W911PT-15-Q-0142-01_CONFORM_COPY.docx

DOCX document 142 KB Posted

Attached to
Elevator maintenance/Service Federal contract opportunity
Solicitation number
W911PT-15-Q-0142
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

About this file

Solicitation Amendment Conform COPY (consolidated up to amendment 01)

View the file

Other files for this federal contract opportunity

Other files attached to Elevator maintenance/Service, newest first.
File Type Posted
W911PT-15-Q-0142-01.docx DOCX document
5PW135_PWS_REV_8_Sept_2015.docx DOCX document
Wage_Determination__WD67-0450_Rev_53.pdf PDF
SITEVISIT_SEPT-16-2015.doc DOC document
5PW135_PWS_REV_8_Sept_2015.docx DOCX document
W911PT-15-Q-0142.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911PT-15-Q-0142

Section SF 30 - BLOCK 14 CONTINUATION PAGE

STATEMENT OF WORK

ELEVATOR, INSPECTION, TESTING, AND MAINTENANCE

Work Order #: 5PW135 Watervliet Arsenal Installation Management, Public Works Division Facilities Engineering (TAWV-IMP-F) Revised: 10 September 2015

PART 1 GENERAL

1.01 Scope.

A. This Performance Work Statement (PWS) defines the effort required for the inspection, testing, and repair of existing Elevators at Watervliet Army Arsenal, NY. This contract shall span the course of 12 months, commencing from the date of award, and, shall not exceed 100 hours Emergency work and 300 hours Routine.

1.02 Submittals.

A. The contractor shall e-mail all submittals to the Contracting Specialist for review and approval. All submittals require government approval unless otherwise explicitly stated.

B. The contractor shall reference APPENDIX A “Consolidated List of Submittals” for complete list of required submittals.

1.03 Hours of Operation.

A. Normal duty hours are 7:00 AM through 4:00 PM, Monday through Thursday, and 7:00 AM through 3:00 PM on select Fridays (the arsenal is closed every-other Friday). Federal holidays are non-work days. If a federal holiday falls on a Saturday or Sunday, the preceding Friday or following Monday is a work holiday.

1.04 General Requirements.

A. The contractor shall perform all work in strict conformance with Watervliet Arsenal Instructions for Contractors (WAIC). The contractor shall read and understand this document prior to submitting a proposal. The WAIC is publically available at:

http://www.wva.army.mil/Documents/Contracting/WAIC.pdf

B. The contractor shall supply all tools, materials, supplies, equipment, labor, temporary utilities and supervision necessary for the complete execution of the requirements within the contract documents and requirements of this SOW.

C. The contractor shall, prior to submitting a proposal, review (i) all contract documents, and (ii) the project work site, and shall provide written notice to Contracting Specialist detailing any discrepancies that are found between the contract documents and the project work site.

D. The contractor shall notify the Contracting Specialist a minimum of two (2) business days before the contractor starts work. The contractor shall notify the COR a minimum of seven (7) business days before the shut-down of a utility or building service.

E. The contactor shall clean all work areas, at the end of each work day, to remove all tools, equipment, debris, materials, and all waste from the work site.

1.05 Safety Requirements.

A. The contractor shall be responsible for complying with all DOD, Army, Federal, and State health and safety requirements which are applicable to this project, and shall use all means and precautions available to ensure the safety of the occupants and protection to the existing buildings and structures.

B. The contractor shall inspect the project work site prior to starting work, and shall request a copy of the asbestos building inspection records to verify the location and description of known asbestos-containing materials. The contractor shall sign the “Asbestos Notification Acknowledgement Record” and submit this form to the Contracting Specialist.

1.06 Personnel Qualification.

A. General. Personnel, either individually or through their affiliation with an organization that is registered, licensed, or certified by a state or local authority, shall be recognized as qualified and experienced in the inspection, testing, and maintenance of Elevator systems addressed within the scope of National Association of Elevator Contractors (NAEC).

B. Inspection Personnel. Inspections shall be performed by personnel who have developed competence through training and experience acceptable to the Government, or meet the requirement of ASME A17.3 and ASME A17.1 and National Association of Elevator Contractors (NAEC).

C. Testing Personnel. Testing personnel shall have knowledge and experience of the testing requirements for elevators of this Code acceptable to Government, or meet the requirement of ASME A17.3 and ASME A17.1 and National Association of Elevator Contractors (NAEC).

D. Service Personnel. Service personnel shall be qualified in the maintenance and servicing of systems addressed within the scope of ASME A17.3 and ASME A17.1 and National Association of Elevator Contractors (NAEC). Qualified personnel shall include, but not be limited to, one or more of the following:

1. Personnel who are factory trained and certified for the specific type and brand of system being serviced.

2. Personnel who are certified by a nationally recognized certification organization acceptable to the authority having jurisdiction. Personnel, either individually or through their affiliation with an organization that is registered, licensed, or certified by a state or local authority to perform service on systems addressed within the scope of ASME A17.3 and ASME A17.1 and National Association of Elevator Contractors.

3. Personnel who are employed and qualified by an organization listed by a nationally recognized testing laboratory for the servicing of Elevator systems within the scope of ASME A17.3 and ASME A17.1 and National Association of Elevator Contractors.

E. Programming. Personnel programming a system shall be certified by the system manufacturer.

F. Evidence of Qualification. Evidence of qualifications shall be submitted to the Government with bid.

1.07 Government Furnished Property and Services

A. The Government will provide a Fire Department representative to assist the contractor with inspection/testing tasks (if required). The contractor shall coordinate with the project COR for this assistance no-sooner-than two (2) weeks prior to the start of inspection/testing work which involves the assistance of the Fire Department representative.

1.08 Project Schedule.

A. The contractor shall create a project schedule and submit for Government review and approval. The project schedule shall detail each building to be inspected/tested and shall indicate proposed dates for each building. The contractor shall indicate any requirements for work performed outside of regular hours of operation.

1.09 Applicable Documents.

A. Watervliet Arsenal Instructions for Contractors (WAIC).

PART 2 PRODUCTS

2.01 General.

A. Unless otherwise stated, all materials for this project shall be new. All products shall not contain any asbestos, mercury, chromium/lead paint, Class I Freon, and Polychlorinated Biphenyls (PCB), and shall state such on the manufacturer’s original packaging.

B. All work shall be in strict accordance with product manufacturer’s instructions and specifications, including but not limited to manufacturer guidance for storage, staging, application, installation, and disposal of the product.

PART 3 PERFORMANCE

3.01 Routine Service Calls.

A. The contractor shall perform routine service call repairs on all Elevator systems to ensure proper operational condition, as requested by authorized government official via phone call or email to the contractor. All work shall be completed during Watervliet normal duty hours and ASME A17.3, ASME A17.1, NAEC, and manufacturers’ listed procedures.

B. The contractor shall charge man-hours for routine service calls starting upon entering WVA, and cease charging man-hours upon leaving WVA. Mileage for travel shall not be allowed.

C. The contractor shall bring all manpower, tools, equipment, and common parts to accomplish routine service calls during the initial site visit. Once the repairs are started, a maximum total of two (2) man-hours per emergency service call will be allowed to acquire additional parts if necessary.

D. The contractor shall notify the COR via phone call upon entering WVA (start of work), upon leaving WVA for parts, and upon leaving WVA (end of work). This allows the Government to validate the man-hours used on each routine service call. The telephone notification shall include the number of contractor personnel and the list of service calls that the contractor will repair during the visit.

E. The contractor shall generate a service order slip for each completed routine repair. The service order slip shall include the total man-hours requested for that single routine repair, and the cost of materials. If the routine repair takes multiple work shifts, the daily man hours shall be broken out on the service order slip.

3.02 Emergency Service Calls.

A. The contractor shall perform emergency service call repairs for malfunctioning or inoperative Elevator systems during business hours, non-business hours (nights and weekends) and holidays. The contractor shall arrive on-site following an emergency service call within one and a half (1.5) hours.

B. The contractor shall charge man-hours for emergency service calls starting upon entering WVA and cease charging man-hours upon leaving WVA.

C. The contractor shall bring all manpower, tools, equipment, and common parts to accomplish emergency service calls during the initial site visit. Once the repairs are started, a maximum total of four (4) man-hours per emergency service call will be allowed to acquire additional parts if necessary.

D. The contractor shall notify the COR via phone call upon entering WVA (start of work), upon leaving WVA for parts, and upon leaving WVA (end of work). This allows the Government to validate the man-hours used on each routine service call. The telephone notification shall include the number of contractor personnel and the list of service calls that the contractor will repair during the visit.

E. The contractor shall generate a service order slip for each completed routine repair. The service order slip shall include the total man-hours requested for that single routine repair, and the cost of materials. If the routine repair takes multiple work shifts, the daily man hours shall be broken out on the service order slip.

3.03 Documentation.

A. The contractor shall provide record of all inspections, testing, and maintenance, as required by ASME A17.3, ASME A17.1 and NAEC.

B. The contractor shall submit a report of all Elevator tests, inspections and maintenance accomplished at the conclusion of each occurrence. Reports shall include a record of conditions, completed tests, inspection results, completed inspection form, and preventive or corrective maintenance performed on a system, and shall include all required and applicable information per ASME A17.3, ASME A17.1, and NAEC.

C. The contractor shall provide all reports and service order slips as legible, professionally appearing documents which include the contractor’s company name, company address, and company phone number. All tasks performed shall be presented each in bullet points.

3.04 Reimbursable Parts.

A. The contractor shall be responsible for procuring all required parts for all repairs.

B. Contractor shall request approval from the COR prior to the purchase of any parts or installation.

C. The contractor will be reimbursed for parts at cost.

D. The contractor shall attach a copy of the supplier’s original invoice to the request for reimbursement for all purchases over $25.

E. The contractor shall seek minimum of two, preferably three, competitive price quotations prior to purchasing replacement parts or services with an estimated value over $2,500. The contractor shall attach competitive quote documentation to request for reimbursement for all purchases over $2,500.

F. It is understood that the contractor shall charge an additional 2 man hours for the acquisition of parts.

G. If additional man hours are required for the acquisition of parts, this requires prior approval by the COR.

PART 4 CLOSEOUT REQUIREMENTS

4.01 Cleanup of Work Site.

A. The contactor shall clean all work areas and remove all tools, equipment, debris, materials, and all waste from the premises upon completion of each service call, inspection, or test procedure.

PART 5 APPENDICES

A. Consolidated List of Submittals B. Quality Assurance Surveillance Plan (QASP) C. Simplex Building List

APPENDIX A: Consolidated List of Submittals

Line
Item Submitted
Submittal Needed By
Submittal Reviewed By (Office)
1
Safety Data Sheets for Hazardous Materials (SDS)
NLT 7 Calendar Days After Award
Safety Office
2
Signed Contractor Asbestos Notification Form
NLT 7 Calendar Days After Award
Environmental Office
3
Personnel Qualifications (1.06)
NLT 7 Calendar Days After Award
COR
4
Test Plan
NLT 7 Calendar Days After Award
COR
5
Inspection Plan
NLT 7 Calendar Days After Award
COR
6
Testing/Inspection Schedule
NLT 7 Calendar Days After Award
COR

APPENDIX B: Quality Assurance Surveillance Plan (QASP)

PURPOSE

This Quality Assurance Surveillance Plan (QASP) will be used as a guide to Government Quality Assurance Personnel (QAP). It provides a systematic method to evaluate the services the contractor is required to furnish.

SURVEILLANCE PROCEDURES

Timeliness: Progress is maintained to assure compliance with completion time.

Quality: Conformance with statement of work and industry standards.

Tasks: Performed according to statement of work requirements.

Problem Resolution: Contractor submits deliverables in accordance with the contract and resolves any deficiencies identified by the government in the final submission. Following final submission, contractor resolves any additional deficiencies identified by the government and resubmits and or corrects within one week.

Delivery: Contractor submits each deliverable in accordance with the statement of work and terms of the contract.

PERFORMANCE AREAS

Management Responsiveness: Evaluate the adequacy of the contractor’s responsiveness and their ability to keep the government informed of work progress and provides for early problem identification and effective corrective action plans.

Schedule Control: Evaluate the contractor’s adherence to completion schedule.

Performance: The contractor will be evaluated as to the workmanship and adherence to the statement of work.

EVALUATION CRITERIA

(Outstanding). Indicates performance clearly exceeds contractual requirements. The area of evaluation contains few minor problems for which corrective actions appear highly effective.

(Satisfactory). Indicates performance clearly meets contractual requirements. The area of evaluation contains some minor problems for which the corrective actions appear satisfactory.

(Unsatisfactory). Indicates the contractor failed to satisfy contractual requirements and recovery is not likely in a timely manner. The area of evaluation contains serious problems for which the corrective actions were ineffective.

DOCUMENTATION

Documentation used to perform surveillance will consist of random government inspections and inspection records, as well as the evaluation of final work product delivery by the project COR/COTR.

RATING

Contractor will be given an overall rating of Outstanding, Satisfactory, or Unsatisfactory by the Government Technical point of contact or Contracting Specialist Representative, if appointed, 3 using the above evaluation criteria.

APPENDIX C: Simplex Building List The following buildings include fire Elevator/ Lift systems under the scope of this contract:

Building
Manufacturer
Serial Number
Capacity
Hydraulic?
Type
10
MATOL
Mod. 200
500

Dumbwaiter

23
OTIS
202207
4,000

Freight

25
WARSAW/Montgomery
CTS-47066
5,000
SCR Drive
Passenger
25
Montgomery
CP50059
3,500
Hydraulic
Passenger
25
OTIS
27698
30,000

Freight

35 (North)
MONTGOMERY
39362
20,000
Hydraulic
Freight
35 (South)
MONTGOMERY
39363
20,000
Hydraulic
Freight
35
MCGUIRE -AUTODOCK
3 Units

SHIPPING & RCVG

DOCK LIFT

40
Montgomery
431H
3,500
Hydraulic
Passenger
40
American Stairglide

Chair Lift

44
OTIS
204521
10,000
Hydraulic
Freight
44
AUTOQUIP
TSL-6FX
13,500

Material Lift

44
THYSSEN KRUPP ELEVATOR
Hydraulic
Passenger

Chair Lift

115
OTIS
202006
20,000

Freight

120
WARSAW
10530
20,000

Freight

135 – East Pit
OTIS
202090
2,500

Passenger

135 – West Pit
OTIS
202164
1,200

Passenger

136
MOHAWK
548763
1,200

Passenger

WAGE DETERMINATION

WD 67-0450 (Rev.-53) was first posted on www.wdol.gov on 05/12/2015 Elevator Services

REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR

THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION

By direction of the Secretary of Labor | WAGE AND HOUR DIVISION

| WASHINGTON, D.C. 20210

Diane C. Koplewski Division of Wage | Wage Determination No: 1967-0450 Director Determinations | Revision No: 53 | Date Of Revision: 05/06/2015 Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Service Contract Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

State: New York Area: New York Counties of Albany, Clinton, Essex, Fulton, Hamilton, Herkimer, Montgomery, Otsego, Rensselaer, Saratoga, Schenectady, Schoharie, Warren, Washington **Fringe Benefits Required Follow the Occupational Listing**

OCCUPATION CODE - TITLE FOOTNOTE RATE

23210 - Elevator Repairer 41.51

ALL OCCUPATIONS LISTED ABOVE RECEIVE THE FOLLOWING BENEFITS:

HEALTH & WELFARE: $13.575 per hour for all hours worked

VACATION: Annual vacation pay is accrued as follows: After 6 months but less than 5 years of service in the industry, 6 percent of regular hourly rate for all hours worked, not to exceed 120 hours pay; more than 5 years of service in the industry, 8 percent of regular hourly rate for all hours worked, at least 160 hours vacation pay. Maximum hours of vacation pay are applicable to an employee who works 1750 hours or more but less than 2000 hours in the year.

HOLIDAYS: A minimum of eight paid holidays per year: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the Day after Thanksgiving Day, and Christmas Day. (A contractor may substitute for any of the named holidays another day off with pay in accordance with a plan communicated to the employees involved.) (See 29 CFR 4.174)

PENSION: Elevator Pension $8.46 per hour.

401(K) Annunity $5.75 per hour for all hours worked.

Elevator Education Fund $.60 per hour for all hours worked.

Elevator - Work Preservation Fund $.30.

CLAUSES INCORPORATED BY FULL TEXT

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

Invoice 2-in-1 (Services Only)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

Not Applicable

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAACHQ0303
Issue By DoDAACW911PT
Admin DoDAACW911PT
Inspect By DoDAACN/A
Ship To CodeN/A
Ship From CodeN/A
Mark For CodeN/A
Service Approver (DoDAAC)N/A
Service Acceptor (DoDAAC)W911PT
Accept at Other DoDAACN/A
LPO DoDAACN/A
DCAA Auditor DoDAACN/A
Other DoDAAC(s)N/A

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

N/A

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

N/A

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

(End of clause)

Section SF 1449 - CONTINUATION SHEET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

FSC:J059 ELEVATOR MAINTENANCE

FFP

As specified in the statement of work 5PW135, which is incorporated, vendor to provide all materials, labor, and equipment necessary to provide annual routine and emergency service to elevators located at the Watervliet Arsenal. Wage determination WD67-0450 rev 23 applies and is incorporated.

Provide quote based upon the following information:

300 hours x ______ labor rate = $_________ routine service hours

100 hours x ______ labor rate = $___________ emergency service

**It is understood that profit and overhead are included in the labor rate quoted.

MID: 74705 M7955

FOB: Destination

NSN: AASSVC522500LM

MILSTRIP: W16H1F522500LM

PURCHASE REQUEST NUMBER: W16H1F522500LM

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

FSC:J059 Contractor Manpower Reporting

FFP

Contractor Reporting System Requirement. For more information SEE CLAUSE 52.0000-4951, Statement of Work/Contractor Manpower Reporting.

Requiring Activity UIC W0K9AA is provided to facilitate reporting. Unit of Issue: 1 Lump Sum.

Contractor Manpower Reporting website: https://cmra.army.mil

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
FSC:J059 ELEVATOR MAINTENANCE

FFP

As specified in the statement of work 5PW135, which is incorporated, vendor to provide all materials, labor, and equipment necessary to provide annual routine and emergency service to elevators located at the Watervliet Arsenal. Wage determination WD67-0450 rev 23 applies and is incorporated.

Provide quote based upon the following information:

300 hours x ______ labor rate = $_________ routine service hours

100 hours x ______ labor rate = $___________ emergency service

**It is understood that profit and overhead are included in the labor rate quoted.

MID: 74705 M7955

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
FSC:J059 Contractor Manpower Reporting

FFP

Contractor Reporting System Requirement. For more information SEE CLAUSE 52.0000-4951, Statement of Work/Contractor Manpower Reporting.

Requiring Activity UIC W0K9AA is provided to facilitate reporting. Unit of Issue: 1 Lump Sum.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
FSC:J059 ELEVATOR MAINTENANCE

FFP

As specified in the statement of work 5PW135, which is incorporated, vendor to provide all materials, labor, and equipment necessary to provide annual routine and emergency service to elevators located at the Watervliet Arsenal. Wage determination WD67-0450 rev 23 applies and is incorporated.

Provide quote based upon the following information:

300 hours x ______ labor rate = $_________ routine service hours

100 hours x ______ labor rate = $___________ emergency service

**It is understood that profit and overhead are included in the labor rate quoted.

MID: 74705 M7955

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
FSC:J059 Contractor Manpower Reporting

FFP

Contractor Reporting System Requirement. For more information SEE CLAUSE 52.0000-4951, Statement of Work/Contractor Manpower Reporting.

Requiring Activity UIC W0K9AA is provided to facilitate reporting. Unit of Issue: 1 Lump Sum.

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government
0002
Destination
Government
Destination
Government
0003
Destination
Government
Destination
Government
0004
Destination
Government
Destination
Government
0005
Destination
Government
Destination
Government
0006
Destination
Government
Destination
Government

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC
0001
POP 01-OCT-2015 TO

30-SEP-2016

N/A
ARMY CONTRACTING COMMAND-WARREN (WVA)

CONTRACTING

ATTN: CCTA-HDW/BLDG 10

1 BUFFINGTON STREET

WATERVLIET NY 12189-4000

W911PT

0002
N/A
N/A
N/A
N/A
0003
N/A
N/A
N/A
N/A
0004
N/A
N/A
N/A
N/A
0005
N/A
N/A
N/A
N/A
0006
N/A
N/A
N/A
N/A

CLAUSES INCORPORATED BY REFERENCE

52.203-11
Certification And Disclosure Regarding Payments To Influence Certain Federal Transactions
SEP 2007
52.204-7
System for Award Management
JUL 2013
52.204-10
Reporting Executive Compensation and First-Tier Subcontract Awards
JUL 2013
52.204-13
System for Award Management Maintenance
JUL 2013
52.209-2
Prohibition on Contracting with Inverted Domestic Corporations--Representation
DEC 2014
52.209-6
Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
AUG 2013
52.209-10
Prohibition on Contracting With Inverted Domestic Corporations
DEC 2014
52.212-1
Instructions to Offerors--Commercial Items
APR 2014
52.212-4
Contract Terms and Conditions--Commercial Items
MAY 2015
52.212-5 (Dev)
Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Items (Deviation 2013-O0019)
MAY 2015
52.214-34
Submission Of Offers In The English Language
APR 1991
52.214-35
Submission Of Offers In U.S. Currency
APR 1991
52.217-5
Evaluation Of Options
JUL 1990
52.219-6
Notice Of Total Small Business Set-Aside
NOV 2011
52.219-14
Limitations On Subcontracting
NOV 2011
52.222-3
Convict Labor
JUN 2003
52.222-21
Prohibition Of Segregated Facilities
APR 2015
52.222-26
Equal Opportunity
APR 2015
52.222-37
Employment Reports on Veterans
JUL 2014
52.222-50
Combating Trafficking in Persons
MAR 2015
52.223-5
Pollution Prevention and Right-to-Know Information
MAY 2011
52.223-16 Alt I
Acquisition of EPEAT - Registered Personal Computer Products - Alternate I
JUN 2014
52.223-18
Encouraging Contractor Policies To Ban Text Messaging While Driving
AUG 2011
52.225-13
Restrictions on Certain Foreign Purchases
JUN 2008
52.232-33
Payment by Electronic Funds Transfer--System for Award Management
JUL 2013
52.233-3
Protest After Award
AUG 1996
52.237-1
Site Visit
APR 1984
52.237-2
Protection Of Government Buildings, Equipment, And Vegetation
APR 1984
52.237-3
Continuity Of Services
JAN 1991
52.242-15
Stop-Work Order
AUG 1989
52.247-34
F.O.B. Destination
NOV 1991
252.203-7000
Requirements Relating to Compensation of Former DoD Officials
SEP 2011
252.203-7002
Requirement to Inform Employees of Whistleblower Rights
SEP 2013
252.204-7003
Control Of Government Personnel Work Product
APR 1992
252.209-7004
Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
DEC 2014
252.223-7006
Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials
SEP 2014
252.223-7008
Prohibition of Hexavalent Chromium
JUN 2013
252.225-7001
Buy American And Balance Of Payments Program-- Basic (Nov 2014)
NOV 2014
252.225-7002
Qualifying Country Sources As Subcontractors
DEC 2012
252.225-7012
Preference For Certain Domestic Commodities
FEB 2013
252.225-7031
Secondary Arab Boycott Of Israel
JUN 2005
252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
JUN 2012
252.232-7010
Levies on Contract Payments
DEC 2006
252.243-7001
Pricing Of Contract Modifications
DEC 1991
252.247-7023
Transportation of Supplies by Sea
APR 2014
252.247-7024
Notification Of Transportation Of Supplies By Sea
MAR 2000

52.0000-4002 REQUEST FOR QUOTE RESPONSES (Aug 2015) (ACC-WRN (WVA))

*** NOTICE – Vendors should not use the ASFI Bid Response System for submitting quote responses to this office as of 10 August 2015****

ALL RESPONSES MUST BE ELECTRONIC. YOU MAY SUBMIT YOUR QUOTE RESPONSES USING ONE OF THE FOLLOWING METHODS:

Email to ___ hemwatie.ramasami.civ@mail.mil

As of 10 August 2015, you may use the Federal Business Opportunities (FBO) System. Offers received after this date using the ASFI Bid Response System (ASFI BRS), may be deemed non-responsive.

(c) Requirements for the online FBO bid submission:

1. Vendors must login to the FBO System to be able to submit electronic responses for opportunities.

1. Vendors must also registered in the System for Award Management (SAM) at www.sam.gov (a Federal Government owned and operated free web site) and have a CAGE Code and CCR Marketing Partner Identification Number (MPIN).

1. Once logged into the FBO System, vendors will be asked to enter basic information and then will be directed to upload one or more files containing the offer and any additional information as outlined in the solicitation.

1. FBO will send an email to the email address on file for the user confirming the electronic submission.

1. For additional information on submitting electronic bid responses via the Federal Business Opportunities System reference the FBO Vendor Guide – Section 4.3.1 Submitting an Electronic Response Topic (https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf).

REQUEST FOR QUOTES MUST BE FILLED OUT COMPLETELY AND SENT IN ITS ENTIRETY TO BE CONSIDERED RESPONSIVE.

(END OF NOTICE)

52.0000-4200 NOTICE OF WATERVLIET ARSENAL INFORMATION/REQUIREMENTS (Dec 2014) (ACC-WRN(WVA)):

IMPORTANT DELIVERY/QUALITY REQUIREMENTS:

ALL OFFERORS MUST CAREFULLY REVIEW THE DELIVERY REQUIREMENT IN THE REQUEST FOR QUOTE OR SOLICITATION. WHEN SUBMITTING AN OFFER/BID, PLEASE ENSURE THAT YOU CAN MEET THE DELIVERY SCHEDULE.

ON TIME DELIVERY IS VERY CRITICAL. THEREFORE, YOU MUST ADHERE TO THE DELIVERY REQUIREMENTS INDICATED IN ANY RESULTANT AWARD. FAILURE TO COMPLY WITH THE CONTRACTUAL DELIVERY SCHEDULE, MAY RESULT IN TERMINATION OF THE ORDER OR REQUIRE CONSIDERATION IF THE GOVERNMENT ELECTS TO EXTEND DELIVERY. (NOTE: Non-availability of raw materials, subcontractor issues, scheduling conflicts, should be considered at the time you are submitting your offer/bid. They are not acceptable excuses for failing to meet the delivery after award).

PROVIDING QUALITY PRODUCTS THAT CONFORM TO THE CONTRACT ARE JUST AS IMPORTANT AS MEETING THE REQUIRED DELIVERY. DELIVERY OF NON-CONFORMING PRODUCTS RESULTS IN DELIVERY DELAYS AND INCREASED COSTS TO THE ARSENAL.

PAST PERFORMANCE FOR QUALITY AND DELIVERY MAY BE A MAJOR CONSIDERATION IN MAKING DETERMINATIONS FOR FUTURE CONTRACT AWARDS.

NOTICE: Throughout this document we may use the terms “we” and “you”, the term “we” means the government of the United States of America, and the term “you” means the contractor.

WATERVLIET ARSENAL INFORMATION FOR CONTRACTORS:

“Watervliet Arsenal Information for Contractors” document is incorporated by reference in all solicitations and contracts. The full text version of the instructions is available at Internet address: http://www.wva.army.mil/Documents/Contracting/WAIC.pdf Upon request, the contracting officer will make its full text available.”

POC - CONTRACT SPECIALIST/BUYER: Miss Hemwatie Ramasami

TELEPHONE NUMBER: 518-266-4634

E-MAIL ADDRESS: hemwatie.ramasami.civ@mail.mil

CONTRACTOR DUNS NUMBER/CAGE CODE/FAX NUMBER:

Please provide the following information for your company.

VENDOR NAME: _________________________

VENDOR POC: __________________________

POC PHONE: ____________________________

E-MAIL ADDRESS (see note below): __________________________

DUNS NUMBER _______________________

CAGE CODE (if known) __________________

TAX ID NUMBER ________________________

VENDOR FAX NUMBER ________________

NOTE: Your e-mail address is required so that in the event you receive the resultant award, we can e-mail it to you. If we experience difficulties with e-mail, it will be datafaxed.

AWCF BULK FUND __x__ DOES ____ DOES NOT APPLY

POSTERS:

Walsh-Healey Act/Service Contract Act. Orders subject to these Acts require contractors to post WH Publication 1313, “Employee Rights on Government Contracts”.

Construction Orders. Orders for construction require contractors to post WH Publication 1321, “Employee Rights under the Davis Bacon Act” and the Office of Federal Contract Compliance poster on “Equal Employment Opportunity is the Law.”

These posters can be accessed electronically at http://www.dol.gov .

Hard copies of the posters will be made available upon request to the contracting officer.

PAYMENTS:

Any vendor that receives an award (except those paid by credit card or accommodation check) can view invoice payments made by DFAS at https://wawf.eb.mil/ using the “my invoice” system. You will be required to register in order to view payments. Payment information is maintained for 120 days from invoice payment. Vendors can find out when invoices have been paid by Electronic Funds Transfer (EFT), etc. This website can save valuable time and frustration over billing questions and it is a free service.

RELEASE OF INFORMATION:

The contractor shall not release or authorize release of DoD specifications; acceptance test results; information involving critical military technology; or any other information in which the DoD maintains proprietary rights, or is otherwise confidential or classified. This restriction includes any endorsement by the Department of Army of a contractor. Release of information under the circumstances referenced above requires the prior written approval of the Contracting Officer responsible for this contract. It is the contractor’s responsibility to be familiar with, and comply with the requirements of Chapter 5, page 22, paragraph 5-48, of AR 360-1 may be found at http://www.apd.army.mil/pdffiles/r360_1.pdf

(END OF CLAUSE)

52.0000-4201 SERVICES/CONSTRUCTION REQUIREMENTS (Dec 2014) (ACC-WRN(WVA)):

SCHEDULE UNIT OF MEASURE NOTE: When "LOT" is stated as a unit of measure it is the equivalent to "JOB".

WORK PERFORMED ON-SITE AT WATERVLIET ARSENAL:

The contractor agrees that each employee working at Watervliet Arsenal will sign the “Contractor Personnel Agreement on Non-Disclosure of Watervliet Arsenal Technology below. Signatures must be received by the Contract Administrator before work may begin and any resultant delay won’t be considered an excusable delay to contract performance as defined in the contract clause “Default”. Additional copies of this Non-Disclosure Statement can be found on the Internet at http://www.wva.army.mil/Documents/Contracting/nondis.pdf

CONTRACTOR PERSONNEL AGREEMENT ON NON-DISCLOSURE

OF WATERVLIET ARSENAL TECHNOLOGY

1. The Undersigned, as an employee of _________________________ (Name of Firm) agrees to the following terms and conditions.

