About this file

This is a Request for Quote (RFQ) issued by Army Contracting Command-Watervliet Arsenal for elevator inspection, testing, and maintenance services across multiple buildings at Watervliet Arsenal, NY. The contract includes a 12-month base period plus two 12-month option periods, with an estimated 300 hours for routine service and 100 hours for emergency service per period.

The scope includes inspecting and maintaining various elevator systems including freight elevators, passenger elevators, dumbwaiters, and chair lifts across 13 buildings. Key requirements include responding to emergency calls within 1.5 hours, performing routine maintenance during normal business hours (Monday-Thursday 7:00 AM - 4:00 PM and select Fridays 7:00 AM - 3:00 PM), documenting all inspections and maintenance activities, and complying with ASME A17.1/A17.3 standards. The contractor must provide all tools, materials, supplies, equipment, labor and supervision. Personnel must be qualified through training and experience acceptable to the government or meet National Association of Elevator Contractors (NAEC) requirements. This is a total small business set-aside with firm-fixed-price contract type.

View the file

Other files for this federal contract opportunity

Other files attached to ELEVATOR INSPECTION AND MAINTENANCE POSTWIDE, newest first.
File Type Posted
W911PT-25-Q-0015-0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911PT25Q0015

Section SF 30 - BLOCK 14 CONTINUATION PAGE

LOCAL NARRATIVES

A.__ NOTICE OF WATERVLIET ARSENAL INFORMATION/REQUIREMENTS

(a) IMPORTANT DELIVERY/QUALITY REQUIREMENTS:

(1) ALL OFFERORS MUST CAREFULLY REVIEW THE DELIVERY REQUIREMENT IN THE REQUEST FOR QUOTE OR SOLICITATION. WHEN SUBMITTING AN OFFER/BID, PLEASE ENSURE THAT YOU CAN MEET THE DELIVERY SCHEDULE.

(2) ON TIME DELIVERY IS VERY CRITICAL. THEREFORE, YOU MUST ADHERE TO THE DELIVERY REQUIREMENTS INDICATED IN ANY RESULTANT AWARD. FAILURE TO COMPLY WITH THE CONTRACTUAL DELIVERY SCHEDULE, MAY RESULT IN TERMINATION OF THE ORDER OR REQUIRE CONSIDERATION IF THE GOVERNMENT ELECTS TO EXTEND DELIVERY. (NOTE: Non-availability of raw materials, subcontractor issues, scheduling conflicts, should be considered at the time you are submitting your offer/bid. They are not acceptable excuses for failing to meet the delivery after award).

(3) PROVIDING QUALITY PRODUCTS THAT CONFORM TO THE CONTRACT ARE JUST AS IMPORTANT AS MEETING THE REQUIRED DELIVERY. DELIVERY OF NON-CONFORMING PRODUCTS RESULTS IN DELIVERY DELAYS AND INCREASED COSTS TO THE ARSENAL.

(4) PAST PERFORMANCE FOR QUALITY AND DELIVERY MAY BE A MAJOR CONSIDERATION IN MAKING DETERMINATIONS FOR FUTURE CONTRACT AWARDS.

NOTICE: Throughout this document we may use the terms “we” and “you”, the term “we” means the government of the United States of America, and the term “you” means the contractor.

(b) WATERVLIET ARSENAL INFORMATION FOR CONTRACTORS:

“Watervliet Arsenal Information for Contractors” document is incorporated by reference in all solicitations and contracts. The full text version of the instructions is available at Internet address: http://www.wva.army.mil/Documents/Contracting/WAIC.pdf Upon request, the contracting officer will make its full text available.”

POC - CONTRACT SPECIALIST/BUYER:Maria Decrescenzo
TELEPHONE NUMBER:518-266-4641
E-MAIL ADDRESS:maria.d.decrescenzo.civ@army.mil

CONTRACTOR DUNS NUMBER/CAGE CODE/FAX NUMBER:

Please provide the following information for your company.

VENDOR NAME: ___________

VENDOR POC: ___________

POC PHONE: ___________

E-MAIL ADDRESS (see note below): ___________

UNIQUE ENTITY ID ___________

CAGE CODE (if known) ___________

TAX ID NUMBER ___________

VENDOR FAX NUMBER ___________

NOTE: Your e-mail address is required so that in the event you receive the resultant award, we can e-mail it to you. If we experience difficulties with e-mail, it will be data faxed.

(c) AWCF BULK FUND __X__ DOES ____ DOES NOT APPLY

(d) POSTERS:

(1) Contracts for Material, Supplies, Articles and Equipment Exceeding $15,000/Service Contract Labor Standards. Orders subject to these Acts require contractors to post WH Publication 1313, “Employee Rights on Government Contracts”.

(2) Construction Orders. Orders for construction require contractors to post WH Publication 1321, “Employee Rights under the Davis Bacon” and the Office of Federal Contract Compliance poster on “Equal Employment Opportunity is the Law.”

(3) These posters can be accessed electronically at http://www.dol.gov .

(4) Hard copies of the posters will be made available upon request to the contracting officer.

(e) PAYMENTS:

Any vendor that receives an award (except those paid by credit card or accommodation check) can view invoice payments made by DFAS at https://wawf.eb.mil/ using the “my invoice” system. You will be required to register in order to view payments. Payment information is maintained for 120 days from invoice payment. Vendors can find out when invoices have been paid by Electronic Funds Transfer (EFT), etc. This website can save valuable time and frustration over billing questions and it is a free service.

