THIS IS THE OFFICIAL SOLICITATION FOR W52P1J-15-R-0030
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W52P1J15R0030-0002.pdf | ||
| 12-2-2015-QUESTIONS_AND_ANSWERS_-_COMBINED_-_RFP_-_W52P1J-15-R-0030_-_9MM_Dummy_Drilled_and_Inert_(DDI)_Additional_Questions.pdf | ||
| W52P1J15R0030-0001.pdf | ||
| Attachment_0005_-_ADDRESS_CODE_DISTRIBUTION_FOR_ECP-RFD-RFV-VECP.pdf | ||
| Attachment_0002_-_Past_Performance_Questionnaire.pdf | ||
| Attachment_0001_-_9mm_DDI_Round_Price_Evaluation_Matrix.xlsx | XLSX spreadsheet | |
| Attachment_0006_-_GUIDANCE_ON_DOCUMENTATION_OF_CONTRACT_REQUIREMENTS_LIST_(CDRL).pdf | ||
| Attachment_0003_-_OPSEC_PLAN.pdf | ||
| EXHIBIT_A_-_CDRLs.pdf | ||
| Attachment_0004_-_ADDRESS.pdf | ||
| Attachment_0007_-_INSTRUCTIONS_FOR_COMPLETING_DD_FORM_1423.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W52P1J-15-R-0030 X
2015NOV04
2015DEC0704:00pm
DOA6
2015NOV04 SEE SCHEDULE
W52P1J
ARMY CONTRACTING COMMAND - RI
ROCK ISLAND, IL 61299-8000
BLDGS 60 & 62
GREGORY L. RICE
(309)782-4942
CCRC-AF
GREGORY.L.RICE10.CIV@MAIL.MIL
1 81
X 1
X 4 X 6
X 11 X 12 X 27
X 34
X 36
X 39
X 63
X 64
X 69
X 78
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: GREGORY L. RICE
Buyer Office Symbol/Telephone Number: CCRC-AF/(309)782-4942
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
EXECUTIVE SUMMARY:
1. THIS SOLICITATION W52P1J-15-R-0030 IS ISSUED ON A FULL AND OPEN BASIS, AND WILL RESULT IN A SINGLE FIRM FIXED PRICE CONTRACT AWARD OF
THE FOLLOWING:
QUANTITY: 250,000 EACH_________
ITEM: DODIC AB45 - 9MM M917A1 DUMMY, DRILLED, & INERT (DDI)CARTRIDGES_____
NSN: 1305-01-568-5691____
2. THE BASE QUANTITY IS 250,000. THERE IS AN EVALUATED OPTION QUANTITY OF 650,000 BUT THE GOVERNMENT HAS NO OBLIGATION TO EXERCISE ANY
OPTION QUANTITY.
3. THE OPTION QUANTITY OF 200,000, IF EXERCISED MAY BE EXERCISED FROM THE DATE OF AWARD THROUGH 365 DAYS AFTER AWARD (DAA). THE OPTION
QUANTITY OF 450,000, IF EXERCISED MAY BE EXERCISED FROM DATE OF AWARD THROUGH 730 DAA.
4. THIS AWARD WILL USE A LOW PRICE TECHNICALLY ACCEPTABLE (LPTA) APPROACH. AWARD WILL BE MADE TO THE OFFEROR WHOSE PROPOSAL IS THE
LOWEST EVALUATED PRICE WHICH MEETS OR EXCEEDS THE ACCEPTABILITY STANDARDS FOR NON-COST FACTORS. THERE ARE THREE EVALUATION FACTORS: 1)
TECHNICAL, 2) PAST PERFORMANCE, AND 3) PRICE. THE TECHNICAL FACTOR CONSISTS OF THE FOLLOWING TWO SUB-FACTORS: 1) TECHNICAL APPROACH /
MANUFACTURING PLAN; (2) QUALITY SYSTEM. IT IS THE OFFEROR'S RESPONSIBILITY TO PROVIDE COMPLETE AND COMPREHENSIVE RESPONSES TO EACH
FACTOR AND SUB-FACTOR. PROPOSALS WHICH DO NOT CONTAIN THE INFORMATION REQUESTED RISK REJECTION BY THE GOVERNMENT. THE GOVERNMENT
RESERVES THE RIGHT TO AWARD WITHOUT DISCUSSIONS; CONSEQUENTLY, IT IS THE OFFEROR'S RESPONSIBILITY TO SUBMIT A PROPOSAL THAT CONFORMS TO
ALL OF THE TERMS AND CONDITIONS OF THE SOLICITATION AND THIS SECTION AND CONTAINS THE OFFEROR'S BEST OFFER. PLEASE SEE SECTION L, PROPOSAL INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS. PLEASE SEE SECTION M, EVALUATION FACTORS FOR AWARD.
