W911KF-20-Q-0007_Released.pdf
PDF 962 KB Posted
- Attached to
- MONARCH MACHINE TOOL PM & ER Federal contract opportunity
- Solicitation number
- W911KF-20-Q-0007
About this file
SOLICITATION
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 001.pdf | ||
| ATTACHMENT_1_Revised_SOW-Monarch_Machine_Tool_PM_and_ER.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W911KF20Q0007 23-Oct-2019
b. TELEPHONE NUMBER
256-240-3196
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 25 Nov 2019
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W911KF9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
LAKEETA BEAVERS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W31G1Y9252017M
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
ARMY CONTRACTING COMMAND - WARREN (ANAD)
ANNISTON ARMY DEPOT
7 FRANKFORD AVENUE, BLDG 35
ANNISTON AL 36201-4199
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W31G1Y 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
ANNISTON ARMY DEPOT
WORK TO BE PERFORMED AT
ANNISTON ARMY DEPOT
ANNISTON AL 36201-4199
TEL: FAX:
256 235-6353FAX:
TEL: 256 235-6231 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$8,000,000
NAICS:
811310
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF68
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
NARRATIVES
PROVISION 1 – ATTACHMENTS
ARE AS FOLLOWS:
1. STATEMENT OF WORK
Narrative: SYSTEM FOR AWARD MANAGEMENT (SAM). Contractors must be registered in the System for Award Management (SAM) database before an award will be issued and shall complete the electronic annual representations and certifications within SAM. After award, companies must ensure that their SAM registration remains valid and current to avoid problems with invoicing and payment. For SAM access and navigation issues, follow the instructions provided at “User Guides and Helpful Hints” on SAM Home page.
Narrative: ELECTRONIC SUBMISSION OF OFFERORS. All responses to this solicitation must be submitted in digitized/electronic format. Paper copy responses will not be accepted. All solicitation responses must be submitted through the Federal Business Opportunities (FedBizOpps) Website, fbo.gov.
Offers submitted using any other means will not be accepted, unless stated otherwise in the solicitation.
FedBizOpps provides industry with a single point of access to all U.S. Army contracting opportunities. The Contracting Opportunities Search feature allows vendors to easily locate opportunities and submit offers/bids online.
Vendors must be registered before being able to respond to a solicitation. Before registering, a Data Universal Numbering System (DUNS) Number is required and registration in the SAMS System (www.sam.gov) is required.
Registration is completed by choosing the Register Now option on the fbo.gov webpage and following the steps. If a format is other than Microsoft Word, Microsoft Excel, Microsoft Access, Microsoft PowerPoint, or Portable Document Format (PDF), a "reader" must be provided. Offeror must insure its offer, in its entirety, reaches the Army Contracting Command-Warren, Anniston Army Depot (ANAD), before the time set for opening or closing of the solicitation.
Any clauses or provisions of this solicitation which mention writing, returning, or submission of offer will mean electronic submission as stated in the paragraph above.
Electronic offers must identify the solicitation and the opening/closing date, and include, as a minimum, the following:
a. The SF33/SF1449/SF18/SF1442 filled out and signed.
b. All applicable fill-in provisions from the solicitation must be completed.
c. Any other information required by the solicitation.
It is your responsibility to furnish all information requested. We will not confirm information by telephone. If you do not fully respond (such as price, delivery date) to the Request for Quotation, you will be determined non-responsive.
If you choose to password-protect access to your offer, you must provide the password to ANAD before the opening or closing date. Contact the buyer identified on the cover page of this solicitation to arrange a means of providing the password. Passwords used only for the purpose of write protecting files need not be provided.
Offerors shall make every effort to ensure that their offer is virus-free. Offers (or portions thereof) submitted which
DO reflect the presence of a virus, or which are otherwise rendered unreadable by damage in either physical or electronic transit, shall be treated as “unreadable.” See Federal Acquisition Regulation 14.406 or 15.207(c) for a description of the steps the Government shall take with regard to unreadable offers.
Any bid bond required by this solicitation must be submitted with the offer. Also, the properly completed original bid bond must be furnished to the Army Contracting Command-Warren, Anniston Army Depot (ANAD), 7 Frankford Ave, Anniston, AL 36201-4199, prior to the opening or closing of the solicitation.
Narrative: PAYMENT. Contractor must accept Government Smart Pay Credit Card or provide their electronic funds transfer address. Contractors must be registered in the System for Award Management (SAM) database before an award will be issued. Companies should verify their SAM registration to ensure it is valid and current.
COMPLETE THE FOLLOWING INFORMATION AND INCLUDE WITH ANY OFFER.
Accept MasterCard? Yes_____ No_____
If no, EFT address: _____________________________
Federal Tax Identification Number: _____________________ Dun & Bradstreet Number (DUNS): _____________________ CAGE Code: _____________________ System for Award Management (SAM) Registration: Yes____ No____ Expiration Date:______ Vendor Contact Information: POC: __________________________ Telephone: _____________________
FAX: __________________________
Email: _________________________
Narrative: WAWF PROCEDURES. If your order WILL BE PAID BY DFAS (not by credit card) and contains DFARS Clause 252.232-7003, Electronic Submission of Payment Requests, you must submit your invoice through Wide Area Workflow (WAWF). This clause requires invoices for supplies and services purchased by the DoD be submitted via electronic means. The Wide Area Workflow system satisfies this mandatory requirement.