(f) RELEASE OF INFORMATION:

The contractor shall not release or authorize release of DoD specifications; acceptance test results; information involving critical military technology; or any other information in which the DoD maintains proprietary rights, or is otherwise confidential or classified. This restriction includes any endorsement by the Department of Army of a contractor. Release of information under the circumstances referenced above requires the prior written approval of the Contracting Officer responsible for this contract. It is the contractor’s responsibility to be familiar with, and comply with the requirements of Chapter 5, page 22, paragraph 5-48, of AR 360-1 may be found at http://www.usapa.army.mil/pdffiles/r360_1.pdf

C._1_ Submission of Recordable Injuries and Illness Cases (Dec 2012) (ACC-Warren (WVA)) Watervliet Arsenal is pursuing OSHA Voluntary Protection Program (VPP) recognition. The VPP impacts all contractors whose employees cumulatively work more than 1000 hours per quarter within a calendar year at Watervliet Arsenal (herein referred to as “applicable contractors”).

It is the contractor’s responsibility to ensure its employees and managers are in full compliance with OSHA requirements and have a general understanding of VPP. Detailed information on VPP is available on the OSHA website at http://www.osha.gov/dcsp/vpp/index.html . All contractors, whether regularly involved in routine site operations or engaged in temporary projects such as construction or repair, must follow the safety and health rules of Watervliet Arsenal.

Applicable contractors are required to annually submit to Watervliet Arsenal, ATTN: TAWV-XO-S/Safety Office, Bldg. 10, 1 Buffington Street, Watervliet, NY 12189-4000 or email: usarmy.watervliet.tacom.list.wate-safety@mail.mil the following documents (covering the previous calendar year quarters) by 15 January:

· Total Case Incidence Rate (TCIR) - the number of recordable injuries and illness cases per 100 full-time employees that a site has experienced in a given time frame.

· Days Away, Restricted, and/or Transfer Case Incident Rate (DART) - Number of recordable injuries and illness cases per 100 full-time employees resulting in days away from work, restricted work activity, and/or job transfer that a site has experienced in a given time frame.

· OSHA Form 300A Applicable contractors may submit the above immediately following the completion of a quarter, if desired.

H._1_ SERVICES/CONSTRUCTION REQUIREMENTS

(a) SCHEDULE UNIT OF MEASURE NOTE: When "LOT" is stated as a unit of measure it is the equivalent to "JOB".

(b) WORK PERFORMED ON-SITE AT WATERVLIET ARSENAL:

The contractor agrees that each employee working at Watervliet Arsenal will sign the “Contractor Personnel Agreement on Non-Disclosure of Watervliet Arsenal Technology below. Signatures must be received by the Contract Administrator before work may begin and any resultant delay won’t be considered an excusable delay to contract performance as defined in the contract clause “Default”. Additional copies of this Non-Disclosure Statement can be found on the Internet at http://www.wva.army.mil/Documents/Contracting/nondis.pdf

(d) CONTRACTOR PERSONNEL AGREEMENT ON NON-DISCLOSURE

OF WATERVLIET ARSENAL TECHNOLOGY

(1) The Undersigned, as an employee of _________________________ (Name of Firm) agrees to the following terms and conditions.

(2) Any knowledge gained, as a result of my being permitted on Watervliet Arsenal’s premises, concerning cannon production technology (as defined below) or other technology on any defense item being manufactured or developed at Watervliet Arsenal, will not be released outside of _________________________ (Name of firm) and/or the United States of America (this prohibition includes, but is not limited to, the company’s domestic and foreign subsidiaries, affiliates, etc.), nor will such technology be used to manufacture or assist another in the manufacture of cannon (as described below) or other defense items being manufactured or developed at Watervliet Arsenal, without the written prior approval of Watervliet Arsenal.

(3) Definitions:

(a) CANNON: is defined as any and all components/parts of a complete assembly consisting of a tube, breech mechanism, tube attachments, muzzle appendages, firing mechanisms, and all integral components. It may also be a component of a weapons system of 40mm Bore or over such as tank guns, towed and self-propelled howitzers, naval guns, mortars and recoilless guns.

(b) CANNON PRODUCTION TECHNOLOGY: is defined as the technical data package and manufacturing technology.

(1) TECHNICAL DATA PACKAGE: cannon engineering drawings, specifications and standards.

(2) MANUFACTURING TECHNOLOGY: technical knowledge, documentation, assistance and equipment and machines used and/or useful in the manufacturing of cannon.

(c) TECHNICAL KNOWLEDGE: the know how collected, trade secrets, production experience and special skills necessary for the production of cannon and the technical information and inventions necessary for the manufacture of cannon and relating to the manufacture of cannon.

(d) TECHNICAL DOCUMENTATION: manufacturing technical data comprised of drawings, specifications, schemes, composition, descriptions, methods of calculations, instructions and other information necessary for the manufacture of cannon.

(e) TECHNICAL ASSISTANCE: all assistance required to make practical and economical use of the technology required to manufacture cannon, such as delivery of documentation, training of personnel, instructions, consultations and acquainting of specialists with the most economical method of using this technology in the manufacture of cannon.

(f) EQUIPMENT AND MACHINES: production machines, machine accessories, apparatuses, spare parts and tooling used for cannon manufacture.

_______________________________________________________________________
TYPED OR PRINTED NAME, SIGNATUREDATE
_______________________________________________________________________
TYPED OR PRINTED NAME, SIGNATUREDATE
_______________________________________________________________________
TYPED OR PRINTED NAME, SIGNATUREDATE

(e) JOB SITE AVAILABILITY:

The work site will be available for performance during normal business hours:

Monday through Thursday Business Hours: 7:00 a.m. EST to 4:00 p.m. EST

Friday Business Hours: Every other Friday from 7:00 a.m. EST to 3:00 p.m. EST

Fridays will be staggered with every other Friday being a closed business day. The first Friday of 2025 to be closed is January 10, 2025.

Based on the above, service contractors should call contract/purchase order administrator in advance if service is scheduled for a Friday to determine if the Arsenal will be open for business.

When a federal holiday is normally observed on Friday, the Arsenal may be closed on the preceding Thursday. In this case, contact the contract/purchase order administrator in advance if scheduling service to determine if the Arsenal will be open for business.

Work at other than the above hours won’t be allowed unless the contractor makes an application at least 48 hours in advance and gets written contracting officer approval. No guarantee is made that the job site will be made available other than as stated above.

(f) CONTROL OF FOREIGN VISITORS TO WATERVLIET ARSENAL:

Offerors are advised that any employee or representative of their company who is not a U.S. citizen, (or is representing a foreign company) and is a U.S. citizen), planning on visiting the Watervliet Arsenal for the purpose of attending: bid conferences, bid openings, site visits, engineering services, or any other visit related to this solicitation will be escorted at all times by an arsenal representative while on the installation grounds.

Therefore, offerors must notify the Contracting Officer in advance (a minimum of two [2] weeks) of any proposed visit by a non-U.S. citizen or U.S. citizen representing a foreign firm, to assure proper clearance for entry into the arsenal. Failure to comply, or disclose a foreign national visitor, may subject the Contractor to the penalties set forth in 18 U.S.C.A. Section 1001, Chapter 14.

Due to manpower constraints, Watervliet Arsenal is often unable to provide escort services during contract performance. Therefore, if the resulting contract requires performance on Watervliet Arsenal property, employees, individuals or subcontractors representing the successful offeror who are not U.S. citizens may not, depending on staffing levels and the availability of escorts, be allowed access to the Arsenal for purpose of contract performance.

Be further advised that the inability of the Arsenal to provide escorts resulting in denial of access to Watervliet Arsenal of the aforementioned personnel will not be considered an excusable delay to contract performance as defined in the contract clause “Default” contained in the contract. Therefore, offerors should consider the above contingencies during offer preparation.

(h) CONTRACTOR IDENTIFICATION:

Contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence, and when working in situations where their actions could be construed as official government acts.

LS7002

L. __ Army Contract Writing System (ACWS) Transition Information for Offerors

a. The Army Contracting Enterprise (ACE) is in the process of deploying new solicitation and contract writing software to Army contracting offices worldwide. Known as the Army Contract Writing System (ACWS), this modern software suite will soon replace most existing Army contract writing systems, including the system used to create and release this Solicitation.

b. During this transition period, Offerors are hereby advised:

1. The Contracting Office may use any combination of contract writing systems to create and release documents related to this solicitation (e.g. solicitation amendments and awards, if any). Due to this:

i. This solicitation may contain different offer submission instructions than other solicitations released by the same Contracting Office (e.g. requiring offer submission via the PIEE Solicitation Module vs. e-mail). Offerors should review all offer submission instructions contained in the solicitation documents and direct any questions or concerns to the Contract Specialist or Contracting Officer.

ii. If the Contracting Office switches contract writing systems prior to award, documents you receive from the Contracting Officer or view on SAM.gov or other forums may appear noticeably different than the initial solicitation or previous solicitations or awards from the same Contracting Office. This is normal and expected.

iii. A change between contract writing systems may cause important information concerning solicitation response (amendments) or accepted terms (awards) to take on different formatting or appear in different parts of later documents issued. Offerors shall review all documents carefully to locate this important information and direct any questions or concerns to the Contract Specialist or Contracting Officer.

2. The Government does not intend to use the transition between contract writing systems to effect any changes to solicitation or award terms and conditions without accompanying document narratives explicitly stating such changes are deliberate and desired. While the Contract Specialist and Contracting Officer will take care to minimize or eliminate any inadvertent changes when adapting to the new contract writing software, you, as the Offeror, may still be the first to spot such errors. Therefore, Offerors shall:

i. Notify the Contracting Officer immediately if any observed changes, removals, or additions affect your award eligibility, violate or alter existing quote/proposal terms, or could affect Contract performance post-award.

ii. Take special care to ensure all fill-in Clauses are populated and remain populated across documents received from the Contracting Office throughout the Solicitation and Award process.

iii. Contact the Contracting Officer listed on the first page of the solicitation or solicitation amendment for guidance if you notice or suspect any inadvertent change has occurred between document issuances.

3. The Contracting Officer will correct problems affecting award documents (if any) via bilateral modification, at no cost to the Contractor. Any such modification will reconcile the award with the latest version of this solicitation reflecting deliberate action by the Contracting Officer (e.g. the first issuance if no amendments, or the latest amendment with accompanying narratives), inclusive of any documented pre-award negotiations or accepted supplemental offer terms.

4. In the unlikely event a network disruption, contract writing system error, or financial system error threatens timely award of the requirement set forth in this solicitation, the Contracting Officer:

i. May elect to use alternative mechanisms to obligate funds and allow work or deliveries to legally begin to the benefit of, and with legal protection for, both parties.

ii. Will incorporate the latest version of this Solicitation into such mechanisms to serve as a framework for contract execution until any such system problems are resolved.

iii. Will ensure any action taken does not conflict with the stated offer evaluation and award methodology of this requirement.

iv. Will issue a complete, properly-formatted award accurately reflecting this requirement and all applicable terms and conditions once systems return to normal.

A.__ Electronic Contracting Electronic Bids/Proposals/Commercial Offers Required in Response to this Solicitation (June 2020) ACC-WVA

(a) All Army Contracting Command – Watervliet Arsenal (WVA) solicitations will be publicized on the SAM.gov website (https://sam.gov /). Any additional attachments, including Technical Data Packages, when available electronically, will be separate attachments or links embedded in the solicitation.

(b) Bids/Proposals must be submitted in electronic media. When submitting your bid/proposal electronically, the bid/proposal and any supplemental information (such as spreadsheets, backup data, technical information), can be submitted using any of the following electronic formats:

(1) Microsoft* Office Products (Watervliet can read Microsoft* Office 2007 and lower); Word, Excel, or PowerPoint. Spreadsheets must be sent in a format that includes all formulate macro and format information. Print image is not acceptable.

(2) Files in Adobe PDF (Portable Document Format). Scanners should be set to 300 dots per inch.

(3) Files in HTML (Hypertext Markup Language). HTML documents must not contain active links to live Internet sites or pages. All linked information must be contained within your electronic bid/offer and be accessible offline.

(4) Other electronic formats are not acceptable.

(c) Please select only one medium by which to transmit each bid/proposal.

(d) Timely receipt of offers/proposals:

(1) Your attention is called to the solicitation closing date and time on the solicitation is local time for the Army Contracting Command – Watervliet Arsenal (WVA). Lateness rules for electronic submissions for bids are outlined in FAR 52.214-7, “Late Submissions, Modifications, and Withdrawal of Bids,” for proposals in FAR 52.215-1, “Instructions to Offerors—Competitive Acquisition” or FAR 52.212-1, “Instructions to Offerors-Commercial Items.” Pay particular attention to the applicable clause as it relates to the timing of submissions.

(2) NOTE: There is no “expected” or “target” length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned to submit their proposals allowing adequate time for submission.

(3) Solicitations may remain posted on the SAM.gov website after the solicitation closes. Even though the system may allow you to submit a proposal after the closing date/time, your proposal will be considered late and may not be considered for award.

(e) Security Note: If you choose to password-protect access to your bid/offer, you must provide the password to Watervliet Arsenal at least ten days prior to the opening/closing date. Contact the buyer identified in “Watervliet Arsenal Information/Requirements”. Passwords used only for the purpose of write protecting files need not be provided.

(f) Electronic bids/proposals must include, as minimum:

(1) E-mailed bids/proposals must include a signed SF 33 cover sheet, SF 1449 or SF 1442 (whichever is applicable) that can be scanned. If scanned, attach it to your e-mail offer (or first e-mail message if you are sending multiple e-mails due to length).

(2) All applicable fill-in provisions. For solicitations issued on an SF 33 or SF 1442, this would include Sections A, B, F, and K. For solicitations issued on an SF 1449, you must review the solicitation to ascertain where all of the required fill-ins are located since commercial acquisitions do not have designated sections.

(3) A statement of agreement to all the terms, conditions, and provisions of the solicitation.

(4) Any other information required by the solicitation.

(g) Please see FAR 14.406 for a description of the steps the Government shall take with regard to unreadable electronic bids received via the media described in paragraphs (b) above. See FAR 15.207(c) for a description of steps the government shall take with regard to unreadable proposals.

(h) Bidders/Offerors shall make every effort to ensure that their bid/proposal is virus-free. Bids/proposals (or portions thereof) submitted which DO reflect the presence of a virus, or which are otherwise rendered unreadable by damage in electronic transit, shall be treated as “unreadable” per paragraph (h) above. Use of any formats other than those listed above may result in the file being quarantined and will be considered by Watervliet Arsenal to be “unreadable” files.

Note (Macros): The virus scanning software used by our e-mail systems cannot always distinguish a macro from a virus. Therefore, sending a macro embedded in an email message or an email attachment may cause the email bid/offer to be quarantined. In that event paragraph (g) above applies.

*Registered trademark

C.__ REQUEST FOR QUOTE RESPONSES

ALL RESPONSES MUST BE ELECTRONIC. YOU MUST SUBMIT YOUR QUOTE RESPONSES USING THE FOLLOWING METHODS:

(a) Email to: maria.d.decrescenzo.civ@army.mil Contract Specialist email

(b) Request for Quotes must be filled out completely and sent in its entirety to be considered responsive.

A.__ ALL OR NONE-COMMERCIAL ITEM ACQUISITION

(a) This provision serves as an addendum that modifies paragraph (h) of FAR 52.212-1, entitled INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS. Paragraph (h) is modified to say that the proposal or quote must offer to provide the total quantity of the items in this solicitation.

(b) Only one award will be made as a result of this solicitation. Offers submitted for less than the total quantities of all the items in this solicitation will NOT be considered for award.

STATEMENT OF WORK

ELEVATOR INSPECTION, TESTING, MAINTENANCE

Work Order #: 25PW002 Watervliet Arsenal Installation Management, Public Works Division Facilities Engineering (TAWV-IMP-F)

PART 1 GENERAL

1.01 Scope.

A. This Statement Of Work (SOW) defines the effort required for the inspection, testing, and repair of existing Elevators at Watervliet Army Arsenal, NY. This contract shall span the course of 12 months, commencing from the date of award, and shall not exceed 100 hours Emergency work and 300 hours Routine.

1.02 Submittals.

A. The contractor shall e-mail all submittals to the Contracting Specialist for review and approval. All submittals require government approval unless otherwise explicitly stated.

B. The contractor shall reference APPENDIX A “Consolidated List of Submittals” for complete list of required submittals.

1.03 Hours of Operation.

A. Normal duty hours are 7:00 AM through 4:00 PM, Monday through Thursday, and 7:00 AM through 3:00 PM on select Fridays (the arsenal is closed every-other Friday). Federal holidays are non-work days. If a federal holiday falls on a Saturday or Sunday, the preceding Friday or following Monday is a work holiday.

1.04 General Requirements.

A. The contractor shall perform all work in strict conformance with Watervliet Arsenal Instructions for Contractors (WAIC). The contractor shall read and understand this document prior to submitting a proposal. The WAIC is publicly available at:

http://www.wva.army.mil/Documents/Contracting/WAIC.pdf

B. The contractor shall supply all tools, materials, supplies, equipment, labor, temporary utilities and supervision necessary for the complete execution of the requirements within the contract documents and requirements of this SOW.

C. The contractor shall, prior to submitting a proposal, review (i) all contract documents, and (ii) the project work site, and shall provide written notice to Contracting Specialist detailing any discrepancies that are found between the contract documents and the project work site.

D. The contractor shall notify the Contracting Specialist a minimum of two (2) business days before the contractor starts work. The contractor shall notify the COR a minimum of seven (7) business days before the shut-down of a utility or building service.

E. The contactor shall clean all work areas, at the end of each work day, to remove all tools, equipment, debris, materials, and all waste from the work site.

1.05 Safety Requirements.

A. The contractor shall be responsible for complying with all DOD, Army, Federal, and State health and safety requirements which are applicable to this project, and shall use all means and precautions available to ensure the safety of the occupants and protection to the existing buildings and structures.

B. The contractor shall inspect the project work site prior to starting work, and shall request a copy of the asbestos building inspection records to verify the location and description of known asbestos-containing materials. The contractor shall sign the “Asbestos Notification Acknowledgement Record” and submit this form to the Contracting Specialist.

1.06 Personnel Qualification.

A. General. Personnel, either individually or through their affiliation with an organization that is registered, licensed, or certified by a state or local authority, shall be recognized as qualified and experienced in the inspection, testing, and maintenance of Elevator systems addressed within the scope of National Association of Elevator Contractors (NAEC).

B. Inspection Personnel. Inspections shall be performed by personnel who have developed competence through training and experience acceptable to the Government or meet the requirement of ASME A17.3 and ASME A17.1 and National Association of Elevator Contractors (NAEC).

C. Testing Personnel. Testing personnel shall have knowledge and experience of the testing requirements for elevators of this Code acceptable to Government or meet the requirement of ASME A17.3 and ASME A17.1 and National Association of Elevator Contractors (NAEC).

D. Service Personnel. Service personnel shall be qualified in the maintenance and servicing of systems addressed within the scope of ASME A17.3 and ASME A17.1 and National Association of Elevator Contractors (NAEC). Qualified personnel shall include, but not be limited to, one or more of the following:

1. Personnel who are factory trained and certified for the specific type and brand of system being serviced.

2. Personnel who are certified by a nationally recognized certification organization acceptable to the authority having jurisdiction. Personnel, either individually or through their affiliation with an organization that is registered, licensed, or certified by a state or local authority to perform service on systems addressed within the scope of ASME A17.3 and ASME A17.1 and National Association of Elevator Contractors.

3. Personnel who are employed and qualified by an organization listed by a nationally recognized testing laboratory for the servicing of Elevator systems within the scope of ASME A17.3 and ASME A17.1 and National Association of Elevator Contractors.

E. Programming. Personnel programming a system shall be certified by the system manufacturer.

F. Evidence of Qualification. Evidence of qualifications shall be submitted to the Government with bid.

1.07 Government Furnished Property and Services

A. The Government will provide a Fire Department representative to assist the contractor with inspection/testing tasks (if required). The contractor shall coordinate with the project COR for this assistance no-sooner-than two (2) weeks prior to the start of inspection/testing work which involves the assistance of the Fire Department representative.

1.08 Project Schedule.

A. The contractor shall create a project schedule and submit for Government review and approval. The project schedule shall detail each building to be inspected/tested and shall indicate proposed dates for each building. The contractor shall indicate any requirements for work performed outside of regular hours of operation.

1.09 Applicable Documents.

A. Watervliet Arsenal Instructions for Contractors (WAIC).

PART 2 PRODUCTS

2.01 General.

A. Unless otherwise stated, all materials for this project shall be new. All products shall not contain any asbestos, mercury, chromium/lead paint, Class I Freon, and Polychlorinated Biphenyls (PCB), and shall state such on the manufacturer’s original packaging.

B. All work shall be in strict accordance with product manufacturer’s instructions and specifications, including but not limited to manufacturer guidance for storage, staging, application, installation, and disposal of the product.

PART 3 PERFORMANCE

3.01 Routine Service Calls.

A. The contractor shall perform routine service call repairs on all Elevator systems to ensure proper operational condition, as requested by authorized government official via phone call or email to the contractor. All work shall be completed during Watervliet normal duty hours and ASME A17.3, ASME A17.1, NAEC, and manufacturers’ listed procedures.

B. The contractor shall charge man-hours for routine service calls starting upon entering WVA and cease charging man-hours upon leaving WVA. Mileage for travel shall not be allowed.

C. The contractor shall bring all manpower, tools, equipment, and common parts to accomplish routine service calls during the initial site visit. Once the repairs are started, a maximum total of two (2) man-hours per emergency service call will be allowed to acquire additional parts if necessary.

D. The contractor shall notify the COR via phone call upon entering WVA (start of work), upon leaving WVA for parts, and upon leaving WVA (end of work). This allows the Government to validate the man-hours used on each routine service call. The telephone notification shall include the number of contractor personnel and the list of service calls that the contractor will repair during the visit.

E. The contractor shall generate a service order slip for each completed routine repair. The service order slip shall include the total man-hours requested for that single routine repair, and the cost of materials. If the routine repair takes multiple work shifts, the daily man hours shall be broken out on the service order slip.

3.02 Emergency Service Calls.

A. The contractor shall perform emergency service call repairs for malfunctioning or inoperative Elevator systems during business hours, non-business hours (nights and weekends) and holidays. The contractor shall arrive on-site following an emergency service call within one and a half (1.5) hours.

B. The contractor shall charge man-hours for emergency service calls starting upon entering WVA and cease charging man-hours upon leaving WVA.

C. The contractor shall bring all manpower, tools, equipment, and common parts to accomplish emergency service calls during the initial site visit. Once the repairs are started, a maximum total of four (4) man-hours per emergency service call will be allowed to acquire additional parts if necessary.

D. The contractor shall notify the COR via phone call upon entering WVA (start of work), upon leaving WVA for parts, and upon leaving WVA (end of work). This allows the Government to validate the man-hours used on each routine service call. The telephone notification shall include the number of contractor personnel and the list of service calls that the contractor will repair during the visit.

E. The contractor shall generate a service order slip for each completed routine repair. The service order slip shall include the total man-hours requested for that single routine repair, and the cost of materials. If the routine repair takes multiple work shifts, the daily man hours shall be broken out on the service order slip.

3.03 Documentation.

A. The contractor shall provide record of all inspections, testing, and maintenance, as required by ASME A17.3, ASME A17.1 and NAEC.

B. The contractor shall submit a report of all Elevator tests, inspections and maintenance accomplished at the conclusion of each occurrence. Reports shall include a record of conditions, completed tests, inspection results, completed inspection form, and preventive or corrective maintenance performed on a system, and shall include all required and applicable information per ASME A17.3, ASME A17.1, and NAEC.

C. The contractor shall provide all reports and service order slips as legible, professionally appearing documents which include the contractor’s company name, company address, and company phone number. All tasks performed shall be presented each in bullet points.

D. A7485_R Document to be filled out and submitted for every Elevators Routine Maintenance visit.

3.04 Reimbursable Parts.

A. The contractor shall be responsible for procuring all required parts for all repairs.

B. Contractor shall request approval from the COR prior to the purchase of any parts or installation.

C. The contractor will be reimbursed for parts at cost.

D. The contractor shall seek minimum of two, preferably three, competitive price quotations prior to purchasing replacement parts or services with an estimated value over $2,500. The contractor shall attach competitive quote documentation to request for reimbursement for all purchases over $2,500.

E. It is understood that the contractor shall charge an additional 2 man hours for the acquisition of parts.

F. If additional man hours are required for the acquisition of parts, this requires prior approval by the COR.

PART 4 CLOSEOUT REQUIREMENTS

4.01 Cleanup of Work Site.

A. The contactor shall clean all work areas and remove all tools, equipment, debris, materials, and all waste from the premises upon completion of each service call, inspection, or test procedure.

PART 5 APPENDICES

A. Consolidated List of Submittals B. Simplex Building List

APPENDIX A: Consolidated List of Submittals

Line
Item Submitted
Submittal Needed By
Submittal Reviewed By (Office)
1
Safety Data Sheets for Hazardous Materials (SDS)
NLT 7 Calendar Days After Award
Safety Office
2
Signed Contractor Asbestos Notification Form
NLT 7 Calendar Days After Award
Environmental Office
3
Personnel Qualifications (1.06)
NLT 7 Calendar Days After Award
COR
4
Test Plan
NLT 7 Calendar Days After Award
COR
5
Inspection Plan
NLT 7 Calendar Days After Award
COR
6
Testing/Inspection Schedule
NLT 7 Calendar Days After Award
COR
7
A7485_R
NLT 7 Calendar Days after Routine Elevator Inspection
COR

APPENDIX B: Simplex Building List The following buildings include fire Elevator/ Lift systems under the scope of this contract:

Building
Manufacturer
Serial Number
Capacity Lbs.
Hydraulic?
Type
10
D.A. MATOL INC.
Mod. 200
500
Electric
Dumbwaiter
23
OTIS
202207
4,000
Electric
Freight
25
WARSAW/Montgomery
CTS-47066
5,000
SCR Drive
Passenger
25
MONTGOMERY
CP50059
3,500
Hydraulic
Passenger
25
OTIS
27698
30,000
Hydraulic
Freight
35 (North)
MONTGOMERY
39362
20,000
Hydraulic
Freight
35 (South)
MONTGOMERY
39363
20,000
Hydraulic
Freight
35
MCGUIRE -AUTODOCK
SHIPPING & RCVG

Electric/ Hydraulic 3 Dock Lifts

35
SAVARIA
750
Electric
Chair Lift
40-1
MONTGOMERY
431H
3,500
Hydraulic
Passenger
40-3
AMERICAN STAIR GLIDE/PORCH LIFT
CO389WLS5009760BR
500
Electric
Chair Lift
44
OTIS
204521
10,000
Hydraulic
Freight
44
AUTOQUIP
TSL-6FX
13,500
Electric/

Hydraulic Material Lift

44
THYSSENN KRUPP
2102AM-TAC20
2500
Hydraulic
Passenger
115
CHENEY
VPL SERIES-2000
750
Electric
Chair Lift
115
OTIS
202006
20,000
Hydraulic
Freight
120
WARSAW
10530
20,000
Hydraulic
Freight
124
GARAVENTA
91-408-35
750
Electric
Chair Lift
135 – East Pit
OTIS
202090
2,500
Electric
Passenger
135 – West Pit
OTIS
202164
1,200
Electric
Passenger
135
GARAVENTA GENESIS
83933
750
Electric
Chair Lift
136
MOHAWK
548763
1,200
Electric
Passenger

CLAUSES INCORPORATED BY FULL TEXT

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

N/A

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Invoice as 2-in-1 (Services Only)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAACHQ0303
Issue By DoDAACW911PT
Admin DoDAACW911PT
Inspect By DoDAACN/A
Ship To CodeN/A
Ship From CodeN/A
Mark For CodeN/A
Service Approver (DoDAAC)N/A
Service Acceptor (DoDAAC)W911PT
Accept at Other DoDAACN/A
LPO DoDAACN/A
DCAA Auditor DoDAACN/A
Other DoDAAC(s)N/A

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

N/A

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Section SF 1449 - CONTINUATION SHEET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

ELEVATOR INSPECTIONS & MAINTENANCE

FFP

As specified in the statement of work 25PW002, which is hereto attached and incorporated, vendor to provide all materials, labor, and equipment necessary to provide maintenance and testing to elevators located at the Watervliet Arsenal.

ESTIMATED HOURS:

300 hours x _________ labor rate = $_________ routine service hours

100 hours x ________ labor rate = $__________ emergency service

**It is understood that profit and overhead are included in the labor rate quoted.

Service Contract Labor Standards WD 1967-0450 latest Revision Applies and is incorporated.

Technical POC: DENVER BABOWICZ.

FOB: Destination

NSN: AASSVC42060169

MILSTRIP: W16H1F42060169

PURCHASE REQUEST NUMBER: W16H1F42060169

PSC CD: J059

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
ELEVATOR INSPECTIONS & MAINTENANCE

FFP

As specified in the statement of work 25PW002, which is hereto attached and incorporated, vendor to provide all materials, labor, and equipment necessary to provide maintenance and testing to elevators located at the Watervliet Arsenal.

ESTIMATED HOURS:

300 hours x _________ labor rate = $_________ routine service hours

100 hours x ________ labor rate = $__________ emergency service

**It is understood that profit and overhead are included in the labor rate quoted.

Service Contract Labor Standards WD 1967-0450 latest Revision Applies and is incorporated.

Technical POC: DENVER BABOWICZ.

FOB: Destination

NSN: AASSVC42060169

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
ELEVATOR INSPECTIONS & MAINTENANCE

FFP

As specified in the statement of work 25PW002, which is hereto attached and incorporated, vendor to provide all materials, labor, and equipment necessary to provide maintenance and testing to elevators located at the Watervliet Arsenal.

ESTIMATED HOURS:

300 hours x _________ labor rate = $_________ routine service hours

100 hours x ________ labor rate = $__________ emergency service

**It is understood that profit and overhead are included in the labor rate quoted.

Service Contract Labor Standards WD 1967-0450 latest Revision Applies and is incorporated.

Technical POC: DENVER BABOWICZ.

FOB: Destination

NSN: AASSVC42060169

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government
0002
Destination
Government
Destination
Government
0003
Destination
Government
Destination
Government

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
0001
POP 15-JAN-2025 TO

14-JAN-2026

N/A
ARMY CONTRACTING COMMAND-WVA

SERVICES TEAM

ATTN: CCTA-HDW/BLDG 10

1 BUFFINGTON STREET

WATERVLIET NY 12189-4050

518-266-4535 FOB: Destination

W911PT

0002
POP 15-JAN-2026 TO

14-JAN-2027

N/A
(SAME AS PREVIOUS LOCATION)

W911PT

0003
POP 15-JAN-2027 TO

14-JAN-2028

N/A
(SAME AS PREVIOUS LOCATION)

W911PT

CLAUSES INCORPORATED BY REFERENCE

52.203-11
Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions
SEP 2024
52.203-12
Limitation On Payments To Influence Certain Federal Transactions
JUN 2020
52.204-7
System for Award Management
NOV 2024
52.204-9
Personal Identity Verification of Contractor Personnel
JAN 2011
52.204-10
Reporting Executive Compensation and First-Tier Subcontract Awards
JUN 2020
52.204-13
System for Award Management Maintenance
OCT 2018
52.204-16
Commercial and Government Entity Code Reporting
AUG 2020
52.204-17
Ownership or Control of Offeror
AUG 2020
52.204-18
Commercial and Government Entity Code Maintenance
AUG 2020
52.204-23
Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities
DEC 2023
52.204-25
Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
NOV 2021
52.209-6
Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
NOV 2021
52.209-10
Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.212-1
Instructions to Offerors--Commercial Products and Commercial Services
SEP 2023
52.212-4
Contract Terms and Conditions--Commercial Products and Commercial Services
NOV 2023
52.217-5
Evaluation Of Options
JUL 1990
52.219-6
Notice Of Total Small Business Set-Aside
NOV 2020
52.222-3
Convict Labor
JUN 2003
52.222-21
Prohibition Of Segregated Facilities
APR 2015
52.222-26
Equal Opportunity
SEP 2016
52.222-37
Employment Reports on Veterans
JUN 2020
52.222-41
Service Contract Labor Standards
AUG 2018
52.222-50
Combating Trafficking in Persons
NOV 2021
52.222-55
Minimum Wages for Contractor Workers Under Executive Order 14026
JAN 2022
52.222-62
Paid Sick Leave Under Executive Order 13706
JAN 2022
52.223-5
Pollution Prevention and Right-to-Know Information
MAY 2024
52.225-13
Restrictions on Certain Foreign Purchases
FEB 2021
52.226-8
Encouraging Contractor Policies To Ban Text Messaging While Driving
MAY 2024
52.232-33
Payment by Electronic Funds Transfer--System for Award Management
OCT 2018
52.233-1
Disputes
MAY 2014
52.233-3
Protest After Award
AUG 1996
52.237-1
Site Visit
APR 1984
52.237-2
Protection Of Government Buildings, Equipment, And Vegetation
APR 1984
52.237-3
Continuity Of Services
JAN 1991
52.242-15
Stop-Work Order
AUG 1989
52.243-1 Alt I
Changes--Fixed Price (Aug 1987) - Alternate I
APR 1984
52.247-34
F.O.B. Destination
JAN 1991
252.203-7000
Requirements Relating to Compensation of Former DoD Officials
SEP 2011
252.203-7002
Requirement to Inform Employees of Whistleblower Rights
DEC 2022
252.204-7003
Control Of Government Personnel Work Product
APR 1992
252.209-7004
Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
MAY 2019
252.223-7006
Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials
SEP 2014
252.223-7008
Prohibition of Hexavalent Chromium
JAN 2023
252.225-7001
Buy American and Balance of Payments Program
FEB 2024
252.225-7002
Qualifying Country Sources As Subcontractors
MAR 2022
252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
DEC 2018
252.232-7010
Levies on Contract Payments
DEC 2006
252.243-7001
Pricing Of Contract Modifications
DEC 1991
252.244-7000
Subcontracts for Commercial Products or Commercial Services
NOV 2023
252.247-7023
Transportation of Supplies by Sea
OCT 2024

CLAUSES INCORPORATED BY FULL TEXT

52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS--REPRESENTATION (JAN 2017)

(a) Definition. As used in this provision-- Internal confidentiality agreement or statement, subcontract, and subcontractor, are defined in the clause at 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.

(b) In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions), Government agencies are not permitted to use funds appropriated (or otherwise made available) for contracts with an entity that requires employees or subcontractors of such entity seeking to report waste, fraud, or abuse to sign internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting such waste, fraud, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.

(c) The prohibition in paragraph (b) of this provision does not contravene requirements applicable to Standard Form 312, (Classified Information Nondisclosure Agreement), Form 4414 (Sensitive Compartmented Information Nondisclosure Agreement), or any other form issued by a Federal department or agency governing the nondisclosure of classified information.

(d) Representation. By submission of its offer, the Offeror represents that it will not require its employees or subcontractors to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting waste, fraud, or abuse related to the performance of a Government contract to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information (e.g., agency Office of the Inspector General).

(End of provision)

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)

(a) Definitions. As used in this clause-- Internal confidentiality agreement or statement means a confidentiality agreement or any other written statement that the contractor requires any of its employees or subcontractors to sign regarding nondisclosure of contractor information, except that it does not include confidentiality agreements arising out of civil litigation or confidentiality agreements that contractor employees or subcontractors sign at the behest of a Federal agency.

Subcontract means any contract as defined in subpart 2.1 entered into by a subcontractor to furnish supplies or services for performance of a prime contract or a subcontract. It includes but is not limited to purchase orders, and changes and modifications to purchase orders.

Subcontractor means any supplier,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .