W911S0-18-R-000100001_Amendment1.pdf
PDF 362 KB Posted
- Attached to
- Intelligence Surveillance Reconnaissance Mobile Advisory Team (ISRMAT) Support Federal contract opportunity
- Solicitation number
- W911S0-18-R-0001
About this file
W911S0-18-R-00010001_Amendment 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911S0-18-R-0001_Conformed.pdf | ||
| Attachment_4_Industry_QA.pdf | ||
| Attachment_1_PWS_Amendment_1.pdf | ||
| W911S0-18-R-000100001_Conformed.pdf | ||
| Attachment_1_Performance_Work_Statement.pdf | ||
| Attachment_2_DD_254.pdf | ||
| Attachment_3_W911S0-18-R-0001_Pricing_Worksheet.xlsx | XLSX spreadsheet | |
| W911S0-18-R-0001_2_12_2018.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. CONTRACT ID CODE PAGE OF PAGES
S 1 26
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Mar-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911S0-18-R-0001
X 9B. DATED (SEE ITEM 11)
12-Feb-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of amendment 1 is to include the answers to industry's questions at Attachment 4, adjust the period of performance, add necessary clauses, add Section H language regarding Optional Support, and make other necessary changes. Changes have been marked in blue font in Sections F, G, J, and L.
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Mar-2018
CODE
MICC - FORT EUSTIS
705 WASHINGTON BLVD SUITE 126
FORT EUSTIS VA 23604
W911S0 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911S0-18-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0002
The pricing detail quantity has decreased by 2.00 from 12.00 to 10.00.
SUBCLIN 0003AA
The pricing detail quantity has decreased by 2.00 from 12.00 to 10.00.
SUBCLIN 0003AB
The pricing detail quantity has decreased by 2.00 from 12.00 to 10.00.
SUBCLIN 0005AA
The CLIN extended description has changed from:
DBA Insurance for 12 months
To:
DBA Insurance for 10 months
SUBCLIN 0005AB
The CLIN extended description has changed from:
Hazard/Uplift for 12 months
To:
Hazard/Uplift for 10 months
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule item for CLIN 0002 has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2018 TO
10-SEP-2019
N/A W905YQ
To:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2018 TO
09-JUL-2019
N/A W905YQ
The following Delivery Schedule item for SUBCLIN 0003AA has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2018 TO
09-SEP-2019
N/A W905YQ
To:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2018 TO
09-JUL-2019
N/A W905YQ
The following Delivery Schedule item for SUBCLIN 0003AB has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2018 TO
09-SEP-2019
N/A W905YQ
To:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2018 TO
09-JUL-2019
N/A W905YQ
The following Delivery Schedule item for CLIN 0004 has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2018 TO
09-SEP-2019
N/A W905YQ
To:
POP 10-SEP-2018 TO
09-JUL-2019
N/A W905YQ
The following Delivery Schedule item for SUBCLIN 0005AA has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2018 TO
09-SEP-2019
N/A W905YQ
To:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2018 TO
09-JUL-2019
N/A W905YQ
The following Delivery Schedule item for SUBCLIN 0005AB has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2018 TO
09-SEP-2019
N/A W905YQ
To:
POP 10-SEP-2018 TO
09-JUL-2019
N/A W905YQ
The following Delivery Schedule item for SUBCLIN 0005AC has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2018 TO
09-SEP-2019
N/A W905YQ
To:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2018 TO
09-JUL-2019
N/A W905YQ
The following Delivery Schedule item for CLIN 0006 has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2018 TO
09-SEP-2019
N/A W905YQ
To:
POP 10-SEP-2018 TO
09-JUL-2019
N/A W905YQ
The following Delivery Schedule item for CLIN 1001 has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2019 TO
10-SEP-2020
N/A W905YQ
To:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-JUL-2019 TO
10-JUL-2020
N/A W905YQ
The following Delivery Schedule item for SUBCLIN 1002AA has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2019 TO
09-SEP-2020
N/A W905YQ
To:
POP 10-JUL-2019 TO
09-JUL-2020
N/A W905YQ
The following Delivery Schedule item for SUBCLIN 1002AB has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2019 TO
09-SEP-2020
N/A W905YQ
To:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-JUL-2019 TO
09-JUL-2020
N/A W905YQ
The following Delivery Schedule item for CLIN 1003 has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2019 TO
09-SEP-2020
N/A W905YQ
To:
POP 10-JUL-2019 TO
09-JUL-2020
N/A W905YQ
The following Delivery Schedule item for SUBCLIN 1004AA has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2019 TO
09-SEP-2020
N/A W905YQ
To:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-JUL-2019 TO
09-JUL-2020
N/A W905YQ
The following Delivery Schedule item for SUBCLIN 1004AB has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2019 TO
09-SEP-2020
N/A W905YQ
To:
POP 10-JUL-2019 TO
09-JUL-2020
N/A W905YQ
The following Delivery Schedule item for SUBCLIN 1004AC has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2019 TO
09-SEP-2020
N/A W905YQ
To:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-JUL-2019 TO
09-JUL-2020
N/A W905YQ
The following Delivery Schedule item for CLIN 1005 has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2019 TO
09-SEP-2020
N/A W905YQ
To:
POP 10-JUL-2019 TO
09-JUL-2020
N/A W905YQ
The following Delivery Schedule item for CLIN 2001 has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2020 TO
10-SEP-2021
N/A W905YQ
To:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-JUL-2020 TO
10-JUL-2021
N/A W905YQ
The following Delivery Schedule item for SUBCLIN 2002AA has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2020 TO
09-SEP-2021
N/A W905YQ
To:
POP 10-JUL-2020 TO
09-JUL-2021
N/A W905YQ
The following Delivery Schedule item for SUBCLIN 2002AB has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2020 TO
09-SEP-2021
N/A W905YQ
To:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-JUL-2020 TO
09-JUL-2021
N/A W905YQ
The following Delivery Schedule item for CLIN 2003 has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2020 TO
09-SEP-2021
N/A W905YQ
To:
POP 10-JUL-2020 TO
09-JUL-2021
N/A W905YQ
The following Delivery Schedule item for SUBCLIN 2004AA has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2020 TO
09-SEP-2021
N/A W905YQ
To:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-JUL-2020 TO
09-JUL-2021
N/A W905YQ
The following Delivery Schedule item for SUBCLIN 2004AB has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2020 TO
09-SEP-2021
N/A W905YQ
To:
POP 10-JUL-2020 TO
09-JUL-2021
N/A W905YQ
The following Delivery Schedule item for SUBCLIN 2004AC has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2020 TO
09-SEP-2021
N/A W905YQ
To:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-JUL-2020 TO
09-JUL-2021
N/A W905YQ
The following Delivery Schedule item for CLIN 2005 has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2020 TO
09-SEP-2021
N/A W905YQ
To:
POP 10-JUL-2020 TO
09-JUL-2021
N/A W905YQ
The following Delivery Schedule item for CLIN 3001 has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2021 TO
10-SEP-2022
N/A W905YQ
To:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-JUL-2021 TO
10-JUL-2022
N/A W905YQ
The following Delivery Schedule item for SUBCLIN 3002AA has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2021 TO
09-SEP-2022
N/A W905YQ
To:
POP 10-JUL-2021 TO
09-JUL-2022
N/A W905YQ
The following Delivery Schedule item for SUBCLIN 3002AB has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2021 TO
09-SEP-2022
N/A W905YQ
To:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-JUL-2021 TO
09-JUL-2022
N/A W905YQ
The following Delivery Schedule item for CLIN 3003 has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2021 TO
09-SEP-2022
N/A W905YQ
To:
POP 10-JUL-2021 TO
09-JUL-2022
N/A W905YQ
The following Delivery Schedule item for SUBCLIN 3004AA has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2021 TO
09-SEP-2022
N/A W905YQ
To:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-JUL-2021 TO
09-JUL-2022
N/A W905YQ
The following Delivery Schedule item for SUBCLIN 3004AB has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2021 TO
09-SEP-2022
N/A W905YQ
To:
POP 10-JUL-2021 TO
09-JUL-2022
N/A W905YQ
The following Delivery Schedule item for SUBCLIN 3004AC has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2021 TO
09-SEP-2022
N/A W905YQ
To:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-JUL-2021 TO
09-JUL-2022
N/A W905YQ
The following Delivery Schedule item for CLIN 3005 has been changed from:
DELIVERY DATE QUANTITY DODAAC /
CAGE
POP 10-SEP-2021 TO
09-SEP-2022
N/A W905YQ
To:
POP 10-JUL-2021 TO
09-JUL-2022
N/A W905YQ
The following have been modified:
PERIOD OF PERFORMANCE SCHEDULE
The Period of Performance will be as follows:
60-day Phase-In 10 July 2018 - 09 September 2018 Base Year (12-months) 10 September 2018 - 09 July 2019 Option Year 1 (12-months) 10 July 2019 - 09 July 2020 Option Year 2 (12-months) 10 July 2020 - 09 July 2021 Option Year 3 (12-months) 10 July 2021 - 09 July 2022 (includes phase-out)
At the expiration of the base period, Option 1 will commence, provided the Government exercises the option in accordance with the terms and conditions of the contract. Subsequent with the expiration of each exercised option period, the next option period will commence provided the Government exercises the option in accordance with the terms and conditions of the contract.
SECTION H - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
OPTIONAL SUPPORT
When the TRADOC G2 has a need for optional ITC or SOCEUR support as defined in PWS paragraph 5.2, the Contracting Officer will issue a modification to add appropriate funds to exercise those CLINs. The prices for this support are based on firm-fixed prices in Schedule B of the awarded contract.
Travel funds will be added as appropriate. If ITC support is exercised, the DBA and Hazard/Uplift price amounts awarded for base CONUS/OCONUS support will be adjusted if necessary, and will be added to the established ODC subCLINs as appropriate.
SECTION I - CONTRACT CLAUSES
The following have been added by reference:
52.217-7 Option For Increased Quantity-Separately Priced Line Item MAR 1989 52.222-43 Fair Labor Standards Act And Service Contract Labor
Standards - Price Adjustment (Multiple Year And Option Contracts)
MAY 2014
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
ATTACHMENTS
LIST OF ATTACHMENTS
ATTACHMENT 1,
PERFORMANCE WORK STATEMENT
The Performance Work Statement is attached as a separate PDF document.
ATTACHMENT 2,
DD 254, DOD CONTRACT SECURITY CLASSIFICATION SPECIFICATION
A copy of the DD Form 254 is attached as a separate PDF document.
ATTACHMENT 3,
ISRMAT PRICING WORKSHEET
The ISRMAT Pricing Worksheet is attached as a separate Excel document.
ATTACHMENT 4,
Industry Questions and Answers
This attachment provides the responses to the questions received from industry.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
INSTRUCTIONS TO OFFERORS
Section L: Solicitation/Proposal Instructions and Requirements
a. Proposal Submittal and Inquiries.
1. Proposals shall be submitted prior to the closing date and time identified in block 9 on the SF 33 in accordance with the instructions provided below.
2. Electronic submissions via email will be accepted and is the preferred method. Facsimile and/or paper submissions will not be accepted. Electronic submissions may be submitted in more than one email but should be titled appropriately (e.g. Email 1 of 2, Email 2 of 2, etc). Zipfiles cannot be accepted. Submissions shall be sent to the points of contacts listed below. Offeror’s shall perform a virus check prior to proposal submitted to ensure offerors’ submittals shall be free of viruses, Trojans, spyware, and other malicious code for which appropriate detection and removal/quarantine software exists. NOTE: Attachments included in emails should not contain a period (.) in its title as the document may be stripped during transmittal.
3. The points of contact responsible for supplying additional information and answering all inquiries are the Contract
Specialist and Contracting Officer. Address all questions or concerns, including the attachments, regarding this solicitation to: Ms. Christina Crawley, Contract Specialist, at christina.m.crawley.civ@mail.mil and “CC” Ms.
Shaina McKeel, Contracting Officer, at shaina.s.mckeel.civ@mail.mil. All questions regarding this solicitation and/or its attachments shall be submitted in writing via email by 10:00 am (ET) on Monday, February 26, 2018.
Note: All questions shall annotate source document , page, and paragraph number. Questions should be consolidated into 1 document, no piecemealing.
b. General Instructions.
1. The selection of a source for award purposes will be conducted utilizing source selection (negotiated) procedures as delineated in FAR Part 15.3. Offers will be evaluated using the criteria under Section M, “Factors to be Evaluated.” Noncompliance with the Request for Proposal (RFP) requirements may hamper the Government's ability to properly evaluate the proposal and may result in elimination of the proposal from further consideration for contract award.
2. The Offer. The submission of the documentation specified below will constitute the offeror's acceptance of the terms and conditions of the RFP, concurrence with the Performance Work Statement, and the proposed contract type.
3. It is the Government’s intention to award without discussions. Offerors are encouraged to present their best technical solutions and prices in their initial proposal submission. However, IAW FAR Part 15.306, should discussions become necessary, the Government reserves the right to hold them. If this occurs, a competitive range will be determined and offerors notified. The competitive range may be limited for purposes of efficiency IAW FAR Part 15.306 (c)(2).
4. These instructions prescribe the format for the proposal and describe the approach for the development and presentation of proposal data. These instructions are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals.
5. If an offeror believes that the requirements in these instructions contain an error, an ambiguity, omission, or are otherwise unsound, the offeror shall immediately notify the Contracting Officer in writing with supporting rationale.
The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion.
6. In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals. Unless the offeror requests otherwise, the Government will destroy extra copies of such unsuccessful proposals.
7. All referenced documents for this solicitation are available on the Federal Business Opportunities (FedBizOpps) web site at http://www.fedbizopps.gov. Potential offerors are encouraged to subscribe for real-time e- mail notifications when information has been posted to the website for this solicitation. Additional documents referred to in the performance work statement are available at the locations specified in Part 8 of that document.
8. Debriefings. The Contracting Officer will promptly notify offerors of any decision to exclude them from the competitive range, whereupon they may request and receive a debriefing in accordance with FAR 15.505. The Contracting Officer will notify unsuccessful offerors in the competitive range of the source selection decision in accordance with FAR 15.506. Upon such notification, unsuccessful offerors may request and receive a debriefing.
Offerors desiring debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable.
9. Period for Acceptance of Offerors. The offeror agrees to hold the prices in its offer firm for 120 calendar days from the date specified for receipt of offers.
c. Proposal Preparation Instructions.
1. Offeror’s proposal shall consist of four (4) separate volumes/files: (I) General, (II) Mission Capability, (III) Past Performance, and (IV) Price.
2. Proposal Format:
(a) Offerors shall submit proposal via email in accordance with paragraph (c) below.
(b) Exceptions. Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors (Sections A through M). Failure to meet a requirement may result in an offer being ineligible for award. If the offeror finds it necessary to take exception to any of the requirements specified in this solicitation, the offeror shall clearly identify the applicable Volume and exceptions with a complete explanation of why the exception was taken, what benefit accrues to the Government (if any), and its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Offerors are cautioned that taking an exception may render the offer ineligible for award. It is recommended that the Offeror contact the Contracting Officer immediately/prior to solicitation closing upon identifying an area that may result in an exception. This information shall be provided in the format below.
Table L1, Solicitation Exceptions
Solicitation Document Page/ Paragraph Requirement/ Portion Rationale & Impact
Section B, PWS/SOO/ SOW, Section L&M, etc.
Applicable Page and Paragraph Numbers
Identify the requirement or portion to which exception is taken
Describe The rationale and impact of the exception
(c) The proposals shall be organized into four (4) volumes. Proposals shall be provided in Microsoft Word, PDF and Excel and shall adhere to all proposal preparation instructions. A cover sheet should be provided with each volume that clearly marks the volume number, title, solicitation identification, the offeror's name, DUNS#, Cage Code, Federal Tax ID, Business Size, Business Type (i.e.: SDVOSB), and Point of Contact (with phone number and email address). All text shall be single spaced and in black font (Black font requirement does not apply to tables, graphics, photos, etc., Company stationary and logos are acceptable). Font shall be easily readable (12-pitch type or 10 point proportional spacing.) Cross-references should be utilized to preclude unnecessary duplication of data between sections. File names to be “Company Name – Volume # – Initial” for the first submission. File name of later submissions (if necessary), shall be “Company Name – Volume # – Revision X” with X indicating the number of the revision. Page limitations are as follows:
Table L2, Page Limitations and Format
VOLUME TITLE PAGE LIMITS Format I General n/a Word or PDF II Mission Capability:
Factor 1- Mission Capability Scenario Factor 2 - Management and Staffing Plan
45 Word or PDF
III Past Performance:
Factor 3 – Past Performance
15 Word or PDF
IV Price:
Factor 4 – Price n/a
Narrative in Word or PDF, and Pricing in Excel
(d) Proposal Limitation. The proposal shall not exceed the limits stated above. If the page limits are exceeded, the pages in excess of the limit shall be unread. The Government will not accept any changes to the contractor’s proposal after the closing date of the solicitation (See FAR 15.208 for further information regarding late proposals).
If discussions become necessary, page limitations may be placed on responses to Evaluation Notice (ENs). The specified page limits for EN responses will be identified in the letters forwarding the ENs to the offerors.
(e) Page Limit Includes: All appendices, charts, graphs, diagrams, tables, photographs, drawings, etc.
(f) Page Limit does not include: covers for volumes, tables of contents, glossary of abbreviations and acronyms, indices, title pages, and cross reference matrices (shall be limited to one page), letters of commitment, Consent Letters, Client Authorization Letters, and resumes for Key Personnel (shall be limited to one page), which should be submitted as separate appendices or attachments. Pages will be counted if they contain any other information, i.e., diagrams, extraneous data, etc. Pages marked “This page intentionally left blank” will not be counted.
(g) What Counts As A Page? A page shall be an 8 ½ X 11” sheet of paper. When both sides of a sheet display printed material, it shall be counted as two pages. Letter size and spacing requirements for illustrations and tables can be at the discretion of the offeror but must be easily readable. Fold-outs will be counted as the appropriate number of pages based on an 8 ½ X 11” sheet of paper. Use at least 1 inch margins on the top and bottom and 3/4 inch side margins. The Contractor shall number each page in order to eliminate any confusion. In the event contractor creates an ambiguity in their numbering of pages, the Government may exercise its own discretion in counting pages.
(h) Indexing. Each volume shall contain a detailed table of contents to delineate the subparagraphs within that volume. Tab indexing shall be used to identify sections.
(i) Glossary of Abbreviations and Acronyms. Each volume shall contain a glossary of all abbreviations and acronyms used, with a definition for each.
3. Proposal Content:
(a) Volume I – General.
i. The General Volume shall be organized as follows and contain the identified information. Failure to follow the Contract Proposal preparation instructions may cause your proposal to be deemed unacceptable by the Government.
All final monetary extensions shall be in whole dollars only.
ii. TAB A, Exceptions/Assumptions (if required) – The Offeror shall identify and explain any exceptions, deviations or assumptions used in preparing its proposal.
iii. TAB B, SF 33 - The SF 33 shall be fully completed upon submission. The offeror is cautioned that the SF 33 must contain an original signature in block 17 of the form (electronic signature is acceptable). The contractor shall acknowledge any amendments to the RFP in accordance with the instructions on the SF 33 in Block 14, Section L, and FAR 52.215-1 (b), Instruction to Offerors—Competitive Acquisition. The offeror shall provide the name, title, telephone number and email address of the Offeror’s principal point(s) of contact for its proposal and shall identify those individuals authorized to negotiate with the Government and contractually bind the Offeror. The Offeror shall provide Taxpayer Identification Number (TIN), Data Universal Numbering System (DUNS), contractor and Government Entity (CAGE) code, business size, and business type.
iv. TAB C, Section K (Representation, Certifications, and Other Statements of Offerors) – The offeror shall ensure that Section K is submitted thoroughly completed with all blocks in each certification/representation completed truthfully and completely.
v. TAB D, Conflicts of Interest – The Offeror shall disclose all organizational and/or personal conflicts of interest as described in Section H of this solicitation.
vi. TAB E, Business Licenses – Offerors shall provide copies of their Afghanistan and Iraq Business Licenses at time of proposal submission. Afghanistan Business Licenses shall be required for all Offerors and their teaming partners and/or subcontractors. This includes all parties in a joint-venture or mentor-protégé program. At least one member of the team shall have an Iraq Business License. Any Offeror that fails to provide the required Business Licenses will be considered non-responsive and the proposal will not be evaluated. Business Licenses ‘in process’ or
‘under application’ will not be accepted, only approved licenses will be accepted and considered compliant with the solicitation’s instructions.
(b) Volume II – Mission Capability Volume.
i. The Mission Capability Volume shall be clear, concise, and include sufficient detail for effective evaluation and for substantiating the validity of stated claims. Legibility, clarity and coherence are very important. The Offeror’s submission will be evaluated against the Mission Capability factors identified below and defined in Section M, Evaluation Factors for Award.
ii. The proposal should not simply rephrase or restate the Government's requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Statements that the offeror understands, can, or will comply with the PWS (including referenced publications, technical data, etc.); statements paraphrasing the PWS or parts thereof (including applicable publications, technical data, etc.); and phrases such as “standard procedures will be employed” or “well known techniques will be used,” etc., will be considered unacceptable. Offerors shall assume that the Government has no prior knowledge of their facilities and experience.
The Government will base its evaluation on the information presented in the offeror's proposal. Elaborate brochures or documentation, binding, detailed art work, or other embellishments are unnecessary and are not desired.
iii. The Mission Capability Volume shall, at a minimum, be prepared in a form consistent with the PWS and the evaluation criteria for award set forth in Section M of this solicitation. The Volume shall be prepared in an orderly format and in sufficient detail to enable the Government to make a thorough evaluation of the offeror’s technical competence and ability to comply with the contract requirements specified in the PWS. The offeror shall address as specifically as possible the actual methodology it will use for accomplishing the PWS requirements. This volume shall be organized according to the following general format:
(1) Table of Contents
(2) List of Table and Drawings
(3) Cross Reference Matrix – This matrix shall cross-reference the proposal paragraphs to the applicable Factors and PWS paragraphs/solicitation requirements.
(4) Factor 1: Mission Capability Scenario: The Offeror’s proposal shall demonstrate a clear understanding of the requirements by thoroughly responding to the Mission Capability Scenario. This response shall provide a comprehensive discussion of all of the questions posed within the scenario and any additional information or detail that the Offeror deems necessary to demonstrate understanding of the requirement.
(5) Factor 2: Management and Staffing Plan: The offeror shall provide a detailed management and staffing plan with their proposal. The proposal shall demonstrate their understanding of the program and retention of employees.
Offeror’s shall demonstrate:
Proposed organizational chart showing positions, including those determined key, decision authority, and what parts of the organization are responsible for managing and accomplishing each task.
Proposed recruitment and retention plan for personnel that demonstrate SOF, SMU, and combat experience, specialized training and education, certifications, and credentials contained in the PWS.
Proposed methodology for maintaining 95% staffing throughout the life of the contract and the offeror’s ability to manage gaps in staffing.
Offerors phase-in plan and their ability to recruit personnel, management of required processes for deployment, and capability to be at full performance on Day 1.
Resumes for personnel determined as key under this contract shall be provided with proof of their certifications, appropriate security clearances, and other qualifications required for their designated position(s). Hardcopies are not required and will not be accepted. Letters of Commitment/Intent shall be provided (signed within 60 days of proposal submission). Resumes must conform to the following format and shall be limited to one page:
Resume Contents
Name:
Education (Degree/discipline/year attained, educational institution):
Security Clearance (List clearance(s) currently held):
Proposed Labor Category:
Experience:
Past and Present Positions:
Company and title of position Dates of employment (month/year to month/year or to ‘present’) Brief description of duties and responsibilities, including supervisory experience Number and type of personnel supervised
(c) Volume III – Past Performance.
i. The Past Performance evaluation is an assessment of the Offeror’s probability of meeting the minimum past performance solicitation requirements. This assessment is based on the Offeror’s record of relevant and recent past performance information focusing on and targeting performance which is relevant to the effort as it directly related to the work being procured under this solicitation and as defined in Section M.
ii. The Offeror shall provide a listing of all relevant contracts held by the firm, as a prime or major subcontractor, or its teaming partners for a minimum of the previous six (6) months or maximum of three (3) years. There is no limit on the number of references. Page limitations are listed in the Table L2. The information shall be submitted in the following format:
(1) Contract Number (with task order number, if applicable), award date, and contract type (Note: If a ‘D’ contract is given with no task order(s), it will not be considered for assessment.) If submitting task order past performance information, offerors shall annotate total awarded value, total value of task orders awarded to offeror, and value of the referenced task order.
(2) Point(s) of contact to include name, phone number, and email address
(3) Value at time of award and final value with explanation for significant differences
(4) Period of Performance
(5) A copy of any cure notices or show cause letter received for each contract listed and a description of any corrective action by the Offeror or proposed subcontractor
iii. The Offeror shall provide information concerning termination actions. The information shall be submitted for ALL contracts it has had terminated, in whole or part, for default during the past three (3) years and any contracts which are currently in the process of such termination. The termination may be submitted by the company that received the termination if they are not the prime offeror. The prime contractor shall provide notation of the termination by the teaming partner in their past performance volume. This information is required for any contract, similar or not to the proposed action.
iv. In conducting the past performance evaluation, the Government reserves the right to use both the information provided in the Offeror’s past performance volume and information obtained from other sources, such as the Past Performance Information Retrieval System (PPIRS) or similar systems.
v. In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the Offeror shall be determined to have unknown (or ‘neutral’) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered ‘acceptable’.
(d) Volume IV – Price.
i. This section shall consist of all information required to support the proposed prices for phase-in, CONUS/OCONUS Support (base and option years), ITC Support (base and option years), SOCEUR Support (base and option years), DBA Insurance (base and option years), Hazard/Uplift (base and option years), and CMR (base and option years). All final monetary extension shall be in whole dollars only. The Offeror is required to submit a price narrative (Word or PDF format) and a price proposal (Attachment 3, ISRMAT Pricing Worksheet in Excel format). Certified cost or pricing data is not required; however, the Government reserves the right to request such data prior to award.
ii. The Offeror shall complete and submit all tabs in the Pricing Worksheet – ‘Proposal Summation’ and breakdowns for Phase-In & Base, and option years 1 – 3. In the ‘Breakdown’ tabs, the Offeror shall identify the staffing (by Labor Category, Labor Hours, Contractor Manpower Equivalents (CMEs), and their associated fully burdened rates) that will be used by the Offeror and its subcontractors/partners to perform each functions/service within the PWS.
The ‘Breakdown’ tabs should be tailored as needed to provide all requested and required information with all formulas intact. Additional tabs may be added as needed. The NTE amounts shall not be altered. The technical evaluation board will receive a copy of this document, without the associated pricing information, to assess the reasonableness of the staffing approach and the Offeror’s overall understanding of the requirement.
iii. Information relating to the proposed prices must be included to the extent practical. If any indirect costs will be applied against the actual travel cost, this must be stated in the price proposal. This section shall contain all narrative explanations used in deriving calculated costs. These narratives shall clearly explain the methodologies, calculations, exceptions, and assumptions used in developing the price. The narrative should also include a list summarizing the proposed subcontractors, team members, joint-venture partners, etc. to include their CAGE code and socio-economic size standard. A workshare percentage table showing the percentage breakdown of labor costs of the SDVOSB and other contracts to assist in the assurance that the Offerors are in compliance with FAR clause 52.219-27.
iv. For pricing purposes, assume an OCONUS deployment schedule consists of 12 hour days, 7 days a week.
Holidays are not observed OCONUS. The length of deployment is typically 4 months, but have lasted as long as 6 months.
(End of Summary of Changes)
File details come from the government source that posted it.