WAWF can be accessed on the internet at https://wawf.eb.mil/
Ensure the Electronic Business POCs listed in the System for Award Management (SAM) for your company are the same individuals that will submit invoices through WAWF before using WAWF. SAM is accessible at www.sam.gov. For SAM access and navigation issues, follow the instructions provided at “User Guides and Helpful Hints” on SAM Home page.
If your Electronic Business (EB) POCs are correct, contact the WAWF helpdesk at 1-866-618- 5988 or by e-mail at cscassig@ogden.disa.mil and ask them to establish a group for your CAGE code. The group administrator will also have to call the WAWF helpdesk to request account activation. Once the group is established and the account is activated, you will be able to create a Combination Invoice/Receiving report (SUPPLIES/MATERIALS) or a 2 in 1 Invoice (SERVICES/EQUIPMENT) using the codes below and instructions available from our contract administrator/buyer.
Questions concerning payment should be directed to the responsible Defense Finance Accounting Services (DFAS). Please have the order number and invoice number ready when calling about payment status.
The accounts payable mailing address can be located in Block 18a of your order. You can easily access payment information using the DFAS web site at http://www.dfas.mil. Your purchase order/contract number or invoice will be required to inquire status of your payment. Go to DFAS on the web at: www/dfas.mil/money/vendor. THE
FOLLOWING CODES WILL BE REQUIRED TO ROUTE YOUR INVOICES AND ADDITIONAL EMAILS
CORRECTLY THROUGH WAWF:
WAWF
Data/CODES needed for
Invoice
SUPPLIES/
MATERIALS
(PRs that start with W31G1Y)
SERVICES/
EQUIPMENT
SUPPLIES/
MATERIALS
(PRs DO NOT that start with W31G1Y)
CONSTRUCTION
CAGE CODE
SAM Cage code listed in
Contractor/ Offeror field of contract
SAM Cage code listed in
Contractor/ Offeror field of contract
SAM Cage code listed in Contractor/
Offeror field of contract
SAM Cage code listed in Contractor/Offeror field of contract
ISSUE/ADMIN BY
DODAAC
W911KF W911KF W911KF W911KF
INSPECT BY
DODAAC (If needed)
W31G1Y (Must have inspector code)
W911KF
W911KF
(Unless Inspected by DCMA)
W911KF
SHIP TO
(Supplies/Material s Only)
W911KF NOT AVAILABLE W911KF W911KF
ACCEPTOR
(Services/Equipment Only)
NOT AVAILABLE W911KF NOT AVAILABLE NOT AVAILABLE
Type of Invoice COMBO 2 IN 1 COMBO CONSTRUCTION
Pay DODAAC HQ0303 HQ0303 HQ0303 HQ0303
CONTRACT NUMBER:
DELIVERY ORDER NUMBER (IF APPLICABLE):
EMAIL POINT OF CONTACT LISTING: (Please insert following email addresses for additional email distribution)
CONTRACT
ADMINISTRATOR:
CONTRACTING OFFICER:
USER AND/OR INSPECTOR:
Narrative: AUTOMATED INSTALLATION ENTRY (AIE) BADGE. Contractors accessing Anniston Army Depot will be required to obtain an AIE badge. To do so, contractors must submit a completed SIOAN 380-2 (sent to contractor at time of award) to the Contract Specialist with all required signatures to the badge office. A background check will be completed and approved/disapproved within 7-10 days. Once approved, the contractor can schedule an appointment for an AIE badge to be issued.
ADDENDA
ADDENDUM TO FAR 52.212-1
INSTRUCTIONS TO OFFERORS - COMMERCIAL ITEMS
52.212-1 (b) (1) THROUGH (11) IS CHANGED TO READ AS FOLLOWS:
1. Complete and return (electronically) one entire copy of solicitation package.
2. Submit Firm Fixed Prices in Schedule of Supplies/Services.
3. Review required delivery schedules in clauses entitled “Time of Delivery” and consider giving expedited delivery schedule.
4. Complete all Representations and Certifications in clauses 52.212-3 entitled “Offeror Representations and Certifications—Commercial Items” or ensure the Representations and Certifications are completed in on-line Representations and Certifications Applications.
http://www.sam.gov
5. Provide evidence of signer’s authority to bind the company as stated in paragraph entitled “Signature Authority.”
6. Telegraphic and telephonic offers are not authorized. See clause entitled “Electronic Submission of Offers” for submission instructions.
7. Acknowledge all, if any, amendments issued against this solicitation. Acknowledgement of amendments issued prior to quotation closing date must be received in the Directorate of Contracting prior to quotation closing date and time. Acknowledgement of amendments will not be acceptable by telephone or telegraph. Offeror shall use procedures at clause entitled Electronics Submission of Offers for submission of any acknowledgement of an amendment.
8. Provide technical literature as described in clause entitled “Technical Literature.” As part of the package please submit the following:
(a) The vendor shall state at time of quotation either "EXCEPTION" or "NO EXCEPTION" to each and every paragraph of the SPECIFICATIONS AND SCOPE OF WORK. Where exception is taken, the degree of noncompliance shall be fully explained. The bid shall clearly indicate any exceptions to, or alternatives to, every part of this specification. Bids shall be arranged similar to this specification and shall reference paragraph numbers for ease of analysis and discussion, if the Government determines discussion to be necessary.
(b) Proposals shall include catalogue pictures, drawings, literature, specifications, installation data and additional information, as applicable, to completely describe the system and its controls, instrumentation, performance, installation, warranty details and training procedures proposed to meet the requirements of this specification.
(c) The proposal shall state detailed space requirements for equipment.
(d) If this specification leaves out any requirements or component parts that would cause the total system to not function properly, manufacturer shall provide such items. If special tools or tooling are required to operate the system, manufacturer shall provide such tools or tooling.
(e) As part of the bid package, manufacturer shall provide a description of all utilities (air, electric, etc.) required for the proper operation of the system. This list shall describe the total system requirements as well as break out of the requirements of the significant components.
(f) As part of the bid package, manufacturer / supplier shall provide a description of all utilities (air, electric, etc.) required during the installation of the system.
9. Furnish copy of Warranty with quotation.
10. Provide past performance information as described in clause “Past Performance Proposal and Evaluation Information” if that clause is included in this solicitation.
ADDENDUM TO 52.212-1c is changed as follows:
Change 30 calendar days to 90 calendar days. The remainder of this paragraph remains the same.
LOCAL RULES AND REGULATIONS
(a) Identification Badges and Vehicle Decals: The following requirements apply to all contractors working inside the Controlled Area of Anniston Army Depot.
(1) Contractors are required to secure, and wear at all times, employee identification badges for all employees who must enter the Anniston Army Depot (ANAD) to engage in contract work. Badges must be secured before an employee will be allowed entry onto the depot. Contractors that are non-US citizens must be escorted by depot personnel with the proper security clearance. Emergency badges will be issued on a case-by-case basis.
Vehicle decals must be obtained for all Contractor vehicles entering ANAD. These badges and decals may be obtained from the Badge and Vehicle Registration Office (BVRO), Building 367, located at the main entrance to ANAD. No charge is made for badges if they are returned. Contractors will be charged twenty-five dollars ($25.00) for each badge issued to replace lost badges or badges damaged through carelessness, negligence, or misuse. All persons to be badged shall present a PHOTO identification from one of the following sources:
a. - State driver's license
b. - State identification card
c. - Federal, municipal, or school identification card bearing a seal and the following information: photo, name, social security number, date of birth, and physical description
NOTE: A social security card is not a photo identification and will not be accepted as proper identification. Employee identification cards issued by the Contractor will not be accepted. The Directorate of Emergency Services (DES) will reject any identification presented which is altered, not issued by one of the above identified agencies, or otherwise questioned regarding validity.
(2) Contractors shall submit the name of a point of contact responsible for security requirements through the Contracting Officer to the Installation Security Management Office upon notification of contract award.
(3) ) Ten working days prior to the date Contractor employee will begin work in the controlled area of ANAD (within the gates), a Personal Data Questionnaire/Privacy Act Statement (SIOAN Form 380-2) must be completed and signed for each employee. The form authorizes ANAD to conduct a local background check for any criminal record or questionable reliability. No contractors or employees will be issued a badge without a favorable local background check. SIOAN Forms 380-2 may only be submitted for persons who are current employees of the Contractor or who hold a letter of intent to hire issued by the Contractor. Forms will be submitted to the Badge and Vehicle Registration Office (BVRO), Building 367, located at the main entrance to ANAD. NO PRE- EMPLOYMENT
LOCAL BACKGROUND CHECKS WILL BE CONDUCTED BY ANNISTON ARMY
DEPOT. The prime contractor is responsible for checking with the Badge and Vehicle Registration Office (BVRO), Building 367, phone number 256 235-6820, to ensure that employees have been cleared for entrance to ANAD.
(4) Also, at least ten working days before the Contractor expects to begin work on the installation, prime Contractor shall submit, on company letterhead, the name, social security number, date/place of birth, and citizenship of all persons entering ANAD to perform contract work for the prime and any subcontractors. Letter shall be submitted through the Contracting Officer to the Badge and Vehicle Registration Office
(BVRO).
(5) Violation of any security or safety requirements will be grounds for immediate suspension of the individual's badge. DES will notify the Contracting Officer when suspension actions are taken. The Contractor can appeal the suspension to DES, who is the final adjudication authority of the individual's reinstatement or revocation of badge privileges.
(6) See clause entitled Identification of Contractor Employees for Contractor employees working on Anniston
Army Depot.