5. FIRST ARTICLE ACCEPTANCE TESTING (FAAT) AND SUBMISSION OF THE REPORT IS REQUIRED FOR THIS AMMUNITION.
6. OFFERORS ARE REQUIRED TO COMPLETE AND SUBMIT THE "PRICING EVALUATION MATRIX" AT ATTACHMENT 0001. PLEASE PROVIDE PRICES FOR ALL
OPTIONS, AND ALL RANGES, INCLUDING THE BREAKOUT OF FIRST ARTICLE TESTS/REPORTS. PROPOSALS OFFERING PRICES FOR QUANTITIES OR RANGES OTHER
THAN THOSE SOLICITED, OR NOT FILLED OUT COMPLETELY WILL NOT BE CONSIDERED.
7. DELIVERY PRODUCTION RATES SHALL BE AS FOLLOWS:
AWARDED WITH FIRST ARTICLE ACCEPTANCE TESTING (FAAT)
CONTRACTOR SUBMITS FAAT PLAN - 60 DAA
GOVERNMENT APPROVES FAAT PLAN - 90 DAA
CONTRACTOR SUBMITS FAAT REPORT - 150 DAA
GOVERNMENT APPROVES FAAT REPORT - 180 DAA
INITIAL DELIVERIES - 210 DAA
COMPLETION OF DELIVERIES - 540 DAA
AWARDED WITHOUT FAAT
INITIAL DELIVERIES - 90 DAA
COMPLETION OF DELIVERIES - 420 DAA
ONCE INITIAL DELIVERIES COMMENCE, THE GOVERNMENT WILL REQUIRE MONTHLY DELIVERIES.
8. INSPECTION/ACCEPTANCE/FOB POINT FOR PRODUCTION SHALL BE SOURCE/SOURCE/DESIGNATION- FOR CONUS AND OCONUS SOURCES
FOB POINT WILL BE DESTINATION. THEREFORE COSTS FOR SHIPPING SHALL BE REFLECTED IN THE UNIT PRICES.
9. SEE SECTION C FOR INSTRUCTIONS ON OBTAINING THE TECHNICAL DATA PACKAGE FOR THIS SOLICITATION.
2 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
10. A SMALL BUSINESS SUBCONTRACTING PLAN IS REQUIRED AT THE TIME OF PROPOSAL SUBMISSION (REFERENCE SECTION I) FROM LARGE BUSINESSES
ONLY. THE ELECTRONIC SUBCONTRACTING REPORTING SYSTEM (ESRS) MUST BE USED FOR ALL APPLICABLE SUBCONTRACTING REPORTING PERIODS. TRAINING
IS AVAILABLE ON THE ESRS WEBSITE, http://www.esrs.gov.
11. TELECONFERENCE: _______________
TELECONFERENCES: TELECONFERENCES SHALL BE CONDUCTED BY THE GOVERNMENT INTEGRATED PRODUCT TEAM (IPT), CONSISTING OF GOVERNMENT AND PRIME
CONTRACTOR PERSONNEL. THESE TELECONFERENCES WILL BE HELD AT MUTUALLY AGREED TO TIMES OR AT THE DISCRETION OF THE CONTRACTING OFFICER.
THEIR PURPOSE IS TO ENSURE THAT PERTINENT PROGRAM ISSUES ARE ADDRESSED IN A TIMELY MANNER. THE 9MM DDI CARTRIDGE IPT SHALL UTILIZE A
CONFERENCE CALL PHONE LINE (NOT A TOLL-FREE TELEPHONE NUMBER) PROVIDED BY THE GOVERNMENT.
12. PLEASE PROVIDE THE FOLLOWING INFORMATION WITH YOUR PROPOSAL:
CAGE CODE: __________________
DUNS NUMBER:__________________
TAX ID:_______________________
POINT OF CONTACT: ___________________________
PHONE #:_____________________________________
FAX #:_______________________________________
PROPOSAL SUBMITTED ON THIS SOLICITATION SHALL REMAIN VALID FOR 90 DAYS
13. POINT OF CONTACT FOR THIS SOLICITATION IS GREGORY RICE, PHONE 309-782-4942, EMAIL, GREGORY.L.RICE10.CIV@MAIL.MIL.
*** END OF NARRATIVE A0002 ***
3 81
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 DATA ITEM _________
NOUN: First Article Acceptance Test Report
CLIN: 0001
DODIC: AB45
NSN: 1305-01-568-5691
Nomenclature: 9MM DDI, M917A1
*** Do Not enter unit prices in this section. All pricing shall be submitted in the Attachment 0001, Price Evaluation Matrix. ***
Delivery schedule:__________________
FAATR
Due 150 DAA
Inspection and Acceptance:__________________________
FAAT Report:
Inspection/Acceptance/FOB Point:
S/D/D
(End of narrative A001)
0002 PRODUCTION QUANTITY ___________________
NOUN: 9MM DDI, M917A1
CLIN: 0002
DODIC: AB45
NSN: 1305-01-568-5691
NOMENCLATURE: 9MM DDI, M917A1
*** Do Not enter unit prices in this section. All pricing shall be submitted in the Attachment 0001, Price Evaluation Matrix. ***
This contract includes a Base quantity and the
Evaluated option for increased quantity IAW FAR
52.217-4080.
Delivery Schedule:__________________
Production w/FAAT:
Initial Deliveries due: 210 DAA
Final Deliveries due: 540 DAA
Production w/o FAAT:
Initial Deliveries due: 90 DAA
Final Deliveries due: 420 DAA
Inspection and Acceptance / FOB Point:______________________________________
4 81
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
S/S/D
(End of narrative A001)
0003 DATA ITEM _________
NOUN: Contract Data Requirements List (CDRL)
The data required by the DD 1423, Contract Data
Requirements List (CDRL) will be delivered per the distribution list on the attached CDRL.
Inspection and Acceptance_________________________
See Contract Data Requirements List (CDRL) EXHIBIT A
(End of narrative A001)
5 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
C-1 52.210-4501 DRAWINGS/SPECIFICATIONS APR/2012
(ACC-RI)
(a) In addition to the drawing(s) and/or specifications listed below, other documents which are part of this procurement and which apply to Preservation/Packaging/Packing and Inspection and Acceptance are contained elsewhere.
(b) Drawings and Specifications for the (DODIC AB45) 9mm DDI Round in accordance with Technical Data Package Listing
13023601:19200, with revisions in effect as of January 20, 2015, are applicable to this procurement.
(c) Technical Data Packages, including any exceptions thereto, will be obtained electronically in accordance with the clause titled "Technical Data Package Information and Distribution and Destruction of Restricted Technical Data" in Section C of this document.
(End of statement of work)
(CS6100)
C-2 52.211-4502 TECHNICAL DATA PACKAGE INFORMATION, AND DISTRIBUTION AND DESTRUCTION NOV/2012
(ACC-RI) OF RESTRICTED TECHNICAL DATA
(a) Army Contracting Command - Rock Island (ACC-RI) will no longer make Technical Data Packages (TDPs) available for order via CD-ROMS.
TDPs will be obtained electronically via the link(s) below which will direct you to the Federal Business Opportunities (FBO) website.
You must have an FBO account prior to accessing any TDP(s). To register for an account in FBO, please visit http://www.fbo.gov/index and click on Register Now under Vendors/Citizens. The toll free FBO helpdesk phone number is (866) 606-8220 and for international (334) 206-
7828. Vendors are responsible for placing correct information in FBO.
(b) You may need to use special software to view the documents that we post to the FBO. This viewing software is freeware, available for download at no cost from commercial websites like Microsoft and Adobe. Additionally, some TDPs may require Lucent Viewer to view the
TDP(s) which is available as freeware at: http://www.ec-edi.com/.
(c) The TDP(s) for this solicitation will be accessible via the FBO website (as described below) from the date of issue through the time specified in the solicitation for receipt of offers.
(d) FOR UNRESTRICTED TDPs:
(1) TDPs for this solicitation are unrestricted and can be accessed electronically via the FBO website. The URL will take you to that
CLINs web-located TDP. You must have an FBO account prior accessing the TDP.
(2) To access the TDP(s), click directly on the link provided below to be directed to the TDP. You may also copy and paste the link into your browser and hit the Enter key. You will be prompted for your FBO username and password prior to gaining access to the TDP.
CLIN: 0002
TDP Link (URL): https://www.fbo.gov/fedteds/W52P1J15R0030
(e) FOR RESTRICTED TDPs:
TDPs and any other related documents, if applicable, for this solicitation are restricted and can be accessed electronically via the FBO website, with valid contractor login credentials. TDPs and any other related documents are posted with various options, such as
Restricted and Export Control. These additional controls are described below:
(1) Access to RESTRICTED TDPs
Technical Data Packages that have been marked as 'Restricted' can be accessed electronically via the FBO website, with valid contractor login credentials. TDPs that have been marked as 'Restricted' will require approval from the Contracting Officer prior to gaining access to the requested information. To request access click on the link(s) provided below, log in to FBO, click on the packages sub-tab and then click on the request explicit access button. Completion of a Use and Non-Disclosure Agreement may be required prior to gaining access to the TDP. Please allow 2-3 working days to process your request. You will receive a system generated email from FBO stating you have been granted permission for viewing or downloading the TDP items.
(2) Access to EXPORT CONTROL TDPs
6 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(i) TDPs that have been marked as 'Export Control' can be accessed electronically via the FBO website, with valid contractor login credentials. In addition, to obtain access to these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical
Technical Data Agreement on file with Defense Logistics Information Service (DLIS). If you do not have an approved DD 2345, Militarily
Critical Technical Data Agreement on file with DLIS then you will not be able to access the TDP. To obtain certification, go to http://www.logisticsinformationservice.dla.mil/jcp/, click on documents and follow instructions provided. Processing time is estimated at five working days after receipt.
(ii) TDPs that have been marked as Export Control will require approval from the Contracting Officer prior to gaining access to the requested information. To request access click on the link(s) provided below, log in to FBO, click on the packages sub-tab, enter your
Marketing Partner Identification Number (MPIN) and click on the request explicit access button. The requestor must be the "data custodian" that is listed on the DD 2345. Please allow 2-3 working days to process your request. If the company MPIN changes the user will be required to verify the MPIN again to gain access to Export Control TDP(s). Completion of a Use and Non-Disclosure Agreement may be required prior to gaining access to the TDP. You will receive a system generated email from FBO stating you have been granted permission for viewing or downloading the TDP items.
(iii) If multiple individuals in your company need access to the Export Control TDP for a solicitation, it can be obtained from your data custodian that is listed on the DD 2345.
(iv) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq.
CLIN: N/A
TDP Link (URL): N/A
(3) Further dissemination of Restricted TDPs must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(4) Upon completion of the purposes for which the Restricted technical data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
(f) Questions related to registration in FBO should be directed to http://www.fbo.gov/index. The FBO helpdesk phone number is (866)
606-8820. Vendors are responsible for placing correct information in FBO. A user guide for FBO can be found at http://www.fbo.gov/index - on the right of the screen is User Guides - click on Vendor.
(End of clause)
(CS6102)
C-3 52.225-4502 STATEMENT OF WORK-ENGLISH LANGUAGE DOCUMENTATION FEB/1992
(ACC-RI)
All contractor prepared material to be furnished under this contract shall be written in the English language.
(End of statement of work)
(CS7103)
C-4 52.246-4535 AMMUNITION DATA CARDS AND REPORT OF CONTRACTOR BALLISTIC TESTING SEP/2014
(ACC-RI)
(a) Ammunition Data Cards shall be prepared in accordance with MIL-STD-1168 and shall follow the format required by the world wide web application identified as WARP or Worldwide Ammunition-data Repository Program. Information provided in paragraphs 6.7 through 6.16 of
MIL-STD-1168 shall be considered mandatory requirements where all instances of the term "should" are considered to be replaced with the word "shall." This shall also include, if required on the DD Form 1423, a Report of Contractor Lot Acceptance/Ballistic Testing and
Acceptance and Description Sheets (for Propellants and Explosives). WARP will reside within the Munitions History Program (MHP).
Additional details on these WARP applications are provided below.
(b) MHP-WARP Access Procedures
(1) Government or Contractor employee with CAC and AKO account:
7 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(a) Click on the MHP hyperlink which is https://mhp.redstone.army.mil/
(b) Enter CAC PIN when prompted
(c) Click on WARP (ADC)
(d) Click on Help
(e) Click on WARP Request Access and follow instructions
(2) Contractor or Government employee without CAC and AKO account: MHP-WARP uses PKI authentication requiring a DoD approved digital certificate as a security measure to protect the integrity of stored data. There are three vendors that have been approved to issue DoD approved certificates per an External Certification Authority (ECA) program. You are required to use one of the approved vendors listed on the following DISA website: http://iase.disa.mil/pki/eca/index.html
A nominal fee is charged for each certificate. The Contractor, including any subcontractors, shall assume the responsibility for all costs of obtaining each digital certificate needed.
(3) After the required certificate is obtained:
(a) Click on the MHP-WARP hyperlink: https://mhpwarp.redstone.army.mil/
(b) Enter ECA password
(c) Click on Help and follow the instructions for obtaining the necessary access
(c) HELP Numbers are as follows:
MHP Access (256)313-2143; DSN 897-2143
JMC Quality Administrators for WARP issues (309)782-2697 or (309)782-7107
(d) Worldwide Ammunition-data Repository Program (WARP)
An online users manual will provide additional help in the development of an ammunition data card. It is recommended that you download and read the users manual prior to inputting your initial data card. The user's manual also contains screen shots, which depict what the inputter will see during the ADC input process.
(e) Ammunition Data Card Input
ADC input allows current contractors and government facilities the capability to create, and submit for approval, ADCs which meet the format requirements of MIL-STD-1168. ADCs are automatically forwarded to the respective Government Agency Responsible for
Acceptance (GARA). The GARA in most cases is the Defense Contract Management Agency (DCMA) Quality Assurance Representative (QAR), who reviews contractor input for accuracy and completeness, and after updating the disposition code for the specific lot, submits the ADC to the database. The inputter is granted access only to ADCs identified with its specific manufacturing code. The use of previously inputted ADCs through the TEMPLATE option significantly reduces input effort, while increasing accuracy and consistency of data.
(f) Email Notification
WARP provides immediate, automated notification to process participants when actions are required. When the contractor has completed an ADC submission, an email message is routed to the GARA advising that an ADC awaits review and approval. If the GARA approves the ADC as submitted, the ADC is released to the base and an email, with approved data card, is routed back to the originator.
If the ADC requires modification or correction to conform with MIL-STD-1168 and contract requirements, an email is provided to the ADC originator advising that corrective action is required prior to approval.
(g) Information Updates
It is important that the System Administrators are apprised when a contractor receives a new contract. The contractor shall notify mailto:usarmy.ria.jmc.mbx.warp@mail.mil within 30 days after receipt of a new contract. Information to be included shall be the contract number, item, GARA, Manufacturer's identification symbol and the names of the individuals who will be inputting ADCs into the system. If you are a new contractor and do not have a Manufacturer's identification symbol, you can obtain one by sending an email to mailto:usarmy.ria.jmc.mbx.warp@mail.mil. The email must contain manufacturer's name, address where performance of the contract will take place, and a point of contact.
(h) Report of Contractor Ballistic/Function Testing Module
(1) In addition to its ADC function, WARP also serves as a repository for reports of contractor ballistic (or functional) testing.
Whenever the contract requires contractor performance of ballistic testing, the results of such testing shall be captured by you, the performing contractor, within a specially designed Lot Acceptance Test Report (LATR) module.
(2) Within the LATR module, you are required to provide a report of any contractor ballistic/function testing and to submit the report in electronic format via the WWW. The report must be a .pdf file for the upload process to work.
8 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(i) Acceptance and Description Sheets (for Propellants and Explosives) Module: The WARP application now contains an area for on-screen data entry capturing requirements per MIL-STD-1171 for Acceptance and Description Sheets with respect to contract specified Propellant, Chemical and Explosive constituents.
(End of clause)
(CS7200)
C-5 52.246-4536 STATEMENT OF WORK - 2-D BAR CODING VERIFICATION DEC/2010
(ACC-RI)
(a) As a logistics measure to improve inventory, accountability, security and control, the supplier is required to provide 2-D
Bar Codes in accordance with MIL-STD-129 and MIL-PRF-61002 and as further detailed in Section D of the contract.
(b) An approval of the supplier's 2-D Bar Code Label is required before each product with a unique national stock number (NSN) or federally recognized number (FRN) shall be presented for acceptance to the Government Quality Assurance Representative.
Prior to formal submission of product to the Government for acceptance, a first time sample of the supplier's initial 2-D Bar
Coding Label, comprising of two (2) each of the exterior pack label and two (2) each of the pallet label, shall be submitted for approval to HQ, US Army Joint Munitions Command, 1 Rock Island Arsenal, ATTN: AMSJM-QAP, Rock Island, IL 61299-6500 to be read by a High Performance Bar Code Verification system.
(c) Within fifteen calendar days, the supplier will be notified electronically of the approval, conditional approval, or disapproval of the submitted 2-D Bar Code Label. A notice of conditional approval shall state any further actions required of the supplier. A notice of disapproval shall cite reasons for the disapproval.
(d) Once approval of the 2-D Bar Code Label is received, the supplier may begin presenting product to the Government for acceptance.
(e) During life cycle management of the product, the Government may randomly perform checks of the integrity and conformity of the 2-D Bar Code labeling that is affixed to the supplier's product.
(f) The supplier is responsible for all costs associated with correcting 2-D Bar Code labels that do not meet contractual requirements.
(End of statement of work)
(CS7300)
C-6 52.248-4502 CONFIGURATION MANAGEMENT DOCUMENTATION AUG/2015
(ACC-RI)
(a) The contractor may submit Engineering Change Proposals (ECPs) and Requests for Variance (RFVs) for the requirements in the
Government provided Technical Data Package (TDP). The contractor shall prepare and submit ECPs, Notices of Revision (NORs), and RFVs as required by the accompanying DD Form 1423, Contract Data Requirements List (CDRL). If a Value Engineering Change Proposal (VECP) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.
(1) ECPs - The contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all NORs necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The contractor shall not present any production items for acceptance incorporating any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.
(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR (or equivalent) shall be submitted to completely describe the desired change on each affected document.
(ii) All ECPs submitted by the contractor will be routine priority unless otherwise justified. If the contractor considers the ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.
(2) RFVs - The contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or post-production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The contractor shall not present any production items for acceptance with any nonconformance to the requirements
9 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.
(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.
(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).
(End of clause)
10 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
D-1 52.211-4508 PACKAGING REQUIREMENTS JUL/1997
(ACC-RI)
(a) Packaging shall be in accordance with 9396206, Revision AD, dated 26 FEB 2014.