2. Any knowledge gained, as a result of my being permitted on Watervliet Arsenal’s premises, concerning cannon production technology (as defined below) or other technology on any defense item being manufactured or developed at Watervliet Arsenal, will not be released outside of _________________________ (Name of firm) and/or the United States of America (this prohibition includes, but is not limited to, the company’s domestic and foreign subsidiaries, affiliates, etc.), nor will such technology be used to manufacture or assist another in the manufacture of cannon (as described below) or other defense items being manufactured or developed at Watervliet Arsenal, without the written prior approval of Watervliet Arsenal.

3. Definitions:

a. CANNON: is defined as any and all components/parts of a complete assembly consisting of a tube, breech mechanism, tube attachments, muzzle appendages, firing mechanisms, and all integral components. It may also be a component of a weapons system of 40mm Bore or over such as tank guns, towed and self-propelled howitzers, naval guns, mortars and recoilless guns.

b. CANNON PRODUCTION TECHNOLOGY: is defined as the technical data package and manufacturing technology.

(1) TECHNICAL DATA PACKAGE: cannon engineering drawings, specifications and standards.

(2) MANUFACTURING TECHNOLOGY: technical knowledge, documentation, assistance and equipment and machines used an/or useful in the manufacturing of cannon.

(a) TECHNICAL KNOWLEDGE: the know how collected, trade secrets, production experience and special skills necessary for the production of cannon and the technical information and inventions necessary for the manufacture of cannon and relating to the manufacture of cannon.

(b) TECHNICAL DOCUMENTATION: manufacturing technical data comprised of drawings, specifications, schemes, composition, descriptions, methods of calculations, instructions and other information necessary for the manufacture of cannon.

(c) TECHNICAL ASSISTANCE: all assistance required to make practical and economical use of the technology required to manufacture cannon, such as delivery of documentation, training of personnel, instructions, consultations and acquainting of specialists with the most economical method of using this technology in the manufacture of cannon.

(d) EQUIPMENT AND MACHINES: production machines, machine accessories, apparatuses, spare parts and tooling used for cannon manufacture.

_______________________________________________________________________
TYPED OR PRINTED NAME, SIGNATUREDATE
_______________________________________________________________________
TYPED OR PRINTED NAME, SIGNATUREDATE
_______________________________________________________________________
TYPED OR PRINTED NAME, SIGNATUREDATE

JOB SITE AVAILABILITY:

The work site will be available for performance during normal business hours:

Monday through Thursday Business Hours: 7:00 a.m. EST to 4:00 p.m. EST

Friday Business Hours: Every other Friday from 7:00 a.m. EST to 3:00 p.m. EST

Fridays will be staggered with every other Friday being a closed business day. The first Friday of 2015 to be closed is January 9, 2015.

Based on the above, service contractors should call contract/purchase order administrator in advance if service is scheduled for a Friday to determine if the Arsenal will be open for business.

When a federal holiday is normally observed on Friday, the Arsenal may be closed on the preceding Thursday. In this case, contact the contract/purchase order administrator in advance if scheduling service to determine if the Arsenal will be open for business.

Work at other than the above hours won’t be allowed unless the contractor makes an application at least 48 hours in advance and gets written contracting officer approval. No guarantee is made that the job site will be made available other than as stated above.

CONTROL OF FOREIGN VISITORS TO WATERVLIET ARSENAL:

Offerors are advised that any employee or representative of their company who is not a U.S. citizen, (or is representing a foreign company) and is a U.S. citizen), planning on visiting the Watervliet Arsenal for the purpose of attending: bid conferences, bid openings, site visits, engineering services, or any other visit related to this solicitation will be escorted at all times by an arsenal representative while on the installation grounds.

Therefore, offerors must notify the Contracting Officer in advance (a minimum of two [2] weeks) of any proposed visit by a non-U.S. citizen or U.S. citizen representing a foreign firm, to assure proper clearance for entry into the arsenal. Failure to comply, or disclose a foreign national visitor, may subject the Contractor to the penalties set forth in 18 U.S.C.A. Section 1001, Chapter 14.

Due to manpower constraints, Watervliet Arsenal is often unable to provide escort services during contract performance. Therefore, if the resulting contract requires performance on Watervliet Arsenal property, employees, individuals or subcontractors representing the successful offeror who are not U.S. citizens may not, depending on staffing levels and the availability of escorts, be allowed access to the Arsenal for purpose of contract performance.

Be further advised that the inability of the Arsenal to provide escorts resulting in denial of access to Watervliet Arsenal of the aforementioned personnel will not be considered an excusable delay to contract performance as defined in the contract clause “Default” contained in the contract. Therefore, offerors should consider the above contingencies during offer preparation.

CONTRACTOR IDENTIFICATION:

Contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence, and when working in situations where their actions could be construed as official government acts.

52.0000-4202 DELIVERY INFORMATION (Dec 2014) (ACC-WRN(WVA))

NOTICE: NORMAL BUSINESS HOURS/WORK SCHEDULE FOR WATERVLIET ARSENAL IS AS FOLLOWS:

Monday through Thursday Business Hours: 6:30 A.M. EST to 3:30 P.M. EST

Friday Business Hours: Every other Friday from 6:30 A.M. EST to 2:00 P.M. EST

Fridays will be staggered with every other Friday being a closed business day. The first Friday of 2015 to be closed is January 9, 2015.

BASED ON THE ABOVE, CONTRACTORS SHOULD CALL THE CONTRACT/PURCHASE ORDER ADMINISTRATOR IN ADVANCE IF DELIVERY IS SCHEDULED FOR A FRIDAY TO FIND OUT IF THE ARSENAL WILL BE OPEN FOR BUSINESS.

Also, when a federal holiday is normally observed on a Friday, the arsenal may be closed on the preceding Thursday. In these instances, please contact the contract/purchase order administrator in advance of delivery if Thursday delivery is anticipated to determine if the arsenal will be open for business.

THE ABOVE INFORMATION SHOULD BE NOTED WHEN SCHEDULING DELIVERIES AS WATERVLIET ARSENAL WILL NOT BE LIABLE FOR ANY STORAGE, DEMURRAGE OR SHIPPER LABOR COSTS INCURRED AS A RESULT OF CONTRACTOR ATTEMPTED DELIVERIES ARRIVING DURING NON-BUSINESS HOURS.

ITEM DESCRIPTION:

The material delivered hereon must be tagged or otherwise identified by placing the purchase order/contract number on the packing slip or it will be returned at the contractor’s expense. If more than one item is involved, material must be segregated by item and must be tagged or otherwise identified by item number. National stock number, when applicable, must be shown on all vendor’s documents, such as Bill of Lading, Notice of Shipment, delivery or packing slip, etc.

52.0000-4207 PROMPT PAYMENT NOTICE TO FAR 52.232-25 (OCT 2003) (ACC-WRN(WVA))

(a)(5)(i) For the purposes of this clause referenced elsewhere herein, Government acceptance shall be deemed to have occurred constructively on the 10th day after the contractor delivered the supplies or performed the services.

52.0000-4385 EVALUATION OF OPTION TO EXTEND SERVICES UNDER FAR 52.217-8 (OCT 2011) (ACC)

As part of the price evaluation, the Government will evaluate the Option to Extend Services under FAR Clause 52.217-8 by adding one-half of the offeror’s final option period price to the offeror’s total price. Thus, the offeror’s total price for the purpose of the evaluation will include the base period, total of options, and one-half of the last year option to determine the price basis. Offerors are required only to price the base and each option. Offerors shall not submit a price for the potential one-half year extension of services period.

(End of Provision)

52.0000-4702 HQ-AMC-LEVEL PROTEST PROCEDURES (Oct 2013) (ACC-WRN)

Complete AMC Protest Procedures can be found at: http://www.amc.army.mil/amc/commandcounsel.html

An agency protest may be filed with either the contracting officer or to HQAMC but not both following the procedures listed on the website above.

(END OF CLAUSE)

52.0000-4950 Disclosure of Unit Price Information (Jun 2004) (ACC-WRN (WVA))

This constitutes notification pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for Confidential Commercial Information (June 23, 1987), of our intention to release unit prices of the awardee in response to any request under the Freedom of Information Act, 5 USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the contracting officer is notified of your objection to such release prior to submission of initial proposals.

END OF CLAUSE

52.0000-4951 STATEMENT OF WORK/CONTRACTOR MANPOWER REPORTING (Mar 2013) (ACC-WRN(WVA))

The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the required data fields in the format using the following web address: https://cmra.army.mil

The required information includes:

1. Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative;

1. Contract number, including task and delivery order number;

1. Beginning and ending dates covered by reporting period;

1. Contractor name, address, phone number, e-mail address, identity of contractor employee entering data;

1. Direct labor hours (including sub-contractors);

1. Direct labor dollars paid this reporting period (including sub-contractors);

1. Total payments (including sub-contractors);

1. Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different);

1. Data collection cost;

1. Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information);

1. Locatoins where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website);

1. Presence of deployment or contingency contract language; and

1. Number of contractor and sub-contractor employees deployed in theater this reporting period (by country).

Reporting inputs will be fore the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at: https://cmra.army.mil.

(End of statement of work for contractor manpower reporting)

For clarification purposes:

The requiring activity UIC is found in the contract line item for “Contractor Manpower Reporting” (i.e. W0K9AA, W4MK03).

The Command for Watervliet Arsenal is the Army Materiel Command (AMC – Code 6A)).

52.0000-4961 EVALUATION—COMMERCIAL ITEMS (APR 2009) (ACC-WRN (WVA))

(a) We will award a contract to the offeror that:

1. submits the lowest evaluated bid or offer, and

2. submits a bid or proposal that meets all the material requirements of this solicitation, and

3. meets all the responsibility criteria at FAR 9.104

(b) To make sure that you meet the responsibility criteria at FAR 9.104 we may:

1. arrange a visit to your plant and perform a preaward survey;

2. ask you to provide financial, technical, production, or managerial background information.

(c) Options. We will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. We may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate us to exercise the option(s).

(d) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, we may accept an offer (or part of an offer), regardless of whether there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

52.0000-4961 ALT I EVALUATION—COMMERCIAL ITEMS - ALT I (MAR 2015) (ACC-WRN (WVA))

(a) We will award a contract to the offeror that:

1. submits the lowest evaluated bid or offer, and

2. submits a bid or proposal that meets all the material requirements of this solicitation,

3. meets or exceeds the technical requirements of the specification, and

4. meets all the responsibility criteria at FAR 9.104

(b) To make sure that you meet the responsibility criteria at FAR 9.104 we may:

1. arrange a visit to your plant and perform a preaward survey;

2. ask you to provide financial, technical, production, or managerial background information.

(c) Options. If applicable, we will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .