Solicitation.pdf

PDF 5 MB Posted

Attached to
RAILROAD REPAIR Federal contract opportunity
Solicitation number
W911KF11B0001
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

About this file

RAILROAD REPAIR

View the file

Other files for this federal contract opportunity

Other files attached to RAILROAD REPAIR, newest first.
File Type Posted
amendment_3_released.pdf PDF
released_amendment_0001.pdf PDF
amendment_2_released.pdf PDF
amendment_2_released.pdf PDF
Solicitation.pdf PDF
released_amendment_0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A3A00011520502QT6910

Railroad Repairs Furnish all plant, labor, materials, and equipment and perform all w ork w ithin the specif ications, scedules, and draw ings forming parts thereof, for railroad repairs located at Anniston Army Depot.

SPECIAL INSTRUCTIONS - PREPARATION OF PROPOSALS - CONSRUCTION -(ALSO REFER TO BIDDING SCHEDULE/INSTRUCTIONS TO

BIDDERS, SECTION 00100)

1. Offeror is to complete, as minimun, SF 1442, bid schedule, Section 00600 "Representations and Certif ications" and "Evidence of Authoirty to Bid", and any Amendment(s) to solicitations by facsimile to (256) 240-3077 extension 2222 or email to acqnet@anad.army.mil

2. Furnish Performance/Payment Bonds or acceptable guarantee if bid exceeds $1000,000.00

3. Offeror is expected to examine the draw ings, specifications, schedule and al instructions. Failure to do so w ill be at Offeror's risk.

4. Pre-Bid Site Visit is scheduled 21 July 2011 at 9:00 a.m. local time.

5. This is an unrestricted procurememnt.

Performance Period: Offeror of this project should submit propsed completion item is less than that show n in Block 11.

Estimated Magnitude of this project is betw een $250,000.00 and $500,000.00.

North American Industrial Classification System (NAICS) Code is 237990, Size Standard is $31.0 M.

X

HEATHER N. GLOVER 256-235-6449

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

13-Jul-2011

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________270 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________15 Aug 2011 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______30 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

DOC-ANNISTON ARMY DEPOT

DIRECTORATE OF CONTRACTING

7 FRANKFORD AVENUE

ANNISTON AL 36201-4199

W911KF

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

10:00 AM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

2562403077 EXT. 2222FAX:TEL: TEL: FAX:

W911KF-11-B-0001 57

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W911KF-11-B-0001

Section SF 30 - BLOCK 14 CONTINUATION PAGE

PROVISIONS

Drawings are available with this electronic solicitation in PDF format. If you require hard copies, please contact Heather Glover at 256-235-6449 and drawings will be mailed to you.

IMPORTANT: IT IS YOUR RESPONSIBILITY TO ENSURE YOUR BID HAS BEEN RECEIVED BY THE

CLOSING DATE AND TIME AS SPECIFIED IN THE SOLICITATION: Vendors must use the ASFI BRS to respond via the secure Bid Response System. To use the Bid Response System, vendors must have an active Central Contractor Registration (CCR) profile. This is validated each time a bid response is initiated within the ASFI. ASFI Vendor User Guide may be accessed at https://acquisition.army.mil/asfi_faq.cfm.

The completion date for this procurement is 270 days.

#1: Please note the items included as part of this solicitation: (1) General Wage Decision, (2) Evidence of Authority to Sign Offers, (3) Technical Provisions and Drawings, (4) Personal Data Questionnaire Form 380-2; (5) Contractor Request for Waiver Non-EPA items; (6) EPA Guideline Items; and (7) Contractor Affirmative Procurement Report Form.

#2: All submittals may not be listed in the submittal sections of the Technical Provisions. Please read the Technical Provisions carefully to be sure all required materials and documentation are submitted to the Contracting Officer as required.

#3: See FAR Clause 52.246-21 “Warranty of Construction,” Contractor will execute all warranties, in writing, for the benefit of the Government by one of the following methods:

a. Require manufacturer to place all warranties in the name of the US Army, Anniston Army Depot, 7 Frankford Ave. , Anniston, AL 36201-4199, OR

b. Sign over warranty rights to Anniston Army Depot and advise manufacturer, in writing, of the transfer.

#4: Please review the accuracy of your Central Contractor Registration (CCR) information.

The Department of Defense began using a new reporting system in fiscal year 2005. The system will automatically pull information from the CCR. It is imperative that the information for your company is correctly recorded.

Awarding of a contract to a particular company could be impacted by the information found at the CCR.

#5: Contractors may accept Government Smart Pay Visa Credit Card or provide their electronic funds transfer address. Contractors must be registered in the Central Contractor Registration (CCR) Program before an award will be issued. COMPLETE THE FOLLOWING INFORMATION AND INCLUDE WITH ANY OFFER.

