Amendment_01_19-B-0034_Construct_New_Administration_Building_B_NFH_.pdf
PDF 121 KB Posted
- Attached to
- Construct New Administration Building B NFH Federal contract opportunity
- Solicitation number
- W91151-19-B-0034
About this file
Amendment 01 19-B-0034 Responses to RFI Questions
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MISSION AND INSTALLATION CONTRACTING
MISSION CONTRACTING OFFICE (MCO)
36000 DARNALL LOOP, ROOM 1300B
FORT HOOD TX 76544-5025
0011342815-0001 NH105398P
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
A. This amendment is issued to provide Responses to Industry.
B. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Jul-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9115119B0034
X 9B. DATED (SEE ITEM 11)
01-Jul-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Jul-2019
CODE
MISSION AND INSTALLATION CONTRACTING
MISSION CONTRACTING OFFICE (MCO)
36000 DARNALL LOOP, ROOM 1300B
FORT HOOD TX 76544-5095
W91151 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W91151
FACILITY CODECODE
EMAIL:TEL:
W9115119B0034
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been added by full text:
RESPONSE TO INDUSTRY QUESTIONS
Solicitation W91151-19-B-0034 Construct New Administration Building B North Fort Hood Government RFI Responses to Contractor Questions submitted after Site Visit on 10 July 2019
1. Will the 2 existing buildings be removed before work starts?
Yes, 2 existing buildings will be removed before work starts.
2. Will the existing fence be removed before work starts?
Yes, the existing fence will be removed before work starts.
3. Will any and all existing water lines outside the building structure be contracted with American Water through the GC?
Existing Water lines will be removed by American Water before work starts. GC shall contact American Water for pricing to install new water/wastewater service to the 2 new buildings and pricing shall be included in this contract.
4. Will demo of water lines be contracted with American Water through the GC?
Existing Water lines will be removed by American Water before work starts. Demo of these utilities will not be part of this contract.
5. Will any and all electrical lines be contracted through Dominion Electric through the GC? To include any demo?
Existing Electrical lines will be removed by Dominion before work starts. Demo of these utilities will not be part of this contract. Contractor shall contact Dominion for pricing to install new electrical service to the 2 new buildings and pricing shall be included in this contract.
6. Other than the Pre-engineered steel building is there any other licensed engineering requirements?
Reference Contract Plans and Specifications for Project Requirements.
7. Can we use concrete for the parking lot in lieu of asphalt?
Follow contract plans and specifications.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
W9115119B0034
The following have been modified:
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Amendment 01:
A. This amendment is issued to provide Responses to Industry.
(End of provision)
(End of Summary of Changes)
File details come from the government source that posted it.