Amendment_0001.pdf
PDF 125 KB Posted
- Attached to
- Furniture Federal contract opportunity
- Solicitation number
- W911KF-17-Q-0056
About this file
Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 6_-_Cont_Affirm_Procurement_Report.pdf | ||
| 7_-_Wage_Determination.pdf | ||
| 8_-_Pricing_Spreadsheet.xlsx | XLSX spreadsheet | |
| 4_-_Contractor_Request_for_Waiver.pdf | ||
| 2_-_Personal_Data_Questionnaire_Form_380-2.pdf | ||
| Solicitation.pdf | ||
| 3_-_Evidence_of_Authority.pdf | ||
| 1_-_Statement_of_Work_-_Furniture.pdf | ||
| 5_-_EPA_Guideline_Items.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See page tw o for details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 30
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Aug-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KF-17-Q-0056
X 9B. DATED (SEE ITEM 11)
10-Aug-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Aug-2017
CODE
ARMY CONTRACTING COMMAND - WARREN (ANAD)
ANNISTON ARMY DEPOT
7 FRANKFORD AVENUE, BLDG 35
ANNISTON AL 36201-4199
W911KF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911KF-17-Q-0056
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT NOTES
1. The purpose of this amendment is to fill-in the required delivery schedule for the following clause:
52.0211-4202 TIME OF DELIVERY (OCT 1993)
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
WITHIN CALENDAR DAYS
ITEM NO. QUANTITY AFTER DATE OF
CONTRACT
CLIN0001 1 Lot 6 Weeks
CLIN0002 1 Lot 6 weeks
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule.
If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR'S PROPOSED DELIVERY SCHEDULE
WITHIN CALENDAR DAYS
ITEM NO. QUANTITY AFTER DATE OF
CONTRACT
CLIN0001 1 Lot ___________
CLIN0002 1 Lot ___________
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding one working day if the award is transmitted electronically. The term “working day” excludes weekends and U. S. Federal holidays.)
End of clause Updated June 2004
2. All other terms and conditions remain unchanged.
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
SPECIAL PROVISIONS
SPECIAL PROVISION 1: Definition of “small business concern” eligible for award under a small business set-aside, in accordance with 13 CFR 121 as referenced in this solicitation, FAR Clause 52.212-3(a) Definitions: “How does SBA define ``business concern or concern''? (a) A business concern eligible for assistance from SBA as a small business is a business entity organized for profit, with a place of business located in the United States, and which operates primarily within the United States or which makes a significant contribution to the U.S. economy through payment of taxes or use of American products, materials or labor. (b) A business concern may be in the legal form of an individual proprietorship, partnership, limited liability company, corporation, joint venture, association, trust or cooperative, except that where the form is a joint venture there can be no more than 49 percent participation by foreign business entities in the joint venture. (c) A firm will not be treated as a separate business concern if a substantial portion of its assets and/or liabilities are the same as those of a predecessor entity. In such a case, the annual receipts and employees of the predecessor will be taken into account in determining size.” Offerors must comply with the nonmanufacturer rule as stated in FAR Parts 19.102(f) and 19.502-2(c), and must also comply with FAR Clause 52.219-14, Limitations on Subcontracting (Nov 2011), as follows: “(a) This clause does not apply to the unrestricted portion of a partial set-aside. (b) Applicability. This clause applies only to -- (1) Contracts that have been set aside or reserved for small business concerns or 8(a) concerns; (2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a) concerns; and (3) Orders set aside for small business or 8(a) concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F). (c) By submission of an offer and execution of a contract, the Offeror/ Contractor agrees that in performance of the contract in the case of a contract for- (1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern. (2) Supplies (other than procurement from a nonmanufacturer of such supplies). The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials. (3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees. (4) Construction by special trade contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.” Size standards apply as stated in this solicitation.
SPECIAL PROVISION 2: IMPORTANT: IT IS YOUR RESPONSIBILITY TO ENSURE
YOUR BID/OFFER/PROPOSAL HAS BEEN RECEIVED BY THE CLOSING DATE AND
TIME AS SPECIFIED IN THE SOLICITATION: Offer must be submitted electronically in accordance with clause 52.0000-4706 Electronic Submission of Offers.