Accept VISA? Yes_____ No_____

If no, EFT address: ________________________

Federal Tax Identification Number: __________________

Dun & Bradstreet Number (DUNS):__________________

CAGE Code: _____________

Central Contractor Registration: Yes______ No_______ Expiration Date:__________

Vendor Contact Information: POC____________________________

Telephone:_______________________

FAX: ___________________________

Email:___________________________

#6: The contractor shall comply with Resource Conservation and Recovery Act (RCRA) affirmative procurement (or 'buying recycled') requirements by giving preference in their purchasing process to products and practices that promote recycling and other environmentally friendly practices. The contractor is also responsible for insuring that all sub-contractors comply with ap requirements. Except as specifically waived in writing, for reasons of price, performance or availability, any products in the attached EPA guideline items list provided by the contractor as part of the performance of this contract must meet the minimum percentage levels of recovered materials as specified to these standard contract terms and conditions. Please refer to the attached EPA list of designated recovered materials content products (attached). On completion of work, contractor shall submit to the COR or Contract Administrator a completed “affirmative procurement reporting form” (attached) for actions taken under that specific order.

The contractor shall submit the attached "contractor request for waiver for non-EPA comprehensive guideline items" (attached) as written documentation to support the decision not to acquire items meeting the minimum content levels, based on one of the three justifications below:

a. The product is not available from a sufficient number of sources to maintain a sufficient level of competition (i.

e., available from two or more sources) or is not available at a reasonable price.

b. The product is not available within a reasonable period of time.

c. The product does not meet the performance standards in applicable specifications or fails to meet reasonable performance standards of the agency.

See FAR clauses 52.223-4 and 52.223-9 for further guidance.

#7: Prospective contractors may complete electronic annual representations and certifications at HTTP://ORCA.BPN.GOV in conjunction with required registration in the central contractor registration (CCR) database (see FAR 4.1102). Prospective contractors shall update the representations and certifications submitted to ORCA as necessary, but at least annyally, to ensure they are kept current, accurate, and compelte. The representations and certifications are effective until one year from date of submission or update to ORCA.

#8: Safety Practices and Guidelines. The Contractor shall conform to all federal OSHA standards applicable to the work performed and all safety practices and guidelines contained within this Statement of Work. Contractor shall strictly adhere to the contract clause entitled "Accident Prevention", Army Material Command (AMC) Regulation

(R) 385-100, Safety and Occupational Health Regulation ANADR 385-1, Engineering Manual (EM) 385-1-1, 29 Code of Federal Regulations (CFR) 1926/1910, other related Department of Transportation (DOT) Regulations (49 CFR), and all local policies.

If a contractor employee is observed performing an activity in a manner inconsistent with any of the above cited regulations or is engaged in any activity that is dangerous to life, limb, or government property, the ANAD Safety Representative shall have the authority to notify the employee and/or the contractor’s on-site supervisor of the hazardous activity and require correction of the hazardous activity. This authority does not preclude the Safety Representative from notifying the Contracting Officer’s Representative of the hazardous condition or safety violation in appropriate situations.

If necessary, the ANAD Safety Representative shall have the authority on behalf of the Contracting Officer to require the contractor and/or its employee to stop the hazardous activity until corrective action is taken to eliminate a hazardous condition or safety violation. Said action shall not be considered to be the basis of a claim and shall be at no cost to the Government.

Contractor will notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from by local, State, and Federal Regulators in which the violation is attributed to the action of the contractor or its subcontractors while working or providing services on ANAD’s installation. Contractor will provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation.

Ensure the Electronic Business POCs listed in the Central Contractor Registration (CCR) for your company are the same individuals that will submit invoices through WAWF before using WAWF. You can make changes to your CCR profile at http://www.ccr.gov/www.ccr.gov. Click on "Update” or “Renew” using “TPIN". CCR customer support can be reached at 1-888-227-2423.

If your Electronic Business (EB) POCs are correct, contact the WAWF helpdesk at 1-866-618-5988 or by e-mail at cscassig@ogden.disa.mil and ask them to establish a group for your CAGE code. The group administrator will also have to call the WAWF helpdesk to request account activation. Once the group is established and the account is activated, you will be able to create a Combination Invoice/Receiving report (SUPPLIES/MATERIALS) or a 2 in 1 Invoice (SERVICES/EQUIPMENT) using the codes below and instructions available from our contract administrator/buyer.

Questions concerning payment should be directed to the responsible Defense Finance Accounting Services (DFAS).

Please have the order number and invoice number ready when calling about payment status.

The accounts payable mailing address can be located in Block 18a of your order. You can easily access payment information using the DFAS web site at http://www.dfas.mil/http://www.dfas.mil. Your purchase order/contract number or invoice will be required to inquire status of your payment. Go to DFAS on the web at:

www/dfas.mil/money/vendor.

WAWF PROCEDURES

If your order WILL BE PAID BY DFAS (not by credit card) and contains DFARS Clause 252.232-7003, Electronic Submission of Payment Requests, you must submit your invoice through Wide Area Workflow (WAWF). This clause requires invoices for supplies and services purchased by the DoD be submitted via electronic means. The Wide Area Workflow system satisfies this mandatory requirement. WAWF can be accessed on the internet at https://wawf.eb.mil/

THE FOLLOWING CODES WILL BE REQUIRED TO ROUTE YOUR INVOICES AND ADDITIONAL

EMAILS CORRECTLY THROUGH WAWF:

WAWF Data/CODES needed for Invoice

SUPPLIES/

MATERIALS

(PRs that start with W31G1Y)

SERVICES/

EQUIPMENT

SUPPLIES/

MATERIALS

(PRs DO NOT that start with W31G1Y)

CONSTRUCTION

CAGE CODE CCR Cage code listed in Contractor/Offer or field of contract

CCR Cage code listed in Contractor/Offer or field of contract

CCR Cage code listed in Contractor/Offer or field of contract

CCR Cage code listed in Contractor/Offeror field of contract

ISSUE/ADMIN BY

DODAAC

W911KF W911KF W911KF W911KF

INSPECT BY

DODAAC (If needed)

W31G1Y (Must have inspector code)

W911KF W911KF

(Unless Inspected by

DCMA)

W911KF

SHIP TO

(Supplies/Materials Only)

W911KF NOT

AVAILABLE

W911KF W911KF

ACCEPTOR

(Services/Equipment Only)

NOT

AVAILABLE

W911KF NOT

AVAILABLE

NOT AVAILABLE

Type of Invoice COMBO 2 IN 1 COMBO CONSTRUCTION Pay DODAAC HQ0303 HQ0303 HQ0303 HQ0303

CONTRACT NUMBER:

DELIVERY ORDER NUMBER (IF APPLICABLE):

EMAIL POINT OF CONTACT LISTING: (Please insert following email addresses for additional email distribution)

CONTRACT ADMINISTRATOR:

CONTRACTING OFFICER:

USER AND/OR INSPECTOR:

ADDITIONAL CONTACTS:

Section 00010 - Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lump Sum Contractor shall repair railro

FFP

Contractor shall repair railroads to include replacing two turn-outs in the East area with new turn-outs, repairing two additional turn-outs in the West area, replacement of bad crossties and general switch maintenance & lubrication FOB: Destination

PURCHASE REQUEST NUMBER: A3A00011520502QT6910

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 10-APR-2012 1 ANNISTON ARMY DEPOT

WORK TO BE PERFORMED AT

ANNISTON ARMY DEPOT

ANNISTON AL 36201-4199

FOB: Destination

W31G1Y

Section 00100 - Bidding Schedule/Instructions to Bidders

CLAUSES INCORPORATED BY REFERENCE

52.211-2 Availability of Specifications, Standards, and Data Item

Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST)

JAN 2006

52.214-3 Amendments To Invitations For Bids DEC 1989 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids MAR 1997 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.222-5 Davis-Bacon Act--Secondary Site of the Work JUL 2005

CLAUSES INCORPORATED BY FULL TEXT

52.000-4702 AMC-LEVEL PROTEST PROGRAM

If you have complaints about this procurement, it is preferable that you first attempt to resolve those concerns with the responsible contracting officer. However, you can also protest to Headquarters, AMC. The HQ, AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the General Accounting Office or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 20 working days from filing. To be timely, protests must be filed within the periods specified in FAR 33.103.

Send protests (other than protests to the contracting officer) by U. S. Postal Service to:

HQ Army Materiel Command Office of Command Counsel 9301 Chapek Rd, Room 2-1SE3401 Fort Belvoir, VA 22060-5527

Facsimile number (703) 806-8866/8875

Packages sent by Federal Express or UPS should be addressed to:

HQ Army Materiel Command Office of Command Counsel Room 2-1SE3401 1412 Jackson Loop Fort Belvoir, VA 22060-5527

The AMC-level protest procedures are found at:

http://www.amc.army.mil/pa/COMMANDCOUNSEL.asp

If Internet access is not available, contact the contracting officer or HQ, AMC to obtain the AMC-Level Protest Procedures.

(End of provision) Updated August 2004

52.0000-4706 ELECTRONIC SUBMISSION OF OFFERS

All responses to this solicitation must be submitted in digitized/electronic format. Paper copy responses will not be accepted. All solicitation responses must be submitted through the Army Single Face to Industry Bid Response System (ASFI BRS).

The ASFI provides industry with a single point of access to all U.S. Army contracting opportunities. The Contracting Opportunities Search feature allows vendors to easily locate opportunities and submit offers/bids online. You can access this website by going to: https://acquisition.army.mil/asfi

Vendors must use the ASFI BRS to respond via the secure Bid Response System. To use the Bid Response System, vendors must have an active Central Contractor Registration (CCR) profile. This is validated each time a bid response is initiated within the ASFI. ASFI Vendor User Guide may be accessed at https://acquisition.army.mil/asfi_faq.cfm.

Offers submitted using any other means will not be accepted, unless stated otherwise in the solicitation.

If format is other than Microsoft Word, Microsoft Excel, Microsoft Access, Microsoft PowerPoint, or Portable Document Format (PDF), a "reader" must be provided. Offeror must insure its offer, in its entirety, reaches the Army Contracting Command-Warren (ANAD), Anniston Army Depot, before the time set for opening or closing of the solicitation.

Any clauses or provisions of this solicitation which mention writing, returning, or submission of offer will mean electronic submission as stated in the paragraph above.

Electronic offers must identify the solicitation and the opening/closing date, and include, as a minimum, the following:

a. The SF33/SF1449/SF18/SF1442 filled out and signed.

b. All applicable fill-in provisions from the solicitation must be completed.

c. Any other information required by the solicitation.

Lateness rules are outlined in the solicitation.

If you choose to password-protect access to your offer, you must provide the password to ANAD before the opening or closing date. Contact the buyer identified on the cover page of this solicitation to arrange a means of providing the password. Passwords used only for the purpose of write protecting files need not be provided.

Offerors shall make every effort to ensure that their offer is virus-free. Offers (or portions thereof) submitted which DO reflect the presence of a virus, or which are otherwise rendered unreadable by damage in either physical or electronic transit, shall be treated as “unreadable.” See Federal Acquisition Regulation 14.406 or 15.207(c) for a description of the steps the Government shall take with regard to unreadable offers.

Any bid bond required by this solicitation must be submitted with offer. Also, the properly completed original bid bond must be furnished to the Army Contracting Command-Warren (ANAD), Anniston Army Depot, 7 Frankford Ave, Anniston, AL 36201-4199, prior to the opening or closing of the solicitation.

(End of provision) June 2011

52.211-4401 LOCAL RULES AND REGULATIONS

(a) Identification Badges and Vehicle Decals: The following requirements apply to all contractors working inside the Controlled Area of Anniston Army Depot.

(1) Contractors are required to secure, and wear at all times, employee identification badges for all employees who must enter the Anniston Army Depot (ANAD) to engage in contract work. Badges must be secured before an employee will be allowed entry onto the depot. Contractors that are non-US citizens must be escorted by depot personnel with the proper security clearance. Emergency badges will be issued on a case-by-case basis. Vehicle decals must be obtained for all Contractor vehicles entering ANAD. These badges and decals may be obtained from the Badge and Vehicle Office, Building 367, located at the main entrance to ANAD. No charge is made for badges if they are returned. Contractors will be charged twenty-five dollars ($25.00) for each badge issued to replace lost badges or badges damaged through carelessness, negligence, or misuse. All persons to be badged shall present a PHOTO identification from one of the following sources:

1 - State driver's license

2 - State identification card

3 - Federal, municipal, or school identification card bearing a seal and the following information: photo, name, social security number, date of birth, and physical description

NOTE: A social security card is not a photo identification and will not be accepted as proper identification.

Employee identification cards issued by the Contractor will not be accepted. The Director of Law Enforcement (DLE) will reject any identification presented which is altered, not issued by one of the above identified agencies, or otherwise questioned regarding validity.

(2) Contractors shall submit the name of a point of contact responsible for security requirements through the Contracting Officer to the Installation Security Management Office upon notification of contract award.

(3) Ten calendar days prior to the date Contractor employee will begin work in the controlled area of ANAD (within the gates), a Personal Data Questionnaire/Privacy Act Statement (SIOAN Form 380-2) must be completed and signed for each employee. The form authorizes ANAD to conduct a local background check for any criminal record or questionable reliability. No contractors or employees will be issued a badge without a favorable local background check. SIOAN Forms 380-2 may only be submitted for persons who are current employees of the Contractor or who hold a letter of intent to hire issued by the Contractor. Forms will be submitted to the Badge and Vehicle Office, Building 367, located at the main entrance to ANAD. NO PRE-EMPLOYMENT LOCAL BACKGROUND CHECKS WILL BE CONDUCTED BY ANNISTON ARMY DEPOT. The prime contractor is responsible for checking with the Badge and Vehicle Office, Building 367, phone number 256 235-6820, to ensure that employees have been cleared for entrance to ANAD.

(4) Also, at least ten calendar days before the Contractor expects to begin work on the installation, prime Contractor shall submit, on company letterhead, the name, social security number, date/place of birth, and citizenship of all persons entering ANAD to perform contract work for the prime and any subcontractors. Letter shall be submitted through the Contracting Officer to the Badge and Vehicle Office.

(5) Violation of any security or safety requirements will be grounds for immediate suspension of the individual's badge. DLE will notify the Contracting Officer when suspension actions are taken. The Contractor can appeal the suspension to DLE, who is the final adjudication authority of the individual's reinstatement or revocation of badge privileges.

(6) See clause entitled Identification of Contractor Employees for Contractor employees working on Anniston Army Depot.

(b) AMMUNITION LIMITED AREA. Yes , No work to be performed in the Ammunition Limited Area (ALA). Contractors working within the ALA must abide by the above guidance plus the following additional requirements:

(1) The prime Contractor will be notified which persons are approved for access to the ALA. Contractor personnel who are denied access based on the local background check will have the right to appeal to the DLE. The Director's decision is considered the final action.

(2) No privately-owned vehicles (POV) are authorized in the ALA.

(3) Contractor-owned, rented, or leased vehicles which are construction-type (i.e., pickup trucks, dump trucks, etc.) may be authorized within the ALA upon being inspected and registered with ANAD. ALL VEHICLES AND

PERSONS SHALL BE SEARCHED UPON ENTERING AND EXITING THE ALA.

(4) Contractor vehicles may not remain overnight within the ALA without obtaining permission from DLE and by disabling the vehicle (by removing the battery or some other method approved by DLE).

(5) No alcohol, photographic equipment, firearms, flame producing devices (to include lighters and matches), or other items prohibited by safety requirements are permitted within the ALA.

(6) All damages caused by the Contractor to security lighting, fencing, intrusion detection systems, security telephones, or any other security equipment will be repaired immediately at the Contractor's expense by the Contractor. Normal contract work will not resume until the security equipment is returned to normal.

(c) CHEMICAL LIMITED AREA. Yes , No work to be performed in the Chemical Limited Area (CLA).

Contractors working within the CLA are required to adhere to all of the requirements of paragraph (a) and (b) above plus the following requirements:

(1) Contractors entering the CLA on a temporary entry control roster are required to attend a safety briefing. The safety briefing, approximately 30 minutes in length, is an annual requirement. Contact DLE at 256 235-7578 to schedule this briefing.

(2) Contractors working within the CLA must be escorted by a member of the security force or an ANAD employee qualified to escort. Escorts remain with the Contractor the entire time the Contractor is within the CLA.

(3) The requirement for a security escort must be coordinated through the Contracting Officer to DLE two weeks in advance of initial required work date. The number of available escorts is limited, which may affect the amount of work area available to the Contractor each day.

(4) Escorts will be conducted with a "line of sight" being maintained at all times between the escort and the Contractor. This will limit the amount of distance one crew may spread out to perform work. Escorts may direct Contractor employees regarding the distance to travel from the escort.

(5) Contractors working within the CLA may be required to cease work and evacuate from the CLA up to six (6) times per year for exercises and/or emergencies. The duration of the cease work periods will vary, but normally they will not exceed 24 hours. These interruptions will be at no cost to the Government.

(6) Contractor work hours within the CLA will be normal ANAD duty days and duty hours. Contractors must depart the CLA 15 minutes prior to the end of ANAD's normal shift.

(d) Restricted Area (Includes ALA and CLA): The following rules apply to contractor vehicles in the Restricted Area.

(1) Contractors shall only enter into the restricted areas of Anniston Army Depot for the purpose of completing the official business as stipulated in the contract.

(2) Contract vehicles entering into the restricted area shall be on official contract business verified by the Contractor; shall be construction type vehicles; shall be properly registered on Anniston Army Depot; shall have a placard with the name of the contractor affixed, and the contractor shall assume liability for all vehicles used within the restricted area in support of the contract. (See paragraph (d)(4) below for definition of an acceptable document to the liability requirement.)

(3) Contractor Employees’ Privately-Owned Vehicles not included in (d)(2) above shall not be authorized in the restricted area.

(4) The documentation to satisfy the liability language in paragraph (d)(2) would be:

a. A vehicle (i) registered (titled) in the name of the contractor or (ii) a lease, signed by the lessee/contractor and the lessor/owner. The person signing for the contractor must be a person acting with authority for the contractor.

b. In the case of a vehicle owned (titled) by the contractor, evidence of insurance combined with the terms of the contract will ensure a method of covering liability.

c. In the case of a vehicle leased by the contractor, evidence of insurance in the owner/lessor’s name and the contractor must sign a statement substantially as follows: “In consideration for allowing entry and use of the described vehicle within the Restricted Area, the undersigned hereby assumes liability for all damage or injury caused by the operation of this vehicle.”

(e) Hours of Work:

WORK HOURS RECEIVING HOURS DAY(S) OF WEEK

7:00 AM - 4:30 PM 7:00 AM - 2:00 PM Monday - Thursday 7:00 AM - 3:30 PM 7:00 AM - 2:00 PM Every other Friday CLOSED 7:00 AM - 2:00 PM Every other Friday CLOSED CLOSED Saturdays, Sundays, and Federal Holidays

(1) Federal Holidays. Federal holidays may cause the Depot to be closed for one or more of the work days identified. The contract performance period has taken this possibility into consideration.

(2) Shutdown Periods. The Government may choose to shutdown for a week or portions of a week as stated below. During this shutdown, and unless otherwise stated, only those Government personnel essential for equipment/facility maintenance will be permitted work.

4th of July Holiday Safety Stand-Down Day* Christmas Holiday Employee Appreciation Day*

*Safety Stand-Down Day and Employee Appreciation Day generally occur on a Friday (8-hour day). Safety Stand- Down Day consists of either two half-days occurring at six-month intervals or one full workday per year. Employee Appreciation Day generally occurs on a Friday (half of an 8-hour day) and is usually held in the afternoon. The Contractor’s services may not be required during these periods. In such cases, the Contractor will be notified in writing by the Government. These interruptions will be at no cost to the Government.

(3) Schedule Changes. When situations warrant, the Government may change the hours of operation to adjust for certain conditions, i.e., weather conditions (extreme heat or cold). For example, during summer production, shops may begin work at 6:00 am and leave work at 3:30 pm to avoid the afternoon heat. The Contractor shall be provided as much advance written notice as possible when these situations occur and will be expected to support any schedule change provided by the Contracting Officer.

(f) Traffic: The Contractor will be required to conform to Depot regulations concerning:

(1) Designated routes

(2) Parking regulations

(3) Insurance--See clause entitled "Insurance Requirements." The Contractor will also insure that all POVs brought on the installation are fully insured for minimum amount of personal injury and personal damage liability required by Federal Acquisition Regulation 28.307-2.

(g) Highway Barricades, Warning Signs, and Parking: The Contractor shall comply with Depot Regulation ANADR 190-5 and Manual on Uniform Traffic Control Devices, ANSI D6.1, Part VI, Latest Edition. Contractors are permitted to drive their vehicles inside buildings to load and unload supplies and equipment. However, when finished loading and unloading, the Contractor should move the vehicle outside to a designated parking space.

(h) Temporary Structures: The Contractor shall comply with Corps of Engineers Manual (EM) 385-1-1.

(i) Fire Prevention and Protection: The Contractor shall comply with all fire prevention measures prescribed in the installation fire prevention and protection regulation, a copy of which is on file in the office of the Contracting Officer. A written hot work permit shall be obtained from the installation fire department for use of any heat producing devices such as blowtorches, portable furnaces, tar kettles, or gas and electric welding and cutting equipment. The Contractor shall be liable for any fire loss to Government property attributable to negligence on the part of the Contractor, including failure to comply with fire prevention measures prescribed by the terms of this contract.

(j) Utilities: Government-owned and operated utilities are adequate for the needs and use of the Contractor as well as the Government. All reasonably required amounts of water and electricity are available to the Contractor without charge.

(k) Vehicle Searches: All vehicles entering, moving throughout, and exiting ANAD are subject to random searches as directed by the Depot Commander.

(l) Land Use Control: Contractors who will be required to “disturb soil” in the performance of this contract shall review and strictly adhere to the Standard Operating Procedure for Land Use Control Implementation. The SOP is available in the Directorate of Risk Management, Building 1, for review by Contractors.

(m) Cellular telephones with built-in cameras are prohibited on this installation. If a cell phone with camera is found, that cell phone is subject to confiscation, and any violation may be punishable by fine or imprisonment or both.

(n) Air Emissions: The contractor is responsible for early coordination with the Directorate of Risk Management on any action that might result in air emissions (dust, volatile substances, etc). ANAD's Title V Air Permit requires the installation to obtain construction permits for new or modified air sources. The Alabama Department of Environmental Management (ADEM) must issue a construction permit before ANAD purchases and installs any equipment which will produce air emissions. Installation and/or start-up of this equipment without the proper permit and coordination with ADEM is a violation of State and federal environmental law. The violation could result in a possible civil penalty or fine of $32,500 per day per violation from the Federal Environmental Protection Agency. Contractors considering a new process or device, or a modification to an existing unit, must first coordinate with the Environmental Compliance Division, Directorate of Risk Management.

(o) Exercise Events: Contractors working on the installation are expected to participate in LEAN thinking, Value Stream Analysis, Rapid Improvement Events, and Six Sigma activities that may last from one to seven weeks in duration. These efforts, as defined below, are an integral part of the process improvements of ANAD on our journey toward building a LEAN manufacturing facility. The COR will provide detailed instructions when your involvement is required.

LEAN thinking is a coordinated response to today’s highly competitive environment. LEAN production is aimed at the elimination of waste in every area of production including customer relations, product design, supplier networks and factory management. Its goal is to incorporate less human effort, less inventory, less time to develop products, and less space to become highly responsive to customer demand while producing top quality products in the most efficient and economical manner possible.

