W91151-19-B-0031_Amendment_0001.pdf

PDF 388 KB Posted

Attached to
Replace HVAC at Building Federal contract opportunity
Solicitation number
W9115119B0031
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

W91151-19-B-0031 Amendment 0001

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011344357 AD001278P

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

a.) The purpose of this amendment is to add the Questions from Industry, and the fillable Aircraft Operatons Area Work Request form.

b.) All other terms and conditions remain unchanged.

c.) See summary of changes for details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Jul-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9115119B0031

X 9B. DATED (SEE ITEM 11)

24-Jun-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Jul-2019

CODE

MISSION AND INSTALLATION CONTRACTING

MISSION CONTRACTING OFFICE (MCO)

36000 DARNALL LOOP, ROOM 1300B

FORT HOOD TX 76544-5095

W91151 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9115119B0031

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A Technical Exhibit A 3313 11-JAN-2016 Exhibit B Technical Exhibit B 10 18-APR-2019 Attachment 1 Apendix A 139 27-JUL-2018 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A Technical Exhibit A 3313 11-JAN-2016 Exhibit B Technical Exhibit B 10 18-APR-2019 Attachment 1 Apendix A 139 27-JUL-2018 Attachment 2 Attachemetn 2 Fillable

AOA Work Request Form

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been added by full text:

QUESTIONS FROM INDUSTRY

Request for Information (RFI)

RPR HVAC at Building 90155

W91151-19-B-0031

1. Please provide the Site Visit Agenda.

Site visit agenda will be attached with the amendment

2. Please provide the site visit sign in sheet.

Sign in sheet will be attached with the amendment

3. Is RS Means estimate required?

RS Means is a tool that the Government uses. The Contractor can use any estimating tool that they choose, so as long as they meet the requirements of this solicitation and estimates are realistic.

4. Work Experience pg. 5 of 52: this section requires 3 examples of relevant work experience from the General Contractor. Will we be allowed to submit our prime subcontractors experience in lieu of the general contractors’ experience? This SOW is very specific not many WOSB Contractors will be able to meet this requirement.

No, the prime contractor shall demonstrate general construction contract management by providing at least three examples of relevant work experience within the last 5 years in awarded contracts similar to the requirements stated in this solicitation.

Please be mindful that per FAR Clause 52.219-30 (Deviation 2019-O0003) By submission of an offer and execution of a contract, a WOSB concern eligible under the WOSB Program agrees that in the performance of the contract for;

(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 85 percent subcontract amount that cannot be exceeded; or

(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 75 percent subcontract amount that cannot be exceeded.

5. Will integrating the Building Automation System (BAS) to the UMCS network be part of the scope?

No.

6. Is the contractor responsible for mapping points from the new equipment controllers to the BAS controller?

Yes.

7. What hours of the day are we allowed to complete the scope?

Building staff will be there from 0730 till 1600 Mon thru Fri. Coordinate with the

COR.

8. Does the contractor need to provide temporary cooling?

No, but contractor shall give the COR a notice for any outages, and shall coordinate all work with the COR to minimize any outage to the building.

9. Does the air-cooled chiller need to meet FEMP guidelines for Full-load and Part-Load Optimized applications?

Yes. IPLV and EER values are as scheduled in sheet M-601.

10. How do we plan around airfield operations?

Any work performed on the air or ramp side of bldg. 90155 must be requested and approved in advance. Submit a work request (attached) to Airfield Manager Mr.

Tracy A. Crawford (tracy.a.crawford8.civ@mail.mil).

11. Is a crane permitted on the airfield side of the building for chiller install and demolition?

With approval by submitting a work request. Crane must be less than 120' AGL.

12. It appears no truly equivalent option for the York Chiller as scheduled is available. Is there a list of approved alternates?

The contractor shall provide and install a chiller equal or equivalent to York Chiller per sheet M-601 schedule.

13. What is the procedure, access to, and restrictions to the airfield for working purposes.

For access to building 90155 - An access roster listing all contractors and subcontractors must be provided to Mr. Tracy A. Crawford for approval. The access roster will be placed on file at the airfield checkpoint. Once the roster is approved a temporary code to Gate #19 will be provided. For Access to the South Ramp - Personnel operating on the South Ramp must complete Flight Line Drivers Training.

Mr. Tracy A. Crawford is the POC

14. Is there a limitation or restriction to Setting up a Crane for rigging purposes on the Airfield?

A work request needs to be submitted for approval. Crane must be less than 120'

AGL.

15. Is there any requirement for provision of a Temporary chiller or temporary cooling to the building during replacement?

No, but contractor shall give the COR a notice for any outages, and shall coordinate all work with the COR to minimize any outage to the building.

16. What limitations to building access will we face during interior test and balance of the system, as building will be occupied.

Building staff will be there from 0730 till 1600 Mon thru Fri. Flights will not stop, be prepared to have passengers in terminal.

17. Is the intent of plan page M-601, note 14 on the New Air Handling Unit Schedule and note 16 on the new roof top package unit Schedule to sole source the equipment on this job?

No, the contractor shall provide and install HVAC equipment equal or equivalent to the ones scheduled on sheet M-601. The new air handling (A-AHU-1) and roof top package (A-RTU-1) units must match existing curbs, and supply/return penetrations without the need for a curb adaptor. The notes are used for references only.

18. Specification section 23 73 13.00, page 1935, calls for cabinets and casing that are double walled with 2” insulation. Plan note on M-601, note 6 on the New Air Handling Unit Schedule, calls for 3” double wall, R-19 injected foam insulation.

Which insulation is acceptable, as Ft Hood has primarily used air units both indoors and outdoors with 2”, R-13 foam insulation? Only one manufacturer makes a 3” double wall unit.

New air handling unit shall be rated for outdoor and have a 3” double wall galvanized steel construction as scheduled (drawing notes supersede the specs). There are more than one manufacturer that make a 3” double wall unit.

19. On M-601, new air cooled chiller schedule, the scheduled tons at 105 ambient is 135 tons. The existing chiller is designed for nominal 165 tons. Please confirm the new chiller will handle the load for the building.

135 tons at 105 Deg. F ambient.

20. Ft Hood has primarily used scroll chillers in this size range. Will a scroll chiller be acceptable as long as it meets the efficiency and electrical requirements? DPW area maintenance service shops have all been trained on the use and servicing or air cooled scroll chillers so DPW is not reliant upon a manufacturer to work on the machine once the warranty has expired.

New chiller requires to have screw compressors. Existing chiller has screw compressors and was chosen as the least cost option for this facility considering operating cost, capital cost, energy efficiency, long-run, and etc.

21. On M-601, the New Air Handling Unit Schedule, note 10 states the chiller must be Buy American Act Compliance. Are the York chillers still being manufactured in the JCI York, Monterrey, Mexico plant acceptable?

All HVAC equipment shall comply with the Buy American Act. Manufacturer shall provide you with a letter stating whether their products are compliant with the Buy American Act or not.

LATE RFIs

1. Will the bond for this project be claimable after contract award? Or will the bond have to be dispersed throughout the contract’s project schedule and claimed in increments?

Per FAR Clause 52.232-6(g); the Government shall, upon request, reimburse the Contractor for the amount of premiums paid for performance and payment bonds after the Contractor has furnished evidence of full payment to the surety.

2. Are there latrines available for use on this project? Or will the contractor be responsible for supplying portable latrines to the on-site workers?

Contractor shall provide a portable restroom and place in a pre-selected location approved by the COR.

3. Is the intent of plan page M-601, note 14 on the New Air Handling Unit Schedule and note 16 on the new roof top package unit Schedule to sole source the equipment on this job?

No, the contractor shall provide and install HVAC equipment equal or equivalent to the ones scheduled on sheet M-601. The new air handling (A-AHU-1) and roof top package (A-RTU-1) units must match existing curbs, and supply/return penetrations without the need for a curb adaptor. The notes are used for references only.

4. Specification section 23 73 13.00, page 1935, calls for cabinets and casing that are double walled with 2” insulation. Plan note on M-601, note 6 on the New Air Handling Unit Schedule, calls for 3” double wall, R-19 injected foam insulation. Which insulation is acceptable, as Ft Hood has primarily used air units both indoors and outdoors with 2”, R- 13 foam insulation? Only one manufacturer makes a 3” double wall unit.

New air handling unit shall be rated for outdoor and have a 3” double wall galvanized steel construction as scheduled (drawing notes supersede the specs). There are more than one manufacturer that make a 3” double wall unit.

5. On M-601, new air cooled chiller schedule, the scheduled tons at 105 ambient is 135 tons. The existing chiller is designed for nominal 165 tons. Please confirm the new chiller will handle the load for the building.

135 tons at 105 Deg. F ambient.

6. Ft Hood has primarily used scroll chillers in this size range. Will a scroll chiller be acceptable as long as it meets the efficiency and electrical requirements? DPW area maintenance service shops have all been trained on the use and servicing or air cooled scroll chillers so DPW is not reliant upon a manufacturer to work on the machine once the warranty has expired.

New chiller requires to have screw compressors. Existing chiller has screw compressors and was chosen as the least cost option for this facility considering operating cost, capital cost, energy efficiency, long-run, and etc.

7. On M-601, the New Air Handling Unit Schedule, note 10 states the chiller must be Buy American Act Compliance. Are the York chillers still being manufactured in the JCI York, Monterrey, Mexico plant?

All HVAC equipment shall comply with the Buy American Act. Manufacturer shall provide you with a letter stating whether their products are compliant with the Buy American Act or not.

The following have been modified:

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Amendment 01: The purpose of this amendment is to add the Questions from Industry, and add the fillable Aircraft Operatons Area Work Request form.

(End of clause)

(End of Summary of Changes)