W911PT-19-R-0006-0001.docx
DOCX document 44 KB Posted
- Attached to
- 120 MM TUBE FORGING Federal contract opportunity
- Solicitation number
- W911PT19R0006
About this file
This federal contract opportunity notice solicits offers for 120mm cannon tube forgings. The Department of Army Materiel Command Contracting Command Detroit Arsenal seeks 500 forgings per technical drawing 12577300 Revision E. First article testing is required. The estimated solicitation date is March 8, 2019. Offers must include active SAM representations and certifications. The solicitation and technical data package will be available electronically at FBO and under ACC-Warren listings. An active DD Form 2345 is required to receive technical data. The associated files include a contract data requirement list specifying chemical and inspection test data, certificates of conformance, and ultrasonic inspection procedures to be provided with deliveries starting 270 days and 300 days after award at minimum monthly rates.
This solicitation has been modified. Please see the latest attachment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911PT19R0006_-_Amendment_0002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911PT19R0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 27-May-2019 02:30 PM to 14-Jun-2019 02:30 PM.
The depository location has changed from LOCAL NARRATIVE SECT L to SECT L-See Narrative.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
ATTACHMENT A
GENERAL DATA/GENERAL DRAWINGS
THIS TDP DOES NOT CONTAIN A SPECIFICATION OR STANDARD REQUIRING THE USE OF A CLASS I COC OR A CONTRACTUAL REQUIREMENT THAT CAN BE MET ONLY THROUGH USE OF SUCH A SUBSTANCE.
| DRAWING |
| REV |
| DATE |
| TITLE |
QAP-APP-WVA
QAP-APP-BL
010301 010731 General Quality Assurance Provisions General Quality Assurance Provisions
12521199 13074737
13075798 A
PB
PB
930528 181015
181015 General Data Drawing Governing Special Inspection Equipment Envelope Drawing, Ultrasonic Inspection Equipment and Procedures for Cannon Forging Tube, 120mm Ultrasonic Inspection Standard for Forging, M298
ADDITIONAL DRAWINGS/DOCUMENTS
| DRAWING # |
| REV |
| DATE |
| TITLE |
| 12577300 |
| E |
| 180912 |
| 120mm Mortar - Cannon Forging Tube (Two Pages) |
| QAP 12577300 |
| K |
| 180912 |
Quality Assurance Provisions for Cannon Forging Tube
MILITARY/FEDERAL SPECIFICATIONS/STANDARDS
| NUMBER |
| REV |
| AMD |
| NOT |
| DATE |
| TITLE |
| MIL-STD-130 |
| N |
| 1 |
| 121116 |
| Identification Marking of U.S Military Property |
| MIL-DTL-13931 |
| J |
| 2 |
| 141106 |
| Cannon: General Specification For |
MIL-S-46119
MIL-HDBK-204
C A
180112 141106 Steel Forgings, Tubular Parts For Cannon Design of Inspection Equipment for Dimensional Characteristics
INDUSTRY STANDARDS
| SOCIETY/NUMBER |
| YEAR |
| TITLE |
ASTM E8/E8M, Rev A
ASTM E10
ASTM E23
Standard Test Methods for Tension Testing of Metallic Materials Standard Test Method for Brinell Hardness of Metallic Materials Standard Test Methods for Notched Bar Impact Testing of Metallic Materials
| ASME Y14.3 |
| 12 |
| Orthographic and Pictorial Views |
| ANSI Y14.5 |
| 09 |
| Dimensioning And Tolerancing |
ASME Y14.100
AIA/NAN NAS 410
ASTM E1444/E1444M
SAE AMS-STD-2154-C
ASTM E8/E8M-A
NSCL Z540.3
SAE AS9102
06 (R2013) Engineering Drawing Practices NAS Certification & Qualification of Nondestructive Test Personnel - REV 4 Standard Practice for Magnetic Particle Testing Inspection, Ultrasonic, Wrought Metals, Process for Standard Test Methods for Tension Testing of Metallic Materials Requirements for the Calibration of Measuring and Test Equipment
