W52P1J-17-R-5011.pdf
PDF 429 KB Posted
- Attached to
- Upgrade Freight Elevator #1 Federal contract opportunity
- Solicitation number
- W52P1J-17-R-5011
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Ammendment_0001_Revised_SOW-_25_Apr_2017.pdf | ||
| Amendment_0001.pdf | ||
| Davis_Bacon_Wage_Rates_Solicitation.pdf | ||
| DPW_SOW_-_PR_2014-6497_-_28_Feb_2017.pdf | ||
| Appendix_B_-_Engineering_Graphics_Standard_-_13Jun16.pdf | ||
| Appendix_C_-_Non-Hazardous_Construction_and_Demolition_Debris_Submittal_Form_-_17Jan17.pdf | ||
| Attachment_0001_Non-Disclosure_Agreement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The U.S. Army Contracting Command - Rock Island Contracting Center requests a proposal for Upgrade of Freight Elevator #1 in Building 220 on the Rock Island Arsenal, Rock Island IL.
In accordance w ith FAR 36.204, Disclosure of magnitude of construction projects, the magnitude for this project is betw een $500,000.00 and $1,000,000.00.
The draw ings referenced in this solicitation may be obtained by executing a Non-Disclosure Agreement, Attachment 0001, and returning it via email to Julie Culliton at julie.k.culliton.civ@mail.mil.
The draw ings referenced in the solicitation are obtained by having an active Joint Certif icate Program (JCP) account. You can obtain an active account by visiting: http://public.logisticsinformationservice.dla.mil/jcp/search.aspx and submitting the necessary documents. Once your account is active, you may request access to draw ings in FedBizOpps (w w w .fbo.gov).
A pre-construction site visit is scheduled for 9:00 am CST, 20 April 2017 in the Public Works Conference Room, Basement Building 102.
RESERVATIONS FOR THIS SITE VISIT ARE MANDATORY NO LATER THAN 72 HOURS PRIOR TO THE DATE OF THE SITE VISIT.
JULIE CULLITON 309-782-5354
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
10-Apr-2017
(RFP)
(IFB)
X
CALL:
Repair Elevator #1, Building 220
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______14 calendar days and complete it w ithin ________160 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________10 May 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
ARMY CONTRACTING COMMAND ROCK ISLAND
ACC-RI
3055 RODMAN AVENUE
ROCK ISLAND IL 61299-8000
W52P1J
PAGE OF PAGES
1 OF
CODE W52P1J
(Title, identifying no., date):
12B. CALENDAR DAYS
03:00 PM (hour)
Sealed envelopes containing offers
GARRISON CONTRACTING BRANCH
CCRC-IG
BLDG 60, 3RD FLOOR
3055 RODMAN AVENUE
ROCK ISLAND IL 61299
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
2014-6497
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W52P1J-17-R-5011 28
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W52P1J-17-R-5011
Section SF 30 - Block 14 Continuation Page (SF 30)
SUPPLEMENTAL INFORMATION
1. The U.S. Army Contracting Command – Rock Island Contracting Center requests a proposal for the
Upgrade of Freight Elevator #1 in Building 220 on the Rock Island Arsenal, Rock Island IL. All work is to be done in accordance with the Scope of Work (SOW) for PR 2014-6497.
2. This Request for Proposal (RFP) is issued as full and open competition.
3. This solicitation is issued subject to the availability of funds; therefore this soliciation is currently unfunded. The Government reserves the right to not fund any or all of the CLIN(s) listed in this solicitation, see FAR 52.232-18.
4. The Government intends to award a firm fixed price type contract, resulting from this solicitation, to the responsive, responsible offeror whose proposal represents the lowest total evaluated price.
5. The prevailing Davis-Bacon Act for wage determination will be incorporated into the resultant contract and will be in effect for the entire performance period of the resultant contract. The most recent wage determinations can be found online at:
http://www.wdol.gov/dba.aspx
6. Please note the new Security Requirements in Part 3 of the SOW. The contractor is responsible for these requirements.
7. Contractor questions regarding soliciation and work contained in the SOW are due to the soliciation POC no later than 3 May 2017 in order to assure that all Contractor questions can be answered and posted for all
Contractors’ knowledge prior to soliciation closing.
8. Contractors must submit a Non-Disclosure Agreement, Attachment 0001 prior to gaining access to the soliciation Drawings and Appendices. The Contractor shall sign and return a copy of the Non-Disclosure
Agreement to the POC listed below. After receipt of the Non-Disclosure Agreeemnt, access to the project drawings and SOW Appendices may be obtained by having an active Joint Certificate Program (JCP) account. You can obtain an active account by visiting:
https://public.logisticsinformationservice.dla.mil/jcp/search.aspx and submitting the necessary documents.
Once your account is active, you may request access to drawings in FedBizOpps (www.fbo.gov).
9. Contractor proposal sumbission may be completed by drop off to the POC listed below, located in Building
60, 3rd floor, West Wing or by mail. Access to the third floor is restricted, please enter Building 60 on the
1st floor and phone the POC (2-5354 or 2-8736) and wait in the reception area by the elevator.
http://www.wdol.gov/dba.aspx https://public.logisticsinformationservice.dla.mil/jcp/search.aspx http://www.fbo.gov/
10. A pre-construction site visit is scheduled for 20 April 2017 at 9:00 a.m CST.in the Public Works
Conference Room, Basement, Building 102. PPE required is steel toed shoes and safety glasses.
Contractors are required to provide their own PPE. RESERVATIONS FOR THIS SITE VISIT ARE
MANDATORY AND REQUIRED AT LEAST 72 HOURS IN ADVANCE OF THE SITE VISIT.
*****VERY IMPORTANT*****
ALL ATTENDEES MUST COMPLETE AND RETURN THE “ACCESS CONTROL RECORDS
CHECK REQUEST FORM” LOCATED AT
http://www.usagria.army.mil/ACCESSREQUESTS/Process.aspx
NLT 72 HOURS PRIOR TO THE SITE VISIT AND RETURN THE FORM TO
usarmy.ria.imcom.mbx.usag-access-request@mail.mil AND julie.k.culliton.civ@mail.mil.
CONTRACTORS NOT RETURNING THIS FORM 72 HOURS PRIOR TO THE SITE VISIT WILL
NOT BE ABLE TO ATTEND THE SITE VISIT.
PLEASE NOTE: ALL ATTENDEES MUST ACCESS THE ISLAND THROUGH THE MOLINE
GATE AND STOP AT BUILDING 23, VISITOR CONTROL CENTER, TO GAIN ACCESS TO THE
ISLAND.
11. This executive summary is provided as an administrative convenience and is not intended to alter the terms and conditions of the solicitation and SOW in any way. Any inconsistencies between this executive summary and other soliciation provisions shall be resolved in favor of the other soliciation provisions.
12. The Government representative for this RFP is Julie Culliton, (309)782-5354. Comments or questions should be directed in writing to Julie Culliton, julie.k.culliton.civ@mail.mil.
http://www.usagria.army.mil/ACCESSREQUESTS/Process.aspx mailto:usarmy.ria.imcom.mbx.usag-access-request@mail.mil mailto:julie.k.culliton.civ@mail.mil
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Job Repair Elevator #1 in Building 220
FFP
Repair Elevator #1 in Building 220 in accordance with the Scope of Work.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 Job Contractor Manpower Reporting
FFP
In accordance with the Scope of Work.
FOB: Destination
NET AMT
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 N/A N/A N/A N/A
0002 N/A N/A N/A N/A
Section 00 21 00 - Instructions
CLAUSES INCORPORATED BY FULL TEXT
52.0000-4001 CLAUSES/SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
(FAR 52.252-1/52.252-2)
This solicitation incorporates one or more clauses and/or solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at these addresses:
http://farsite.hill.af.mil/; http://www.arnet.gov/far/; http://akss.dau.mil/jsp/default.jsp;
(End of clause/provision)
52.0000-4003 DISCLOSURE OF UNIT PRICE INFORMATION (JUN 2005)
This constitutes notification pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for
Confidential Commercial Information (June 23,1987), of our intention to release unit prices of the awardee in response to any request under the Freedom of Information Act, 5 USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the Contracting Officer is notified of your objection to such release prior to submission of initial proposals.
(End of clause)
52.0000-4035 ROCK ISLAND ARSENAL SITE CLAUSE (JUN 2015)
ROCK ISLAND ARSENAL SECURITY, LAW ENFORCMENT, FIRE PREVENTION, AND SAFETY
REQUIREMENTS. Any contractor personnel entering Rock Island Arsenal (RIA) as the result of this order/contract are required to adhere to all regulations governing safety, law enforcement, security, and fire prevention in effect at the time of entrance. Failure to comply with said regulations may result in immediate removal from RIA. The contractor shall bear full responsibility of the consequences of said removal. Further clarifications of RIA regulations are available from the Contracting Officer for this order/contract.
Emergency Phone Number for Rock Island Arsenal. Dial 9-1-1 FOR POLICE, FIRE, AMBULANCE. State your name, location, nature of emergency and answer any questions the dispatcher may have. Stay on the line with the dispatcher until you are told you can hang up. If calling from a cell phone, tell the dispatcher that you are calling from the Rock Island Arsenal.
http://farsite.hill.af.mil/ http://www.arnet.gov/far/ http://akss.dau.mil/jsp/default.jsp
1. Operations Security (OPSEC) Review:
a. All contractor/sub-contractor employees will insure an OPSEC review is conducted through coordination with the COR, by a (level II) certified, Operations Security Officer by the originating command and/or organization prior to the release of any of the following products; (a reviewed product may be, but is not limited to), picture, map, blue print, memorandum, letter, article, academic paper, video, briefing, contract, news release, technical document, proposal, plan, order, response to Privacy Act requests, or other visual or electronic media. The obligation for prior
OPSEC review applies to releases occurring both during and after completion of the contract. If the command/organization does not have a Level II certified OPSEC officer the review will be sent to the next higher headquarters.
b. The contractor/sub-contractor will be responsible for establishing and maintaining an OPSEC program to adequately manage, protect and control critical, sensitive and classified information that has been provided or generated under the contract.
2. SECURITY REQUIREMENTS:
a. Physical Security. The contractor shall be responsible for proper security and safeguarding of all property within designated work areas, to include all vehicles and storage areas. Loss or theft of property/equipment will be reported to RIA Police immediately upon discovery.
b. Installation Access. All personnel requesting access to Rock Island Arsenal will only enter through a manned and operational Access Control Point and present a United States National or State issued identification that is capable of being scanned for valid entry. All contractor and contractor employees' vehicles, equipment, and packages are subject to inspection or examination (search) at entry/exit of the Arsenal. Security personnel/police will conduct the inspection deemed necessary to enforce security requirements. The contractor shall comply with all installation and other applicable security regulations, requirements, and instructions.
c. Restricted Areas.
(1) Contractor personnel requiring access to a restricted area are required to obtain proper identification and authorization. Access or escort with the owner/occupant of the restricted area shall be coordinated through the
Contracting Officer’s Representative (COR).
(2) Government Administrative Office Areas. Government personnel will be working in office areas during normal working hours. Contractor employees shall cooperate with personnel in the immediate area where any service or maintenance work is being performed. Work performed after normal duty hours shall be coordinated with the Contracting Officer or his designated representative.
d. Photographic Equipment Restrictions:
(1) There are restrictions on the use of photographic devices in all non-public areas of Arsenal Island. This includes, but is not limited to, digital cameras, cell phones, and personal data assistants (PDAs) with cameras. Per
U.S. Army Regulation 360-1, taking or producing ground or aerial photographs, sketches, or graphic representations of classified military equipment or installations designated as restricted areas is punishable by law (18 United States
Code 795). Reproducing, publishing, or selling this type of material is also punishable by law unless the photograph, sketch, or graphic representation indicates it has been reviewed and cleared for release by proper authority (18 USC 797). Video, still photos, digital photos, sketches, and graphic representations are for official use only and are not authorized for public release. The contractor must get permission from the Physical Security
Office, Bldg 225, to use any type of photographic device at the Access Control Points or in any Restricted Area.
(2) Upon completion of this contract, all critical and sensitive information (video, still photos, digital photos, sketches, graphic representations, etc.) that is no longer needed, must be destroyed (burned, shredded, etc.) to prevent the inadvertent disclosure and reconstruction of this material.
e. Electronic Access. The COR must coordinate, request, and issue electronic access keys for contractor personnel. Contractor personnel must report the loss of electronic keys immediately to the COR.
f. Key Control. The Director, Public Works key custodian, thru the COR, is responsible for issuing keys to the contractor. The contractor shall establish a key control system IAW AR 190-11, Physical Security of Arms
Ammunition and Explosives, and AR 190-51, Security of Unclassified Army Property (Sensitive and Non-sensitive), to ensure that none of the keys issued to the contractor are lost, misplaced, or used by unauthorized persons. Government keys shall not be duplicated by the contractor.
(1) Replacement. The contractor shall be responsible for all costs incurred as a result of the contractor losing any key. The contractor shall reimburse the government for replacement of locks or keys required as a result of the contractor losing any key(s).
(2) Entrance to Locked Areas. The contractor shall not permit entrance to locked areas to any person (other than employees of the contractors engaged in the performance of work in those areas) without authorization by the
COR.
(3) Lock Combinations. The contractor shall ensure that no lock combinations are made available to unauthorized persons.
g. Industrial Security:
(1) Contractor personnel requiring issuance of a government Common Access Card (CAC) and/or require access to any government Automated Information System (AIS), must obtain a favorable National Agency Check with Inquiries (NACI) or equivalent personnel security investigation, initiated by the Garrison Security &
Intelligence Division.
(2) Foreign Nationals must be escorted by a US Citizen at all times. This person must be a cleared government employee or a contractor employed on RIA.
(3) Access to the installation may be denied during increased readiness or Force Protection Conditions
(FPCONs).
3. GENERAL SAFETY AND OCCUPATIONAL HEALTH GUIDANCE:
a. The Army has an overall goal of ensuring that contracted work is performed using procedures and risk controls that ensure workers, the public and the environment are not endangered.
b. Contractors must comply with applicable Federal, State, and local codes and standards, including Safety and
Occupational Health (SOH) requirements, as well as any additional specific requirements invoked by the contract.
These requirements are listed in, but not limited to: (1) DoD Instruction 6055.1, "DoD Occupational Safety and
Health Program," (2) Army Regulation 385–10, "The Army Safety Program," (3) Department of the Army Pamphlet
385–10, "Army Safety Program," (4) Occupational Safety and Health Administration, General Industry Standards, CFR 1910, (5) Occupational Safety and Health Administration, Construction Standards, CFR 1926, (6) U.S. Army
Corps of Engineers Safety and Health Requirements Manual, EM 385–1–1, (7) Local Installation Safety and Health
Regulations.
c. Army contractors will be required to have a Safety and Occupational Health Program implemented that is tailored to meet the safety requirements of each contract and the associated tasks and products of that contract. This program will be documented in the contractor’s safety plan.
d. Contract activities will be conducted in a safe and healthful manner that minimizes accidents as well as impacts on Army operations and members of the public.
e. Contractors are responsible for the safety and health of their employees and protection of the public at contractor plants and work sites.
4. Automated Information Systems (AIS) Access:
a. The contractor will ensure that all automation systems are operated, used, maintained and disposed of IAW AR
380-5, AR 380-67, AR 25-1, DOD Directives 5200.1, 5200.1-R, 5200-40, and 5200-40M, and all other RIA and higher headquarters regulations.
b. Government Computer Access. The contractor will be responsible for the following items for personnel accessing government systems:
- No contractor computer accessing a government system will be allowed to access a non-government system through any means.
- The contractor will support compliance with all Information Assurance Vulnerability Alerts (IAVA), Information Assurance Vulnerability Bulletins, and Tech. Tips.
- The contractor will ensure that all computers and devices are accredited prior to connection to any government network.
- The contractor will report information assurance (computer) incidents immediately to their Information
Assurance Support Officer.
- The contractor will ensure that only approved virus detection software is installed on computers.
- The contractor will scan all media utilizing approved virus detection software before it is introduced into computers.
- Contractors will ensure that individuals accessing government computer systems sign and comply with the
Acceptable Use Policy (AUP) and complete initial and annual information assurance awareness training.
- The contractor will not process classified data on computers that are not accredited for classified processing.
- The contractor will not share personally assigned accounts, passwords, or PINs with anyone.
- The contractor will use Command Access Card (CAC) as the primary system access credential.
- The contractor will not allow anyone else to operate the computer while they are logged on.
- The contractor will not use unapproved accounts (such as Hotmail or Yahoo mail) for official army business.
The use of a commercial Internet Service Provider (ISP) or email accounts for official purposes is prohibited.
- The contractor will not install their personally owned software, Shareware, Freeware, Public Domain or software downloaded from the INTERNET on a government system.
- The contractor will not be simultaneously connected to a local area network and an active dial-up modem.
- The contractor will not be allowed remote management capabilities in the defense perimeter of the RIA.
5. PARKING:
a. Parking is on a first-come, first served basis, provided the parking space is not posted with a reserved, visitor or handicapped parking sign. Parking is allowed in “marked” spaces only. At no time will a contractor park within
40 feet of an inhabited building. Violator’s vehicle may be subject to ticket, or towed at contractor expense.
b. All valid spaces are clearly marked with white lines on both sides of the parking space. Vehicles parked in other than valid spaces are subject to being issued a parking ticket.
6. SMOKING POLICY: All contractor personnel must comply with local smoking policy. See COR for local policy.
7. GOVERNMENT INSPECTIONS AND INVESTIGATIONS: The government reserves the right to conduct announced or unannounced inspections and investigations at any time, pertaining to government information, equipment and/or facilities. This includes, but is not limited to, security, safety, fire prevention, and environmental inspections. The contractor shall cooperate with government officials in the conduct of all investigations.
8. REMOVAL OF CONTRACTOR OR GOVERMENT-FURNISHED PROPERTY: The following procedures are prescribed for the issuance of passes for removing contractor owned material and equipment which has been brought onto the Rock Island Arsenal by authorized contractors for use in accomplishing work under a contract, or government-furnished property which, under the terms of a contract, may properly be removed by the contractor.
a. It will be the responsibility of the contracting officer, or designated inspector, to determine that property being removed by a contractor is property of the contractor, or government-furnished property being removed under the terms of the applicable contract. In case government-furnished property is involved, it will be the responsibility of the individuals designated above to insure that all accounting papers prescribed by the contract or other regulations have been completed before the contractor is permitted to remove the property.
b. All contractor owned property will be labeled with the contractor’s name for quick identification.
9. EQUAL EMPLOYMENT OPPORTUNITY (EEO) SERVICES: EEO does not service contractors. However, if a government employee allegedly discriminates against a contractor employee, the RIA Garrison EEO office should be contacted.
52.0000-4036 REQUIRED INSURANCE
Dec 2010
Pursuant to paragraph (a) of FAR Clause 52.228-5, ”Insurance – Work on a Government Installation”, or
FAR Clause 52.228-7, “Insurance – Liability to Third Persons”, the Contractor shall procure and maintain the following insurance during the entire period of performance under this contract:
TYPE AMOUNT
Worker’s Compensation As required by Law
Employer’s Liability Minimum liability limit $100,000
General Liability Minimum bodily injury limits, $500,000 per occurrence
Automobile Liability Minimum liability of $200,000 per person, $500,000 per occurrence for bodily injury, and
$20,000 per occurrence for property damage
Aircraft Public and Passenger Coverage required when contract performance
Liability involves use of aircraft:
Minimum liability of $200,000 per person, $500,000 per occurrence for bodily injury, other than passenger liability, and $200,000 per occurrence for property damage. Passenger liability shall be at least $200,000 multiplied by the number of seats or number of passengers, whichever is greater.
Vessel Collision Liability Coverage required when contract performance involves use of vessels:
Minimum liability of $5,000,000 or the market value of the property being shipped by vessel, whichever is greater
52.0000-4834 AMC-LEVEL PROTEST PROGRAM
(LS7000) Jan 2016
If you have complaints about this procurement, it is preferable that you first attempt to resolve those concerns with the responsible Contracting Officer. However, you can also protest to Headquarters, AMC. The HQ, AMC-Level
Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an
Alternative Dispute Resolution forum, rather than filing a protest with General Accounting Office or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. To be timely, protests must be filed within the periods specified in FAR 33.103.
Send protests (other than protests to the Contracting Officer) to:
Headquarters U.S. Army Materiel Command
Office of Command Counsel-Deputy Command Counsel
4400 Martin Road
Rm: A6SE040.001
Redstone Arsenal, AL 35898-5000
Fax: (256) 450-8840 e-mail: usarmy.redstone.usamc.mbx.protests@mail.mil
The AMC-level protest procedures are found at:
http://www.amc.army.mil/amc/commandcounsel.html
If Internet access is not available, contact the Contracting Officer or HQ, AMC Office of Command Counsel to obtain the AMC-Level Protest Procedures.
(End of provision)
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 20% of the bid price or $3,000,000.00, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.232-18 AVAILABILITY OF FUNDS (APR 1984)
Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting
Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
Section 00 45 00 - Representations and Certifications
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2016
52.204-13 System for Award Management Maintenance OCT 2016
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of
Terrorism
OCT 2015
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2017)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238290.
(2) The small business size standard is $15,000,000.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
( ) Paragraph (d) applies.
( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or
Statements--Representation. This provision applies to all solicitations.
(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at
52.204-7, System for Award Management.
(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(vi) 52.209-2; Prohibition on Contracting with Inverted Domestic Corporations--Representation.
(vii) 52.209-5; Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(viii) 52.209-11, Representation by Corporations Regarding elinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.
(ix) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(x) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(xi) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(xii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.
(xiii) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xiv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xv) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.
(xvi) 52.222-57, Representation Regarding Compliance with Labor Laws (Executive Order 13673). This provision applies to solicitations expected to exceed $50 million which are issued from October 25, 2016 through April 24, 2017, and solicitations expected to exceed $500,000, which are issued after April 24, 2017.
Note to paragraph (c)(1)(xvi): By a court order issued on October 24, 2016, 52.222-57 is enjoined indefinitely as of the date of the order. The enjoined paragraph will become effective immediately if the court terminates the injunction. At that time, DoD, GSA, and NASA will publish a document in the Federal
Register advising the public of the termination of the injunction.
(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased
Products Under Service and Construction Contracts.
(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.
(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals--Representation. This provision applies to solicitations that include the clause at 52.204-7.)
(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.
(xxi) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and
III.) This provision applies to solicitations containing the clause at 52.225- 3.
(A) If the acquisition value is less than $25,000, the basic provision applies.
(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.
(C) If the acquisition value is $50,000 or more but is less than $77,533, the provision with its Alternate II applies.
(D) If the acquisition value is $77,533 or more but is less than $100,000, the provision with its Alternate III applies.
(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at
52.225-5.
(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.
(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.
(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.
(2) The following representations or certifications are applicable as indicated by the Contracting Officer:
(i) 52.204-17, Ownership or Control of Offeror.
(ii) 52.204-20, Predecessor of Offeror.
(iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.
(iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for
Maintenance, Calibration, or Repair of Certain Equipment--Certification.
(v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for
Certain Services--Certification.
(vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA-
Designated Products (Alternate I only).
(vii) 52.227-6, Royalty Information.
(A) Basic.
(B) Alternate I.
(viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.
(d) The offeror has completed the annual representations and certifications electronically via the SAM website accessed through https://www.acquisition.gov. After reviewing the SAM database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR Clause Title Date Change
Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.
https://www.acquisition.gov/
Section 00 70 00 - Conditions of the Contract
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions NOV 2013
52.203-3 Gratuities APR 1984
52.203-5 Covenant Against Contingent Fees MAY 2014
52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006
52.203-7 Anti-Kickback Procedures MAY 2014
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014
52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.204-2 Alt II Security Requirements (Aug 1996) - Alternate II APR 1984
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011
52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
OCT 2016
52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for
Debarment
OCT 2015
52.209-7 Information Regarding Responsibility Matters JUL 2013
52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters
JUL 2013
52.209-10 Prohibition on Contracting With Inverted Domestic
Corporations
NOV 2015
52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017
52.215-2 Audit and Records--Negotiation OCT 2010
52.215-8 Order of Precedence--Uniform Contract Format OCT 1997
52.222-3 Convict Labor JUN 2003
52.222-4 Contract Work Hours and Safety Standards- Overtime
Compensation
MAY 2014
52.222-6 Construction Wage Rate Requirements MAY 2014
52.222-7 Withholding of Funds MAY 2014
52.222-8 Payrolls and Basic Records MAY 2014
52.222-9 Apprentices and Trainees JUL 2005
52.222-10 Compliance with Copeland Act Requirements FEB 1988
52.222-11 Subcontracts (Labor Standards) MAY 2014
52.222-12 Contract Termination-Debarment MAY 2014
52.222-13 Compliance With Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988
52.222-15 Certification of Eligibility MAY 2014
52.222-21 Prohibition Of Segregated Facilities APR 2015
52.222-22 Previous Contracts And Compliance Reports FEB 1999
52.222-26 Equal Opportunity SEP 2016
52.222-27 Affirmative Action Compliance Requirements for
Construction
APR 2015
52.222-35 Equal Opportunity for Veterans OCT 2015
52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014
52.222-37 Employment Reports on Veterans FEB 2016
52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-50 Combating Trafficking in Persons MAR 2015
52.222-54 Employment Eligibility Verification OCT 2015
52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017
52.223-4 Recovered Material Certification MAY 2008
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011
52.223-6 Drug-Free Workplace MAY 2001
52.223-11 Ozone-Depleting Substances and High Global Warming
Potential Hydrofluorocarbons.
JUN 2016
52.223-15 Energy Efficiency in Energy-Consuming Products DEC 2007
52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
MAY 2008
52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
AUG 2011
52.223-22 Public Disclosure of Greenhouse Gas Emissions and
Reduction Goals -- Representation.
DEC 2016
52.225-9 Buy American--Construction Materials MAY 2014
52.225-10 Notice of Buy American Requirement--Construction
Materials
MAY 2014
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008
52.227-1 Authorization and Consent DEC 2007
52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
DEC 2007
52.227-4 Patent Indemnity-Construction Contracts DEC 2007
52.228-2 Additional Bond Security OCT 1997
52.228-11 Pledges Of Assets JAN 2012
52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014
52.228-14 Irrevocable Letter of Credit NOV 2014
52.228-15 Performance and Payment Bonds--Construction OCT 2010
52.229-3 Federal, State And Local Taxes FEB 2013
52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014
52.232-17 Interest MAY 2014
52.232-23 Assignment Of Claims MAY 2014
52.232-27 Prompt Payment for Construction Contracts JAN 2017
52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-1 Disputes MAY 2014
52.233-3 Protest After Award AUG 1996
52.233-4 Applicable Law for Breach of Contract Claim OCT 2004
52.236-2 Differing Site Conditions APR 1984
52.236-3 Site Investigation and Conditions Affecting the Work APR 1984
52.236-4 Physical Data APR 1984
52.236-5 Material and Workmanship APR 1984
52.236-6 Superintendence by the Contractor APR 1984
52.236-7 Permits and Responsibilities NOV 1991
52.236-8 Other Contracts APR 1984
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984
52.236-11 Use and Possession Prior to Completion APR 1984
52.236-12 Cleaning Up APR 1984
52.236-13 Accident Prevention NOV 1991
52.236-14 Availability and Use of Utility Services APR 1984
52.236-15 Schedules for Construction Contracts APR 1984
52.236-16 Quantity Surveys APR 1984
52.236-17 Layout of Work APR 1984
52.236-28 Preparation of Proposals--Construction OCT 1997
52.242-13 Bankruptcy JUL 1995
52.242-14 Suspension of Work APR 1984
52.243-1 Changes--Fixed Price AUG 1987
52.244-6 Subcontracts for Commercial Items JAN 2017
52.246-12 Inspection of Construction AUG 1996
52.246-21 Warranty of Construction MAR 1994
52.248-3 Value Engineering-Construction OCT 2015
52.249-2 Alt I Termination for Convenience of the Government (Fixed-
Price) (Apr 2012) - Alternate I
SEP 1996
52.249-10 Default (Fixed-Price Construction) APR 1984
52.253-1 Computer Generated Forms JAN 1991
252.201-7000 Contracting Officer's Representative DEC 1991
252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-
Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013
252.204-7003 Control Of Government Personnel Work Product APR 1992
252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.225-7001 Buy American And Balance Of Payments Program-- Basic
(Dec 2016)
DEC 2016
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006
252.236-7000 Modification Proposals-Price Breakdown DEC 1991
252.236-7008 Contract Prices-Bidding Schedules DEC 1991
252.243-7001 Pricing Of Contract Modifications DEC 1991
252.247-7023 Transportation of Supplies by Sea APR 2014
252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000
52.0000-4037 U.S. DEPARTMENT OF LABOR WAGE DETERMINATIONS (MAY 1993)
ONLY THOSE ITEMS MARKED WITH AN 'X' APPLY:
[ ] (a) The following United States Department of Labor Wage Rates Decision Number is applicable to this procurement:
[X] (b) Wage determinations of the Secretary of Labor are attached.
[] (c) Wage determinations are not attached:
[] are not applicable to this solicitation.
[] are pending decision by Department of Labor and may be added by amendment.
52.0000-4919 CONTRACTOR PERFORMANCE INFORMATION (DEC 2005)
The successful offeror/bidder under this solicitation is advised that after contract award its performance under this contract will be subject to an assessment(s) in accordance with FAR 42.15 and AFARS 5142.1503-90. The
Department of Defense (DoD) Contractors Performance Assessment Reporting System (CPARS) will be used to maintain the performance report(s) generated on this contract. The rating system to be used in this assessment shall be as follows:
Exceptional (Dark Blue) – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good (Purple) – Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory (Green) – Performance meets contractual requirements. The contractual performance of the element or sub element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal (Yellow) – Performance does not meet some contractual requirements. The contractual performance of the element or sub element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory (Red) – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
The evaluation procedures to be used in this assessment, which include coordination with the contractor, are detailed in AFARS 5142.1503-90.
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 14 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for…