B.08.03_Amendment_0003.pdf

PDF 4 MB Posted

Attached to
JBE047 POL Operations Facility, JBER, Alaska Federal contract opportunity
Solicitation number
W911KB-19-R-0020
Issued by
Department of the Army Corps of Engineers Engineering District Alaska

About this file

Amendment 0003 to provide As - Built Drawings

View the file

Other files for this federal contract opportunity

Other files attached to JBE047 POL Operations Facility, JBER, Alaska, newest first.
File Type Posted
B.08.03_JBE047_Amendment_0002.pdf PDF
Mod_0001.pdf PDF
JBE047_J&As_Redacted.pdf PDF
JBE047_Drawings_2019-05-17.pdf PDF
JBE047_Specifications_1Jul19.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JBE047

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE/LOCATION: JBE047 POL Operations Facility, Joint Base Elmendorf/Richardson (Elmendorf), Alaska.

The purpose of this Amendment is to provide As - Built Draw ings as outlined on the attached summary of changes page. The proposal due date remains 16 August 2019 at 2:00PM Alaska Time.

All other terms and conditions outlined in the Solicitation remain the same.

POC for this Amendment is Ron Jackson, 907 753-5596.

1. CONTRACT ID CODE PAGE OF PAGES

1 25

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911KB19R0020

X 9B. DATED (SEE ITEM 11)

01-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Aug-2019

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

Amendment 0003 (AM#03) 12 August 2019

Summary of Changes

a. The following drawings are substituted for the superseded documents/sections:

NONE

b. The following drawings are added, As - Builts:

C-1, C-2, C-3, C-4, C-5, A-1, A-3, A-4, A-5, A-6, R-1, R-2, S-1, M-1, M-2, M-3, M-4, M-5, E-1, E-2, E-3, Plan and Profile Service, Lift Station Details.

c. The following revised documents/sections are substituted for the superseded documents/sections:

NONE

d. The following sections are added:

NONE

e. The following sections are deleted:

NONE

f. Other:

NONE

ALL OTHER TERMS AND CONDITIONS SHALL REMAIN THE SAME

(End of Summary of Changes)

Building 11673 As Builts.pdf
elm_7_dwg_28_sh02of23
elm_7_dwg_28_sh03of23
elm_7_dwg_28_sh04of23
elm_7_dwg_28_sh05of23
elm_7_dwg_28_sh06of23
elm_7_dwg_28_sh07of23
elm_7_dwg_28_sh09of23
elm_7_dwg_28_sh10of23
elm_7_dwg_28_sh11of23
elm_7_dwg_28_sh12of23
elm_7_dwg_28_sh13of23
elm_7_dwg_28_sh14of23
elm_7_dwg_28_sh15of23
elm_7_dwg_28_sh16of23
elm_7_dwg_28_sh17of23
elm_7_dwg_28_sh18of23
elm_7_dwg_28_sh19of23
elm_7_dwg_28_sh20of23
elm_7_dwg_28_sh21of23
elm_7_dwg_28_sh22of23
elm_7_dwg_28_sh23of23

File details come from the government source that posted it.