17-T-0006-0001.pdf

PDF 23 KB Posted

Attached to
Flooring Restoration Services Federal contract opportunity
Solicitation number
W9098S17T0006
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Flooring Restoration Services, newest first.
File Type Posted
Attachment0004_QASP.pdf PDF
Attachment0001_CDRL.docx.pdf PDF
17-T-0006.pdf PDF
Attachment0003_BldgLayoutDrawing.pdf PDF
Attachment0002_WageDetermination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROCK ISLAND ARSENAL (ACC-RI)

SABRINA LOWE

PHONE 309-782-1598

ROCK ISLAND IL 61299-5000

W52H1B6104027W

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to provide answ ers to questions as a result of the scheduled site visit.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Oct-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9098S-17-T-0006

X 9B. DATED (SEE ITEM 11)

07-Oct-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Oct-2016

CODE

ROCK ISLAND ARSENAL (ACC-RI)

JOINT MANUFACTURING & TECHNOLOGY CENTER

BLDG 211 RODMAN AVENUE

1 ROCK ISLAND ARSENAL

ROCK ISLAND IL 61299-5000

W9098S 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W9098S

FACILITY CODECODE

EMAIL:TEL:

W9098S-17-T-0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been added by full text:

AMENDMENT 0001

1. The purpose of this amendment is to provide answers to questions received as a result of the site visit dated 14 October 2016.

2. All other terms and conditions remain unchanged.

3. Questions and answers as follows:

a. Is Quality Control required to be on-site during performance?

- No, not unless your processes require it.

b. What is the expectation for job start-up?

- The period of performance allotted for task one and all awarded optional tasks is 127 calendar days. Project start-up shall begin within 2- weeks of receiving the award. It is expected that task one and all awarded optional tasks will be completed within the same 127 day period.

c. Currently several of the areas have existing markings, for example: walkways. Are these types of markings required to be replaced once the floor is resurfaced?

- No, this SOW does not require the contractor to provide any additional markings. All markings will be completed by the Government at a later date.

d. What is the available power hook-ups in each area?

- Task One: 460-V, 60Hz, 3Ph-AC

- Task Two: 460-V, 60Hz, 3Ph-AC

- Task Three: 460-V, 60Hz, 3Ph-AC

- Task Four: 460-V, 60Hz, 3Ph-AC

- Task Five: 460-V, 60Hz, 3Ph-AC

- Task Six: 110-V outlets

e. Is the areas temperature controlled?

- Yes, see SOW J9000-16-3-06 dated 10-04-2016, paragraph 1.3.4.4.

f. If we need to have our materials delivered, do they have to be delivered to central receiving in Building 299?

- No, Deliveries can be arranged to be directly shipped to Building 212/210 with proper prior coordination with the designated COR. The contractor must be present to accept

W9098S-17-T-0006 and signed (if needed) for shipments. The Government will not be responsible for such deliveries.

g. Are there any specific safety requirements for the areas?

- No, Each contractor employee will be required to receive a short safety briefing before starting work. This will be provided by the appropriate Government personnel.

h. Is there any requirements for dust mitigation?

- Dust needs to be controlled, however it is up to the contractor to determine the best method.

i. In Task 4, the areas currently has a carpeted floor. Is it possible to re-use the existing carpet?

- Per SOW J9000-16-3-06 dated 04 October 2016, Task 4 shall be an Epoxy floor.

Contractor shall remove all carpet and dispose of.

j. Is it possible to perform the restoration work on off-shifts for the administrative areas (Task 4, 5, and 6)?

- Yes, the Government is willing to entertain work being performed during a 2nd or 3rd shift schedule. However, all such work would need prior written approval by the COR and Contracting Officer.

k. Are actual samples required with quote packages?

- No, samples are not required.

l. Clarification: For Task 6 – The current layout drawings do not account for the double-door entrances. The Contractor shall remove all tile to include the “knockout” sections for the double-door areas.

j. Clarification: Reminder that all equipment to perform this SOW shall be provided by the contractor. There is a freight elevator accessible to all areas for large equipment and supplies to be moved around. Contractors shall be area of the elevator load limits as to no over load at any time.

Building 220 Freight Elevator load limit is: 16000lbs (as posted) Building 210 Freight Elevator load limit is: 23000lbs (as posted)

(End of Summary of Changes)