(b) AMMUNITION LIMITED AREA. Yes_ , No work to be performed in the Ammunition Limited Area
(ALA). Contractors working within the ALA must abide by the above guidance plus the following additional requirements:
(1) The prime Contractor will be notified which persons are approved for access to the ALA. Contractor personnel who are denied access based on the local background check will have the right to appeal to the DES. The Director's decision is considered the final action.
(2) No privately-owned vehicles (POV) are authorized in the ALA.
(3) Contractor-owned, rented, or leased vehicles which are construction-type (i.e., pickup trucks, dump trucks, etc.) may be authorized within the ALA upon being inspected and registered with ANAD. ALL VEHICLES AND
PERSONS SHALL BE SEARCHED UPON ENTERING AND EXITING THE ALA.
(4) Contractor vehicles may not remain overnight within the ALA without obtaining permission from DES and by disabling the vehicle (by removing the battery or some other method approved by DES).
(5) No alcohol, photographic equipment, firearms, flame producing devices (to include lighters and matches), or other items prohibited by safety requirements are permitted within the ALA.
(6) All damages caused by the Contractor to security lighting, fencing, intrusion detection systems, security telephones, or any other security equipment will be repaired immediately at the Contractor's expense by the Contractor. Normal contract work will not resume until the security equipment is returned to normal.
(7) The Contractor shall comply with the requirements of the Department of the Army Pamphlet 385-64, Safety, Ammunition and Explosives Safety Program, in effect on the date of the solicitation for this contract.
(8) The Prime contractor shall assure that each contract employee is instructed in the known potential hazards of fire, explosion, or toxic release hazards related to his/her job while working in the Ammunition limited Area, and the applicable provisions of the installation/contractor emergency action plans.
(9) The contractor will ensure that each employee requiring access to the ALA receives Explosives Safety brief from ANAD Safety Office at least annually.
(c) Contractor Vehicles in the AMMUNITION LIMITED AREA (ALA): The following rules apply to contractor vehicles in the ALA Area.
(1) Contractors shall only enter into the restricted areas of Anniston Army Depot for the purpose of completing the official business as stipulated in the contract.
(2) Contract vehicles entering into the restricted area shall be on official contract business verified by the Contractor; shall be construction type vehicles; shall be properly registered on Anniston Army Depot; shall have a placard with the name of the contractor affixed, and the contractor shall assume liability for all vehicles used within the restricted area in support of the contract. (See paragraph (c)(4) below for definition of an acceptable document to the liability requirement.)
(3) Contractor Employees’ Privately-Owned Vehicles not included in (c)(2) above shall not be authorized in the restricted area.
(4) The documentation to satisfy the liability language in paragraph (c)(2) would be:
a. A vehicle (i) registered (titled) in the name of the contractor or (ii) a lease, signed by the lessee/contractor and the lessor/owner. The person signing for the contractor must be a person acting with authority for the contractor.
b. In the case of a vehicle owned (titled) by the contractor, evidence of insurance combined with the terms of the contract will ensure a method of covering liability.
c. In the case of a vehicle leased by the contractor, evidence of insurance in the owner/lessor’s name and the contractor must sign a statement substantially as follows: “In consideration for allowing entry and use of the described vehicle within the Restricted Area, the undersigned hereby assumes liability for all damage or injury caused by the operation of this vehicle.”
(d) Hours of Work:
WORK HOURS RECEIVING HOURS DAY(S) OF WEEK
7:00 AM - 4:30 PM 7:00 AM - 2:00 PM Monday - Thursday 7:00 AM - 3:30 PM 7:00 AM - 2:00 PM Every other Friday CLOSED 7:00 AM - 2:00 PM Every other Friday CLOSED CLOSED Saturdays, Sundays, and Federal Holidays
(1) Federal Holidays. Federal holidays may cause the Depot to be closed for one or more of the work days identified. The contract performance period has taken this possibility into consideration.
(2) Shutdown Periods. The Government may choose to shutdown for a week or portions of a week as stated below. During this shutdown, and unless otherwise stated, only those Government personnel essential for equipment/facility maintenance will be permitted work.
4th of July Holiday Safety Stand-Down Day* Christmas Holiday Employee Appreciation Day*
*Safety Stand-Down Day and Employee Appreciation Day generally occur on a Friday (8-hour day). Safety Stand- Down Day consists of either two half-days occurring at six-month intervals or one full workday per year. Employee Appreciation Day generally occurs on a Friday (half of an 8-hour day) and is usually held in the afternoon. The Contractor’s services may not be required during these periods. In such cases, the Contractor will be notified in writing by the Government. These interruptions will be at no cost to the Government.
(3) Schedule Changes. When situations warrant, the Government may change the hours of operation to adjust for certain conditions, i.e., weather conditions (extreme heat or cold). For example, during summer production, shops may begin work at 6:00 am and leave work at 3:30 pm to avoid the afternoon heat. The Contractor shall be provided as much advance written notice as possible when these situations occur and will be expected to support any schedule change provided by the Contracting Officer.
(e) Traffic: The Contractor will be required to conform to Depot regulations concerning:
(1) ) Designated routes
(2) ) Parking regulations
(3) Insurance--See clause entitled "Insurance Requirements." The Contractor will also insure that all POVs brought on the installation are fully insured for minimum amount of personal injury and personal damage liability required by Federal Acquisition Regulation 28.307-2.
(f) ) Highway Barricades, Warning Signs, and Parking: The Contractor shall comply with Depot Regulation ANADR 190-5 and Manual on Uniform Traffic Control Devices, ANSI D6.1, Part VI, Latest Edition. Contractors are permitted to drive their vehicles inside buildings to load and unload supplies and equipment. However, when finished loading and unloading, the Contractor should move the vehicle outside to a designated parking space.
(g) Temporary Structures: The Contractor shall comply with Corps of Engineers Manual (EM) 385-1-1.
(h) ) Fire Prevention and Protection: The Contractor shall comply with all fire prevention measures prescribed in the installation fire prevention and protection regulation, a copy of which is on file in the office of the Contracting Officer. A written hot work permit shall be obtained from the installation fire department for use of any heat producing devices such as blowtorches, portable furnaces, tar kettles, or gas and electric welding and cutting equipment. The Contractor shall be liable for any fire loss to Government property attributable to negligence on the part of the Contractor, including failure to comply with fire prevention measures prescribed by the terms of this contract.
(i) Utilities: Government-owned and operated utilities are adequate for the needs and use of the Contractor as well as the Government. All reasonably required amounts of water and electricity are available to the Contractor without charge.
(j) Vehicle Searches: All vehicles entering, moving throughout, and exiting ANAD are subject to random searches as directed by the Depot Commander.
(k) ) Land Use Control: Contractors who will be required to “disturb soil” in the performance of this contract shall review and strictly adhere to the Standard Operating Procedure for Land Use Control Implementation. The SOP is available in the Directorate of Risk Management, Building 199, for review by Contractors.
(l) Use of any cellular telephone camera is prohibited on this installation. If a cellular telephone is illegally used on this installation, that cellular telephone is subject to confiscation, and any violation may be punishable by fine or imprisonment or both. Use of cameras without ANAD-issued permit is strictly prohibited. Non-permitted cameras are subject to confiscation.
(m) ) Air Emissions: The contractor is responsible for early coordination with the Directorate of Risk Management on any action that might result in air emissions (dust, volatile substances, etc). ANAD's Title V Air Permit requires the installation to obtain construction permits for new or modified air sources. The Alabama Department of
Environmental Management (ADEM) must issue a construction permit before ANAD purchases and installs any equipment which will produce air emissions. Installation and/or start-up of this equipment without the proper permit and coordination with ADEM is a violation of State and federal environmental law. The violation could result in a possible civil penalty or fine of $32,500 per day per violation from the Federal Environmental Protection Agency.
Contractors considering a new process or device, or a modification to an existing unit, must first coordinate with the Environmental Compliance Division, Directorate of Risk Management.
(n) ENVIRONMENTAL MANAGEMENT SYSTEM, ISO 14001: The contractor and its subcontractors shall conform to Anniston Army Depot's Environmental Management System (EMS) including all policies and procedures required by the EMS. All activities conducted within the installation are subject to the EMS and any plans, goals, objectives, targets, etc. established through the EMS. It is the contractor's responsibility to ensure that any work performed under this contract is accomplished in accordance with the Anniston Army Depot's Environmental Policy (Commander's Policy #72). Information about the EMS can be obtained from the Directorate of Risk Management by calling (256) 235-7746.
The contractor or subcontractors shall be responsible for stopping work (or stopping the work of subcontractors) and reporting any operation or condition on ANAD that could adversely affect the environment or the health and safety of employees or the public. In such situations, the contractor should immediately advise the COR or an appropriate authority. Emergencies should be reported by dialing "911" from any Anniston Army Depot base telephone.
(o) Exercise Events: Contractors working on the installation are expected to participate in LEAN thinking, Value Stream Analysis, Rapid Improvement Events, and Six Sigma activities that may last from one to seven weeks in duration. These efforts, as defined below, are an integral part of the process improvements of ANAD on our journey toward building a LEAN manufacturing facility. The COR will provide detailed instructions when your involvement is required.
LEAN thinking is a coordinated response to today’s highly competitive environment. LEAN production is aimed at the elimination of waste in every area of production including customer relations, product design, supplier networks and factory management. Its goal is to incorporate less human effort, less inventory, less time to develop products, and less space to become highly responsive to customer demand while producing top quality products in the most efficient and economical manner possible.
A Value Stream Analysis (VSA) is an event that documents the current process, the planned future process and an action plan to get to the planned future process. The VSA normally last three to four days and includes representatives from all aspects of the process.
A Rapid Improvement Event is a seven-week process that focuses on events where teams of people from a broad range of parts of the business gather to streamline a process. The first three weeks are used to select an area and topic, create the team, and plan for the event. The fourth week is the actual event where waste is identified, removed, and changes to processes made. The last three weeks are to ensure changes are continuing to be used and process is working correctly.
Six Sigma is the leading quality improvement program for a rigorous and disciplined methodology that uses data and statistical analysis to measure and improve a company's operational performance by identifying and eliminating "defects" in manufacturing and service-related processes. Six Sigma differs from traditional quality improvement programs in its focus on input variables. While traditional process improvement methods depend upon measuring outputs and establishing control plans to shield customers from organizational defects, a Six Sigma program demands that problems be addressed at the input root cause level, thereby eliminating the need for unnecessary inspection and rework processes.
(p) ANAD Network: For access to the ANAD network, send a letter stating that a National Agency Check with Inquiries (NACI) has been initiated and furnish a copy of the SF 85, Questionnaire for Non-Sensitive Positions, for review prior to issuance of an interim password. The results of the NACI investigation shall be furnished to the Security Management Office, Security Office Identifier number A077, for the final adjudication.
(q) ) Safety and Accident Prevention: SAFETY AND HEALTH REQUIREMENTS:
Contractors shall adhere to all safety rules and regulation of corrective actions, which will be taken into consideration:
General:
Applicable Publication: The publications listed below form a part of this specification to extent referenced. The publications are referred to in the text by basic designation only.
Code of Federal Regulation (CFR): OSHA General Industry Safety and Health Standards (29 CFR 1910), Publication V2206; OSHA Construction Industry Standards (29 CFR 1926). One source of these regulations is
OSHA Publication 2207, which includes a combination of both parts 1910 and 1926 as they relate to construction safety and health. It is for sale by the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402. National Emission Standards for Hazardous Air Pollutants (40 CFR, Part 61).
Title 29 of the Code of Federal Regulations, Subtitle B, Part 1926 provides the safety and health regulations for construction. Under the general provisions, it gives each contractor responsibility to “…initiate and maintain such programs as may be necessary to comply with this part (29CFR1926).” The general company safety plan should address the how the company will comply with the basic requirements of the standard.
For 29 CFR 1926 and other OSHA standards and interpretations plus other resources are available from the Occupational Safety and Health web site, www.osha.gov.
In addition to contract clause entitled "ACCIDENT PREVENTION," FAR 52.236-13, the contractor shall comply with all regulations, publications and manuals current at the time the Task Order is being performed to include but are not limited to Army Material Command (AMC) Regulation 385-100, Safety and Occupational Health Regulation ANADR 385-1, Engineering Manual (EM) 385-1-1, 29 Code of Federal Regulations (CFR) 1926/1910, other related Department of Transportation (DOT) Regulations (49 CFR), Federal Standard (Fed Std): 313A Material Safety Data Sheets, ANSI BHMA A156, National Electric Safety Code ANSI C2, NFPA Codes and Standards, National Electric Code Handbook, UFGS (Unified Facilities Guide Specification) and all local policies. Definition of Hazardous Materials: Refer to hazardous and toxic materials/substances included in Subparts H and Z of 29 CFR 1910 and to others as additionally defined in Fed. Std 313. Those most commonly encountered include asbestos, polychlorinated biphenyl’s (PCB’s) explosives and radioactive material, but may include others. The most likely products to contain asbestos are sprayed-on fireproofing, insulation, boiler lagging and pipe covering. Engineering Manual 385-1-1 outlines safety requirements for construction. A copy of it is available for review in the Anniston Army Depot safety office, or from the Army Corp of Engineers web site, www.usace.mil/publications.
The Contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on his/her part or that of his/her employees or subcontractors, which results in illness, injury, or death.
Contractors prior year OSHA logs (form 300A) and a site specific safety plan for work to be performed on Anniston Army Depot must be provided for approval by the Anniston Army Depot Safety Office no more than 10 days after award of contract. Contractor shall maintain an accurate record of accidents resulting in traumatic injury or death and accidents resulting in damage to Government property, supplies, and equipment. The Contractor shall report incidents causing disruption of contract services, or any accidents in connection with performance of this contract, to the Contracting Officer Representative within two (2) hours of occurrence. Contractor will notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from/by local, State, and Federal Regulators in which the violation or alleged violation is attributed to the action of the contractor or its subcontractors. Contractor will provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation.
Contractor shall safeguard and maintain all Government property, as well as, provide for the safety and well being of personnel employed in the administration of this contract. Local PPE requirements are at minimum long pants, long sleeved shirts, protective footwear, protective eyewear, hearing protection and shall be used and provided by contractor.
The Government reserves the right to conduct unannounced safety inspection at any time, all OSHA required records to include OSHA form 300 and 300A will be made available to COR or ANAD Safety Office Staff upon request or during unannounced safety inspections. OSHA logs must be produced for review within 3 working days of initial request. Contractor will notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from/ by local, State, and Federal Regulators in which the violation is attributed to the action of the contractor or its subcontractors. Contractor will provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation with in 1 day of receipt of documentation.
If a contractor employee is observed performing an activity in a manner inconsistent with any of the above cited regulations or is engaged in any activity that is dangerous to life, limb, or government property, the ANAD Safety Representative shall have the authority to notify the employee and/or the contractor’s on-site supervisor of the hazardous activity and require correction of the hazardous activity. If necessary, the ANAD Safety Representative shall have the authority on behalf of the Contracting Officer to require the contractor and/or its employee to stop the hazardous activity until corrective action is taken to eliminate a hazardous condition or safety violation. Said action shall not be considered to be the basis of a claim against the government and shall be at no cost to the Government.
The contractor must have a Drug Free Workplace plan that includes post accident testing. This shall be part of their Safety Plan.
(r) ) CONTRACTOR SAFETY PROGRAMS AND ACCIDENT PREVENTION PLANS:
For each specific job or contract, an accident prevention plan (or job safety plan) must be submitted. This plan is specific for the current project, and must address the particular hazards which will be inherent in the project and how they will control them. This plan must be submitted to the ANAD Safety Office not more than 10 days after contract award. Contractor must have approved plan in place prior to any work being performed on ANAD. Listed below are some of the items that must be covered in the plan, the plan must also meet current standards listed above.
(1.) SIGNATURE SHEET. Title, signature, and phone number of the following:
a. Plan preparer
b. Plan approval, e.g., owner, company president, etc.
c. Plan concurrence (concurrence of other applicable corporate and project personnel (contractor) such as their safety officer, project manager, or superintendent)
(2.) BACKGROUND INFORMATION. List the following:
a. Contractor
b. Contract number
c. Project name
d. Brief description of the work to be performed and location
e. Contractor accident experience (provide information such as OSHA 200 logs, company safety trend analysis)
f. Listing of phases of work and hazardous activities requiring activity hazards analyses.
(3.) STATEMENT OF SAFETY AND HEALTH POLICY.
(4.) RESPONSIBILITIES AND LINES OF AUTHORITIES.
a. Identification and accountability of personnel responsible for safety - at both corporate and project level if applicable.
b. Lines of authority.
(5.) SUBCONTRACTORS AND SUPPLIERS.
a. Identification of subcontractors and suppliers (if known).
b. Means for controlling and coordinating subcontractors and suppliers.
c. Safety responsibilities of subcontractors and suppliers.
(6.) TRAINING.
a. List subjects to be discussed with employees in safety indoctrination.
b. List mandatory training and certifications, which are applicable to this project (e.g., explosive actuated tools, confined space entry, crane operator, vehicle operator, HAZWOPER training and certification, personal protective equipment, electrical hazards, elevated surfaces.).
c. Identify requirements for emergency response training.
d. Outline requirements (who attends, when given, who will conduct etc.) for supervisory and employee safety meetings.
(7.) SAFETY AND HEALTH INSPECTIONS. Provide details on:
a. Who will conduct safety inspections (e.g. project manager, safety professional, QC, supervisor, employees, etc.)
b. Any external inspections/certifications that may be required.
(8.) SAFETY AND HEALTH EXPECTATIONS, INCENTIVE PROGRAMS, AND COMPLIANCE.
a. The company's written safety program goals, objectives, and accident experience.
b. A brief description of the company's safety incentive programs (if any)
c. Policies and procedures for holding managers and supervisors accountable for safety.
(9.) ACCIDENT REPORTING. The contractor shall identify who shall complete the following, how, and when:
a. Exposure data (man hours worked)
b. Accident investigations, reports and logs
c. Immediate notification of accidents
(10.) PLANS (PROGRAMS, PROCEDURES) AS APPLICABLE TO THE WORK TO BE CONDUCTED. This list is not all-inclusive, nor will all topics apply to all contractors.
a. Hazard communication
b. Emergency response plans (spills, posting of emergency telephone numbers, fire prevention, etc.)
c. Layout plans
d. Respiratory protection plan
e. Health hazard control program
f. Lead abatement plan
g. Asbestos abatement plan
h. Abrasive blasting
i. Confined space
j. Hazardous energy control plan
k. Critical lift procedures
l. Contingency plan for severe weather
m. Access and haul road plan
n. Demolition plan (engineering and asbestos survey)
o. Material handling equipment licensing
p. Plan for prevention of alcohol and drug abuse
q. Fall protection
(11.) Detailed site-specific hazards and controls shall be provided in the activity hazard analysis for each phase of the operation.
(s) NOTICE TO CONTRACTORS WORKING ON ANNISTON ARMY DEPOT PREMISES
Sexual Assault and Harassment in the Workplace
Contractor employees working in areas with Federal employees must be aware of the workplace rules and requirements prohibiting and responding to sexual harassment and sexual assault incidents and claims. Sexual assault is an involuntary sexual act in which a person is threatened, coerced, or forced to engage against their will, or any sexual touching of a person who has not consented. Sexual assault and sexual harassment are strictly forbidden and the Depot Commander has mandated that everyone on the premises of ANAD has a responsibility to prevent assault and harassment and report it if discovered. The COR will provide a Fact Sheet defining sexual harassment to be distributed to contractor employees working in government facilities.
As with any workforce, there is opportunity for inappropriate behavior between Contractor and Government employees. Prevention and prompt reporting and resolution of any such incidents are Top Priorities at Anniston Army Depot. Offending employees are subject to barment from ANAD. Contract performance requirements will not be adjusted for reasons related to an incident involving an offense by contractor employees.
In order to prevent problems from arising, Contractor supervisors must provide the following information to each employee working on ANAD premises:
If you believe you are a victim of sexual harassment:
It is important that you take action. Ignoring sexual harassment seldom makes it stop; in most cases, sexual harassment continues or becomes worse when it is tolerated. While removing yourself from the uncomfortable situation may seem to be a solution, it is probably not in your best interest or the interests of other potential victims around you.
Tell the harasser that the behavior is unwelcome and must stop. Any way of telling them to stop is acceptable, including directly telling him or her, calling, e-mailing or sending a memo.
Tell someone; do not keep it to yourself. There are things that other people can do to help you Document the incident. Write down dates, places, names of witnesses and what happened. Keep e-mails, text messages, instant messages, voice mails, and all history of the incidents.
Report harassment to your supervisor, director, EEO staff, Victim Advocate, or union representative.
W911KF20Q0007
Follow whatever complaint procedures apply with your employer If you witness sexual harassment or it is reported to you:
Report it to your supervisor
Report it to the Depot Sexual Harassment/Assault Response and Prevention (SHARP) Coordinator, Mr. Tim Rolfe, at (256) 235-7971
Cooperate with any investigative agencies
(t) Contractor Owned Property:
When contractors bring in equipment onto Anniston Army Depot for use in performing contracted work to repair, replace or install, all contractor-owned equipment must have ‘company name’ stenciled, laser marked, or marked in some other permanent way on the equipment.
(u) Contractors Transport of Government Owned Property:
If contractors are picking up or returning Government Furnished Property, Government Furnished Material, or Government Furnished Equipment, contractors must have proper government-issued documents in possession such as DD Form 1149 Requisition and Invoice/ Shipping Document, DD250 Material Inspection and Receiving Report, DD1348-1A Issue Release/Receipt Document, OF7 Property pass, or some other document or memorandum indicating Government ownership.
(v) MOTOR FREIGHT DELIVERIES
Contractor shall schedule appointments for delivery of material/equipment consigned to Anniston Army Depot. To schedule a delivery appointment, call 256 235-7198 between the hours of 6:00 am and 4:30 pm, Monday through Friday, excluding legal holidays. Scheduled appointment time will be made for delivery within 24 hours.
If carrier's equipment arrives prior to the scheduled time, free time shall begin to run from the scheduled time or actual time unloading commences. If carriers cannot meet their appointed delivery time, contact the above number to reschedule. Carriers are reminded to have all applicable shipment documentation and to ensure material is readily accessible for offloading. Questions should be directed to Defense Distribution Depot, Anniston, ATTN: DDAA-T, 7 Frankford Ave, Anniston, AL 36201-4199, or call 256 235-6031.
(w) COVERAGE OF OPEN DELIVERY TRUCKS All open delivery trucks or other delivery vehicles shall be covered with a tarp or other means to preclude paper or other materials from blowing out along the roadways.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot Annual Alignment /Inspection-Base Year
FFP
The contractor shall be responsible for accomplishing the following annual inspections and annual preventive maintenance duties in accordance with OEM specifications for the government owned Monarch Vertical Machining Centers models VMC150B and VMC-200B. SEE Attached SOW MONARCH VERTICAL
MACHINING CENTERS.
FOB: Destination
NSN: AASSVC9252017M
MILSTRIP: W31G1Y9252017M
COLOR: white
PURCHASE REQUEST NUMBER: W31G1Y9252017M
PSC CD: J034
NET AMT
0002 1 Lot Emergency Repairs-Base Year
FFP
On Call Emergency Repairs for or the government owned Monarch Vertical Machining Centers models VMC150B and VMC-200B in accordance with the attached Statement of Work.
Emergency repairs shall consist of any work that is necessary to restore the machine to a 100% performance level. Base Year Period from Date of award to 12 months after contract award. Principal period of maintenance, Monday thru Thursday and every other Friday $__________per hour. Outisde principal period, Monday thru Thursday and every other Friday $________per hour. Travel expenses should include hourly rate per diem, airfare and rental vehicle.
FOB: Destination COLOR: white
0003 1 Lot Contractor Manpower Reporting-Base
FFP
This CLIN is used for pricing of the collection and reporting of Contractor Manpower Reporting data. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. FINAL payment may be withheld on this contract if the required data is not input into this collection site by 31 October (or end of contract if sooner). Notify the Contract Specialist listed on the contract award at block 16 when the information has been entered into the system. The Unit Identifier Code (UIC) for Anniston Army Depot is W0LXAA. Contractors may direct questions to the help desk at: "https://www.ecmra.mil/Default.aspx” FOB: Destination
0004 1 Lot Annual Alignment /Inspection-1st Yr. Op
FFP
The contractor shall be responsible for…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.