180250046_(SOW)_Controls_Bridge_Crane.docx

DOCX document 15 KB Posted

Attached to
Upgrade Controls on Gantry Crane Federal contract opportunity
Solicitation number
W911PT-19-Q-0043
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

About this file

Scope of Work

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Controls on Gantry Crane, newest first.
File Type Posted
FBO_Amendment_Posting_0004.pdf PDF
FBO_Amendment_Posting_00003.pdf PDF
W911PT-19-Q-0043-0002.pdf PDF
W911PT-19-Q-0043-0001.pdf PDF
Electrical_drawings.pdf PDF
W911PT-19-Q-0043.pdf PDF
15-4143_Rev_10.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK AAS #180250046

1. Upgrade/Replace controls for all crane functions (Trolley, Bridge, Main and Aux Hoists) for crane B103, Bldg 110, Watervliet Arsenal, NY

2. Contractor will cover the cost of labor, equipment, and materials for the Upgrade/Replace Cab controls with mini-masters

3. Contractor will:

· Install new enclosures for function controls.

· Install one (1) new console using the Hubbell min master controller for one (1) for each motion (bridge, trolley, main hoist and auxiliary hoist)

· Upgrade/Replace contactors and wiring. Install arc suppressors on all coils of all functions

· Provide and install new resistors and all associated wiring and conduits as needed.

· Upgrade/Replace existing bridge brake with newer electric over hydraulic to include new master and slave cylinders like the braking systems installed on crane B248

· Install Magnatek remote control system (or equal product) similar to the ones installed on post (See Below)

a. The wireless digital radio remote-control system(s) utilized shall be designed and manufactured by a manufacturer engaged in design and manufacture of wireless radio remote control systems such as Magnetek Inc

All work will be in accordance with the manufacturer’s specifications.

When work is complete, the crane will be turned over for any and all work will be inspected and accepted by the Government Requiring Activity Representative.