A02 ATTACHMENT 0001 SCOPE OF WORK.pdf
PDF 305 KB Posted
- Attached to
- M915 BKIT SHIPPING BOX Federal contract opportunity
- Solicitation number
- W9098S21Q0072
About this file
This document outlines a scope of work for a federal contract to produce 220 wood box kits for final packaging of an M915A B KIT vehicle part. The contractor will use provided specifications to purchase all required materials and assemble the kits according to instructions. Blocking will be cut, identified with letters, and assembled as shown in the specifications. Loose hardware will be bagged and tagged. The contractor must provide all tools and equipment to produce the final assemblies and deliver them as kit 57K7683RIA-100 in monthly increments from September 2021 through June 2022 according to the production schedule. Each kit will be shipped separately, with blocking and assemblies shipped on a separate pallet or skid attached to the base. All certifications and test reports are required with deliveries, and the first shipment will be inspected for compliance by Rock Island Arsenal-Joint Manufacturing and Technology Center. The related federal contract opportunity is solicitation number W9098S21Q0072 for the M915 BKit shipping boxes through the Department of the Army Materiel Command Contracting Command Rock Island Arsenal.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08 21Q0072 Amendment 0001.pdf | ||
| A02 ATTACHMENT 0002 AK15920557_C.pdf | ||
| B08 W9098S21Q0072 FINAL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of work – M915A B KIT, Final Pack Box 57K7683RIA-100
Dated: 17 May 2021
Background:
The M915A B Kit is part of a transportation vehicle used by the US Army. There is a requirement to purchase 220 wood box kits for final packaging of a manufactured
M915A B KIT. This wood box kit will be used for shipping and storage of the
M915A B KIT. The wood box kit will be made according to the provided Special
Packaging Instructions (SPI) AK15920557 REV. C.
General Contractor Requirements:
Rock Island Arsenal-Joint Manufacturing and Technology Center (RIA JMTC) will provide the SPI AK15920557 REV C. Using the SPI AK15920557 REV C as instructions, the contractor shall purchase all items per the description provided.
Contractor will, cut, assemble and mount all blocking up to Figure 5 (page 8).
Beginning with Table 7 Blocking “F” (page 9) all blocking will be cut per the bill of materials and assembled as shown. All blocking beginning with “F” will be identified/stenciled with the letter associated with each blocking. All loose hardware will be separately bagged and tagged with description. The hardware bags will be packed and shipped in a separate box/container. The contractor will provide all tools and equipment to produce the final assemblies. The contractor will deliver as the final kit 57K7683RIA-100.
Packaging requirements:
Each kit 57K7683RIA-100 will be shipped as one kit. The base figure 5 (page 8) will be shipped as the base and the remaining blocking and assemblies will be shipped on a separate pallet/skid. This separate skid will be attached to the base by banding and/or screws and be able to be removed upon arrival at RIA-JMTC.
Quality requirements:
All Certificate of Conformance (COC) and/or Certified Test Reports (CTR) are to be delivered with each shipment. RIA-JMTC will inspect the first monthly delivery for compliance and provide concurrence to move forward with the process.
Transportation Requirements for production:
The contractor shall be responsible for shipping 220 of each kit per a provided monthly schedule. Ship in multiples of 5 or more, must be a full truck load.
Environmental:
The contractor must follow all applicable environmental, local, state, and federal environmental laws/regulations.
Schedule:
The contractor will deliver 15 box kits 30 days after award. Inspection will be competed at RIA-JMTC and concurrence will be provided within 21 days after receipt of product.
Production schedule: Full truck loads only, quantities will be adjusted higher if needed to fill the truck load.
25 box kits September 2021
26 box kits October 2021
18 box kits November 2021
14 box kits December 2021
20 box kits January 2022
19 box kits February 2022
23 box kits March 2022
21 box kits April 2022
21 box kits May 2022
22 box kits June 2022
File details come from the government source that posted it. Updated .