(R) Aerospace First Article Inspection Requirement - Best Copy Available
Note Critical Characteristics in QAP 12577300
EXHIBIT A
CONTRACT DATA REQUIREMENT LIST – DD Form 1423 Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0001 or 0002
B. EXHIBIT: A
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.:
F. CONTRACTOR
1. DATA ITEM NO: A001
2. TITLE OF DATA ITEM: Chemical and Physical Properties for Forging or Casting Analysis Report
3. SUBTITLE: Record of Treatment and Test, Major Forgings/Castings (CN1)
4. AUTHORITY: DI-FORG-81196
5. CONTRACT REFERENCE: Applicable Drawing or Material Specification
6. REQUIRING OFFICE: TAWV-ODQ-M
7. DD250 REQUIRED: No
8. APP CODE:
9. DISTRIBUTION STATEMENT REQUIRED: N/A
10. FREQUENCY: With Each Submission
11. AS OF DATE:
12. DATE OF FIRST SUBMISSION: With First Shipment
13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Shipment
14. DISTRIBUTION:
A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn TAWV-ODQ-M Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000
B. COPIES:
DRAFT: 0
FINAL: 1
15. TOTAL: 1
16. REMARKS: Submit SMCWV Form 1155 for each component or lot. A computerized version of SMCWV Form 1155 may be used with prior approval of the procuring office. Data Item Descriptions (DID) referenced in block 4 can be accessed at: http//assist.daps.mil.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
19. CCTA-HDW, FAX NUMBER: 518-266-5602
G. PREPARED BY:
H. DATE:
I. APPROVED BY: William Potter, TAWV-ODQ-M J. DATE: 9 May 2013
Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0001
B. EXHIBIT: A
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.:
F. CONTRACTOR
1. DATA ITEM NO: A002
2. TITLE OF DATA ITEM: Test/Inspection Report
3. SUBTITLE: Inspection Records – First Article Sample (CN 3)
4. AUTHORITY: DI-NDTI-80809B
5. CONTRACT REFERENCE: First Article Clause
6. REQUIRING OFFICE: TAWV-ODQ-M
7. DD250 REQUIRED: *See Block 16
8. APP CODE:
9. DISTRIBUTION STATEMENT REQUIRED: N/A
10. FREQUENCY: ONE/P
11. AS OF DATE:
12. DATE OF FIRST SUBMISSION: With First Article
13. DATE OF SUBSEQUENT SUBMISSIONS: With First Article
14. DISTRIBUTION:
A. ADDRESSEES: As specified in contract or purchase order
B. COPIES:
DRAFT: 0
FINAL: 1
15. TOTAL: 1
16. REMARKS: Delete paragraph 10.2 of referenced DID (Block 4). Submit WVA Form 702-61-R-E showing results of inspections. Also submit DD Form 1222. Computerized versions of these forms may be used with prior approval of the procuring office. See QAP-APPX-WVA paragraph 10 for requirements. * Inspection/acceptance requirements specified in the contract. Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
19. CCTA-HDW, FAX NUMBER: 518-266-5602
G. PREPARED BY:
H. DATE:
J. DATE: 14 July 2016
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0001 or 0002
B. EXHIBIT: A
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.:
F. CONTRACTOR
1. DATA ITEM NO: A003
2. TITLE OF DATA ITEM: Certification/Data Report
3. SUBTITLE: Certificate of Conformance (COC), NDT Applications (CN 9)
4. AUTHORITY: DI-MISC-80678
5. CONTRACT REFERENCE: QAP-APPX-WVA and applicable drawing or material specification
6. REQUIRING OFFICE: TAWV-ODQ-M
7. DD250 REQUIRED: No
8. APP CODE:
9. DISTRIBUTION STATEMENT REQUIRED: N/A
10. FREQUENCY: With Each Submission
11. AS OF DATE:
12. DATE OF FIRST SUBMISSION: With First Shipment
13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Shipment
14. DISTRIBUTION:
A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn: TAWV-ODQ-M Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000
B. COPIES:
DRAFT: 0
FINAL: 1
15. TOTAL: 1
16. REMARKS: Delete paragraph 10.3, 10.4 of referenced DID (Block 4). See QAP-APPX-WVA paragraph 4.6 and 9 for the general requirements. The COC will also contain specific references to a specification or drawing for the acceptance standards, procedure and personnel qualifications. Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
19. CCTA-HDW, FAX NUMBER: 518-266-5602
G. PREPARED BY:
H. DATE:
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0001 or 0002
B. EXHIBIT: A
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.:
F. CONTRACTOR
1. DATA ITEM NO: A004
2. TITLE OF DATA ITEM: Test/Inspection Report
3. SUBTITLE: Inspection Records, Production Components (CN12)
4. AUTHORITY: DI-NDTI-80809B
5. CONTRACT REFERENCE: QAP-APPX-WVA
6. REQUIRING OFFICE: TAWV-ODQ-M
7. DD250 REQUIRED: No
8. APP CODE:
9. DISTRIBUTION STATEMENT REQUIRED: N/A
10. FREQUENCY: With Each Submission
11. AS OF DATE:
12. DATE OF FIRST SUBMISSION: With First Shipment
13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Shipment
14. DISTRIBUTION:
A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn: TAWV-ODQ-M Bldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000
B. COPIES:
DRAFT: 0
FINAL: 1
15. TOTAL: 1
16. REMARKS: Delete paragraph 10.2 through 10.2.8 of referenced DID (Block 4).
Submit all records for production components. See QAP-APPX-WVA paragraph 4.2 and 4.5 for the requirement.
Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
19. CCTA-HDW, FAX NUMBER: 518-266-5602
G. PREPARED BY:
H. DATE:
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0001 or 0002
B. EXHIBIT: A
C. CATEGORY
D. SYSTEM/ITEM
E. CONTRACT/PR NO.:
F. CONTRACTOR
1. DATA ITEM NO: A005
2. TITLE OF DATA ITEM: Test Procedure
3. SUBTITLE: Ultrasonic Inspection Procedures (CN 25)
4. AUTHORITY: DI-NDTI-80603
5. CONTRACT REFERENCE: QAP-APPX-WVA and AMS-STD-2154
6. REQUIRING OFFICE: TAWV-ODQ-M
7. DD250 REQUIRED: No
8. APP CODE: A
9. DISTRIBUTION STATEMENT REQUIRED: N/A
10. FREQUENCY: ONE/R
11. AS OF DATE:
12. DATE OF FIRST SUBMISSION: *See Block 16
13. DATE OF SUBSEQUENT SUBMISSIONS: With Each Revision
14. DISTRIBUTION:
A. ADDRESSEES: DEPARTMENT OF THE ARMY, Attn: TAWV-ODQ-MBldg. 35-E, Watervliet Arsenal, 1 Buffington Street, Watervliet NY 12189-4000
B. COPIES:
DRAFT: 0
FINAL: 1
15. TOTAL: 1
16. REMARKS: Delete paragraph 10.2 through 10.2.2.8 of referenced DID (Block 4). Submit written procedures for review and approval by the procuring office. The minimum elements of the procedure are detailed in paragraphs 4.3 of AMS-STD-2154. *With First Article or no later than 30 days prior to first production shipment when First Article is not required. Government requires 15 days to review/approve. Data Item Description (DID) referenced in block 4 can be accessed at: http//assist.daps.mil.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE:
19. CCTA-HDW, FAX NUMBER: 518-266-5602
G. PREPARED BY:
H. DATE:
SECTION E - INSPECTION AND ACCEPTANCE
INSPECTION/ACCEPTANCE CRITERIA
PLACE OF INSPECTION AND ACCEPTANCE
Government inspection/acceptance will be made by the authorized Government Representative located at:
| Inspection | Acceptance | |
| [] Watervliet Arsenal | [] Watervliet Arsenal | |
| [ X ] Contractor’s Plant | [ X ] Contractor’s Plant |
52.246-11 HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS (Dec 2014)
(a) The contractor shall comply with the higher-level quality standard selected below.
TITLE NUMBER DATE TAILORING
| [ ] Model for Quality Assurance | ANSI/ISO/ | In effect on date of | ______________ |
| in design, development, | ASQC-Q9001 | contract |
production, installation and servicing
| [ ] Model Quality Assurance | ISO-9001 | In effect on date of ______________ | |
| in production, installation | (ANSI/ISO/ | contract | |
| and servicing | ASQC-Q9001) |
[ ] Equivalent Quality System Program
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in—
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
LATENT MATERIAL DEFECT (Oct 1993) (ACC-WRN(WVA))
When the contractor certifies that the material delivered under this order conforms to the material specified herein, the Government may within a reasonable time from receipt of material, and notwithstanding previous acceptance, perform a physical/chemical analysis of the material to assure conformance to specification requirement. Failure of the material to meet the physical/chemical requirements will be a cause for rejection as a Latent Material Defect and will necessitate replacement of the material at the contractor’s expense when so directed by the Contracting Officer.
(END OF CLAUSE)
52.0209-003 I FIRST ARTICLE APPROVAL- CONTRACTOR TESTING (Sept 1989) – ALT I (Jan 1997)
(a) The contractor shall test _TWO FORGINGS IAW STM-1 of QAP-12577300 unit(s) of Lot/Item 0001 as specified in this contract. At lest 15 calendar days before the beginning of first article tests, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the government may witness the tests.
(b) The contractor shall submit the first article test report within 270 calendar days from the date of this contract to:
WATERVLIET ARSENAL
VENDOR QUALITY & GAGE CALIBRATION WORK GROUP
BLDG #35E, ATTN: TAWV-OD(Q)
WATERVLIET, NY 12189-4050
Marked “FIRST ARTICLE TEST REPORT: Contract No. ______________ Lot/Item No. 0001.”
Within 30 calendar days after the Government receives the test report, the contracting officer shall notify the contractor, in writing, of the conditional approval, approval or disapproval of the first article. The notice of conditional approval or approval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) of this subsection. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) of this subsection, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
(i) The Contractor shall produce both the first article and the production quantity at the same facility.
(End of clause)
CHEMISTRY (Apr 1998) (WATERVLIET ARSENAL)
Offeror shall list in the spaces provided below, the chemistry of the steel which he proposes to use for producing the forgings herein. Chemistry will not be changed during production without prior approval of the Contracting Officer.
SECTION F - DELIVERIES OR PERFORMANCE
52.211-8 TIME OF DELIVERY (JUN 1997)
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
| ITEM |
| QUANTITY |
| DELIVERY |
AS STATED
FIRST ARTICLE - 270 DAYS AFTER DATE OF CONTRACT
PRODUCTION QUANTITY – DELIVERIES STARTING 60 DAYS AFTER FIRST ARTICLE APPROVAL AT A MINIMUM RATE OF 25 EACH PER MONTH FOR THE FIRST TWO MONTHS, THEN 50 PER MONTH UNTIL COMPLETE
OR
| 0002 |
| AS STATED |
| PRODUCTION QUANTITY – DELIVERIES STARTING 300 DAYS AFTER DATE OF CONTRACT AT A MINIMUM RATE OF 25 EACH PER MONTH FOR THE FIRST TWO MONTHS, THEN 50 PER MONTH UNTIL COMPLETE |
| ITEM |
| SHIP TO ADDRESS |
FIRST ARTICLES ONLY
W16H1F
WATERVLIET ARSENAL
VENDOR QUALITY & GAGE CALIBRATION WORKING GROUP
BLDG. #35E, ATTN: TAWV-OD(Q)
WATERVLIET, NY 12189-4000
PRODUCTION QUANTITIES ONLY
0001 or W16H1F
TRANSPORTATION OFFICER
WATERVLIET ARSENAL
BLDG. #35E, ATTN: TAWV-IML-S
SHIPPING AND RECEIVING
WATERVLIET, NY 12189-4000
518-266-5769
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR'S PROPOSED DELIVERY SCHEDULE
Within Days
After Date
Item No. Quantity of Contract
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(End of clause)
(End of Summary of Changes) image1.wmf
File details come from the government source that posted it. Updated .