. During the site visit, space for the custodial closets were identified. Will a small office space also be provided for contractor workspace/use?
A: Office space is not available. An empty cubicle may be available at times, but there is not a permanent spot available for the contractor work space. Work space will have to be approved by the facility POC.
2. Q: PW 4.1.1 Restroom Supplies. Will the government provide historical usage data for consumable supplies such as toilet tissue, paper towels, urinal cakes and soap?
A: No data is available from the current contractor.
3. Q: Task and Frequency. It appears that all work under this contract is currently performed on a Mon-Wed-Fri schedule. While not specifically stated in the PWS, is there any flexibility with the days?
A: Monday, Wednesday and Fridays are required, except during holidays. Alternate days will be used if the holiday falls on the scheduled days.
The contractor can arrange alternate days within the normal operation hours with the Facility POC for tasks that require more manpower time. Please refer to PWS for normal building operation hours.
4. Q: PWS 1.6.15 Key Personnel. PWS states the contractor shall provide a Project Manager (PM) for the "overall statewide project" and a designated Point of Contact (POC) at each location. Please confirm that MO024 is the only location covered under this solicitation and that the contractor's PM/POC can be one and the same person for this contract.
A: Springfield, MO is the only facility on this solicitation. The contractor must provide a PM and the POC will act as a back up for the PM.
5. Q: Do the incumbent employee(s) have First-Right-of-Refusal?
A: Yes, per FAR 52.222-17 found within 52.212-5.
6. Q: PWS 5.2.2 Clean Exterior Window Surfaces. As this is a 2-story facility, is this service currently sub-contracted out? If so, please identify vendor currently performing this service.
A: We do have any information on subcontractors.
(End of Summary of Changes) image1.wmf