ATTACHMENT_2_-_QASP.pdf
PDF 64 KB Posted
- Attached to
- AntiParasitic Drug Testing Support Services Federal contract opportunity
- Solicitation number
- W81XWH19R0007
- Issued by
- Department of the Army Medical Command
About this file
QASP
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT_1_-_PWS.pdf | ||
| PAST_PERFORMANCE_EVALUATION_QUESTIONNAIRE_Letter_v1_lapt.pdf | ||
| PAST_PERFORMANCE_EVALUATION_QUESTIONNAIRE_FORM.docx | DOCX document | |
| W81XWH19R0007_-_11.09.2018_(003).docx | DOCX document | |
| ATTACHMENT_5_-_Price_Proposal.xls.xlsx | XLSX spreadsheet | |
| Questions.Responses.docx | DOCX document | |
| W81XWH19R0007_-_11.02.2018_(003).docx | DOCX document | |
| ATTACHMENT_6_-_ORGANIZATIONAL_CONFLICT_OF_INTEREST.pdf | ||
| ATTACHMENT_3_-_WRAIR_ORGANIZATIONAL_CHART.pdf | ||
| ATTACHMENT_1_-_PWS.pdf | ||
| W81XWH19R0007_-_11.02.2018_(003).pdf | ||
| ATTACHMENT_4_-_Acronyms_List.pdf | ||
| ATTACHMENT_5_-_Price_Proposal.xls | XLS spreadsheet | |
| ATTACHMENT_7_-_Covered_Employee_Participation_Agreement.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
Anti - Parasitic Drug Animal Testing
Experimental Therapeutics (ET) Branch
Contract Number: TBD Contractor's Name: TBD
1. VISION
The Walter Reed Army Institute of Research (WRAIR) vision is to be the premier DoD biomedical research organization, constantly relevant, integrating basic research and advanced technology that protects, projects, and sustains the Warfighter today, invents global medical solutions for the future, and keeps the Warfighter on point for the Nation.
2. MISSION
The WRAIR aims to conduct biomedical research that is responsive to Department of Defense and US Army requirements and delivers life-saving products including knowledge, technology and medical material that sustain the combat effectiveness of the Warfighter. The Vector Control department, Entomology Branch (WRAIR) conducts research, testing and product development activities that reduce the risk of vector-borne disease to U.S. military and DoD support personnel anywhere in the world by mitigating the vector threat through enhanced risk assessment techniques, personal protective measures, vector identification and control methods.
3. PURPOSE:
3.1. This Quality Assurance Surveillance Plan (QASP) is a government-developed document used to determine if the contractor's performance meets the performance standards contained in the contract. The QASP establishes procedures on how this assessment/inspection process will be conducted. It provides the detailed process for a continuous oversight process:
a. What will be monitored,
b. How monitoring will take place,
c. Who will conduct the monitoring, and
d. How monitoring efforts and results will be documented.
3.2. The contractor is responsible for implementing and delivering performance that meets contract standards using its Quality Control Plan. The QASP provides the structure for the government's surveillance of the contractor's performance to assure that it meets contract standards. It is the government's responsibility to be objective, fair and consistent in evaluating contractor performance.
3.3. The QASP is not part of the contract nor is it intended to duplicate the contractor's quality control plan. This
QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance.
3.4. The government may provide a copy of the QASP to the contractor to facilitate open communication. In addition, the QASP should recognize that unforeseen or uncontrollable circumstances might occur that are outside the control of the contractor.
Bottom line, the QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance.
4. AUTHORITY
Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition Regulation, Inspection of Services clauses, which provide for inspection, acceptance and documentation of the service called for in the contract or order. This acceptance is to be executed by the contracting officer or a duly authorized representative.
5. ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
5.1. Contracting Officer (KO)
The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine and document the final assessment of the contractor's performance in the governments past performance tracking system.
Assigned KO: This section is to be completed at time of award
Organization or Agency: To be completed at time of award
Telephone:
Email:
5.2. Contracting Officer's Representative (COR)
The COR is responsible for providing continuous technical oversight of the contractor's performance. The COR uses the QASP to conduct the oversight and surveillance process. The COR shall keep a Quality Assurance file that accurately documents the contractor's actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the KO. The COR is required to provide an annual performance assessment to the KO which will be used in documenting past performance. The QASP is the primary tool for documenting contractor performance.
The COR is not empowered to many any contractual commitments or to authorize any contractual change on the Government's behalf.
Assigned COR: This section is to be completed at time of award
Organization or Agency: To be completed at time of award
Telephone:
Email:
5.3. Other Key Government Personnel
This may include performance monitors, inspectors, technical experts, or others who provide information that helps the COR monitor contractor performance.
The designated technical quality assurance personnel are:
Name: This section is to be completed at time of award
Telephone:
Email:
5.4. Contractor Representatives
The following employees of the contractor serve as the contractor's Program Manager and Task Manager for this contract.
5.4.1. Program Manager
Name: To be completed at time of award
Telephone:
Email:
5.4.2. Task Manager – This section is to be completed at time of award
5.4.3. Other Key Contract Personnel – This section is to be completed at time of award
6. PERFORMANCE REQUIREMENTS AND METHOD OF SURVEILLANCE
This section describes the special requirements for this effort. The following sub-sections provide details of various considerations on this effort.
