W911S6-20-Q-00006_AMD002.docx

DOCX document 14 KB Posted

Attached to
AMENDED 5 AXIS CNC 240 TON HYDRAULIC PRESS Federal contract opportunity
Solicitation number
W911S6-20-Q-0006
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

View the file

Other files for this federal contract opportunity

Other files attached to AMENDED 5 AXIS CNC 240 TON HYDRAULIC PRESS, newest first.
File Type Posted
W911S6-20-Q-00006_AMD003.docx DOCX document
W911S6-20-Q-00006_AMD001.docx DOCX document
W911S6-20-Q-00006.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Document Type: AMENDMENT #002 Solicitation Number: W911S6-20-Q-0006 Posted Date: 03/100189/2020 Original Response Date: 03/19/2020 Current Response Date: 03/19/2020 Product or Service Code: 3442 Set Aside: 100% SMALL BUSINESS NAICS Code: 333517

SIZE STANDARD: 500 EMPLOYEES

QUESTIONS AND ANSWERS –

1. Received 08 March 2020 8:27 PM Vendor Question – I don't see a requirement for at the minimum, manual crowning, and more likely CNC crowning. As a large commercial supplier of North America's #1 selling press brake brand, also USA produced and the brand most purchased by the U.S. government/ military, most machines of this size typically are provided with and require crowning to compensate for deflection on longer parts that will occur at or above the mid- tonnage range of the machine. Is there no requirement for manual or CNC crowning for this machine?

Government Response – Answered 09 March 2020 08:42 AM The brake press must have the CNC crowning as a standard feature, a wedge style system that is mated to each machine.

2. Received 10 March 2020 12:17 PM Vendor Question - you mentioned training on the equipment is needed. Please specify how many hours of training is required? Is training required for different shifts? Please advise...

Government Response – Answered 10 March 2020 13:20 PM - Typically it is two days 16-20 hours. One day for the machine and one day for the computer console/operations.

Interested vendors are required to acknowledge receipt of this amendment by submitting a signed copy of this amendment along with their quote.

__________________________________________________________________
SignatureCompany Name
__________________________________________________________________
Printed NameDate