Ground maintenance service, Kunsan AB. _ Grounds Narrative Federal contract opportunity
Solicitation number
W90VN7-24-R-0006
Issued by
Department of the Army

About this file

This document outlines requirements for ground maintenance services at Kunsan Air Base in South Korea under solicitation number W90VN7-24-R-0006. The contractor will be responsible for cleaning storm drains, drainage ditches, and inlets to ensure continuous water flow and prevent erosion. Storm drains must be cleared of debris from the access point to the next access point. Drainage ditches and inlets in parking lots and on streets must be free of vegetation, leaves, and garbage after mowing. The contractor will also police grounds to maintain a neat appearance and has access to approximately 10,000 square feet of storage area near Building 920.

View the file

Other files for this federal contract opportunity

Other files attached to Ground maintenance service, Kunsan AB. _ Grounds Narrative, newest first.
File Type Posted
W90VN724R0006_Ground MX solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Grate covered storm drain ‐ requirement identified under 5.6 Restore Surface Drainage Ditches “to be free of shrubs, trees, silt, soil, trash and other debris to prevent erosion and ensure continuous flow of water.” If a storm drain is requested to be cleaned, measurements should be made from the end of the line (or access point) to the next access point in meters.

Cleaned ‐ Grate covered storm drain – Picture shows an acceptable level to be cleaned to. “Free of shrubs, trees, silt, soil, trash and other debris”. 5.6 Restore Surface Drainage Ditches

Concrete Base Storm Drain – Contractor is responsible for removing "shrubs, trees, silt, soil, trash and other debris." Report any damage discovered to the COR as soon as discovered. 5.6 Restore Surface Drainage Ditches

Parking lot and street storm drain inlet – Parking lots and streets should clear of grass, leaves and garbage after mowing services. 5.1.4 Remove Debris/Police Grounds “Police areas to maintain a neat and professional appearance.”

Contractor will have access to ~10,000sq/ft for storage of equipment

For reference, storage area located near Bldg 920