Government Responses to Questions
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08_W90WL519Q0011_P00001.pdf | ||
| Appendix_B_Human_Health_Risk_Assessment.pdf | ||
| Appendix_A_Sampling_and_Analysis_Plan_for_RCRA_Subpart_X_Permit_OBOD_Area.pdf | ||
| W90WL519Q0011.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tooele Army Depot
March 5, 2019
Q&A to Solicitation W90WL5Q0011
1. We would like to respectfully request an extension to the due date of the proposal from March 11, 2019 to March 22, 2019.
-The Government cannot offer an extension to the solicitation requirements at this time.
2. Does the Government have a bid sheet that Contractors should use to present the cost proposal for the work? Is cost supporting backup material required (e.g. subcontractor bids)?
- See solicitation schedule pages 8 – 14 for entry of Item Price(s). This is a Firm Fixed Price (FFP) contract, cost proposals are not required. Evaluations are based on final bid, lowest price technically acceptable. See section C.9 of the solicitation for evaluation factors.
3. Is a technical proposal required for submittal in addition to a cost proposal? If a technical proposal is required, what are the page limitations and technical evaluation criteria?
-Deliverables in CLIN 0001AA and CLIN 0002AA are due after award from the awardee only. There are no restrictions on technical proposals after award. All due dates reflect submission due dates to TEAD. CLIN 0001AA and 0002AA are deliverables due after award. This shall be clarified in solicitation modification P00001.
4. Is a proposed milestone payment schedule required to be provided with the Contractor’s proposal?
- Contract Line Items may be invoiced individually after government acceptance.
5. Can the Government please provide Appendices A, B, C as identified in C.5 of the RFP.
- Appendices A & B have been uploaded to the FBO posting. Solicitation Modification P00001 has removed Appendix C and section C.8.6 and edited from section C.6 in the solicitation.
6. What is the period of performance (POP) for the work (i.e., does this contract consist of a one-time event or annually for 5 years)? If this is a one-time event, will there be options included to extend the POP and to include annual sampling for multiple years?
-Delivery Dates are included in the Solicitation Document on Page 15. The requirement is for one sampling event. The Option CLIN for water sampling is strictly at the discretion of the State of Utah should they require water testing be done in conjunction with soil sampling.
7. Section C7.1 Schedule states that the specific schedule and report requirements will be identified in each CLIN. However, the individual CLINs do not include any schedule related details. Can these please be provided?
-Delivery Dates are included in the Solicitation Document on Page 15. The final Award shall include delivery dates at the CLIN Level in addition to the schedule on Page 15 of the solicitation document.
8. Are UXO escorts required during sampling activities and if so are they to be provided by the Contractor or TEAD-N?
-UXO escorts are required and shall be provided by TEAD. Solicitation Modification P00001 reflects the changes in Section C.6.
9. Are there any site access restrictions other than the Access and Working hours presented in the
RFQ (e.g., days and/or hours field work will not be allowed at the OB/OD within the working hours listed for TEAD)?
- Please refer to Page 7, Section C.8.
10. Is AT Level I training required to access the sampling locations at the OB/OD area of TEAD-N?
- Yes, please refer to Page 7 Section C.8.1