Upgrade Controls on Gantry Crane Federal contract opportunity
Solicitation number
W911PT-19-Q-0043
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

About this file

Amendment and revision to Scope.

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Controls on Gantry Crane, newest first.
File Type Posted
FBO_Amendment_Posting_0004.pdf PDF
FBO_Amendment_Posting_00003.pdf PDF
W911PT-19-Q-0043-0002.pdf PDF
Electrical_drawings.pdf PDF
180250046_(SOW)_Controls_Bridge_Crane.docx DOCX document
W911PT-19-Q-0043.pdf PDF
15-4143_Rev_10.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16H1F8040004C

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment is issued to correct the Scope of Work and to include electrical draw ings.

1. CONTRACT ID CODE PAGE OF PAGES

1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Mar-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911PT19Q0043

X 9B. DATED (SEE ITEM 11)

12-Mar-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Mar-2019

CODE

ARMY CONTRACTING COMMAND-WARREN (WVA)

ATTN: CCTA-HDW/BLDG 10

1 BUFFINGTON STREET

WATERVLIET NY 12189-4000

W911PT 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911PT19Q0043

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been added by full text:

SOW

Performance Work Scope AAS #180250046

REVISED 14 MARCH 2019

1. Upgrade/Replace controls for all crane functions (Trolley, Bridge, Main and Aux Hoists) for crane B103, Bldg 110, Watervliet Arsenal, NY

2. Crane manufacturer is P&H, S/N: 12046. Crane capacity is 30 Ton main hoist and 5 Ton auxiliary Hoist. Electrical drawings are available upon written request. The contractor will be required to obtain any drawings that they may require from a source (Kone Cranes or similar source) other that the WVA.

3. Contractor will cover the cost of labor, equipment, and materials for the Upgrade/Replace Cab controls with mini-masters.

4. Contractor will:

-Install new enclosures for function controls.

-Install one (1) new console using the Hubbell (or equal) min master controller one (1) for each motion (bridge, trolley, main hoist and auxiliary hoist)

-Upgrade/Replace contactors and wiring. The power source to which the cranes are powered is 250 VDC. However, the equipment shall be tolerant enough of line fluctuations to operate normally at source voltages ranging from 225 to

275 VDC.

- Provide and install new resistors and all associated wiring and conduits as needed.

- Upgrade/Replace existing bridge brakes with newer electric over hydraulic to include new master and slave cylinders like the braking systems installed on crane B248

-Install Magnatek remote control system (or equal product) similar to the ones installed on post (See Below)

a. The wireless digital radio remote-control system(s) utilized shall be designed and manufactured by a manufacturer engaged in design and manufacture of wireless radio remote control systems such as Magnetek Inc.

b. Provide a “turn-key, all inclusive” integration and installation of a complete digital radio remote-control system to permit full control of an existing 250 VDC bridge crane from a portable wireless transmitter.

Provide a “fail-safe” designed system so that the failure of any component or loss of signal will cause all crane motors to stop. The system shall permit complete, independent and simultaneous operation of all crane functions. Crane must remain operational from the existing cab when the radio remote control system is not in use, and vice versa.

Transmitter/Receiver

a. Portable NEMA 4 Transmitter complete with Adjustable belt or Harness, Magnetek Inc. Model MLTX2 series or equivalent.

b. (2) -NiMH Rechargeable Battery Packs and 120VAC Charger.

c. (3) Lever, (3) Speeds (cranes speeds 1-3-5). With spring back to the “off” position.

d. Operations

i. Power On/Off

ii. E Stop- colored RED

iii. Hoist (common for Primary and Secondary hoist)

iv. Selector switch for Hoist: Primary, Secondary, and Tandem.

v. Trolley

vi. Bridge

vii. Auxiliary #1- horn/buzzer

viii. Battery Indicator

e. Motion direction of the bridge and trolley will be labeled as “north, south, east, or west”. Verify orientation of each crane prior to specifying direction for bridge and trolley on the radio remote control.

f. Must be capable of up to 32 selectable RF (Frequency) channels. The available frequency ranges shall be provided with product submittals. The US Army needs to approve the frequency range that will be utilized.

g. Automatic Channel Search functionality: chooses a free frequency, if interference occurs the radio communication automatically moves to a free channel, while operation is not interrupted.

h. Range Limiting functionality: allows the maximum distance within which the transmitting unit must remain to start up the system and to optionally limit the radio remote control working range. Working range should be limited to the bay of operation.

i. Radio remote control transmitter shall control only 1 device.

Interface Relay Panel

a. NEMA 12 indoor enclosure

Cab to Radio Control Transfer Switch

a. NEMA 12 indoor enclosure

b. Blue Signal Light visible from floor level indicating main contactor is energized (In Radio Remote Control Mode).

c. Buzzer/Bell signal indicating crane operation in progress.

ARC Suppressors (as required)

Shunt DC brake with hydraulic override (as required)

a. Including shunt brake contractor and suppressor.

b. From the same manufacturer producing the wireless radio control system.

Identification Plate

a. Transmitter- A corrosion-resistant metal plate or plates shall be securely attached to the transmitter in a visible location. This plate(s) shall bear, as a minimum, the information called for as follows in a permanent non-erasable means.

i. Manufacturer's name

ii. Model

iii. Manufacturer's Serial Number

iv. Date of Manufacture

v. Radio Frequency

vi. Crane Number

vii. Government Contract Number

viii. Installing Company’s Name

b. Interface Relay Panel

i. Radio Frequency

ii. Government Contract Number

iii. Installing Company’s Name All work will be in accordance with the manufacturer’s specifications.

Equipment furnished shall, except as otherwise noted, comply in all respects with the requirements of the following standards:

*CMAA Crane Manufacturer’s Association of America Specifications for Top Running Bridge & Gantry Type Multiple Girder Electric Overhead Traveling Cranes - No. 70 (2010)

*ANSI/ASME

American National Standards Institute/American Society of Mechanical Engineers ANSI/ASME B30.2 - 201 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) OSHA Occupational Safety and Health Administration Part 1910.179 – Overhead and Gantry Cranes NEMA National Electric Manufacturer’s Association NEC National Electric Code – 2014

*Compliance to this standard is limited to the extent such standard is incorporated into and made mandatory by OSHA regulations.

When work is complete, the crane will be turned over for any and all work will be inspected and accepted by the Government Requiring Activity Representative.

All crane equipment shall be operated through a complete lift and lowering cycle and through a complete travel of the bridge and trolley to determine that the equipment shall perform smoothly and safely. Any defects shall be corrected by the bridge crane provider without any expense to the Owner. Load testing the crane is NOT required given the nature of this project.

Testing shall be conducted in “Cab Operation” as well as “Radio Remote Control Operation”.

At the end of the project, Contractor will provide one paper copy and one electronic copy on CD of the following:

SHOP DRAWINGS AND EQUIPMENT DATA

a. Manufacturer’s catalog data for radio remote control system.

b. Dimensional drawings and details for component installation.

c. Wiring schematics (As-built drawings).

OPERATIONS AND MAINTENANCE MANUALS

a. Equipment function, normal operating characteristics, and limiting conditions.

b. Assembly, installation, alignment, and maintenance instructions.

c. Guide to “troubleshooting”.

d. Parts list.

e. As-built drawing.

WARRANTY

Upon final acceptance of the systems, a Standard Commercial Warranty shall commence for duration of One Year, to include as a minimum, parts and labor for the duration of the warranty, at no cost to the Government. The one year period shall commence from the date of notification by the Contracting Officer of the final acceptance. Final acceptance is defined as the act of an authorized representative of the Government, by which the Government assumes ownership of existing supplies/equipment and/or approves specific services rendered, as partial or complete performance of the contract (i.e. testing, training, and delivery of all required technical documentation).

(End of Summary of Changes)