W911PT-25-Q-0015.docx
DOCX document 145 KB Posted
- Attached to
- ELEVATOR INSPECTION AND MAINTENANCE POSTWIDE Federal contract opportunity
- Solicitation number
- W911PT-25-Q-0015
About this file
This is a Request for Quote (RFQ) issued by Army Contracting Command-Watervliet Arsenal for elevator inspection, testing, and maintenance services across multiple buildings at Watervliet Arsenal, NY. The contract includes a 12-month base period plus two 12-month option periods, with an estimated 300 hours for routine service and 100 hours for emergency service per period.
The scope includes inspecting and maintaining various elevator systems including freight elevators, passenger elevators, dumbwaiters, and chair lifts across 13 buildings. Key requirements include responding to emergency calls within 1.5 hours, performing routine maintenance during normal business hours (Monday-Thursday 7:00 AM - 4:00 PM and select Fridays 7:00 AM - 3:00 PM), documenting all inspections and maintenance activities, and complying with ASME A17.1/A17.3 standards. The contractor must provide all tools, materials, supplies, equipment, labor and supervision. Personnel must be qualified through training and experience acceptable to the government or meet National Association of Elevator Contractors (NAEC) requirements. This is a total small business set-aside with firm-fixed-price contract type.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911PT-25-Q-0015-0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911PT25Q0015
Section SF 30 - BLOCK 14 CONTINUATION PAGE
LOCAL NARRATIVES
A.__ NOTICE OF WATERVLIET ARSENAL INFORMATION/REQUIREMENTS
(a) IMPORTANT DELIVERY/QUALITY REQUIREMENTS:
(1) ALL OFFERORS MUST CAREFULLY REVIEW THE DELIVERY REQUIREMENT IN THE REQUEST FOR QUOTE OR SOLICITATION. WHEN SUBMITTING AN OFFER/BID, PLEASE ENSURE THAT YOU CAN MEET THE DELIVERY SCHEDULE.
(2) ON TIME DELIVERY IS VERY CRITICAL. THEREFORE, YOU MUST ADHERE TO THE DELIVERY REQUIREMENTS INDICATED IN ANY RESULTANT AWARD. FAILURE TO COMPLY WITH THE CONTRACTUAL DELIVERY SCHEDULE, MAY RESULT IN TERMINATION OF THE ORDER OR REQUIRE CONSIDERATION IF THE GOVERNMENT ELECTS TO EXTEND DELIVERY. (NOTE: Non-availability of raw materials, subcontractor issues, scheduling conflicts, should be considered at the time you are submitting your offer/bid. They are not acceptable excuses for failing to meet the delivery after award).
(3) PROVIDING QUALITY PRODUCTS THAT CONFORM TO THE CONTRACT ARE JUST AS IMPORTANT AS MEETING THE REQUIRED DELIVERY. DELIVERY OF NON-CONFORMING PRODUCTS RESULTS IN DELIVERY DELAYS AND INCREASED COSTS TO THE ARSENAL.
(4) PAST PERFORMANCE FOR QUALITY AND DELIVERY MAY BE A MAJOR CONSIDERATION IN MAKING DETERMINATIONS FOR FUTURE CONTRACT AWARDS.
NOTICE: Throughout this document we may use the terms “we” and “you”, the term “we” means the government of the United States of America, and the term “you” means the contractor.
(b) WATERVLIET ARSENAL INFORMATION FOR CONTRACTORS:
“Watervliet Arsenal Information for Contractors” document is incorporated by reference in all solicitations and contracts. The full text version of the instructions is available at Internet address: http://www.wva.army.mil/Documents/Contracting/WAIC.pdf Upon request, the contracting officer will make its full text available.”
| POC - CONTRACT SPECIALIST/BUYER: | Maria Decrescenzo | ||
| TELEPHONE NUMBER: | 518-266-4641 | ||
| E-MAIL ADDRESS: | maria.d.decrescenzo.civ@army.mil |
CONTRACTOR DUNS NUMBER/CAGE CODE/FAX NUMBER:
Please provide the following information for your company.
VENDOR NAME: ___________
VENDOR POC: ___________
POC PHONE: ___________
E-MAIL ADDRESS (see note below): ___________
UNIQUE ENTITY ID ___________
CAGE CODE (if known) ___________
TAX ID NUMBER ___________
VENDOR FAX NUMBER ___________
NOTE: Your e-mail address is required so that in the event you receive the resultant award, we can e-mail it to you. If we experience difficulties with e-mail, it will be data faxed.
(c) AWCF BULK FUND __X__ DOES ____ DOES NOT APPLY
(d) POSTERS:
(1) Contracts for Material, Supplies, Articles and Equipment Exceeding $15,000/Service Contract Labor Standards. Orders subject to these Acts require contractors to post WH Publication 1313, “Employee Rights on Government Contracts”.
(2) Construction Orders. Orders for construction require contractors to post WH Publication 1321, “Employee Rights under the Davis Bacon” and the Office of Federal Contract Compliance poster on “Equal Employment Opportunity is the Law.”
(3) These posters can be accessed electronically at http://www.dol.gov .
(4) Hard copies of the posters will be made available upon request to the contracting officer.
(e) PAYMENTS:
Any vendor that receives an award (except those paid by credit card or accommodation check) can view invoice payments made by DFAS at https://wawf.eb.mil/ using the “my invoice” system. You will be required to register in order to view payments. Payment information is maintained for 120 days from invoice payment. Vendors can find out when invoices have been paid by Electronic Funds Transfer (EFT), etc. This website can save valuable time and frustration over billing questions and it is a free service.
(f) RELEASE OF INFORMATION:
The contractor shall not release or authorize release of DoD specifications; acceptance test results; information involving critical military technology; or any other information in which the DoD maintains proprietary rights, or is otherwise confidential or classified. This restriction includes any endorsement by the Department of Army of a contractor. Release of information under the circumstances referenced above requires the prior written approval of the Contracting Officer responsible for this contract. It is the contractor’s responsibility to be familiar with, and comply with the requirements of Chapter 5, page 22, paragraph 5-48, of AR 360-1 may be found at http://www.usapa.army.mil/pdffiles/r360_1.pdf
C._1_ Submission of Recordable Injuries and Illness Cases (Dec 2012) (ACC-Warren (WVA)) Watervliet Arsenal is pursuing OSHA Voluntary Protection Program (VPP) recognition. The VPP impacts all contractors whose employees cumulatively work more than 1000 hours per quarter within a calendar year at Watervliet Arsenal (herein referred to as “applicable contractors”).
It is the contractor’s responsibility to ensure its employees and managers are in full compliance with OSHA requirements and have a general understanding of VPP. Detailed information on VPP is available on the OSHA website at http://www.osha.gov/dcsp/vpp/index.html . All contractors, whether regularly involved in routine site operations or engaged in temporary projects such as construction or repair, must follow the safety and health rules of Watervliet Arsenal.
Applicable contractors are required to annually submit to Watervliet Arsenal, ATTN: TAWV-XO-S/Safety Office, Bldg. 10, 1 Buffington Street, Watervliet, NY 12189-4000 or email: usarmy.watervliet.tacom.list.wate-safety@mail.mil the following documents (covering the previous calendar year quarters) by 15 January:
· Total Case Incidence Rate (TCIR) - the number of recordable injuries and illness cases per 100 full-time employees that a site has experienced in a given time frame.
· Days Away, Restricted, and/or Transfer Case Incident Rate (DART) - Number of recordable injuries and illness cases per 100 full-time employees resulting in days away from work, restricted work activity, and/or job transfer that a site has experienced in a given time frame.
· OSHA Form 300A Applicable contractors may submit the above immediately following the completion of a quarter, if desired.
H._1_ SERVICES/CONSTRUCTION REQUIREMENTS
(a) SCHEDULE UNIT OF MEASURE NOTE: When "LOT" is stated as a unit of measure it is the equivalent to "JOB".
(b) WORK PERFORMED ON-SITE AT WATERVLIET ARSENAL:
The contractor agrees that each employee working at Watervliet Arsenal will sign the “Contractor Personnel Agreement on Non-Disclosure of Watervliet Arsenal Technology below. Signatures must be received by the Contract Administrator before work may begin and any resultant delay won’t be considered an excusable delay to contract performance as defined in the contract clause “Default”. Additional copies of this Non-Disclosure Statement can be found on the Internet at http://www.wva.army.mil/Documents/Contracting/nondis.pdf
(d) CONTRACTOR PERSONNEL AGREEMENT ON NON-DISCLOSURE
OF WATERVLIET ARSENAL TECHNOLOGY
(1) The Undersigned, as an employee of _________________________ (Name of Firm) agrees to the following terms and conditions.
(2) Any knowledge gained, as a result of my being permitted on Watervliet Arsenal’s premises, concerning cannon production technology (as defined below) or other technology on any defense item being manufactured or developed at Watervliet Arsenal, will not be released outside of _________________________ (Name of firm) and/or the United States of America (this prohibition includes, but is not limited to, the company’s domestic and foreign subsidiaries, affiliates, etc.), nor will such technology be used to manufacture or assist another in the manufacture of cannon (as described below) or other defense items being manufactured or developed at Watervliet Arsenal, without the written prior approval of Watervliet Arsenal.
(3) Definitions:
(a) CANNON: is defined as any and all components/parts of a complete assembly consisting of a tube, breech mechanism, tube attachments, muzzle appendages, firing mechanisms, and all integral components. It may also be a component of a weapons system of 40mm Bore or over such as tank guns, towed and self-propelled howitzers, naval guns, mortars and recoilless guns.
(b) CANNON PRODUCTION TECHNOLOGY: is defined as the technical data package and manufacturing technology.
(1) TECHNICAL DATA PACKAGE: cannon engineering drawings, specifications and standards.
(2) MANUFACTURING TECHNOLOGY: technical knowledge, documentation, assistance and equipment and machines used and/or useful in the manufacturing of cannon.
(c) TECHNICAL KNOWLEDGE: the know how collected, trade secrets, production experience and special skills necessary for the production of cannon and the technical information and inventions necessary for the manufacture of cannon and relating to the manufacture of cannon.
(d) TECHNICAL DOCUMENTATION: manufacturing technical data comprised of drawings, specifications, schemes, composition, descriptions, methods of calculations, instructions and other information necessary for the manufacture of cannon.
(e) TECHNICAL ASSISTANCE: all assistance required to make practical and economical use of the technology required to manufacture cannon, such as delivery of documentation, training of personnel, instructions, consultations and acquainting of specialists with the most economical method of using this technology in the manufacture of cannon.
(f) EQUIPMENT AND MACHINES: production machines, machine accessories, apparatuses, spare parts and tooling used for cannon manufacture.
| _____________________________________________ | __________________________ | |
| TYPED OR PRINTED NAME, SIGNATURE | DATE |
| _____________________________________________ | __________________________ | |
| TYPED OR PRINTED NAME, SIGNATURE | DATE |
| _____________________________________________ | __________________________ | |
| TYPED OR PRINTED NAME, SIGNATURE | DATE |
(e) JOB SITE AVAILABILITY:
The work site will be available for performance during normal business hours:
Monday through Thursday Business Hours: 7:00 a.m. EST to 4:00 p.m. EST
Friday Business Hours: Every other Friday from 7:00 a.m. EST to 3:00 p.m. EST
Fridays will be staggered with every other Friday being a closed business day. The first Friday of 2025 to be closed is January 10, 2025.
Based on the above, service contractors should call contract/purchase order administrator in advance if service is scheduled for a Friday to determine if the Arsenal will be open for business.
When a federal holiday is normally observed on Friday, the Arsenal may be closed on the preceding Thursday. In this case, contact the contract/purchase order administrator in advance if scheduling service to determine if the Arsenal will be open for business.
Work at other than the above hours won’t be allowed unless the contractor makes an application at least 48 hours in advance and gets written contracting officer approval. No guarantee is made that the job site will be made available other than as stated above.
(f) CONTROL OF FOREIGN VISITORS TO WATERVLIET ARSENAL:
Offerors are advised that any employee or representative of their company who is not a U.S. citizen, (or is representing a foreign company) and is a U.S. citizen), planning on visiting the Watervliet Arsenal for the purpose of attending: bid conferences, bid openings, site visits, engineering services, or any other visit related to this solicitation will be escorted at all times by an arsenal representative while on the installation grounds.
Therefore, offerors must notify the Contracting Officer in advance (a minimum of two [2] weeks) of any proposed visit by a non-U.S. citizen or U.S. citizen representing a foreign firm, to assure proper clearance for entry into the arsenal. Failure to comply, or disclose a foreign national visitor, may subject the Contractor to the penalties set forth in 18 U.S.C.A. Section 1001, Chapter 14.
Due to manpower constraints, Watervliet Arsenal is often unable to provide escort services during contract performance. Therefore, if the resulting contract requires performance on Watervliet Arsenal property, employees, individuals or subcontractors representing the successful offeror who are not U.S. citizens may not, depending on staffing levels and the availability of escorts, be allowed access to the Arsenal for purpose of contract performance.
Be further advised that the inability of the Arsenal to provide escorts resulting in denial of access to Watervliet Arsenal of the aforementioned personnel will not be considered an excusable delay to contract performance as defined in the contract clause “Default” contained in the contract. Therefore, offerors should consider the above contingencies during offer preparation.
(h) CONTRACTOR IDENTIFICATION:
Contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence, and when working in situations where their actions could be construed as official government acts.
LS7002
L. __ Army Contract Writing System (ACWS) Transition Information for Offerors
a. The Army Contracting Enterprise (ACE) is in the process of deploying new solicitation and contract writing software to Army contracting offices worldwide. Known as the Army Contract Writing System (ACWS), this modern software suite will soon replace most existing Army contract writing systems, including the system used to create and release this Solicitation.
b. During this transition period, Offerors are hereby advised:
1. The Contracting Office may use any combination of contract writing systems to create and release documents related to this solicitation (e.g. solicitation amendments and awards, if any). Due to this:
i. This solicitation may contain different offer submission instructions than other solicitations released by the same Contracting Office (e.g. requiring offer submission via the PIEE Solicitation Module vs. e-mail). Offerors should review all offer submission instructions contained in the solicitation documents and direct any questions or concerns to the Contract Specialist or Contracting Officer.
ii. If the Contracting Office switches contract writing systems prior to award, documents you receive from the Contracting Officer or view on SAM.gov or other forums may appear noticeably different than the initial solicitation or previous solicitations or awards from the same Contracting Office. This is normal and expected.
iii. A change between contract writing systems may cause important information concerning solicitation response (amendments) or accepted terms (awards) to take on different formatting or appear in different parts of later documents issued. Offerors shall review all documents carefully to locate this important information and direct any questions or concerns to the Contract Specialist or Contracting Officer.
2. The Government does not intend to use the transition between contract writing systems to effect any changes to solicitation or award terms and conditions without accompanying document narratives explicitly stating such changes are deliberate and desired. While the Contract Specialist and Contracting Officer will take care to minimize or eliminate any inadvertent changes when adapting to the new contract writing software, you, as the Offeror, may still be the first to spot such errors. Therefore, Offerors shall:
i. Notify the Contracting Officer immediately if any observed changes, removals, or additions affect your award eligibility, violate or alter existing quote/proposal terms, or could affect Contract performance post-award.
ii. Take special care to ensure all fill-in Clauses are populated and remain populated across documents received from the Contracting Office throughout the Solicitation and Award process.
iii. Contact the Contracting Officer listed on the first page of the solicitation or solicitation amendment for guidance if you notice or suspect any inadvertent change has occurred between document issuances.
3. The Contracting Officer will correct problems affecting award documents (if any) via bilateral modification, at no cost to the Contractor. Any such modification will reconcile the award with the latest version of this solicitation reflecting deliberate action by the Contracting Officer (e.g. the first issuance if no amendments, or the latest amendment with accompanying narratives), inclusive of any documented pre-award negotiations or accepted supplemental offer terms.
4. In the unlikely event a network disruption, contract writing system error, or financial system error threatens timely award of the requirement set forth in this solicitation, the Contracting Officer:
i. May elect to use alternative mechanisms to obligate funds and allow work or deliveries to legally begin to the benefit of, and with legal protection for, both parties.
ii. Will incorporate the latest version of this Solicitation into such mechanisms to serve as a framework for contract execution until any such system problems are resolved.
iii. Will ensure any action taken does not conflict with the stated offer evaluation and award methodology of this requirement.
iv. Will issue a complete, properly-formatted award accurately reflecting this requirement and all applicable terms and conditions once systems return to normal.
A.__ Electronic Contracting Electronic Bids/Proposals/Commercial Offers Required in Response to this Solicitation (June 2020) ACC-WVA
(a) All Army Contracting Command – Watervliet Arsenal (WVA) solicitations will be publicized on the SAM.gov website (https://sam.gov /). Any additional attachments, including Technical Data Packages, when available electronically, will be separate attachments or links embedded in the solicitation.
(b) Bids/Proposals must be submitted in electronic media. When submitting your bid/proposal electronically, the bid/proposal and any supplemental information (such as spreadsheets, backup data, technical information), can be submitted using any of the following electronic formats:
(1) Microsoft* Office Products (Watervliet can read Microsoft* Office 2007 and lower); Word, Excel, or PowerPoint. Spreadsheets must be sent in a format that includes all formulate macro and format information. Print image is not acceptable.
(2) Files in Adobe PDF (Portable Document Format). Scanners should be set to 300 dots per inch.
(3) Files in HTML (Hypertext Markup Language). HTML documents must not contain active links to live Internet sites or pages. All linked information must be contained within your electronic bid/offer and be accessible offline.
(4) Other electronic formats are not acceptable.
(c) Please select only one medium by which to transmit each bid/proposal.
(d) Timely receipt of offers/proposals:
(1) Your attention is called to the solicitation closing date and time on the solicitation is local time for the Army Contracting Command – Watervliet Arsenal (WVA). Lateness rules for electronic submissions for bids are outlined in FAR 52.214-7, “Late Submissions, Modifications, and Withdrawal of Bids,” for proposals in FAR 52.215-1, “Instructions to Offerors—Competitive Acquisition” or FAR 52.212-1, “Instructions to Offerors-Commercial Items.” Pay particular attention to the applicable clause as it relates to the timing of submissions.
(2) NOTE: There is no “expected” or “target” length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned to submit their proposals allowing adequate time for submission.
(3) Solicitations may remain posted on the SAM.gov website after the solicitation closes. Even though the system may allow you to submit a proposal after the closing date/time, your proposal will be considered late and may not be considered for award.
(e) Security Note: If you choose to password-protect access to your bid/offer, you must provide the password to Watervliet Arsenal at least ten days prior to the opening/closing date. Contact the buyer identified in “Watervliet Arsenal Information/Requirements”. Passwords used only for the purpose of write protecting files need not be provided.
(f) Electronic bids/proposals must include, as minimum:
(1) E-mailed bids/proposals must include a signed SF 33 cover sheet, SF 1449 or SF 1442 (whichever is applicable) that can be scanned. If scanned, attach it to your e-mail offer (or first e-mail message if you are sending multiple e-mails due to length).
(2) All applicable fill-in provisions. For solicitations issued on an SF 33 or SF 1442, this would include Sections A, B, F, and K. For solicitations issued on an SF 1449, you must review the solicitation to ascertain where all of the required fill-ins are located since commercial acquisitions do not have designated sections.
(3) A statement of agreement to all the terms, conditions, and provisions of the solicitation.
(4) Any other information required by the solicitation.
(g) Please see FAR 14.406 for a description of the steps the Government shall take with regard to unreadable electronic bids received via the media described in paragraphs (b) above. See FAR 15.207(c) for a description of steps the government shall take with regard to unreadable proposals.
(h) Bidders/Offerors shall make every effort to ensure that their bid/proposal is virus-free. Bids/proposals (or portions thereof) submitted which DO reflect the presence of a virus, or which are otherwise rendered unreadable by damage in electronic transit, shall be treated as “unreadable” per paragraph (h) above. Use of any formats other than those listed above may result in the file being quarantined and will be considered by Watervliet Arsenal to be “unreadable” files.
Note (Macros): The virus scanning software used by our e-mail systems cannot always distinguish a macro from a virus. Therefore, sending a macro embedded in an email message or an email attachment may cause the email bid/offer to be quarantined. In that event paragraph (g) above applies.
*Registered trademark
C.__ REQUEST FOR QUOTE RESPONSES
ALL RESPONSES MUST BE ELECTRONIC. YOU MUST SUBMIT YOUR QUOTE RESPONSES USING THE FOLLOWING METHODS:
(a) Email to: maria.d.decrescenzo.civ@army.mil Contract Specialist email
(b) Request for Quotes must be filled out completely and sent in its entirety to be considered responsive.
A.__ ALL OR NONE-COMMERCIAL ITEM ACQUISITION
(a) This provision serves as an addendum that modifies paragraph (h) of FAR 52.212-1, entitled INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS. Paragraph (h) is modified to say that the proposal or quote must offer to provide the total quantity of the items in this solicitation.
(b) Only one award will be made as a result of this solicitation. Offers submitted for less than the total quantities of all the items in this solicitation will NOT be considered for award.
STATEMENT OF WORK
ELEVATOR INSPECTION, TESTING, MAINTENANCE
Work Order #: 25PW002 Watervliet Arsenal Installation Management, Public Works Division Facilities Engineering (TAWV-IMP-F)
PART 1 GENERAL
1.01 Scope.
A. This Statement Of Work (SOW) defines the effort required for the inspection, testing, and repair of existing Elevators at Watervliet Army Arsenal, NY. This contract shall span the course of 12 months, commencing from the date of award, and shall not exceed 100 hours Emergency work and 300 hours Routine.
1.02 Submittals.
A. The contractor shall e-mail all submittals to the Contracting Specialist for review and approval. All submittals require government approval unless otherwise explicitly stated.
B. The contractor shall reference APPENDIX A “Consolidated List of Submittals” for complete list of required submittals.
1.03 Hours of Operation.
A. Normal duty hours are 7:00 AM through 4:00 PM, Monday through Thursday, and 7:00 AM through 3:00 PM on select Fridays (the arsenal is closed every-other Friday). Federal holidays are non-work days. If a federal holiday falls on a Saturday or Sunday, the preceding Friday or following Monday is a work holiday.
1.04 General Requirements.
A. The contractor shall perform all work in strict conformance with Watervliet Arsenal Instructions for Contractors (WAIC). The contractor shall read and understand this document prior to submitting a proposal. The WAIC is publicly available at:
http://www.wva.army.mil/Documents/Contracting/WAIC.pdf
B. The contractor shall supply all tools, materials, supplies, equipment, labor, temporary utilities and supervision necessary for the complete execution of the requirements within the contract documents and requirements of this SOW.
C. The contractor shall, prior to submitting a proposal, review (i) all contract documents, and (ii) the project work site, and shall provide written notice to Contracting Specialist detailing any discrepancies that are found between the contract documents and the project work site.
D. The contractor shall notify the Contracting Specialist a minimum of two (2) business days before the contractor starts work. The contractor shall notify the COR a minimum of seven (7) business days before the shut-down of a utility or building service.
E. The contactor shall clean all work areas, at the end of each work day, to remove all tools, equipment, debris, materials, and all waste from the work site.
1.05 Safety Requirements.
A. The contractor shall be responsible for complying with all DOD, Army, Federal, and State health and safety requirements which are applicable to this project, and shall use all means and precautions available to ensure the safety of the occupants and protection to the existing buildings and structures.
B. The contractor shall inspect the project work site prior to starting work, and shall request a copy of the asbestos building inspection records to verify the location and description of known asbestos-containing materials. The contractor shall sign the “Asbestos Notification Acknowledgement Record” and submit this form to the Contracting Specialist.
1.06 Personnel Qualification.
A. General. Personnel, either individually or through their affiliation with an organization that is registered, licensed, or certified by a state or local authority, shall be recognized as qualified and experienced in the inspection, testing, and maintenance of Elevator systems addressed within the scope of National Association of Elevator Contractors (NAEC).
B. Inspection Personnel. Inspections shall be performed by personnel who have developed competence through training and experience acceptable to the Government or meet the requirement of ASME A17.3 and ASME A17.1 and National Association of Elevator Contractors (NAEC).
C. Testing Personnel. Testing personnel shall have knowledge and experience of the testing requirements for elevators of this Code acceptable to Government or meet the requirement of ASME A17.3 and ASME A17.1 and National Association of Elevator Contractors (NAEC).
D. Service Personnel. Service personnel shall be qualified in the maintenance and servicing of systems addressed within the scope of ASME A17.3 and ASME A17.1 and National Association of Elevator Contractors (NAEC). Qualified personnel shall include, but not be limited to, one or more of the following:
1. Personnel who are factory trained and certified for the specific type and brand of system being serviced.
2. Personnel who are certified by a nationally recognized certification organization acceptable to the authority having jurisdiction. Personnel, either individually or through their affiliation with an organization that is registered, licensed, or certified by a state or local authority to perform service on systems addressed within the scope of ASME A17.3 and ASME A17.1 and National Association of Elevator Contractors.
3. Personnel who are employed and qualified by an organization listed by a nationally recognized testing laboratory for the servicing of Elevator systems within the scope of ASME A17.3 and ASME A17.1 and National Association of Elevator Contractors.
E. Programming. Personnel programming a system shall be certified by the system manufacturer.
F. Evidence of Qualification. Evidence of qualifications shall be submitted to the Government with bid.
1.07 Government Furnished Property and Services
A. The Government will provide a Fire Department representative to assist the contractor with inspection/testing tasks (if required). The contractor shall coordinate with the project COR for this assistance no-sooner-than two (2) weeks prior to the start of inspection/testing work which involves the assistance of the Fire Department representative.
1.08 Project Schedule.
A. The contractor shall create a project schedule and submit for Government review and approval. The project schedule shall detail each building to be inspected/tested and shall indicate proposed dates for each building. The contractor shall indicate any requirements for work performed outside of regular hours of operation.
1.09 Applicable Documents.
A. Watervliet Arsenal Instructions for Contractors (WAIC).
PART 2 PRODUCTS
2.01 General.
A. Unless otherwise stated, all materials for this project shall be new. All products shall not contain any asbestos, mercury, chromium/lead paint, Class I Freon, and Polychlorinated Biphenyls (PCB), and shall state such on the manufacturer’s original packaging.
B. All work shall be in strict accordance with product manufacturer’s instructions and specifications, including but not limited to manufacturer guidance for storage, staging, application, installation, and disposal of the product.
PART 3 PERFORMANCE
3.01 Routine Service Calls.
A. The contractor shall perform routine service call repairs on all Elevator systems to ensure proper operational condition, as requested by authorized government official via phone call or email to the contractor. All work shall be completed during Watervliet normal duty hours and ASME A17.3, ASME A17.1, NAEC, and manufacturers’ listed procedures.
B. The contractor shall charge man-hours for routine service calls starting upon entering WVA and cease charging man-hours upon leaving WVA. Mileage for travel shall not be allowed.
C. The contractor shall bring all manpower, tools, equipment, and common parts to accomplish routine service calls during the initial site visit. Once the repairs are started, a maximum total of two (2) man-hours per emergency service call will be allowed to acquire additional parts if necessary.
D. The contractor shall notify the COR via phone call upon entering WVA (start of work), upon leaving WVA for parts, and upon leaving WVA (end of work). This allows the Government to validate the man-hours used on each routine service call. The telephone notification shall include the number of contractor personnel and the list of service calls that the contractor will repair during the visit.
E. The contractor shall generate a service order slip for each completed routine repair. The service order slip shall include the total man-hours requested for that single routine repair, and the cost of materials. If the routine repair takes multiple work shifts, the daily man hours shall be broken out on the service order slip.
3.02 Emergency Service Calls.
A. The contractor shall perform emergency service call repairs for malfunctioning or inoperative Elevator systems during business hours, non-business hours (nights and weekends) and holidays. The contractor shall arrive on-site following an emergency service call within one and a half (1.5) hours.
B. The contractor shall charge man-hours for emergency service calls starting upon entering WVA and cease charging man-hours upon leaving WVA.
C. The contractor shall bring all manpower, tools, equipment, and common parts to accomplish emergency service calls during the initial site visit. Once the repairs are started, a maximum total of four (4) man-hours per emergency service call will be allowed to acquire additional parts if necessary.
D. The contractor shall notify the COR via phone call upon entering WVA (start of work), upon leaving WVA for parts, and upon leaving WVA (end of work). This allows the Government to validate the man-hours used on each routine service call. The telephone notification shall include the number of contractor personnel and the list of service calls that the contractor will repair during the visit.
E. The contractor shall generate a service order slip for each completed routine repair. The service order slip shall include the total man-hours requested for that single routine repair, and the cost of materials. If the routine repair takes multiple work shifts, the daily man hours shall be broken out on the service order slip.
3.03 Documentation.
A. The contractor shall provide record of all inspections, testing, and maintenance, as required by ASME A17.3, ASME A17.1 and NAEC.
B. The contractor shall submit a report of all Elevator tests, inspections and maintenance accomplished at the conclusion of each occurrence. Reports shall include a record of conditions, completed tests, inspection results, completed inspection form, and preventive or corrective maintenance performed on a system, and shall include all required and applicable information per ASME A17.3, ASME A17.1, and NAEC.
C. The contractor shall provide all reports and service order slips as legible, professionally appearing documents which include the contractor’s company name, company address, and company phone number. All tasks performed shall be presented each in bullet points.
D. A7485_R Document to be filled out and submitted for every Elevators Routine Maintenance visit.
3.04 Reimbursable Parts.
A. The contractor shall be responsible for procuring all required parts for all repairs.
B. Contractor shall request approval from the COR prior to the purchase of any parts or installation.
C. The contractor will be reimbursed for parts at cost.
D. The contractor shall seek minimum of two, preferably three, competitive price quotations prior to purchasing replacement parts or services with an estimated value over $2,500. The contractor shall attach competitive quote documentation to request for reimbursement for all purchases over $2,500.
E. It is understood that the contractor shall charge an additional 2 man hours for the acquisition of parts.
F. If additional man hours are required for the acquisition of parts, this requires prior approval by the COR.
PART 4 CLOSEOUT REQUIREMENTS
4.01 Cleanup of Work Site.
A. The contactor shall clean all work areas and remove all tools, equipment, debris, materials, and all waste from the premises upon completion of each service call, inspection, or test procedure.
PART 5 APPENDICES
A. Consolidated List of Submittals B. Simplex Building List
APPENDIX A: Consolidated List of Submittals
| Line |
| Item Submitted |
| Submittal Needed By |
| Submittal Reviewed By (Office) |
| 1 |
| Safety Data Sheets for Hazardous Materials (SDS) |
| NLT 7 Calendar Days After Award |
| Safety Office |
| 2 |
| Signed Contractor Asbestos Notification Form |
| NLT 7 Calendar Days After Award |
| Environmental Office |
| 3 |
| Personnel Qualifications (1.06) |
| NLT 7 Calendar Days After Award |
| COR |
| 4 |
| Test Plan |
| NLT 7 Calendar Days After Award |
| COR |
| 5 |
| Inspection Plan |
| NLT 7 Calendar Days After Award |
| COR |
| 6 |
| Testing/Inspection Schedule |
| NLT 7 Calendar Days After Award |
| COR |
| 7 |
| A7485_R |
| NLT 7 Calendar Days after Routine Elevator Inspection |
| COR |
APPENDIX B: Simplex Building List The following buildings include fire Elevator/ Lift systems under the scope of this contract:
| Building |
| Manufacturer |
| Serial Number |
| Capacity Lbs. |
| Hydraulic? |
| Type |
| 10 |
| D.A. MATOL INC. |
| Mod. 200 |
| 500 |
| Electric |
| Dumbwaiter |
| 23 |
| OTIS |
| 202207 |
| 4,000 |
| Electric |
| Freight |
| 25 |
| WARSAW/Montgomery |
| CTS-47066 |
| 5,000 |
| SCR Drive |
| Passenger |
| 25 |
| MONTGOMERY |
| CP50059 |
| 3,500 |
| Hydraulic |
| Passenger |
| 25 |
| OTIS |
| 27698 |
| 30,000 |
| Hydraulic |
| Freight |
| 35 (North) |
| MONTGOMERY |
| 39362 |
| 20,000 |
| Hydraulic |
| Freight |
| 35 (South) |
| MONTGOMERY |
| 39363 |
| 20,000 |
| Hydraulic |
| Freight |
| 35 |
| MCGUIRE -AUTODOCK |
| SHIPPING & RCVG |
Electric/ Hydraulic 3 Dock Lifts
| 35 |
| SAVARIA |
| 750 |
| Electric |
| Chair Lift |
| 40-1 |
| MONTGOMERY |
| 431H |
| 3,500 |
| Hydraulic |
| Passenger |
| 40-3 |
| AMERICAN STAIR GLIDE/PORCH LIFT |
| CO389WLS5009760BR |
| 500 |
| Electric |
| Chair Lift |
| 44 |
| OTIS |
| 204521 |
| 10,000 |
| Hydraulic |
| Freight |
| 44 |
| AUTOQUIP |
| TSL-6FX |
| 13,500 |
| Electric/ |
Hydraulic Material Lift
| 44 |
| THYSSENN KRUPP |
| 2102AM-TAC20 |
| 2500 |
| Hydraulic |
| Passenger |
| 115 |
| CHENEY |
| VPL SERIES-2000 |
| 750 |
| Electric |
| Chair Lift |
| 115 |
| OTIS |
| 202006 |
| 20,000 |
| Hydraulic |
| Freight |
| 120 |
| WARSAW |
| 10530 |
| 20,000 |
| Hydraulic |
| Freight |
| 124 |
| GARAVENTA |
| 91-408-35 |
| 750 |
| Electric |
| Chair Lift |
| 135 – East Pit |
| OTIS |
| 202090 |
| 2,500 |
| Electric |
| Passenger |
| 135 – West Pit |
| OTIS |
| 202164 |
| 1,200 |
| Electric |
| Passenger |
| 135 |
| GARAVENTA GENESIS |
| 83933 |
| 750 |
| Electric |
| Chair Lift |
| 136 |
| MOHAWK |
| 548763 |
| 1,200 |
| Electric |
| Passenger |
CLAUSES INCORPORATED BY FULL TEXT
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
N/A
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Invoice as 2-in-1 (Services Only)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF
| Pay Official DoDAAC | HQ0303 | ||
| Issue By DoDAAC | W911PT | ||
| Admin DoDAAC | W911PT | ||
| Inspect By DoDAAC | N/A | ||
| Ship To Code | N/A | ||
| Ship From Code | N/A | ||
| Mark For Code | N/A | ||
| Service Approver (DoDAAC) | N/A | ||
| Service Acceptor (DoDAAC) | W911PT | ||
| Accept at Other DoDAAC | N/A | ||
| LPO DoDAAC | N/A | ||
| DCAA Auditor DoDAAC | N/A | ||
| Other DoDAAC(s) | N/A |
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
N/A
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section SF 1449 - CONTINUATION SHEET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
ELEVATOR INSPECTIONS & MAINTENANCE
FFP
As specified in the statement of work 25PW002, which is hereto attached and incorporated, vendor to provide all materials, labor, and equipment necessary to provide maintenance and testing to elevators located at the Watervliet Arsenal.
ESTIMATED HOURS:
300 hours x _________ labor rate = $_________ routine service hours
100 hours x ________ labor rate = $__________ emergency service
**It is understood that profit and overhead are included in the labor rate quoted.
Service Contract Labor Standards WD 1967-0450 latest Revision Applies and is incorporated.
Technical POC: DENVER BABOWICZ.
FOB: Destination
NSN: AASSVC42060169
MILSTRIP: W16H1F42060169
PURCHASE REQUEST NUMBER: W16H1F42060169
PSC CD: J059
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| ELEVATOR INSPECTIONS & MAINTENANCE |
FFP
As specified in the statement of work 25PW002, which is hereto attached and incorporated, vendor to provide all materials, labor, and equipment necessary to provide maintenance and testing to elevators located at the Watervliet Arsenal.
ESTIMATED HOURS:
300 hours x _________ labor rate = $_________ routine service hours
100 hours x ________ labor rate = $__________ emergency service
**It is understood that profit and overhead are included in the labor rate quoted.
Service Contract Labor Standards WD 1967-0450 latest Revision Applies and is incorporated.
Technical POC: DENVER BABOWICZ.
FOB: Destination
NSN: AASSVC42060169
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| ELEVATOR INSPECTIONS & MAINTENANCE |
FFP
As specified in the statement of work 25PW002, which is hereto attached and incorporated, vendor to provide all materials, labor, and equipment necessary to provide maintenance and testing to elevators located at the Watervliet Arsenal.
ESTIMATED HOURS:
300 hours x _________ labor rate = $_________ routine service hours
100 hours x ________ labor rate = $__________ emergency service
**It is understood that profit and overhead are included in the labor rate quoted.
Service Contract Labor Standards WD 1967-0450 latest Revision Applies and is incorporated.
Technical POC: DENVER BABOWICZ.
FOB: Destination
NSN: AASSVC42060169
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
| 0001 |
| POP 15-JAN-2025 TO |
14-JAN-2026
| N/A |
| ARMY CONTRACTING COMMAND-WVA |
SERVICES TEAM
ATTN: CCTA-HDW/BLDG 10
1 BUFFINGTON STREET
WATERVLIET NY 12189-4050
518-266-4535 FOB: Destination
W911PT
| 0002 |
| POP 15-JAN-2026 TO |
14-JAN-2027
| N/A |
| (SAME AS PREVIOUS LOCATION) |
W911PT
| 0003 |
| POP 15-JAN-2027 TO |
14-JAN-2028
| N/A |
| (SAME AS PREVIOUS LOCATION) |
W911PT
CLAUSES INCORPORATED BY REFERENCE
| 52.203-11 |
| Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions |
| SEP 2024 |
| 52.203-12 |
| Limitation On Payments To Influence Certain Federal Transactions |
| JUN 2020 |
| 52.204-7 |
| System for Award Management |
| NOV 2024 |
| 52.204-9 |
| Personal Identity Verification of Contractor Personnel |
| JAN 2011 |
| 52.204-10 |
| Reporting Executive Compensation and First-Tier Subcontract Awards |
| JUN 2020 |
| 52.204-13 |
| System for Award Management Maintenance |
| OCT 2018 |
| 52.204-16 |
| Commercial and Government Entity Code Reporting |
| AUG 2020 |
| 52.204-17 |
| Ownership or Control of Offeror |
| AUG 2020 |
| 52.204-18 |
| Commercial and Government Entity Code Maintenance |
| AUG 2020 |
| 52.204-23 |
| Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities |
| DEC 2023 |
| 52.204-25 |
| Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment |
| NOV 2021 |
| 52.209-6 |
| Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment |
| NOV 2021 |
| 52.209-10 |
| Prohibition on Contracting With Inverted Domestic Corporations |
| NOV 2015 |
| 52.212-1 |
| Instructions to Offerors--Commercial Products and Commercial Services |
| SEP 2023 |
| 52.212-4 |
| Contract Terms and Conditions--Commercial Products and Commercial Services |
| NOV 2023 |
| 52.217-5 |
| Evaluation Of Options |
| JUL 1990 |
| 52.219-6 |
| Notice Of Total Small Business Set-Aside |
| NOV 2020 |
| 52.222-3 |
| Convict Labor |
| JUN 2003 |
| 52.222-21 |
| Prohibition Of Segregated Facilities |
| APR 2015 |
| 52.222-26 |
| Equal Opportunity |
| SEP 2016 |
| 52.222-37 |
| Employment Reports on Veterans |
| JUN 2020 |
| 52.222-41 |
| Service Contract Labor Standards |
| AUG 2018 |
| 52.222-50 |
| Combating Trafficking in Persons |
| NOV 2021 |
| 52.222-55 |
| Minimum Wages for Contractor Workers Under Executive Order 14026 |
| JAN 2022 |
| 52.222-62 |
| Paid Sick Leave Under Executive Order 13706 |
| JAN 2022 |
| 52.223-5 |
| Pollution Prevention and Right-to-Know Information |
| MAY 2024 |
| 52.225-13 |
| Restrictions on Certain Foreign Purchases |
| FEB 2021 |
| 52.226-8 |
| Encouraging Contractor Policies To Ban Text Messaging While Driving |
| MAY 2024 |
| 52.232-33 |
| Payment by Electronic Funds Transfer--System for Award Management |
| OCT 2018 |
| 52.233-1 |
| Disputes |
| MAY 2014 |
| 52.233-3 |
| Protest After Award |
| AUG 1996 |
| 52.237-1 |
| Site Visit |
| APR 1984 |
| 52.237-2 |
| Protection Of Government Buildings, Equipment, And Vegetation |
| APR 1984 |
| 52.237-3 |
| Continuity Of Services |
| JAN 1991 |
| 52.242-15 |
| Stop-Work Order |
| AUG 1989 |
| 52.243-1 Alt I |
| Changes--Fixed Price (Aug 1987) - Alternate I |
| APR 1984 |
| 52.247-34 |
| F.O.B. Destination |
| JAN 1991 |
| 252.203-7000 |
| Requirements Relating to Compensation of Former DoD Officials |
| SEP 2011 |
| 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| DEC 2022 |
| 252.204-7003 |
| Control Of Government Personnel Work Product |
| APR 1992 |
| 252.209-7004 |
| Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism |
| MAY 2019 |
| 252.223-7006 |
| Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials |
| SEP 2014 |
| 252.223-7008 |
| Prohibition of Hexavalent Chromium |
| JAN 2023 |
| 252.225-7001 |
| Buy American and Balance of Payments Program |
| FEB 2024 |
| 252.225-7002 |
| Qualifying Country Sources As Subcontractors |
| MAR 2022 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| DEC 2018 |
| 252.232-7010 |
| Levies on Contract Payments |
| DEC 2006 |
| 252.243-7001 |
| Pricing Of Contract Modifications |
| DEC 1991 |
| 252.244-7000 |
| Subcontracts for Commercial Products or Commercial Services |
| NOV 2023 |
| 252.247-7023 |
| Transportation of Supplies by Sea |
| OCT 2024 |
CLAUSES INCORPORATED BY FULL TEXT
52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS--REPRESENTATION (JAN 2017)
(a) Definition. As used in this provision-- Internal confidentiality agreement or statement, subcontract, and subcontractor, are defined in the clause at 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.
(b) In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions), Government agencies are not permitted to use funds appropriated (or otherwise made available) for contracts with an entity that requires employees or subcontractors of such entity seeking to report waste, fraud, or abuse to sign internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting such waste, fraud, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.
(c) The prohibition in paragraph (b) of this provision does not contravene requirements applicable to Standard Form 312, (Classified Information Nondisclosure Agreement), Form 4414 (Sensitive Compartmented Information Nondisclosure Agreement), or any other form issued by a Federal department or agency governing the nondisclosure of classified information.
(d) Representation. By submission of its offer, the Offeror represents that it will not require its employees or subcontractors to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting waste, fraud, or abuse related to the performance of a Government contract to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information (e.g., agency Office of the Inspector General).
(End of provision)
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)
(a) Definitions. As used in this clause-- Internal confidentiality agreement or statement means a confidentiality agreement or any other written statement that the contractor requires any of its employees or subcontractors to sign regarding nondisclosure of contractor information, except that it does not include confidentiality agreements arising out of civil litigation or confidentiality agreements that contractor employees or subcontractors sign at the behest of a Federal agency.
Subcontract means any contract as defined in subpart 2.1 entered into by a subcontractor to furnish supplies or services for performance of a prime contract or a subcontract. It includes but is not limited to purchase orders, and changes and modifications to purchase orders.
Subcontractor means any supplier,…
This is the start of the file's text. The full file is on GovTribe.