SPECIAL PROVISION 3: The following documents are incorporated as part of this solicitation: (1) Statement of Work; (2) Personal Data Questionnaire Form 380-2; (3) Evidence of Authority to Sign Offers; (4) Contractor Request for Waiver For Non-EPA Comprehensive Guideline Items; (5) EPA Guideline Items; (6) Contractor Affirmative Procurement Report Form; (7) Wage Determination (8) Pricing Spreadsheet
SPECIAL PROVISION 4: Contractor must accept Government Smart Pay Visa Credit Card or provide their electronic funds transfer address. Contractors must be registered in the System for Award Management (SAM) database before an award will be issued. Companies should verify their SAM registration to ensure it is valid and current. COMPLETE THE FOLLOWING
INFORMATION AND INCLUDE WITH ANY OFFER.
Accept VISA? Yes_____ No_____
If no, EFT address: ________________________
Federal Tax Identification Number: __________________ Dun & Bradstreet Number (DUNS):__________________ CAGE Code: _____________ System for Award Management (SAM) Registration: Yes______ No_______ Expiration Date:__________
Vendor Contact Information: POC____________________________ Telephone:_______________________
FAX: ___________________________
Email:___________________________
SPECIAL PROVISION 5: The contractor shall comply with Resource Conservation and Recovery Act (RCRA) affirmative procurement (or 'buying recycled') requirements by giving preference in their purchasing process to products and practices that promote recycling and other environmentally friendly practices. The contractor is also responsible for insuring that all sub-contractors comply with Affirmative Procurement (AP) requirements. Except as specifically waived in writing, for reasons of price, performance or availability, any products in the attached EPA guideline items list provided by the contractor as part of the performance of this contract must meet the minimum percentage levels of recovered materials as specified to these standard contract terms and conditions. Please refer to the attached EPA list of designated recovered materials content products (attached). On completion of work, contractor shall submit to the COR or Contract Specialist a completed “affirmative procurement reporting form” (attached) for actions taken under that specific order.
The contractor shall submit the attached "Contractor Request for Waiver for Non-EPA Comprehensive Guideline Items" (attached) as written documentation to support the decision not to acquire items meeting the minimum content levels, based on one of the three justifications below:
a. The product is not available from a sufficient number of sources to maintain a sufficient level of competition (i. e., available from two or more sources) or is not available at a reasonable price.
b. The product is not available within a reasonable period of time.
c. The product does not meet the performance standards in applicable specifications or fails to meet reasonable performance standards of the agency.
See FAR clauses 52.223-4 and 52.223-9 for further guidance.
SPECIAL PROVISION 6: CONTRACTOR MANPOWER REPORTING - Statement of Work, modifications to existing contracts and Provisions:
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Anniston Army Depot via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/, and then click on “Department of the Army CMRA” or the icon of the DoD organization that is receiving or benefitting from the contracted services. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September
30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk by clicking on “Sending an email” which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component’s CMR website.
The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address:
http://www.ecmra.mil/ The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer's Technical
Representative; (2) Contract number including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data; (5) Estimated direct labor hours (including subcontractors); (6) Estimated direct labor dollars paid this reporting period (including subcontractors); (7) Total payments (including sub-contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information); (11) Locations where contractor and subcontractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website);
(12) Presence of deployment or contingency contract language; and (13) Number of contractor and sub-contractor employees deployed in theater this report period (by country). As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a contractor's systems to the secure web site without the need for separate data entries for each requirement data element at the web site. The specific formats for the XML direct transfer may be downloaded from the web site.
Manpower Reporting CLIN description for each year and option year. Remember if your contract does not start on the FY, you will have an additional CMR CLIN:
This CLIN is used for pricing of the collection and reporting of Contractor Manpower Reporting data. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. FINAL payment may be withheld on this contract if the required data is not input into this collection site by 31 October (or end of contract if sooner).
Notify the Contract Specialist listed on the contract award at block 16 when the information has been entered into the system. The Unit Identifier Code (UIC) for Anniston Army Depot is W0LXAA. Contractors may direct questions to the help desk at: “http://www.ecmra.mil/”
SPECIAL PROVISION 7: Prospective contractors shall complete electronic annual representations and certifications at http://www.sam.gov after registration in the System for Award Management (SAM) database (see DFAR 204.1105). Prospective contractors shall update the representations and certifications submitted to SAM as necessary, but at least annually, to ensure they are kept current, accurate, and complete. The representations and certifications are effective until one year from date of submission or update to SAM.
