Drawings _Modifications_to_Rms_53_and_55 _Bldg_4156.pdf

PDF 3 MB Posted

Attached to
Modifications to Rm 53-55, Bldg. 4156 Federal contract opportunity
Solicitation number
W911S6-16-B-0002
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Dugway Proving Ground

About this file

Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Modifications to Rm 53-55, Bldg. 4156, newest first.
File Type Posted
PWS_PRS_-_Modifications_to_Rms_53_and_55 _Bldg_4156_r1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DUGWAY PROVING GROUND

VICINITY MAP

MAIN ENTRANCE

GATE

PROJECT LOCATION MAP

LOCATION

PROJECT

TOP OF WALL T.O.W. CONTRACTOR INSTALLED

GF-GI

GOVERNMENT FURNISHED

GOVERNMENT INSTALLED

G.I.

GND.

GOVT.

GALVANIZED STEEL

GROUND

GOVERNMENT

VERTICAL

TYPICAL

WOOD

WITH

VESTIBULE

VERT.

TYP.

WD

W/

VEST.

POUNDS PER SQUARE INCH

TOP OF SLAB OR SIDEWALK

SIMILAR SIM. FDN. FOUNDATION

F.E.

F.E.C.

F.F.

FIN.

FLR.

FIRE EXTINGUISHER CABINET

FIRE EXTINGUISHER

FINISH FLOOR

FINISH

FLOOR

FTG.

GA.

GALV.

GF-CI

FOOTING

GAGE

GALVANIZED

GOVERNMENT FURNISHED

FLOW LINE F.L.

THROUGH

SPECIFICATION

STANDARD

STRUCTURAL

SUSPENDED

THRU

SPEC.

STD.

STR.

SUSP.

TOP OF CURB

TOP OF ASPHALT

TOP OF FOOTING

T.O.S.

T.O.C.

T.O.A.

T.O.F.

TOP OF T.O.

DWGS.

EA.

DRAWINGS

EACH

ELEV.

EQ.

E.S.

EXIST.

EXPAN.

EXT.

E.W.C.

ELEVATION

EQUAL

EACH SIDE

EXISTING

EXPANSION

EXTERIOR

ELECTRIC WATER COOLER

F.D.

FLOOR DRAIN

EXPANSION JOINT EJ

ROOF DRAIN

RADIUS

R.D.

RAD.

REQUIRED

RETURN

REVERSED

ROOM

ROUGH OPENING

SCHEDULE

SHOWER

SHEET

REQ'D

RET.

REV.

RM.

R.O.

SCHED.

SHR.

SHT.

REINF. REINFORCED

NOT IN CONTRACT NIC CMU

CONCRETE MASONRY UNIT

CTJ

COL.

CONC.

CONT.

CONST.

COORD.

CONTRACTION JOINT

COLUMN

CONCRETE

CONTINUOUS

CONSTRUCTION

COORDINATE

DPG

DPW

DIA.

DTL.

DUGWAY PROVING GROUND

DIRECTOR OF PUBLIC WORKS

DOUBLE

DIAMETER

DETAIL

DBL.

NUMBER

NOT TO SCALE

ON CENTER

OUTSIDE DIAMETER

OVERHEAD

OPPOSITE

PERPENDICULAR

PARTITION

PLATE

PAINTED

NO.

N.T.S.

O.C.

O.D.

O.H.

OPP.

PERP.

PART.

PL.

PNTD.

PSI

BITUM.

BD

BLDG

BITUMINOUS

BOARD

BUILDING

CJ

B.O.

BRG.

BTWN.

CER.

CLG.

CONSTRUCTION JOINT

BOTTOM OF

BEARING

BETWEEN

CERAMIC

CEILING

BENCHMARK B.M.

CLR. CLEAR

INSULATION

LAVATORY

LIGHT

MISCELLANEOUS

MAXIMUM

MECHANICAL

MANUFACTURER

MINIMUM

MASONRY OPENING

MATERIAL

INSUL.

LAV.

LT.

MISC.

MAX.

MECH.

MFR.

MIN.

M.O.

MATL.

MTL.

METAL

DUGWAY PROVING GROUND

Reference to materials or methods have been made on the drawings in accordance with the following abbreviations:

GYPSUM WALL BOARD GYP. BD. FEET

ADJ

AFF

INCHES

AND

AT

DIAMETER

ADJUSTABLE

ABOVE FINISH FLOOR

ATS

ASTM

SWITCH

AUTOMATIC TRANSFER

TESTING MATERIALS

AMERICAN SOCIETY FOR

ALUM ALUMINUM

HANDICAPPED

HARDWARE

HOLLOW METAL

HORIZONTAL

HOUR

HEIGHT

HC.

HDW.

H.M.

HORIZ.

HR.

HT.

INFORMATION

HYDRANT

AIR CONDITIONING

INSIDE DIAMETER

INFO

HYD

I.D.

HVAC HEATING/VENTILATION/

ABBREVIATIONS

NUMBER GYPSUM WALL BOARD GWB.

U.S. ARMY

LOCATION MAP

Bldg 4156

Modifications to Rms 53/55 for Powdered Glovebox Ops

DRAWING INDEX

GENERAL

G-001 GENERAL INFORMATION

ARCH.

A-001

PARTIAL FLOOR PLAN - DEMOLITION

A-101

PARTIAL FLOOR PLAN - NEW WORK

PLUMBING

P-001 PARTIAL FLOOR PLAN - PLUMBING DEMOLITION

P-101

PARTIAL FLOOR PLAN - PLUMBING NEW WORK

ELECTRICAL

E-001 PARTIAL FLOOR PLAN - ELECTRICAL DEMOLITION

E-101 PARTIAL FLOOR PLAN - ELECTRICAL NEW WORK

ELECTRICAL

SP-001

PARTIAL FLOOR PLAN - SPECIALTY PIPING DEMOLITION

SP-101 PARTIAL FLOOR PLAN - SPECIALTY PIPING NEW WORK

11'-7"

11'-7"

File details come from the government source that posted it. Updated .