6.1. Contract Surveillance
The goal of the QASP is to ensure that contractor performance is effectively monitored and documented. The COR's contribution is their professional, non-adversarial relationships with the KO, PM and the contractor, which enables positive, open and timely communications. The foundation of this relationship is built upon objective, fair, and consistent COR evaluations of contractor performance against contract requirements. The COR uses the methods contained in this QASP to ensure the contractor is in compliance with contract requirements. The COR function is responsible for a wide range of surveillance requirements that effectively measure and evaluate the contractor's performance. Additionally, this QASP is based on the premise that the contractor, not the government, is responsible for management and QC/QA actions to successfully meet the terms of the contract.
6.2. Surveillance Matrix
6.2.1. The Surveillance Matrix Table 1 is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
6.2.2. Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of the contractor's performance as it relates to the performance element standards. The matrix should be used to form the foundation of the COR's inspection checklist. In evaluating the quality of contractor’s performance, the following performance ratings may be used.
Performance
Rating Criteria
Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit.
The element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions.
Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
7. PERFORMANCE STANDARDS:
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards. The Performance Requirements Summary Matrix, shown below, and the Performance Work Statement (PWS), includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
Table 1. Performance Requirements Standards Summary
PWS
Ref.
Performance Objective
Performance Standard
Acceptable Quality Level
Performance Measurement Incentive
6.1- 6.3, 6.6- 6.11
Perform IVIS protocols
Completion of all assigned protocols
95% of tasks shall be satisfactorily completed. Tasks completed unsatisfactorily shall be reworked.
99% surveillance
Frequency: Review throughout completion of each protocol
Past Performance
6.2- 6.3, 6.7
Technical consulting on in vivo assays and animal use
Ensure availability of all screens to ET customers
No scheduling conflicts with other screening programs
99% surveillance
Frequency: At each customer request
Past Performance
6.1- 6.2, 6.4, 6.6, 6.8- 6.11
Develop and sustain in vivo Leishmania models
Timely completion task
No avoidable delays of more than 1 week
99% surveillance
Frequency:
Monthly Progress Reports
Past Performance
6.1, 6.3, 6.7, 6.8, 6.10, 6.11
Generate IVIS- Malaria data and perform data analysis
Satisfactory completion of experiments
95% of experiments shall be satisfactorily completed. Experiments completed unsatisfactorily shall be reworked.
99% surveillance
Frequency:
Monthly Progress Reports
Past Performance
6.11.e , 6.3.l Draft IVIS-malaria formal reports
Timely delivery of report
Delivery of reports within 1 week of request.
99% surveillance
Frequency: At due date for each report
Past Performance
6.8.a Format IVIS- Malaria data for the chemical information system
Timely upload of historical data to information and inventory system
95% of data uploaded within 3 months of system being operational
99% surveillance
Frequency:
Monthly Progress Reports
Past Performance
6.2.n, 6.11.e
Draft IVIS- Leishmania formal reports
Timely delivery of report
Reports delivered within 2 weeks of request.
99% surveillance
Frequency: At due date for each report
Past Performance
16.11 .4 iWATCH Training - Contractor provides
Sum of all contractor personnel who have completed
>90% Review of Training report from the contractor.
Past
PWS
Ref.
Performance Objective
Performance Standard
Acceptable Quality Level
Performance Measurement Incentive iWATCH training to all personnel within 30 DACA iWATCH training within 30 DACA
16.11 .4
Installation Access - Contractor follows installation access procedures.
Sum of all incidents in which contractor personnel did not follow installation access procedures
< 1 incident per month
Direct observation by COR and installation security.
Past Performance
16.11 .4
OPSEC SOP –
Submit OPSEC SOP that meets minimum quality standards.
Number of calendar days after contract award that the contractor submits the OPSEC SOP to the COR
< 90 calendar days after contract award
COR receipt of
OPSEC SOP
Past Performance
16.11 .4
Information Assurance Training – Personnel are trained in accordance with DoD and Army policy
Number of calendar days after contract award in which the contractor submits training certifications for all personnel
< 30 calendar days COR receipt of all certifications
Past
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6.
CONTROL
NUMBER
7. DEFICIENCY MAJOR MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT
RECURRENCE
11. COR DETERMINATION
ACCEPTED REJECTED
12. CLOSE DATE
CUSTOMER COMPLAINT RECORD
DATE/TIME OF
COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING
INDIVIDUAL
PHONE
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACT/TASK ORDER
NUMBER
2. CONTRACTOR 3. TYPE OF SERVICES
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND
DATE
5. COR PHONE 6.
SUSPENSE
DATE
I. PERFORMANCE
7. DEFICIENCY (CHECK ALL BOXES THAT
APPLY)
NEW
REPEAT
NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS
PARAGRAPH ITEM REVIEWED
9. BRIEF DESCRIPTION OF DEFICIENCY (IF
DEFICIENCY BOX WAS CHECKED)
10. DETAILED PERFORMANCE
ASSESSMENT
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE CONCUR
NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED
COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE
OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. CONCUR NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
16. CONTRACTOR REPRESENTATIVE REMARKS
File details come from the government source that posted it.