SPECIAL PROVISION 8: WAWF PROCEDURES
If your order WILL BE PAID BY DFAS (not by credit card) and contains DFARS Clause 252.232-7003, Electronic Submission of Payment Requests, you must submit your invoice through Wide Area Workflow (WAWF). This clause requires invoices for supplies and services purchased by the DoD be submitted via electronic means. The Wide Area Workflow system satisfies this mandatory requirement. WAWF can be accessed on the internet at https://wawf.eb.mil/
Ensure the Electronic Business POCs listed in the System for Award Management (SAM) for your company are the same individuals that will submit invoices through WAWF before using WAWF. The previous ‘Central Contractor Registration (CCR)’ system has been migrated to the System for Award Management (SAM) and accessible at www.sam.gov. For SAM access and navigation issues, follow the instruction provided at “User Guides and Helpful Hints” on SAM Home page.
If your Electronic Business (EB) POCs are correct, contact the WAWF helpdesk at 1-866-618- 5988 or by e-mail at cscassig@ogden.disa.mil and ask them to establish a group for your CAGE code. The group administrator will also have to call the WAWF helpdesk to request account activation. Once the group is established and the account is activated, you will be able to create a Combination Invoice/Receiving report (SUPPLIES/MATERIALS) or a 2 in 1 Invoice (SERVICES/EQUIPMENT) using the codes below and instructions available from our contract administrator/buyer.
Questions concerning payment should be directed to the responsible Defense Finance Accounting Services (DFAS). Please have the order number and invoice number ready when calling about payment status.
The accounts payable mailing address can be located in Block 18a of your order. You can easily access payment information using the DFAS web site at http://www.dfas.mil/http://www.dfas.mil. Your purchase order/contract number or invoice will be required to inquire status of your payment. Go to DFAS on the web at:
www/dfas.mil/money/vendor.
THE FOLLOWING CODES WILL BE REQUIRED TO ROUTE YOUR INVOICES AND
ADDITIONAL EMAILS CORRECTLY THROUGH WAWF:
WAWF
Data/CODES needed for Invoice
SUPPLIES/
MATERIAL
S (PRs that start with W31G1Y)
SERVICES/
EQUIPMEN
T
SUPPLIES/
MATERIAL
S (PRs DO NOT that start with W31G1Y)
CONSTRUCTI
ON
CAGE CODE SAM Cage code listed in Contractor/Of feror field of contract
SAM Cage code listed in Contractor/Of feror field of contract
SAM Cage code listed in Contractor/Of feror field of contract
SAM Cage code listed in Contractor/Offero r field of contract
ISSUE/ADMIN
BY DODAAC
W911KF W911KF W911KF W911KF
INSPECT BY
DODAAC (If needed)
W31G1Y (Must have inspector code)
W911KF W911KF
(Unless Inspected by
DCMA)
W911KF
SHIP TO
(Supplies/Material s Only)
W911KF NOT
AVAILABL
E
W911KF W911KF
ACCEPTOR
(Services/Equipme nt Only)
NOT
AVAILABL
E
W911KF NOT
AVAILABL
E
NOT
AVAILABLE
Type of Invoice COMBO 2 IN 1 COMBO CONSTRUCTI
ON
Pay DODAAC HQ0303 HQ0303 HQ0303 HQ0303
CONTRACT NUMBER:
DELIVERY ORDER NUMBER (IF APPLICABLE):
EMAIL POINT OF CONTACT LISTING: (Please insert following email addresses for additional email distribution)
CONTRACT ADMINISTRATOR:
CONTRACTING OFFICER:
USER AND/OR INSPECTOR:
ADDITIONAL CONTACTS:
52.0000-4204 COVERAGE OF OPEN DELIVERY TRUCKS
All open delivery trucks or other delivery vehicles shall be covered with a tarp or other means to preclude paper or other materials from blowing out along the roadways.
52.0000-4404 IDENTIFICATION OF CONTRACTOR EMPLOYEES
This requirement is only applicable to the Contractor when the Contractor has employees working on the Anniston Army Depot.
1. All contractors are responsible for obtaining/returning identification badges and/or vehicle decals required for the term of the contract or release of employee (see paragraph 2 on release of Contractor employee). See Local Rules and Regulations clause. All Contractor employees meeting with Government employees or attending meetings at Anniston Army Depot (ANAD) shall, at the beginning of the meeting, announce to all other attendees that they are Contractor employees, employed by (Name of Contractor/address), and the name of all other companies or individuals that currently employ them or that the Contractor employee currently represents. In addition, Contractor employees shall wear visible insignia that readily displays their company's name. This may be in the form of a hat or clothing bearing a company logo, a badge, etc. Also, all Contractor employees must identify themselves as Contractor employees when answering Government telephones, working in situations where their actions could be construed as official Government acts, and include the company’s name in his or her email display.
(a) If the Contractor requires computer access for completion of the contract, Contractor shall provide a written request to Directorate of Contracting; the COR will provide the Security Investigation Information or Letter of Clearance to the Personnel Security Office, Security Management Office, ten (10) days prior to the requirement for computer access. If Contractor employees depart Anniston Army Depot prior to completion of contract, written notice must be made to Directorate of Contracting and Directorate of Information Management. At the completion of the contract, written notice must be given to Directorate of Contracting AND Directorate of Information Management before final payment will be made.
(b) Contractor must provide written notice to Directorate of Contracting AND Directorate of Emergency Services when Contractor employees are terminated before completion of contract.
Written notice shall be provided to the Directorate of Contracting and Directorate of Emergency Services (DES) by the Contractor when the contract is complete.
2. Badges and vehicle decals should be returned when they expire at the end of the contract or upon employee termination, whichever comes first. When the contract number under which the badge was obtained is completed (date of last delivery or performance of last service), including any exercise of an option pursuant to the terms of the contract, the Contractor shall return the badges for all employees and vehicle decals to the DES and obtain a receipt for each within three
(3) business days after ending date of contract. Contractor shall provide written notice to Directorate of Contracting, Directorate of Information Management (when access to Government computers required), DES, and Security Management Office when Contractor employees are terminated before the completion of the contract.
3. Failure to comply with the requirement in Paragraph 2 will be grounds for withholding any funds due the Contractor until badges are returned or paid for, notwithstanding any other clause or requirements in the contract. Failure to comply may also be used as an adverse factor with respect to Contractor past performance in connection with award of future contracts to the firm.
4. If the Contractor obtains a new or follow-on contract for work at ANAD, Contractor shall obtain new badges for each employee indicating on the request the new or follow-on contract number and comply with the above. This paragraph does not apply under options.
5. Non-Disclosure Agreement: If access to nonpublic information is required, the Contractor and each Contractor employee working on ANAD shall sign a non-disclosure statement on their company's letterhead prior to commencing work under the contract or obtaining the badges required by Paragraph 1 above. There will be one non-disclosure statement for each employee.
The non-disclosure statement shall be worded as stated in Paragraph 7 below.
6. The COR/Government POC shall coordinate the Contractor's badging process (schedule appointments with DES, etc.). The Contractor shall furnish (before initiating work under the contract) two copies of the non-disclosure statement for each Contractor employee to the COR/Government POC. The COR/Government POC shall maintain one copy and provide one copy to the Administrative Contracting Officer for inclusion in the official contract file.
7. Before any non-government employee can be given access to nonpublic information covered by the non-disclosure agreement, there must be a written agreement between the recipient Contractor and the owner of the proprietary information. A copy of this agreement must be made a part of the contract file.
Format for
CERTIFICATE OF NON-DISCLOSURE
I, ________________________________, an employee, authorized representative, and agent of _______, a contractor (hereinafter RECIPIENT) providing support services to Anniston Army Depot (hereinafter ANAD), and likely to have access to nonpublic information under contract number ______________________________, agree to and promise the following:
WHEREAS RECIPIENT is engaged in delivering support services to ANAD under contract; and
WHEREAS it is the intention of ANAD to protect and prevent access to and disclosure of nonpublic information to anyone other than employees of the United States Government who have a need to know; and
WHEREAS ANAD acknowledges that RECIPIENT will from time to time have or require access to such nonpublic information in the course of delivering the contract services;
and
WHEREAS RECIPIENT may be given or otherwise have access to nonpublic information while providing such services; and
WHEREAS "nonpublic information" includes such information as proprietary information (e.g., information submitted by a contractor marked as proprietary), information marked as having restrictions on its use (e.g., data having “limited rights,” “restricted rights” or “Government purpose license rights” legends), information having Distribution Statements thereon per DoDD 5230.24, advanced procurement information (e.g., future requirements, statements of work, and acquisition strategies), source selection information (e.g., bids before made public, source selection plans, and rankings of proposals), trade secrets and other confidential business information (e.g., confidential business information submitted by a contractor), attorney work product, information protected by the Privacy Act (e.g., social security numbers, home addresses and telephone numbers), and other sensitive information that would not be released by ANAD under the Freedom of Information Act (e.g., program, planning and budgeting system information);
NOW THEREFORE, RECIPIENT agrees to and promises as follows:
RECIPIENT shall not seek access to nonpublic information beyond what is required for the performance of the support services contract;
RECIPIENT will ensure that his or her status as a contractor employee is known when seeking access to and receiving such nonpublic information from Government employees;
As to any nonpublic information to which RECIPIENT has or is given access, RECIPIENT shall not use or disclose such information for any purpose other than providing the contract support services, and will not use or disclose the information for any personal or other commercial purpose; and
If RECIPIENT becomes aware of any improper release or disclosure of such nonpublic information, RECIPIENT will advise the contracting officer in writing as soon as possible.
The RECIPIENT agrees to return any nonpublic information given to him or her pursuant to this agreement, including any transcriptions by RECIPIENT of nonpublic information to which RECIPIENT was given access, if not already destroyed, upon RECIPIENT leaving the contract.
RECIPIENT understands that any unauthorized use, release or disclosure of nonpublic information in violation of this CERTIFICATE will subject the RECIPIENT and the RECIPIENT's employer to administrative, civil or criminal remedies as may be authorized by law.
RECIPIENT/AGENT: ______________________________ (signature)
PRINTED NAME: _____________________________
TITLE: ______________________________________
EMPLOYER/PRINCIPAL: _________________________________
(End of clause) Updated August 2005
52.0211-4202 TIME OF DELIVERY (OCT 1993)
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
WITHIN CALENDAR DAYS
ITEM NO. QUANTITY AFTER DATE OF
CONTRACT
CLIN0001 1 Lot 6 Weeks
CLIN0002 1 Lot 6 weeks
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule.
If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR'S PROPOSED DELIVERY SCHEDULE
WITHIN CALENDAR DAYS
ITEM NO. QUANTITY AFTER DATE OF
CONTRACT
CLIN0001 1 Lot ___________
CLIN0002 1 Lot ___________
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding one working day if the award is transmitted electronically. The term “working day” excludes weekends and U. S. Federal holidays.)
End of clause Updated June 2004
52.0211-4401 LOCAL RULES AND REGULATIONS
(a) Identification Badges: The following requirements apply to all contractors working inside the Controlled Area of Anniston Army Depot.
(1) Contractor employees requiring access to Anniston Army Depot (ANAD) to engage in contract work are required to secure aCommon Access Card (CAC) and wear it as an employee identification badge while on depot. In the event an employee is not entitled to or authorized a CAC, a depot badge card may be obtained. A CAC or badge must be secured before an employee will be allowed entry onto the depot. Contractors that are non-US citizens must be escorted by depot personnel with the proper security clearance. An appointment to obtain a CAC or badge must be coordinated through the Contracting Office Representative (COR) and obtained from the Visitor Control Center (VCC)/Badge Office/ Building 367, located at the main entrance to ANAD. No charge is made for badges if they are returned. Contractors will be charged twenty-five dollars ($25.00) for each badge issued to replace lost badges or badges damaged through carelessness, negligence, or misuse. All persons to be badged shall present a PHOTO identification from one of the following sources:
a - State driver's license b - State identification card c - Federal, municipal, or school identification card bearing a seal and the following information: photo, name, social security number, date of birth, and physical description
NOTE: A social security card is not a photo identification and will not be accepted as proper identification. Employee identification cards issued by the Contractor will not be accepted. The Directorate of Emergency Services (DES) will reject any identification presented which is altered, not issued by one of the above identified agencies, or otherwise questioned regarding validity.
(2) Contractors shall submit the name of a point of contact responsible for security requirements through the Contracting Officer to the Installation Security Management Office upon notification of contract award.
(3) At least ten working days before the Contractor expects to begin work on the installation, prime Contractor shall submit, through the TAAS System, the name and social security number of all persons entering ANAD to perform contract work for the prime and any subcontractors.
The COR will approve each individual. Once approval is received, the individual will make an appointment with the CAC office to obtain a CAC.
(4) Ten working days prior to the date Contractor employee will begin work in the controlled area of ANAD (within the gates), a Personal Data Questionnaire/Privacy Act Statement (SIOAN Form 380-2) must be completed and signed for each employee. The form authorizes ANAD to conduct a local background check for any criminal record or questionable reliability. No contractors or employees will be issued a badge without a favorable local background check.
SIOAN Forms 380-2 may only be submitted for persons who are current employees of the Contractor or who hold a letter of intent to hire issued by the Contractor. Forms will be submitted to the VCC. NO PRE-EMPLOYMENT LOCAL BACKGROUND CHECKS WILL BE CONDUCTED BY ANNISTON ARMY DEPOT. The prime contractor is responsible for checking with the VCC, phone number 256 235-6820, to ensure that employees have been cleared for entrance to ANAD.
(5) Violation of any security or safety requirements will be grounds for immediate suspension of the individual's badge or CAC. DES will notify the Contracting Officer when suspension actions are taken. The Contractor can appeal the suspension to DES, who is the final adjudication authority of the individual's reinstatement or revocation of badge privileges.
(6) See clause entitled Identification of Contractor Employees for Contractor employees working on Anniston Army Depot.
(b) AMMUNITION LIMITED AREA (ALA). Contractors working within the ALA must abide by the above guidance as well as the following additional requirements:
(1) The prime Contractor will be notified which persons are approved for access to the ALA.
Contractor personnel who are denied access based on the local background check will have the right to appeal to the DES. The Director's decision is considered the final action.
(2) No privately-owned vehicles (POV) are authorized in the ALA.
(3) Contractor-owned, rented, or leased vehicles which are construction-type vehicles (i.e., pickup trucks, dump trucks, etc.) may be authorized within the ALA upon being inspected and registered with ANAD. ALL VEHICLES AND PERSONS SHALL BE SEARCHED UPON
ENTERING AND EXITING THE ALA.
(4) Contractor vehicles may not remain overnight within the ALA without obtaining permission from DES and by disabling the vehicle by a method approved by DES such as removing the battery.
(5) No alcohol, photographic equipment, firearms, flame producing devices (to include lighters and matches), or other items prohibited by safety requirements are permitted within the
ALA.
(6) All damages caused by the Contractor to security lighting, fencing, intrusion detection systems, security telephones, or any other security equipment will be repaired immediately at the Contractor's expense by the Contractor. Normal contract work will not resume until the security equipment is returned to normal.
(7) The Contractor shall comply with the requirements of the Department of the Army
Pamphlet 385-64, Safety, Ammunition and Explosives Safety Program, in effect on the date of the solicitation for this contract.
(8) The Prime contractor shall assure that each contract employee is instructed in the known potential hazards of fire, explosion, or toxic release hazards related to his/her job while working in the Ammunition limited Area, and the applicable provisions of the installation/contractor emergency action plans.
(9) The contractor shall ensure that each employee requiring access to the ALA receives
Explosives Safety brief from ANAD Safety Office at least annually.
(c) Contractor Vehicles in the AMMUNITION LIMITED AREA (ALA): The following rules apply to contractor vehicles in the ALA Area.
(1) Contractors shall only enter into the restricted areas of Anniston Army Depot for the purpose of completing the official business as stipulated in the contract.
(2) Contract vehicles entering into the restricted area shall be on official contract business verified by the Contractor and shall be construction type vehicleswith a placard with the name of the contractor affixed. The contractor shall assume liability for all vehicles used within the restricted area in support of the contract. (See paragraph (c)(4) below for definition of an acceptable document to the liability requirement.)
(3) Contractor Employees’ Privately-Owned Vehicles not included in (c)(2) above shall not be authorized in the restricted area.
(4) The documentation to satisfy the liability language in paragraph (c)(2) would be:
a. A vehicle (i) registered (titled) in the name of the contractor or (ii) a lease, signed by the lessee/contractor and the lessor/owner. The person signing for the contractor must be a person acting with authority for the contractor.
b. In the case of a vehicle owned (titled) by the contractor, evidence of insurance combined with the terms of the contract will ensure a method of covering liability.
c. In the case of a vehicle leased by the contractor, evidence of insurance in the owner/lessor’s name and the contractor must sign a statement substantially as follows: “In consideration for allowing entry and use of the described vehicle within the Restricted Area, the undersigned hereby assumes liability for all damage or injury caused by the operation of this vehicle.”
(d) Hours of Work:
WORK HOURS RECEIVING HOURS DAY(S) OF WEEK
7:00 AM - 4:30 PM 7:00 AM - 2:00 PM Monday - Thursday 7:00 AM - 3:30 PM 7:00 AM - 2:00 PM Every other Friday CLOSED 7:00 AM - 2:00 PM Every other Friday CLOSED CLOSED Saturdays, Sundays, and Federal Holidays
(1) Federal Holidays. Federal holidays may cause the Depot to be closed for one or more of the work days identified. The contract performance period has taken this possibility into consideration.
(2) Shutdown Periods. The Government may choose to shut down for a week or portions of a week as stated below. During this shutdown, and unless otherwise stated, only those Government personnel essential for equipment/facility maintenance will be permitted work.
4th of July Holiday Safety Stand-Down Day* Christmas Holiday Employee Appreciation Day*
*Safety Stand-Down Day and Employee Appreciation Day generally occur on a Friday (8-hour day). Safety Stand-Down Day consists of either two half-days occurring at six-month intervals or one full workday per year. Employee Appreciation Day generally occurs on a Friday (half of an 8-hour day) and is usually held in the afternoon. The Contractor’s services may not be required during these periods. In such cases, the Contractor will be notified in writing by the Government. These interruptions will be at no cost to the Government.
(3) Schedule Changes. When situations warrant, the Government may change the hours of operation to adjust for certain conditions, i.e., weather conditions (extreme heat or cold). For example, during summer production, shops may begin work at 6:00 am and leave work at 3:30 pm to avoid the afternoon heat. The Contractor shall be provided as much advance written notice as possible when these situations occur and will be expected to support any schedule change provided by the Contracting Officer.
(e) Traffic: The Contractor will be required to conform to Depot regulations concerning:
(1) Designated routes
(2) Parking regulations
(3) Insurance--See clause entitled "Insurance Requirements." The Contractor will also insure that all POVs brought on the installation are fully insured for minimum amount of personal injury and personal damage liability required by Federal Acquisition Regulation 28.307-2.
(f) Highway Barricades, Warning Signs, and Parking: The Contractor shall comply with Depot Regulation ANADR 190-5 and Manual on Uniform Traffic Control Devices, ANSI D6.1, Part VI, Latest Edition. Contractors are permitted to drive their vehicles inside buildings to load and unload supplies and equipment. However, when finished loading and unloading, the Contractor should move the vehicle outside to a designated parking space.
(g) Temporary Structures: The Contractor shall comply with Corps of Engineers Manual (EM) 385-1-1.
(h) Fire Prevention and Protection: The Contractor shall comply with all fire prevention measures prescribed in the installation fire prevention and protection regulation, a copy of which is on file in the office of the Contracting Officer. A written hot work permit shall be obtained from the installation fire department for use of any heat producing devices such as blowtorches, portable furnaces, tar kettles, or gas and electric welding and cutting equipment. The Contractor shall be liable for any fire loss to Government property attributable to negligence on the part of the Contractor, including failure to comply with fire prevention measures prescribed by the terms of this contract.
(i) Utilities: Government-owned and operated utilities are adequate for the needs and use of the Contractor as well as the Government. All reasonably required amounts of water and electricity are available to the Contractor without charge.
(j) Vehicle Searches: All vehicles entering, moving throughout, and exiting ANAD are subject to random searches as directed by the Depot Commander.
(k) Land Use Control: Contractors who will be required to “disturb soil” in the performance of this contract shall review and strictly adhere to the Standard Operating Procedure for Land Use Control Implementation. The SOP is available in the Directorate of Risk Management, Building 199, for review by Contractors.
(l) Use of any cellular telephone camera is prohibited on this installation. If a cellular telephone is illegally used on this installation, that cellular telephone is subject to confiscation, and any violation may be punishable by fine or imprisonment or both. Use of cameras without ANAD-issued permit is strictly prohibited. Non-permitted cameras are subject to confiscation.
(m) Air Emissions: The contractor is responsible for early coordination with the Directorate of Risk Management on any action that might result in air emissions (dust, volatile substances, etc).
ANAD's Title V Air Permit requires the installation to obtain construction permits for new or modified air sources. The Alabama Department of Environmental Management (ADEM) must issue a construction permit before ANAD purchases and installs any equipment which will produce air emissions. Installation and/or start-up of this equipment without the proper permit and coordination with ADEM is a violation of State and federal environmental law. The violation could result in a possible civil penalty or fine of $32,500 per day per violation from the Federal Environmental Protection Agency. Contractors considering a new process or device, or a modification to an existing unit, must first coordinate with the Environmental Compliance Division, Directorate of Risk Management.
(n) ENVIRONMENTAL MANAGEMENT SYSTEM, ISO 14001: The contractor and its subcontractors shall conform to Anniston Army Depot's Environmental Management System (EMS) including all policies and procedures required by the EMS. All activities conducted within the installation are subject to the EMS and any plans, goals, objectives, targets, etc.
established through the EMS. It is the contractor's responsibility to ensure that any work performed under this contract is accomplished in accordance with the Anniston Army Depot's Environmental Policy (Commander's Policy #72). Information about the EMS can be obtained from the Directorate of Risk Management by calling (256) 235-7746.
The contractor or subcontractors shall be responsible for stopping work (or stopping the work of subcontractors) and reporting any operation or condition on ANAD that could adversely affect the environment or the health and safety of employees or the public. In such situations, the contractor should immediately advise the COR or an appropriate authority. Emergencies should be reported by dialing "911" from any Anniston Army Depot base telephone.
(o) Exercise Events: Contractors working on the installation are expected to participate in LEAN thinking, Value Stream Analysis, Rapid Improvement Events, and Six Sigma activities that may last from one to seven weeks in duration. These efforts, as defined below, are an integral part of the process improvements of ANAD on our journey toward building a LEAN manufacturing facility. The COR will provide detailed instructions when your involvement is required.
LEAN thinking is a coordinated response to today’s highly competitive environment. LEAN production is aimed at the elimination of waste in every area of production including customer relations, product design, supplier networks and factory management. Its goal is to incorporate less human effort, less inventory, less time to develop products, and less space to become highly responsive to customer demand while producing top quality products in the most efficient and economical manner possible.
A Value Stream Analysis (VSA) is an event that documents the current process, the planned future process and an action plan to get to the planned future process. The VSA normally last three to four days and includes representatives from all aspects of the process.
A Rapid Improvement Event is a seven-week process that focuses on events where teams of people from a broad range of parts of the business gather to streamline a process. The first three weeks are used to select an area and topic, create the team, and plan for the event. The fourth week is the actual event where waste is identified, removed, and changes to processes made.
The last three weeks are to ensure changes are continuing to be used and process is working correctly.
Six Sigma is the leading quality improvement program for a rigorous and disciplined methodology that uses data and statistical analysis to measure and improve a company's operational performance by identifying and eliminating "defects" in manufacturing and service-related processes. Six Sigma differs from traditional quality improvement programs in its focus on input variables. While traditional process improvement methods depend upon measuring outputs and establishing control plans to shield customers from organizational defects, a Six Sigma program demands that problems be addressed at the input root cause level, thereby eliminating the need for unnecessary inspection and rework processes.
(p) ANAD Network: For access to the ANAD network, send a letter stating that a National Agency Check with Inquiries (NACI) has been initiated and furnish a copy of the SF 85, Questionnaire for Non-Sensitive Positions, for review prior to issuance of an interim password.
The results of the NACI investigation shall be furnished to the Security Management Office, Security Office Identifier number A077, for the final adjudication. A CAC Card must be obtained for computer access.
(q) Safety and Accident Prevention: SAFETY AND HEALTH REQUIREMENTS:
Contractors shall adhere to all safety rules and regulation of corrective actions, which will be taken into consideration:
General:
Applicable Publication: The publications listed below form a part of this specification to extent referenced. The publications are referred to in the text by basic designation only.
Code of Federal Regulation (CFR): OSHA General Industry Safety and Health Standards (29 CFR 1910), Publication V2206; OSHA Construction Industry Standards (29 CFR 1926). One source of these regulations is OSHA Publication 2207, which includes a combination of both parts 1910 and 1926 as they relate to construction safety and health. It is for sale by the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402.
National Emission Standards for Hazardous Air Pollutants (40 CFR, Part 61).
Title 29 of the Code of Federal Regulations, Subtitle B, Part 1926 provides the safety and health regulations for construction. Under the general provisions, it gives each contractor responsibility to “…initiate and maintain such programs as may be necessary to comply with this part (29CFR1926).” The general company safety plan should address the how the company will comply with the basic requirements of the standard.
For 29 CFR 1926 and other OSHA standards and interpretations plus other resources are available from the Occupational Safety and Health web site, www.osha.gov.
In addition to contract clause entitled "ACCIDENT PREVENTION," FAR 52.236-13, the contractor shall comply with all regulations, publications and manuals current at the time the Task Order is being performed to include but are not limited to Army Material Command (AMC) Regulation 385-100, Safety and Occupational Health Regulation ANADR 385-1, Engineering Manual (EM) 385-1-1, 29 Code of Federal Regulations (CFR) 1926/1910, other related Department of Transportation (DOT) Regulations (49 CFR), Federal Standard (Fed Std): 313A Material Safety Data Sheets, ANSI BHMA A156, National Electric Safety Code ANSI C2, NFPA Codes and Standards, National Electric Code Handbook, UFGS (Unified Facilities Guide Specification) and all local policies. Definition of Hazardous Materials: Refer to hazardous and toxic materials/substances included in Subparts H and Z of 29 CFR 1910 and to others as additionally defined in Fed. Std 313.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .