W911KB-B-0001_AM_1.pdf

PDF 234 KB Posted

Attached to
2017-2019 MAINTENANCE DREDGING, DILLINGHAM HARBOR, DILLINGHAM, ALASKA Federal contract opportunity
Solicitation number
W911KB-17-B-0001
Issued by
Department of the Army Corps of Engineers Engineering District Alaska

About this file

AM 1

View the file

Other files for this federal contract opportunity

Other files attached to 2017-2019 MAINTENANCE DREDGING, DILLINGHAM HARBOR, DILLINGHAM, ALASKA, newest first.
File Type Posted
B.01.02_ABSTRACT-DHA007-Dillingham_Maintenance_Dredging_2017-19.pdf PDF
W911KB-B-0001_AM_2.pdf PDF
Dwgs-Exhibits805-DHA007-IFB_FullSize.pdf PDF
W911KB-17-B-0001_Solicitation.pdf PDF
Dwgs-DHA007-IFB_FullSize.pdf PDF
Dwgs-Exhibits801-802-DHA007-IFB_FullSize.pdf PDF
Dwgs-Exhibits803-804-DHA007-IFB_FullSize.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE/LOCATION: 2017 - 2019 HARBOR MAINTENANCE DREDGING DILLINGHAM, ALASKA

This amendment provides the follow ing changes to the Invitation for Bid as show n on the Summary of Changes beginning on page 2 of this amendment.

BID DUE DATE remains 6 December 2016, 2:00 PM ALASKA TIME

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Nov-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-17-B-0001

X 9B. DATED (SEE ITEM 11)

03-Nov-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Nov-2016

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911KB-17-B-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 MODIFICATION CONTINUATION PAGE

The following have been added by full text:

AM#1 SUMMARY OF CHANGES

The following revised documents are substituted for the superseded documents. The identifier “AM#1” appears before and after new and/or revised material and replacement pages are provided:

SECTION 00 21 00 – Paragraphs 8-11

SECTION 00 73 00.00 29 – Paragraph 1.3.6

SECTION 01 33 00 – Paragraphs:

1.5.1 1.10 1.14

SECTION 01 45 00.10 10 – Paragraphs:

1.1.1 1.2.1 1.3 1.4.2 1.5 1.6 1.6.1.5 1.6.2.2 1.6.4 1.6.6

SECTION 01 45 04.00 29 – Paragraph 3.4.2 and Attachment 1 CQC Report

(End of Summary of Changes)

INSTRUCTION TO BIDDERS

1. MAGNITUDE OF CONSTRUCTION

The magnitude of this project is between $1,000,000 and $5,000,000.

2. SOLICITATION

The solicitation in electronic format only will be available for download at www.fbo.gov. Reference synopsis for download instructions.

3. BOND AMOUNT REQUIRED (FAR CLAUSE 52.228-15, Performance and Payment Bonds-- Construction (NOV 2006) Section 00 72 00

Performance and Payment Bonds:

(1) The penal amount of the bonds shall be 100 percent of the original price.

(2) The Government may require additional bond protection when a contract price is increased. The increase in protection shall generally equal 100 percent of the increase in contract price. The Government may secure additional protection by directing the contractor to increase the penal amount of the existing bond or obtain an additional bond.

4. BID GUARANTEE (FAR CLAUSE 52.228-1)

The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.

5. EQUIPMENT OWNERSHIP AND OPERATION EXPENSE SCHEDULE

Whenever a contract or modification of contract price is negotiated, the contractor's cost proposal for equipment ownership and operating expenses shall be determined in accordance with the requirements of SCR CW 080: EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE, contained in Section 00 73 00 Special Contract Requirements. A copy of EP 1110-1-8 "Construction Equipment Ownership and Operating Expense Schedule, Region IX" is available for review at the US Army Engineers District, Alaska, Bldg. 2204 Third St, Room 50, Elmendorf AFB, Alaska and at http://publications.usace.army.mil/publications/eng-pamphlets/EP_1110-1-8/EP_1110-1-8_Vol-09.pdf

6. OFFEROR'S QUESTIONS AND COMMENTS

Point of Contact for this solicitation is:

Contract Specialist – Primary POC U.S. Army Engineer District, Alaska ATTN: CEPOA-CT (Tripp) P.O. Box 6898 JBER, Alaska 99506-0898 Phone: 907-753-5594 Fax: 907-753-5767 Email: kimberly.tripp@usace.army.mil with a courtesy copy to the Contracting Officer christine.a.dale@usace.army.mil.

Bidder Inquiry

Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in

ProjNet at (https://www.projnet.org) No Later Than (NLT) 7 Calendar Days prior to proposal submission. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry

Key presented below and follow the instructions listed below the key for access. A prospective vendor

SECTION 00 21 00

mailto:kimberly.tripp@usace.army.mil mailto:christine.a.dale@usace.army.mil who submits a comment /question will receive an acknowledgement of their comment/question via email.

Another email to the same address will notify the prospective vendor once the reply is available for viewing. All timely questions and approved answers will be made available through ProjNet. Approved answers to all timely questions will also be posted in an amendment to the solicitation in the form of a report generated from ProjNet as soon as the comment/question entering period is over and all answers are finalized. In the event of a conflict between the bidder inquiry responses and the solicitation, the solicitation shall govern.

The Bidder Inquiry Key is: BJ5JNM-59E5IH

The Solicitation Number is : W911KB-17-B-0001

Specific Instructions for ProjNet Bid Inquiry Access:

1) From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2) Identify the Agency. This should be marked as USACE.

3) Key. Enter the Bidder Inquiry Key listed above.

4) Email. Enter the email address you would like to use for communication.

5) Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6) Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret

Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7) Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

1) For future access to ProjNet, you will not be provided any type of password. You will utilize your

Secret Question and Secret Answer to log in.

2) From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3) Identify the Agency. This should be marked as USACE.

4) Key. Enter the Bidder Inquiry Key listed above.

5) Email. Enter the email address you used to register previously in ProjNet.

6) Click Continue. A page will then open asking you to enter the answer to your Secret Question.

7) Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

7. PRE-BID MEETING/SITE VISIT

Please reference 52.236-27 – Site Visit (Construction) (Feb 1995) for site visit information.

AM 0001,,,

8. ACCESS TO JBER

All vehicle operators are required to wear seatbelts. Vehicle operators caught not wearing seatbelts will lose their driving privileges for 10 days on their first offense, 30 days on the second offense, and 6 months or longer on the third offense. In addition cell phone use while operating a vehicle is prohibited on JBER.

Please note that base entry procedures have changed. Offerors are now required to be physically sponsored on JBER by Contracting Division personnel.

To get on base each bidder is required to provide the following information: a) valid driver's license; b) proof of current insurance; c) current vehicle registration d) valid base pass.

Failure to follow the above procedure will prevent your access to JBER.

Offerors are reminded that as an alternative to physically attending the bid opening the bidder can fax/e-mail their bid and call in to the Bid Opening Conference Call as indicated below.

9. BID SUBMISSION INSTRUCTIONS

Bidders must mail or deliver bids to be received no later than the date and time stated on the standard form

(SF) 1442 or subsequent solicitation amendment. Questions concerning bid receipt can be directed to the

Contract Specialist/Contracting Officer listed in the solicitation.

Bidders are advised to plan accordingly. No arrangements will be made by the government to assist in bid delivery. Day-pass procedures will not be used for bid delivery purposes nor are there bid pick-up services. No escort services will be provided. It is incumbent on the bidder to plan for unanticipated delays in delivery of bids. Due to heightened security at Government installations, visitors to Joint Base

Elmendorf-Richardson (JBER) must use the Boniface Gate (Visitor Center). All vehicle occupants are required to wear seatbelts and hand-held cell phone usage by vehicle operators while driving on base/post is prohibited. Violators will lose their Base/Post driving privileges for these offenses.

Bidders who will have their bids hand-delivered, or use personal delivery services such as DHL, UPS or

FedEx, the delivery must be by person, courier or personal delivery service with active base access.

Bids will be received no later than the date and time stated on the SF1442 or subsequent solicitation amendment at:

Mailing Address:

U.S. Army Corps of Engineers, Alaska District

ATTN: CEPOA-CT (Tripp)

PO Box 6898

JBER, Alaska 99506-0898

Physical Address:

U.S. Army Corps of Engineers, Alaska District

ATTN: CEPOA-CT (Tripp, Room 30)

2204 3rd Street

JBER, Alaska 99506

Bids will be accepted in Room 30 during Alaska District Corps of Engineer business hours (7:30 AM to

4:30PM) Monday through Friday excluding holidays until the date and time stated on the SF1442 or subsequent solicitation amendment. Bidders are advised that the Alaska District Corps of Engineers building has limited access. Only the main door (in front under the Corps of Engineers red flag facing

Talley Road which used to be known as Bluff Road) and the atrium doors (the tan addition to the main building located on Third Street/Fairchild Avenue) are open to individuals without a building pass. Room

30 is located in the basement near to the DeCafe (turn right if using the center stairs or elevator). There is a date/time stamp located at the front desk in Room 30 and is the official clock used for bid receipt.

The Packaging that contains the Bids shall be marked:

”Bids for Solicitation Number: W911KB-17-B-0001, DO NOT OPEN”

(Note: Facsimile bids or amendments will be accepted.)

Bids will be publicly opened. Information concerning the status of the bids will be available after receipt of bid verification.

10. FACSIMILE BIDS

In accordance with FAR 52.214-31 FACSIMILE BIDS (DEC 1989), Facsimile bids and/or e-mail bids will be accepted. However the only bid guarantees that will be accepted by facsimile is a bid bond at bid opening. Any other type of bid guarantee will only be accepted in original format.

11. BID OPENING CONFERENCE CALL

Offerors are notified that the government will be setting up an audio conference call for the bid opening.

Contact information is as follows:

6 December 2016 at 2:00 PM Alaska Time USACE, AK District 2204 34rd Street (RM 63)

JBER, AK 99506

Teleconference Info:

Dial-In Number 1-888-278-0296 Access Code 9631996 Security Code 55514

…AM 0001

12. EXCLUSION OF DEBARRED AND SUSPENDED CONTRACTORS

By entering into this contract, the Contractor certifies that neither it, nor any person or firm who has an interest in the Contractor's firm, is a person, or firm ineligible to be awarded Government contracts by virtue of being suspended or debarred in accordance with FAR subpart 9.4.

13. CORPORATION, JOINT VENTURE, AND LLC PROPOSAL REQUIREMENTS

All bidders must submit one of the certificates associated with their business enterprise (corporation, JV, LLC\) located in the attachments section at the end of this section.

AM#1 2017 - 2019 HARBOR MAINTENANCE DREDGING DHA007

DILLINGHAM, ALASKA

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 73 00.00 29

SPECIAL CONTRACT REQUIREMENTS

PART 1 GENERAL

1.1 REFERENCES

1.2 GENERAL SCR'S

1.2.1 SCR-GE030 Certificates Of Compliance And Lab Test Report:

1.2.2 SCR-GE040 Self Performance Of Work By The Contractor:

1.2.3 SCR-GE060 Qualifications Of The Contractor Quality Control

Systems Manager (CQCSM):

1.2.4 SCR-GE070 Requirements For Contractors Performance Evaluation:

1.2.5 SCR-GE102 Contractor Supply and Use of Electronic Software for

Processing DAVIS-BACON ACT Certified Labor Payrolls (April 2011):

1.2.6 SCR-GE104 Veterans Employment Emphasis for USACE Contracts

1.2.7 SCR-GE111 Simplified Scheduling Requirements - Dredging Projects

1.3 SAFETY/SITE/SECURITY SCR'S

1.3.1 SCR-SS010 Safety And Health Requirements Manual:

1.3.2 SCR-SS020 Signal Lights:

1.3.3 SCR-SS030 Communication Security:

1.3.4 SCR-SS040 Haul Roads:

1.3.5 SCR-SS060 Preservation Of Historical, Archeological & Cultural

Resources:

1.4 CIVIL WORKS SCR'S

1.4.1 SCR-CW010 Damage To Work:

1.4.2 SCR-CW040 Continuity Of Work:

1.4.3 SCR-CW060 Environmental Litigation:

1.4.4 SCR-CW070 CorpsWatch/iWatch Training

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

Section 00 73 00.00 29 Page 1

SECTION 00 73 00.00 29

SPECIAL CONTRACT REQUIREMENTS

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

33 CFR 81 Navigation and Navigable Waters (International Navigation)

33 CFR 84 Navigation and Navigable Waters (Inland Navigation)

33 CFR 89 Navigation and Navigable Waters (Inland Navigation)

1.2 GENERAL SCR'S

1.2.1 SCR-GE030 Certificates Of Compliance And Lab Test Report:

SEE SECTION 01 33 00: SUBMITTAL PROCEDURES. Any certificates required for demonstrating proof of compliance of materials with specification requirements shall be executed in 3 copies. Each certificate shall be signed by an official authorized to certify in behalf of the manufacturing company and shall contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates shall contain the name and address of the testing laboratory and the date or dates of the tests to which the report applies. Certification shall not be construed as relieving the Contractor from furnishing satisfactory material, if, after tests are performed on selected samples, the material is found not to meet the specific requirements.

1.2.2 SCR-GE040 Self Performance Of Work By The Contractor:

A. The following describes the applicable clause or requirement for self-performance of work by the Contractor, depending upon the type of solicitation (e.g., unrestricted or full or partial set-aside) and/or whether or not a price evaluation preference was provided for in the source selection evaluation.

B. Contract clause 52.236-1, PERFORMANCE OF WORK BY THE CONTRACTOR, is applicable to unrestricted procurement contract awards to any business

Section 00 73 00.00 29 Page 2 except as explained in paragraphs C. and E., below.

C. In lieu of the above clause, contract clause 52.219-4, NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS CONCERNS is applicable for award to a HUBZone small business concern on an unrestricted solicitation when the awardee is a HUBZone small business concern or joint venture and claimed a price evaluation preference in accordance with the clause. For purposes of this clause, "cost of the contract" includes all direct and indirect costs, excluding profit or fees. "Cost of contract performance incurred for personnel" means direct labor costs and any overhead which has only direct labor as its base, plus the concern's general and administrative overhead rate multiplied by the labor cost.

D. Contract clause 52.219-3 NOTICE OF TOTAL HUBZONE SET-ASIDE is applicable to awards made under a partial or total HubZone set-aside. For purposes of this clause, "cost of the contract" includes all direct and indirect costs, excluding profit or fees. "Cost of contract performance incurred for personnel" means direct labor costs and any overhead which has only direct labor as its base, plus the concern's general and administrative overhead rate multiplied by the labor cost.

E. Contract Clause 52.219-14, LIMITATIONS ON SUBCONTRACTING, is the applicable requirement for awards to small business concerns for solicitations that were fully or partially set-aside for Small Business, 8(a), or award to a small disadvantaged business (SDB) concern on an unrestricted procurement where an SDB concern has claimed a price evaluation preference (but see next paragraph for suspension of the SDB price preference).

1.2.3 SCR-GE060 Qualifications Of The Contractor Quality Control Systems Manager (CQCSM):

(a) The CQC System Manager (CQCSM) described in SECTION 01 45 04.00 29 CONTRACTOR QUALITY CONTROL may also serve as the Site Safety and Health Office (SSHO).

(b) In lieu of the education and experience requirements for the CQC

System Manager listed in the CQC SECTION 01 45 04.00 29 CONTRACTOR QUALITY CONTROL, a candidate may qualify provided they have a minimum of 7 years experience in construction quality control.

1.2.4 SCR-GE070 Requirements For Contractors Performance Evaluation:

The Government will evaluate the contractor's performance and prepare a performance report using the Contractor Performance Assessment Reporting System (CPARS), a web-based system (https://www.cpars.gov/). After an evaluation (interim or final) is generated by the Government, the contractor will have the ability to access, review and comment on the evaluation for a period of 30 days. If the Contractor fails to review, and or comment on the evaluation within the 30-day period, the Contracting Officer will take the appropriate steps to finalize the evaluation without the contractor's comments. It is the sole responsibility of the Contractor to purchase any necessary software to access the electronic system, including a Public Key Infrastructure (PKI) certificate. Contractors are encouraged to obtain and use the Public Key Infrastructure (PKI) certificate. Details and information to access the system are listed below. The contractor shall provide the Contacting Officer the primary contact name and email address in order to receive the initial email and to access the system. Additional information and training material is

Section 00 73 00.00 29 Page 3 available at https://www.cpars.gov/. This web site will give the contractor an understanding of the system and levels of access, the policies and regulations governing CPARS and the electronic workflow with particular attention to the Contractor comment function. Contractor users are required to obtain a PKI certificate in order to log into CPARS. PKI certificates can be purchased from DoD's industries partners under External Certificate Authorities (ECAs). A list of ECAs vendors is available at https://www.cpars.gov/main/pki_info.htm.

1.2.5 SCR-GE102 Contractor Supply and Use of Electronic Software for Processing DAVIS-BACON ACT Certified Labor Payrolls (April 2011):

The contractor is encouraged to use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Davis-Bacon Act as stated in FAR 52.222-8, PAYROLLS AND BASIC RECORDS and FAR 52.222-13, COMPLIANCE

WITH DAVIS-BACON AND RELATED ACT REGULATIONS.

If the contractor elects to use an electronic Davis-Bacon payroll processing system, then the contractor shall be responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the contractor to comply with Davis-Bacon and related Act regulations. When the contractor uses an electronic Davis-Bacon payroll system, the electronic payroll service shall be used by the contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract and the electronic payroll service shall be capable of preserving these payrolls and related basic records for the required 3 years after contract completion. If the contractor chooses to use an electronic Davis-Bacon payroll system, then the contractor shall obtain and provide electronic system access to the Government, as required to comply with the Davis-Bacon and related Act regulations over the duration of this construction contract. The access shall include electronic review access by the Government contract administration office to the electronic payroll processing system used by the contractor.

The contractor's provision and use of an electronic payroll processing system shall meet the following basic functional criteria: commercially available; compliant with appropriate Davis Bacon Act payroll provisions in the FAR; able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract; capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records (format at http://www.rmssupport.com/guides.aspx) for export in an Excel spreadsheet to be imported into the contractor's Quality Control System (QCS) version of Resident Management System (RMS), that in turn shall export payroll data to the Government's Resident Management System (RMS); demonstrated security of data and data entry rights; ability to produce contractor-certified electronic versions of weekly payroll data;

ability to identify erroneous entries and track the data/time of all versions of the certified Davis Bacon payrolls submitted to the government over the life of the contract; capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic Davis-Bacon payroll processing system shall be provided to the Government during contract closeout.

All contractor-incurred costs related to the contractor's provision and use

Section 00 73 00.00 29 Page 4 of an electronic payroll processing service shall be included in the contractor's price for the overall work under the contract. The costs for Davis-Bacon Act compliance using electronic payroll processing services shall not be a separately bid/proposed or reimbursed item under this contract.

1.2.6 SCR-GE104 Veterans Employment Emphasis for USACE Contracts

In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS

222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/ Department of Veterans Affairs-VOW to Hire Heros Act http://benefits.va.gov/vow/ Army Wounded Warrior Program -http://wtc.army.mil/modules/employers/index.html U.S. Chamber of Commerce Foundation-Hiring Our Heros http://www.hiringourheroes.org/ Guide to Hiring Veterans - Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_-_guide_t

1.2.7 SCR-GE111 Simplified Scheduling Requirements - Dredging Projects

Schedule Preparation

The contractor shall develop a construction schedule in accordance with FAR 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS. The construction schedule shall be submitted, reviewed and approved by the Contracting Officer or designated representative prior to the start of any construction activities. The schedule shall be in bar chart format and include activities that correspond with the pay activities listed in the QCS data base. A narrative addressing each of the activities shall be provided as part of the schedule.

Non pay activities, sufficient to clearly describe the efforts needed to execute the work, shall be identified and clearly shown on the schedule and in the narrative. As a minimum the following activities shall be included in the schedule:

a. Notice to Proceed (NTP) date

b. Mobilization

c. Plan submittals/approvals

d. Pre-Dredge survey

e. Dredging Start

f. Dredging End

g. Post-Dredge Survey

h. Demobilization

i. Construction Completion Date (CCD)

Section 00 73 00.00 29 Page 5

Schedule Updates

An updated schedule and narrative shall be provided as part of each pay request package. The bar chart shall be updated to graphically reflect the current progress of each item. The narrative shall include a description of each activity and its current status/progress, actual start date and actual end date. An estimated completion percentage shall be identified for each activity in the schedule.

1.3 SAFETY/SITE/SECURITY SCR'S

1.3.1 SCR-SS010 Safety And Health Requirements Manual:

EM 385-1-1 and its changes are available at http://www.usace.army.mil/CESO/Pages/Home.aspx. At the HQ homepage, select Safety and Occupational Health.

The Contractor shall be responsible for complying with the current edition and all changes posted on the web (see web address above) as of the effective date of this solicitation and shall comply with the version in effect on the contract award date. This EM 385-1-1 shall remain in effect throughout the life of the contract.

1.3.2 SCR-SS020 Signal Lights:

The Contractor shall display signal lights and conduct its operations in accordance with the General Regulations of the Department of the Army and of the Coast Guard governing lights and day signals to be displayed by towing vessels with tows on which no signals can be displayed; vessels working on wrecks, dredges, and vessels engaged in laying cables or pipe or in submarine or bank protection operations, lights to be displayed on dredge pipe lines, and day signals to be displayed by vessels of more than 65 feet in length moored or anchored in a fairway or channel, and the passing by other vessels of floating plant working in navigable channels, as set forth in Commandant U.S. Coast Guard Instruction M16672.2, Navigation Rules: International-inland (COMDTINST M16672.2) of 33 CFR 81 Appendix A (International) and 33 CFR 84 through 33 CFR 89 (Inland) as applicable.

1.3.3 SCR-SS030 Communication Security:

All communications with DOD organizations are subject to COMSEC review.

Contractor personnel shall be aware that telecommunications networks are continually subject to intercept by unfriendly intelligence organizations.

The DOD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from or terminating at DOD organizations. Therefore, civilian Contractor personnel are advised that any time they place a call to or receive a call from Alaska District offices or Resident Engineer offices located on military installations, they are subject to COMSEC procedures. The Contractor will assume the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with official DOD information.

1.3.4 SCR-SS040 Haul Roads:

Whenever practical, one-way haul roads shall be used on this contract.

Haul roads built and maintained for this work shall comply with the following:

Section 00 73 00.00 29 Page 6

1. One-way haul roads for off-the-road equipment; e.g., belly dumps, scrapers, and off-the-road trucks shall have a minimum usable width of 25 feet. One-way haul roads for over-the-road haulage equipment only (e.g., dump trucks, etc.) may be reduced to a usable width of 15 feet.

When the Contracting Officer determines that it is impractical to obtain the required width for one-way haul roads (e.g., a road on top of a levee), a usable width of not less than 10 feet may be approved by the Contracting Officer, provided a positive means of traffic control is implemented. Such positive means shall be signs, signals, and/or signalman and effective means of speed control.

2. Two-way haul roads for off-the-road haulage equipment shall have a usable width of 60 feet. Two-way haul-roads for over-the-road haulage equipment only may be reduced to a usable width of 30 feet.

3. Haul roads shall be graded and otherwise maintained to keep the surface free from potholes, ruts, and similar conditions that could result in unsafe operation.

4. Grades and curves shall allow a minimum sight distance of 200 feet for one-way roads and 300 feet for two-way roads. Sight distance is defined as the centerline distance an equipment operator (4.5 feet above the road surface) can see an object 4.5 feet above the road surface. When conditions make it impractical to obtain the required sight distance (e.g., ramp over levees), a positive means of traffic control shall be implemented.

5. Dust abatement shall permit observation of objects on the roadway at a minimum distance of 300 feet.

6. Haul roads shall have the edges of the usable portion marked with posts at intervals of 50 feet on curves and 200 feet maximum elsewhere. Such markers shall extend 6 feet above the road surface and, for nighttime haulage, be provided with reflectors in both directions.

1.3.5 SCR-SS060 Preservation Of Historical, Archeological & Cultural Resources:

If, during construction activities, the Contractor observes items that might have historical or archeological value, such observations shall be reported immediately to the Contracting Officer so that the appropriate authorities may be notified and a determination can be made as to their significance and what, if any, special disposition of the finds should be made. The Contractor shall cease all activities that may result in the destruction of these resources and shall prevent its employees from trespassing on, removing, or otherwise damaging such resources.

AM#1...Section 1.3.6 deleted...AM#1

Section 00 73 00.00 29 Page 7

1.4 CIVIL WORKS SCR'S

1.4.1 SCR-CW010 Damage To Work:

The responsibility for damage to any part of the permanent work shall be as set forth in the clause of the contract entitled "Permits and Responsibilities". However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood or earthquake, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor shall make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable contract unit or lump sum prices as fixed and established in the contract. If, in the opinion of the Contracting Officer, there are no contract unit or lump sum prices applicable to any part of such work an equitable adjustment pursuant to Clause, "Changes", of the contract, will be made as full compensation for the repairs of that part of the permanent work for which there are no applicable contract unit or lump sum prices. Except, as herein provided, damage to all work (including temporary construction), utilities, materials, equipment and plant shall be repaired to the satisfaction of the Contracting Officer at the Contractor's expense, regardless of the cause of such damage.

1.4.2 SCR-CW040 Continuity Of Work:

No payment will be made for work done in any area designated by the Contracting Officer until the full depth required under the contract is secured in the whole or such area, unless prevented by ledge rock, nor will payment be made for excavation in any area not adjacent to and in prolongation of areas where full depth has been secured except by decision of the Contracting Officer. Should any such nonadjacent area be excavated to full depth during the operations carried on under the contract, payment for all work therein may be deferred until the required depth has been made in the area intervening. The Contractor may be required to suspend dredging at any time when for any reason the gages or ranges cannot be seen or properly followed.

1.4.3 SCR-CW060 Environmental Litigation:

A. If the performance of all or part of the work is suspended, delayed, or interrupted due to an order of a court of competent jurisdiction as a result of environmental litigation, as defined below, the Contracting Officer, at the request of the Contractor, shall determine whether the order is due in any part to the acts or omissions of the Contractor or subcontractor at any tier not required by the terms of this contract. If it is determined that the order is not due in any part to acts or omissions of the Contractor or a subcontractor at any tier other than as required by the terms of this contract, such suspension, delay, or interruption shall be considered as if ordered by the Contracting Officer in the administration of this contract under the terms of the "Suspension of Work" clause of this contract. The period of such suspension, delay or interruption shall be considered unreasonable, and an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) as provided in that clause, subject to all the provisions thereof.

B. The term "environmental litigation", as used herein, means a lawsuit alleging that the work will have an adverse effect on the

Section 00 73 00.00 29 Page 8 environment or that the Government has not duly considered, either substantively or procedurally, the effect of the work on the environment.

1.4.4 SCR-CW070 CorpsWatch/iWatch Training

The contractor and all associated sub-contractors shall receive a brief/training on the local suspicious activity reporting program, Corps Watch. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the Contracting Officer's Representative (COR) NLT 5 calendar days after the completion of the training. Information regarding the Corps Watch program is available at:

http://www.poa.usace.army.mil/Portals/34/docs/ AKdistrict/iWatchUSACEContractors28April16.pdf

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

Section 00 73 00.00 29 Page 9

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

1.2 DEFINITIONS

1.2.1 Submittal Descriptions (SD)

1.2.2 Approving Authority

1.2.3 Work

1.3 SUBMITTALS

1.4 SUBMITTAL CLASSIFICATION

1.4.1 Government Approved (G)

1.4.2 For Information Only

1.5 PREPARATION

1.5.1 AM#1... Transmittal Form and Serial Letters ...AM#1

1.5.2 Electronic File Format

1.6 INFORMATION ONLY SUBMITTALS

1.7 SUBMITTAL REGISTER

1.7.1 Use of Submittal Register

1.7.2 Contractor Use of Submittal Register

1.7.3 Approving Authority Use of Submittal Register

1.7.4 Action Codes

1.7.4.1 Government Review Action Codes

1.7.5 Copies Delivered to the Government

1.8 VARIATIONS

1.8.1 Considering Variations

1.8.2 Proposing Variations

1.8.3 Warranting that Variations are Compatible

1.8.4 Review Schedule Extension

1.9 SCHEDULING

1.10 GOVERNMENT APPROVING AUTHORITY

1.10.1 Review Notations

1.11 DISAPPROVED SUBMITTALS

1.12 APPROVED SUBMITTALS

1.13 WITHHOLDING OF PAYMENT

1.14 STAMPS

1.15 ATTACHMENTS

PART 2 PRODUCTS

PART 3 EXECUTION

ATTACHMENTS:

ENG Form 4025-R

Section 01 33 00 Page 1

Section 01 33 00 Page 2

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.

Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.

Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.

Contractor's Quality Control System Manager and the Designer of Record, if applicable, to check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders;

samples; O&M manuals (including parts list); certifications; warranties;

and other such required submittals.

Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.

1.2 DEFINITIONS

1.2.1 Submittal Descriptions (SD)

Submittals requirements are specified in the technical sections.

Submittals are identified by Submittal Description (SD) numbers and titles as follows:

SD-01 Preconstruction Submittals

Submittals which are required prior to the start of construction (work) or the next major phase of the construction on a multi-phase contract, includes schedules, tabular list of data, or tabular list including location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work.

1.2.2 Approving Authority

Office or designated person authorized to approve submittal.

Section 01 33 00 Page 3

1.2.3 Work

As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, except those SD-01 Pre-Construction Submittals noted above, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with this section.

SD-01 Preconstruction Submittals

Submittal Register; G

1.4 SUBMITTAL CLASSIFICATION

Submittals are classified as follows:

1.4.1 Government Approved (G)

Government approval is required for any deviations from the Contract and other items as designated by the Contracting Officer. Within the terms of the Contract Clause SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, they are considered to be "shop drawings."

1.4.2 For Information Only

Submittals not requiring Government approval will be for information only.

They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.

1.5 PREPARATION

1.5.1 AM#1... Transmittal Form and Serial Letters ...AM#1

Use the attached ENG Form 4025-R AM#1... or a serial letter, as directed by the Contracting Officer or their designated representative, ...AM#1for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms are included in the QCS software that the Contractor is required to use for this contract. Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.

1.5.2 Electronic File Format

Provide submittals in electronic format. In addition to the electronic submittal, provide two (2) hard copies of the submittals. Compile the submittal file as a single, complete document, to include the Transmittal Form described within. Name the electronic submittal file specifically according to its contents, coordinate the file naming convention with the

Section 01 33 00 Page 4

Contracting Officer. Electronic files must be of sufficient quality that all information is legible. Use PDF as the electronic format, unless otherwise specified or directed by the Contracting Officer. Generate PDF files from original documents with bookmarks so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Resolution (OCR) routines are required. Index and bookmark files exceeding 30 pages to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature.

Email electronic submittal documents fewer than 8MB to an email address as directed by the Contracting Officer. Provide electronic documents over 8MB on an optical disc, or through an electronic file sharing system such as the AMRDEC SAFE Web Application located at the following website:

https://safe.amrdec.army.mil/safe/.

1.6 INFORMATION ONLY SUBMITTALS

Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals.

The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work;

and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.

1.7 SUBMITTAL REGISTER

Prepare and maintain submittal register, as the work progresses. Do not change data which is output in columns (c), (d), (e), and (f) as delivered by Government; retain data which is output in columns (a), (g), (h), and

(i) as approved. A submittal register showing items of equipment and materials for which submittals are required by the specifications is provided as an attachment. This list may not be all inclusive and additional submittals may be required. Maintain a submittal register for the project in accordance with Section 01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS). The Government will provide the initial submittal register in electronic format with the following fields completed, to the extent that will be required by the Government during subsequent usage.

Column (c): Lists specification section in which submittal is required.

Column (d): Lists each submittal description (SD No. and type, e.g. SD-02 Shop Drawings) required in each specification section.

Column (e): Lists one principal paragraph in specification section where a material or product is specified. This listing is only to facilitate locating submitted requirements. Do not consider entries in column (e) as limiting project requirements.

Thereafter, the Contractor is to track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the Government.

Section 01 33 00 Page 5

1.7.1 Use of Submittal Register

Submit submittal register. Submit with QC plan and project schedule.

Verify that all submittals required for project are listed and add missing submittals. Coordinate and complete the following fields on the register submitted with the QC plan and the project schedule:

Column (a) Activity Number: Activity number from the project schedule.

Column (g) Contractor Submit Date: Scheduled date for approving authority to receive submittals.

Column (h) Contractor Approval Date: Date Contractor needs approval of submittal.

Column (i) Contractor Material: Date that Contractor needs material delivered to Contractor control.

1.7.2 Contractor Use of Submittal Register

Update the following fields in the Government-furnished submittal register program or equivalent fields in program utilized by Contractor with each submittal throughout contract.

Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.

Column (j) Action Code

Column (k) Date of action used to record Contractor's review when forwarding submittals to QC.

Column (l) List date of submittal transmission.

Column (q) List date approval received.

1.7.3 Approving Authority Use of Submittal Register

Update the following fields in the Government-furnished submittal register program or equivalent fields in program utilized by Contractor.

Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.

Column (l) List date of submittal receipt.

Column (m) through (p) List Date related to review actions.

Column (q) List date returned to Contractor.

1.7.4 Action Codes

Entries for columns (j) and (o), are to be used are as follows (others may be prescribed by Transmittal Form):

Section 01 33 00 Page 6

1.7.4.1 Government Review Action Codes

"A" - "Approved as submitted"

"B" - "Approved, except as noted on drawings"

"C" - "Approved, except as noted on drawings, resubmission required"; "Resubmit"

"D" - "Will be returned by seperate correspondence"

"E" - "Disapproved (See attached)"; "Resubmit"

"F" - "Receipt acknowledged"

"FX" - "Receipt acknowledged, does not comply as noted with contract requirements"; "Resubmit"

"G" - "Other (Specify)"; "Resubmit"

1.7.5 Copies Delivered to the Government

Deliver one copy of submittal register updated by Contractor to Government with each invoice request.

1.8 VARIATIONS

Variations from contract requirements require both Designer of Record (DOR) and Government approval pursuant to contract Clause FAR 52.236-21 and will be considered where advantageous to Government.

1.8.1 Considering Variations

Discussion with Contracting Officer prior to submission, after consulting with the DOR, will help ensure functional and quality requirements are met and minimize rejections and re-submittals. When contemplating a variation which results in lower cost, consider submission of the variation as a Value Engineering Change Proposal (VECP).

Specifically point out variations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.

1.8.2 Proposing Variations

When proposing variation, deliver written request to the Contracting Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government, including the DOR's written analysis and approval. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item.

Clearly mark the proposed variation in all documentation.

Check the column "variation" of ENG Form 4025 for submittals which include proposed deviations requested by the Contractor. Set forth in writing the reason for any deviations and annotate such deviations on the submittal.

The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.

Section 01 33 00 Page 7

1.8.3 Warranting that Variations are Compatible

When delivering a…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .