Drawings _Modifications_to_Rms_53_and_55 _Bldg_4156.pdf
PDF 3 MB Posted
- Attached to
- Modifications to Rm 53-55, Bldg. 4156 Federal contract opportunity
- Solicitation number
- W911S6-16-B-0002
About this file
Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PWS_PRS_-_Modifications_to_Rms_53_and_55 _Bldg_4156_r1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DUGWAY PROVING GROUND
VICINITY MAP
MAIN ENTRANCE
GATE
PROJECT LOCATION MAP
LOCATION
PROJECT
TOP OF WALL T.O.W. CONTRACTOR INSTALLED
GF-GI
GOVERNMENT FURNISHED
GOVERNMENT INSTALLED
G.I.
GND.
GOVT.
GALVANIZED STEEL
GROUND
GOVERNMENT
VERTICAL
TYPICAL
WOOD
WITH
VESTIBULE
VERT.
TYP.
WD
W/
VEST.
POUNDS PER SQUARE INCH
TOP OF SLAB OR SIDEWALK
SIMILAR SIM. FDN. FOUNDATION
F.E.
F.E.C.
F.F.
FIN.
FLR.
FIRE EXTINGUISHER CABINET
FIRE EXTINGUISHER
FINISH FLOOR
FINISH
FLOOR
FTG.
GA.
GALV.
GF-CI
FOOTING
GAGE
GALVANIZED
GOVERNMENT FURNISHED
FLOW LINE F.L.
THROUGH
SPECIFICATION
STANDARD
STRUCTURAL
SUSPENDED
THRU
SPEC.
STD.
STR.
SUSP.
TOP OF CURB
TOP OF ASPHALT
TOP OF FOOTING
T.O.S.
T.O.C.
T.O.A.
T.O.F.
TOP OF T.O.
DWGS.
EA.
DRAWINGS
EACH
ELEV.
EQ.
E.S.
EXIST.
EXPAN.
EXT.
E.W.C.
ELEVATION
EQUAL
EACH SIDE
EXISTING
EXPANSION
EXTERIOR
ELECTRIC WATER COOLER
F.D.
FLOOR DRAIN
EXPANSION JOINT EJ
ROOF DRAIN
RADIUS
R.D.
RAD.
REQUIRED
RETURN
REVERSED
ROOM
ROUGH OPENING
SCHEDULE
SHOWER
SHEET
REQ'D
RET.
REV.
RM.
R.O.
SCHED.
SHR.
SHT.
REINF. REINFORCED
NOT IN CONTRACT NIC CMU
CONCRETE MASONRY UNIT
CTJ
COL.
CONC.
CONT.
CONST.
COORD.
CONTRACTION JOINT
COLUMN
CONCRETE
CONTINUOUS
CONSTRUCTION
COORDINATE
DPG
DPW
DIA.
DTL.
DUGWAY PROVING GROUND
DIRECTOR OF PUBLIC WORKS
DOUBLE
DIAMETER
DETAIL
DBL.
NUMBER
NOT TO SCALE
ON CENTER
OUTSIDE DIAMETER
OVERHEAD
OPPOSITE
PERPENDICULAR
PARTITION
PLATE
PAINTED
NO.
N.T.S.
O.C.
O.D.
O.H.
OPP.
PERP.
PART.
PL.
PNTD.
PSI
BITUM.
BD
BLDG
BITUMINOUS
BOARD
BUILDING
CJ
B.O.
BRG.
BTWN.
CER.
CLG.
CONSTRUCTION JOINT
BOTTOM OF
BEARING
BETWEEN
CERAMIC
CEILING
BENCHMARK B.M.
CLR. CLEAR
INSULATION
LAVATORY
LIGHT
MISCELLANEOUS
MAXIMUM
MECHANICAL
MANUFACTURER
MINIMUM
MASONRY OPENING
MATERIAL
INSUL.
LAV.
LT.
MISC.
MAX.
MECH.
MFR.
MIN.
M.O.
MATL.
MTL.
METAL
DUGWAY PROVING GROUND
Reference to materials or methods have been made on the drawings in accordance with the following abbreviations:
GYPSUM WALL BOARD GYP. BD. FEET
ADJ
AFF
INCHES
AND
AT
DIAMETER
ADJUSTABLE
ABOVE FINISH FLOOR
ATS
ASTM
SWITCH
AUTOMATIC TRANSFER
TESTING MATERIALS
AMERICAN SOCIETY FOR
ALUM ALUMINUM
HANDICAPPED
HARDWARE
HOLLOW METAL
HORIZONTAL
HOUR
HEIGHT
HC.
HDW.
H.M.
HORIZ.
HR.
HT.
INFORMATION
HYDRANT
AIR CONDITIONING
INSIDE DIAMETER
INFO
HYD
I.D.
HVAC HEATING/VENTILATION/
ABBREVIATIONS
NUMBER GYPSUM WALL BOARD GWB.
U.S. ARMY
LOCATION MAP
Bldg 4156
Modifications to Rms 53/55 for Powdered Glovebox Ops
DRAWING INDEX
GENERAL
G-001 GENERAL INFORMATION
ARCH.
A-001
PARTIAL FLOOR PLAN - DEMOLITION
A-101
PARTIAL FLOOR PLAN - NEW WORK
PLUMBING
P-001 PARTIAL FLOOR PLAN - PLUMBING DEMOLITION
P-101
PARTIAL FLOOR PLAN - PLUMBING NEW WORK
ELECTRICAL
E-001 PARTIAL FLOOR PLAN - ELECTRICAL DEMOLITION
E-101 PARTIAL FLOOR PLAN - ELECTRICAL NEW WORK
ELECTRICAL
SP-001
PARTIAL FLOOR PLAN - SPECIALTY PIPING DEMOLITION
SP-101 PARTIAL FLOOR PLAN - SPECIALTY PIPING NEW WORK
11'-7"
11'-7"
File details come from the government source that posted it. Updated .