Exhibit 2, Performance Requirement Summary (PRS)

View the file

Other files for this federal contract opportunity

Other files attached to Storm Shelter Relocations, newest first.
File Type Posted
Exhibit_1,_Performance_Work_Statement_(PWS).pdf PDF
Attachment_3,_Special_Contract_Requirements,_18-Q-0101.pdf PDF
Attachment_2,_Shelter_Move_Location_Maps.pdf PDF
RFQ_18-Q-0101,_Shelter_Relocation.pdf PDF
Attachment_1,_SCA_WD_2015-5343_Rev_8.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE REQUIREMENTS SUMMARY

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. There are no incentives (Positive and/or Negative) with Impact on Contractor Payments.

Required Services (Tasks) Performance Standard Acceptable

Quality Level

Method of Surveillance Disincentive for failure of PRS Item.

PRS #1 – C.1.5.1 Submission/Approval of Quality Control Plan

The contractor shall submit an approved plan 100% 100% Inspection

Document Contractor's performance in Contractor Performance Assessment Reporting System or Issue a Contract Discrepancy Report

PRS # 2 – C.1.6.7 Submission of Training Certifications

The contractor shall submit training certificates 100% 100% Inspection

Document Contractor's performance in Contractor Performance Assessment Reporting System or Issue a

PRS # 3 – C.5.5 Relocation of Shelters

The contractor shall execute the specific task, as designated in section C.5.5

100% 100% Inspection

Document Contractor's performance in Contractor Performance Assessment Reporting System or Issue a

PERFORMANCE REQUIREMENTS SUMMARY