A Value Stream Analysis (VSA) is an event that documents the current process, the planned future process and an action plan to get to the planned future process. The VSA normally last three to four days and includes representatives from all aspects of the process.

A Rapid Improvement Event is a seven-week process that focuses on events where teams of people from a broad range of parts of the business gather to streamline a process. The first three weeks are used to select an area and topic, create the team, and plan for the event. The fourth week is the actual event where waste is identified, removed, and changes to processes made. The last three weeks are to ensure changes are continuing to be used and process is working correctly.

Six Sigma is the leading quality improvement program for a rigorous and disciplined methodology that uses data and statistical analysis to measure and improve a company's operational performance by identifying and eliminating "defects" in manufacturing and service-related processes. Six Sigma differs from traditional quality improvement programs in its focus on input variables. While traditional process improvement methods depend upon measuring outputs and establishing control plans to shield customers from organizational defects, a Six Sigma program demands that problems be addressed at the input root cause level, thereby eliminating the need for unnecessary inspection and rework processes.

(p) ANAD Network: For access to the ANAD network, send a letter stating that a National Agency Check (NAC) has been initiated and furnish a copy of the SF 85P, Questionnaire for Public Trust Positions, for review prior to issuance of an interim password. The results of the NAC investigation shall be furnished to the Security Management Office, Security Office Identifier number A077, for the final adjudication.

(q) Safety and Accident Prevention: SAFETY AND HEALTH REQUIREMENTS:

Contractors shall adhere to all safety rules and regulation of corrective actions, which will be taken into consideration:

General:

Applicable Publication: The publications listed below form a part of this specification to extent referenced. The publications are referred to in the text by basic designation only.

Code of Federal Regulation (CFR): OSHA General Industry Safety and Health Standards (29 CFR 1910), Publication V2206; OSHA Construction Industry Standards (29 CFR 1926). One source of these regulations is OSHA Publication 2207, which includes a combination of both parts 1910 and 1926 as they relate to construction safety and health. It is for sale by the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402. National Emission Standards for Hazardous Air Pollutants (40 CFR, Part 61).

Title 29 of the Code of Federal Regulations, Subtitle B, Part 1926 provides the safety and health regulations for construction. Under the general provisions, it gives each contractor responsibility to “…initiate and maintain such programs as may be necessary to comply with this part (29CFR1926).” The general company safety plan should address the how the company will comply with the basic requirements of the standard.

For 29 CFR 1926 and other OSHA standards and interpretations plus other resources are available from the Occupational Safety and Health web site, www.osha.gov.

In addition to contract clause entitled "ACCIDENT PREVENTION," FAR 52.236-13, the contractor shall comply with all regulations, publications and manuals current at the time the Task Order is being performed to include but are not limited to Army Material Command (AMC) Regulation 385-100, Safety and Occupational Health Regulation ANADR 385-1, Engineering Manual (EM) 385-1-1, 29 Code of Federal Regulations (CFR) 1926/1910, other related Department of Transportation (DOT) Regulations (49 CFR), Federal Standard (Fed Std): 313A Material Safety Data Sheets, ANSI BHMA A156, National Electric Safety Code ANSI C2, NFPA Codes and Standards, National Electric Code Handbook, UFGS (Unified Facilities Guide Specification) and all local policies. Definition of Hazardous Materials: Refer to hazardous and toxic materials/substances included in Subparts H and Z of 29 CFR 1910 and to others as additionally defined in Fed. Std 313. Those most commonly encountered include asbestos, polychlorinated biphenyl’s (PCB’s) explosives and radioactive material, but may include others. The most likely products to contain asbestos are sprayed-on fireproofing, insulation, boiler lagging and pipe covering. Engineering Manual 385-1-1 outlines safety requirements for construction. A copy of it is available for review in the Anniston Army Depot safety office, or from the Army Corp of Engineers web site, www.usace.mil/publications.

The Contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on his/her part or that of his/her employees or subcontractors, which results in illness, injury, or death. Contractors prior year OSHA logs (form 300A) and a site specific safety plan for work to be performed on Anniston Army Depot must be provided for approval by the Anniston Army Depot Safety Office no more than 10 days after award of contract. Contractor shall maintain an accurate record of accidents resulting in traumatic injury or death and accidents resulting in damage to Government property, supplies, and equipment. The Contractor shall report incidents causing disruption of contract services, or any accidents in connection with performance of this contract, to the Contracting Officer Representative within two (2) hours of occurrence.

Contractor will notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from/by local, State, and Federal Regulators in which the violation or alleged violation is attributed to the action of the contractor or its subcontractors. Contractor will provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation.

Contractor shall safeguard and maintain all Government property, as well as, provide for the safety and well being of personnel employed in the administration of this contract. Local PPE requirements are at minimum long pants, long sleeved shirts, protective footwear, protective eyewear, hearing protection and shall be used and provided by contractor.

The Government reserves the right to conduct unannounced safety inspection at any time, all OSHA required records to include OSHA form 300 and 300A will be made available to COR or ANAD Safety Office Staff upon request or during unannounced safety inspections. OSHA logs must be produced for review with in 3 working days of initial request. Contractor will notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from/ by local, State, and Federal Regulators in which the violation is attributed to the action of the contractor or its subcontractors. Contractor will provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation with in 1 day of receipt of documentation.

If a contractor employee is observed performing an activity in a manner inconsistent with any of the above cited regulations or is engaged in any activity that is dangerous to life, limb, or government property, the ANAD Safety Representative shall have the authority to notify the employee and/or the contractor’s on-site supervisor of the hazardous activity and require correction of the hazardous activity. If necessary, the ANAD Safety Representative shall have the authority on behalf of the Contracting Officer to require the contractor and/or its employee to stop the hazardous activity until corrective action is taken to eliminate a hazardous condition or safety violation. Said action shall not be considered to be the basis of a claim against the government and shall be at no cost to the Government.

The contractor must have a Drug Free Workplace plan that includes post accident testing. This shall be part of their Safety Plan.

(r) CONTRACTOR SAFETY PROGRAMS AND ACCIDENT PREVENTION PLANS:

For each specific job or contract, an accident prevention plan (or job safety plan) must be submitted. This plan is specific for the current project, and must address the particular hazards which will be inherent in the project and how they will control them. This plan must be submitted to the ANAD Safety Office not more than 10 days after contract award. Contractor must have approved plan in place prior to any work being performed on ANAD. Listed below are some of the items that must be covered in the plan, the plan must also meet current standards listed above.

(1.) SIGNATURE SHEET. Title, signature, and phone number of the following:

a. Plan preparer

b. Plan approval, e.g., owner, company president, etc.

c. Plan concurrence (concurrence of other applicable corporate and project personnel (contractor) such as their safety officer, project manager, or superintendent)

(2.) BACKGROUND INFORMATION. List the following:

a. Contractor

b. Contract number

c. Project name

d. Brief description of the work to be performed and location

e. Contractor accident experience (provide information such as OSHA 200 logs, company safety trend analysis)

f. Listing of phases of work and hazardous activities requiring activity hazards analyses.

(3.) STATEMENT OF SAFETY AND HEALTH POLICY.

(4.) RESPONSIBILITIES AND LINES OF AUTHORITIES.

a. Identification and accountability of personnel responsible for safety - at both corporate and project level if applicable.

b. Lines of authority.

(5.) SUBCONTRACTORS AND SUPPLIERS.

a. Identification of subcontractors and suppliers (if known).

b. Means for controlling and coordinating subcontractors and suppliers.

c. Safety responsibilities of subcontractors and suppliers.

(6.) TRAINING.

a. List subjects to be discussed with employees in safety indoctrination.

b. List mandatory training and certifications, which are applicable to this project (e.g., explosive actuated tools, confined space entry, crane operator, vehicle operator, HAZWOPER training and certification, personal protective equipment, electrical hazards, elevated surfaces.).

c. Identify requirements for emergency response training.

d. Outline requirements (who attends, when given, who will conduct etc.) for supervisory and employee safety meetings.

(7.) SAFETY AND HEALTH INSPECTIONS. Provide details on:

a. Who will conduct safety inspections (e.g. project manager, safety professional, QC, supervisor, employees, etc.)

b. Any external inspections/certifications that may be required.

(8.) SAFETY AND HEALTH EXPECTATIONS, INCENTIVE PROGRAMS, AND COMPLIANCE.

a. The company's written safety program goals, objectives, and accident experience.

b. A brief description of the company's safety incentive programs (if any)

c. Policies and procedures for holding managers and supervisors accountable for safety.

(9.) ACCIDENT REPORTING. The contractor shall identify who shall complete the following, how, and when:

a. Exposure data (man hours worked)

b. Accident investigations, reports and logs

c. Immediate notification of accidents

(10.) PLANS (PROGRAMS, PROCEDURES) AS APPLICABLE TO THE WORK TO BE CONDUCTED. This list is not all-inclusive, nor will all topics apply to all contractors.

a. Hazard communication

b. Emergency response plans (spills, posting of emergency telephone numbers, fire prevention, etc.)

c. Layout plans

d. Respiratory protection plan

e. Health hazard control program

f. Lead abatement plan

g. Asbestos abatement plan

h. Abrasive blasting

i. Confined space

j. Hazardous energy control plan

k. Critical lift procedures

l. Contingency plan for severe weather

m. Access and haul road plan

n. Demolition plan (engineering and asbestos survey)

o. Material handling equipment licensing

p. Plan for prevention of alcohol and drug abuse

q. Fall protection

(11.) Detailed site-specific hazards and controls shall be provided in the activity hazard analysis for each phase of the operation.

(End of clause) February 2007

52.214-4705 SIGNATURE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .