Amendment_001.pdf

PDF 87 KB Posted

Attached to
CNC Press Brake Federal contract opportunity
Solicitation number
W911KF-15-Q-0094
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

About this file

Answers to Questions submitted

View the file

Other files for this federal contract opportunity

Other files attached to CNC Press Brake, newest first.
File Type Posted
w911kf15q0094.pdf PDF
DD_Form_1664_cnc_brake_press.doc DOC document
STATEMENT_OF_WORK_for_CNC_Press_Brake_.pdf PDF
DD-Form_1423_cnc_brake_press.xfdl XFDL file
Attachmetnts.pdf PDF
SURVEILLANCE_PLAN_for_CNC_Brake_Press.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W31G1Y5139006G

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Page 2

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Dec-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KF-15-Q-0094

X 9B. DATED (SEE ITEM 11)

23-Nov-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Dec-2015

CODE

ARMY CONTRACTING COMMAND - WARREN (ANAD)

ANNISTON ARMY DEPOT

7 FRANKFORD AVENUE, BLDG 35

ANNISTON AL 36201-4199

W911KF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911KF-15-Q-0094

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

The following items are applicable to this modification:

AMENDMENT NOTES

1. The purpose of this amendment is to provide answers to questions submitted by prespective vendors.

a. Question: How close can the delivery vehicle (a flatbed truck) get to the entrance of the facility?

Answer: Can be escorted within 200 feet of building.

b. Question: Are there any ramps, gravel, or obstacles in the way, or is there clear passage to the installation location?

Answer: No

c. Question: What are the dimensions of the entrance doorway?

Answer: 12 feet wide 12 feet tall

d. Question: Is the machine to be placed on the ground floor or another level?

Answer: Ground

e. Question: Are there any interior doorways to navigate through and what are their dimensions?

Answer: No

f. Question: Is the floor concrete and what is its thickness? Is it level?

Question: 12 inches concrete floor ‐ Yes

g. Question: Do any existing machines need to be moved in order to place the new machine in position?

Answer: No ANAD will have existing machine moved

h. Question: Is the electrical supply in place? Who is to provide hook‐up?

Answer: Yes, ANAD will have a fused discount within 20 feet of contractor machine. ANAD will need instruction on wiring machine.

i. Question: Are there any special requirements for gaining access to the facility? (This would involve delivery by flatbed truck, possibly a rigging company to offload and training personnel).

Answer: Must have clearance for personnel to come in to install machine there is a form that has to be filled out by contractor. The COR will pick up the truck at front gate and escort to building 108.the

W911KF-15-Q-0094

contractor is responsible for all shipping handling and storage (SOW 5.1.1)there are rigging company's local that can handle this.

j. Question: Who is to provide offloading and setting the machine in place?

Answer: Contractor SOW 5.1.1 and 5.2.

k. Question: Any other information that can provide that pertains to delivery and rigging.

Answer: There are a few rigging company in close proximity of the depot, Model City and Litton Electric. (This is a ref. only. The contractor must furnish Riggers for this contractor)

2. The solicitation closing date and time is not changed.

3. All other terms and conditions remain unchanged.