(b) When lot numbering is required, no more than one lot shall be packaged in an outer shipping container.
(c) Marking shall be in accordance with 9396206, Revision AD, Dated 26 FEB 2014. 2-D Barcodes are required in accordance with 12999545, Revision G, Dated 19 August 2013.
EXCEPTION: The following shall apply to drawing 9396206, Revision AD, dated 26 FEB 2014: DI-PACK-81059 is NOT required for this contract.
HEAT TREAT WOOD QUALITY MARKING: "In accordance with the requirements of the International Standards for Phytosanitary Measures (ISPM)
15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM shall be constructed from heat treated (treated to 56 degrees Celsius -core temperature- for 30 minutes) lumber and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement
Regulations (see URL: http://www.alsc.org). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment Marking. Each box/pallet shall be marked to show the conformance to the
International Plant Protection Convention Standard. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the stringer or block on diagonally opposite sides or ends of the pallet and be contrasting and clearly visible. All dunnage lumber used in configuring and/or securing the load shall also comply with ISPM-15 and be marked with an ALSC approved dunnage stamp on opposite surfaces. Foreign manufacturers shall have the heat treatment and marking of non-manufactured wood products verified in accordance with the ISPM-15 compliance program.
(End of clause)
(DS6303)
D-2 52.247-4517 PALLETIZATION INSTRUCTION MAR/1992
(ACC-RI)
Palletization shall be in accordance with 19-48-4116/10B, revision 4, dated May 2012. 19-48-4116, Revision 12, dated DEC 2011, applies. This drawing is the basic palletization drawing called out in this contract.
Marking shall be in accordance with ACV00561, Revision F, dated 02 DEC 2008. WPM shall be in accordance with ACV00831, dated 01
MAR 2010. 2-D barcodes are required.
(End of clause)
(DS6204)
D-3 52.247-4521 COMMERCIAL UNITIZATION/PALLETIZATION MAY/2015
(ACC-RI)
(a) Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of
50 cubic feet or more, unless skids or other forklift handling features are included in the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease in stacking.
(b) A palletized load shall not exceed 4,000 pounds and should not exceed 52 inches in length or width, or 54 inches in height.
When the item being palletized is ammunition/explosive, at least one of the horizontal dimensions must be less than 47 inches.
When level A packaging is required, a four-way entry pallet or pallet box, shall be used. All pallet loads shall contain the load in a manner that will permit safe, multiple rehandling during storage and shipment
(End of clause)
(DS7203)
11 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/VFFARA.HTM or http://farsite.hill.af.mil/VFDFARA.HTM or http://farsite.hill.af.mil/VFAFARa.HTM
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-3 52.209-4512 FIRST ARTICLE TEST (CONTRACTOR TESTING) NOV/2011
(ACC-RI)
(a) The first article shall consist of:
IAW MIL-DTL-3498C (Amendment 3) which shall be examined and tested in accordance with contract requirements, the item specifications, Quality Assurance
Provisions (QAPS) and all drawings listed in the Technical Data Package.
(b) The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package provided by the Government.
(c) The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAP(s), and specification(s) referenced thereon, except for:
(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.
(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.
(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the First Article Test Report.
(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the First Article Test Report.
(5) Onetime qualification tests, which are defined as a onetime on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.
(d) Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.
(e) A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests
(including supplier's and Vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The Government Quality Assurance Representative's (QAR) findings shall be documented on DD Form 1222, Request for and Results of Tests, and attached to the contractor's test report.
Two copies of the First Article Test Report and the DD Form 1222 will be submitted through the Administrative Contracting
Officer to the Contracting Officer with an additional information copy furnished to AMSJM-SOS .
(f) Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may
12 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) Whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the first article testing resulting from production process change, change in the place of performance, or material substitution shall be borne by the Contractor.
(End of clause)
(ES6031)
E-4 52.246-4018 MEASUREMENT SYSTEM EVALUATION (MSE) APR/2014
(ACC-RI)
(a) Definitions. This paragraph defines specific terms utilized throughout the rest of the clause and in the accompanying Contract Data
Requirements List (CDRL) and Data Item Description (DID) (DI-QCIC-81960). This aids in clarifying the MSE requirements to Government and contractor personnel.
(1) Acceptance Inspection Equipment (AIE). All equipment (includes AAIE defined below), special and standard, including dimensional gages, measuring equipment, test fixtures, electronic and physical test equipment, and other test equipment used for examination and test of a product to determine conformance to the Technical Data Package (TDP) which may include drawings and specifications (e.g., Detail, Performance, Weapon specifications, and QAPs).
(2) Automated Acceptance Inspection Equipment (AAIE). AIE in which the inspection and acceptance determination of the product is performed, in whole or in part, in an automatic manner.
(3) Contractor Inspection Equipment. Government-approved equipment utilized by the contractor to perform examination and tests to assure conformance to contract requirements.
(4) Commercial Inspection Equipment. Industry-developed inspection equipment of universal application, without limitations to a specific part or item, which is advertised or cataloged as available to the trade or to the public on an unrestricted basis at an established price. Examples follow:
(i) Standard Test Equipment. Multiusage equipment that is specific to a function rather than to an item. It includes such items as hardness testers, tensile strength testers, meters, weighing devices, standard gear testers, ohmmeters, voltmeters, and oscilloscopes.
(ii) Standard Measuring Equipment (SME). Multipurpose equipment and standards used for performing measurements. It includes such items as micrometers, rulers, tapes, height gages, and protractors, etc. Standards include visual inspection equipment such as scratch and dig standards, surface finish comparator, color standards (FED-STD-595), etc.
(5) Nondestructive Testing. The development and application of technical methods to examine materials or components in ways that do not impair future usefulness and serviceability in order to detect, locate, measure and evaluate flaws; to assess integrity, properties and composition; and to measure geometrical characteristics. NDT includes Radiography/Radioscopic, Ultrasonic, Eddy Current, Magnetic
Particle, and Liquid Penetrant.
(6) Measurement System Analysis (MSA). Per ASTM E2782 (Standard Guide for MSA), paragraph 3.1.7, MSA is any of a number of specialized methods useful for studying a measurement system and its properties.
(b) Scope. This clause establishes requirements for design, supply, performance, and maintenance of AIE used for product inspection and acceptance. In addition, this clause establishes requirements for the preparation, submission, and approval of AIE documentation.
(c) AIE. The contractor shall provide all AIE necessary to ensure conformance of components and end-items to contract requirements. AIE shall include inspection, measuring, and test equipment whether Government furnished or contractor furnished (including commercially acquired) along with the necessary specifications and procedures for their use (see ISO 10012, paragraph 6.2.1). The AIE shall not create or conceal defects on the product being inspected. All AIE documentation shall contain sufficient information to permit evaluation of the AIEs ability to test, verify, and/or measure the applicable characteristics or parameters (see DI-QCIC-81960).
(d) AIE Designs & Government Furnished Gages. AIE designs are of two types Government designs (see (d)(1)) and contractor designs (see
(d)(2)). When applicable, Government designs or Government furnished gages are designated in the TDP/contract; responsibility for all other AIE is assigned to the contractor. The designs, associated inspection procedures, and theory of operation shall have the level of detail to demonstrate capability of the proposed AIE to perform the required inspection.
(1) Government AIE Designs. Government AIE designs may consist of detailed drawings necessary for the fabrication and use of the AIE.
13 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Unless otherwise specified, the contractor may submit alternate or modified contractor designs of Government AIE designs.
(2) Contractor AIE Designs. Contractor AIE design drawings shall meet the requirements of ASME Y14.100, ASME Y14.5 and ASME Y14.43 and may include commercial inspection equipment. [Commercial inspection equipment is defined as shown in paragraph (a)(4) above. It shall be fully described by catalog listings or other means which provide sufficient information to permit identification and evaluation by the
Government and may include illustrations and engineering data.] Designs shall be submitted for any special fixture(s) to be used. Unless otherwise specified, Gage Tolerancing Policy shall be in accordance with ASME Y14.43, Absolute Tolerancing (Pessimistic Tolerancing).
(3) Visual Inspection. Visual inspection standards used for the acceptance/rejection of product shall be submitted for approval.
(e) AIE Package Submittals. The contractor shall prepare the AIE package submittal in accordance with DI-QCIC-81960 in the applicable
Contract Data Requirements List (CDRL DD Form 1423). In addition, the contractor shall adhere to the following requirements:
(1) Designs for Approval. Contractor designs and/or the submission for the use of Government designs shall be approved by the
Government. Partial submission of AIE designs is permissible in order to expedite the approval process; however, the response date for design review will be based on the date of the final complete submission of designs.
(2) Correspondence in English. The contractor shall ensure all AIE correspondence and documentation are submitted in English.
(3) Units of Measurement. The units of measurement within the AIE package submittal shall be consistent with the requirements of the
Technical Data Package (TDP).
(4) AIE Flow Down. The contractor shall flow down AIE requirements to sub-contractors at any tier who are performing acceptance inspections.
(f) Characteristics for Inspection. AIE documentation for Critical, Special, and Major characteristic inspections shall be submitted to the Government for approval in accordance with (IAW) the CDRL (DI-QCIC-81960). AIE for Minor characteristic inspections shall be submitted to the Government for approval IAW CDRL (DI-QCIC-81960) and as required below:
(1) [X] Listed Minor (characteristics displayed on specifications and/or drawings
(2) [ ] Government selected list (as attached or as provided herein)
(3) [ ] Not submitted
(g) Automated Acceptance Inspection Equipment. The AAIE shall accept only conforming material. All characteristics requiring AAIE per the TDP shall utilize inspection equipment with a minimum demonstrated reliability of 99.8% at a 90% confidence level to detect non-conforming material unless otherwise specified below.
(1) Reliability of 99.8% at a 90% Confidence Level for Critical/Special Characteristics
(2) Reliability of 99.8% at a 90% Confidence Level for Major Characteristics
(3) For inspection of major and minor characteristics where contractor utilizes AAIE when it is not required by the TDP, the AAIE package shall be submitted to the Government for approval. If the Minor characteristic is not listed in paragraph (f)(2) or not required for submittal in paragraph (f)(3), then the AAIE requirements (e.g., verification, calibration, prove-out, etc.) of the inspection shall still be performed.
(4) All AAIE packages submitted to the Government for approval shall be in accordance with MIL-A-70625 (Automated Acceptance
Inspection Equipment Design, Testing and Approval of). Furthermore, the contractor shall be responsible for producing the acceptance and rejection verification standards/masters representative of the characteristics the AAIE is designed to inspect. The verification standards and frequency of use require Government approval prior to use. When verification standards are used for the VL-VII sampling plan per MIL-STD-1916 paragraph 4.4, verification standards and frequency of use shall require Government approval prior to use.
(5) If the AAIE accepts a critical characteristic reject standard the contractor shall notify the Government and act in accordance with paragraph (f) of the Critical Characteristic Control Clause. In addition, if the AAIE accepts a major and/or minor characteristic reject standard the contractor shall act in accordance with paragraph 8.3 of ISO 10012 or paragraph 5.2.3 of ANSI/NCSL Z540.3.
(6) All AAIE shall be required to pass a Government-approved Acceptance (Prove-Out) Test. The contractor shall conduct this test per the approved test plan and shall submit a test analysis report for approval. See applicable CDRL (DI-QCIC-81960). This test shall be performed at the contractors facilities whose manufacturing system has had the AAIE fully integrated and calibrated as per paragraph (j) of this clause. The contractor shall allow Government personnel access to this facility and unobstructed monitoring of this test.
(7) The contractor shall notify the Government prior to a modification and/or relocation of the Government-approved AAIE. The modified
AAIE designs shall be submitted for approval. The modified and/or relocated AAIE shall require submission of the acceptance test plan
14 81
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(prove-out) and results for review and approval prior to use. The modified and/or relocated AAIE shall be in accordance with paragraphs
(g)(1) - (g)(6).
(h) Measurement System Analysis (MSA). The contractor is responsible to ensure all AIE is, at a minimum, stable, repeatable, and reproducible for all characteristics. Refer to ASTM E2782 and/or AIAG MSA for guidance. The contractor shall provide objective evidence, including the MSA assessment plan, associated data, and analysis, which demonstrates the AIE is, at a minimum, stable, repeatable, and reproducible for the following characteristics (MSA CDRL): N/A
Specification Paragraph No. Drawing Characteristic
__-N/A-__________ __-N/A-________ __-N/A-_________ __-N/A-_________
__-N/A-__________ __-N/A-________ __-N/A-_________ __-N/A-_________
__-N/A-__________ __-N/A-________ __-N/A-_________ __-N/A-_________
__-N/A-__________ __-N/A-________ __-N/A-_________ __-N/A-_________
Approval of submitted MSA(s) must be granted before the corresponding AIE can be used or continue to be used for acceptance of product.
If at any time following approval of the AIE and MSA the AIE is disapproved, then the MSA shall be disapproved. After the resubmitted
AIE is approved, the MSA shall be conducted on the approved AIE and resubmitted for approval.
(i) Robust AIE System. The contractor shall ensure the AIE and its use is not negatively affected by any manufacturing/inspection environmental stimuli including, but not limited to production rate, noise, temperature, humidity, and vibration.
(j) AIE Calibration and Verification. The calibration system shall be in accordance with ISO 10012 or ANSI/NCSL Z540.3. All AIE shall be subjected to scheduled calibration intervals to ensure that the equipment will accept only conforming product and reject all non-conforming product for the duration of the approved calibration period. AIE shall be subjected to periodic verification to ensure that the equipment will continue to accept and reject product with the same consistency as it did at the time of its previous calibration.
(k) Non-Destructive Testing (NDT). Contractor shall submit detailed plans for qualifying and certifying NDT personnel and plans for qualification and ongoing use of NDT methods used for inspecting product. If re-qualification of NDT personnel and/or NDT methods is required, then the applicable plans shall be submitted.
(1) Personnel performing NDT examinations shall be qualified and certified in accordance with the standard practices prescribed by NAS