W519TC-23-R-2067 Amendment 0001.pdf

PDF 585 KB Posted

Attached to
HAZMAT SAFETY SHOWER and AMENDMENT 0001 Federal contract opportunity
Solicitation number
W519TC-23-R-2067
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

This amendment modifies a solicitation for a HAZMAT safety shower. The amendment extends the response deadline from August 31st to September 20th. It also revises the evaluation criteria to lowest price technically acceptable and changes instructions to offerors. Offerors must provide a compliance statement and identify equipment, software, and drivers being offered. Proposals will be evaluated on technical acceptability of the compliance statement, equipment identification, and inclusion of a one-year parts and labor warranty beginning on final acceptance. Acceptable proposals will then be evaluated based on the lowest firm fixed price for all contract line items. The Department of the Army Materiel Command Contracting Command Rock Island Arsenal is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to HAZMAT SAFETY SHOWER and AMENDMENT 0001, newest first.
File Type Posted
Attachment 0001 - RIPD E4000-23-9-50 - REVISED.pdf PDF
Attachment 0002 - CDRL.pdf PDF
W519TC-23-R-2067.pdf PDF
Attachment 0001 - RIPD E4000-23-9-50.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provi ded herei n, all t erms and condit ions of t he document refere nced in Item 9A or 10A, as heretofore change d, remai ns unchanged and in ful l force and effect .

15A. NAME AND TIT LE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

ST ANDARD FORM 30 (Rev. 10-83) Prescr ibed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is noted in the AMENDMENT 0001 NARRATIVE.

1. CO NTRACT ID CODE P AGE OF P AGES

J 1 5

16A. NAME AND T ITLE OF CONTRACTING OFFICER (Type or print)

16C. DAT E SIGNED

BY 07-Sep-2023

16B. UNITED ST AT ES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contract ing Officer )(Signature of person authorized t o sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, Count y, Stat e and Zip Code) X W519TC23R2067

X 9B. DAT ED (SEE IT EM 11)

21-Aug-2023

10B. DAT ED (SEE IT EM 13)

9A. AMENDMENT OF SOLICITAT ION NO.

11. THIS IT EM ONLY APPLIES T O AMENDMENT S OF SOLICITATIONS

X The above numbered soli cit ati on i s amended as set forth in It em 14. The hour and date specified for rece ipt of Offer X is ext ended, is not extended.

Offer must acknowl edge rece ipt of t his amendment pri or to the hour and date specified in the sol ici tat ion or as amended by one of t he fol lowing methods:

(a) By compl eti ng Items 8 and 15, and returning 1 copi es of the amendment ; (b) By acknowledgi ng recei pt of thi s a mendment on each copy of t he offer submit ted;

or (c) By s epara te let ter or t elegram whi ch i ncludes a refe rence t o t he s olic ita tion and amendment numbers . FA ILURE OF YOU R A CKNOWLEDGMENT TO BE RECEIVED AT TH E P LACE D ESIGNATED FOR TH E RECEIPT OF OFFERS P RIO R TO THE HOUR AN D DATE SP ECIFIED MA Y RESULT IN

REJECTIO N OF YOUR OFFER. If by vir tue of thi s amendment you desire t o change an offer already submit ted, s uch c hange ma y be made by t ele gram or let ter, provided each t elegram or l ett er makes reference to the sol ici tat ion and this amendment , and is re ceived prior to the openi ng hour and dat e speci fi ed.

12. ACCOUNTING AND APPROPRIATION DAT A (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORT H IN ITEM 14 ARE MADE IN THE

CONT RACT ORDER NO. IN ITEM 10A.

B. T HE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED T O REFLECT THE ADMINIST RATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORT H IN ITEM 14, PURSUANT TO T HE AUTHORITY OF FAR 43.103(B).

C. T HIS SUPPLEMENT AL AGREEMENT IS ENT ERED INTO PURSUANT TO AUTHORITY OF:

D. OT HER (Specify type of modification and authorit y)

E. IMPORTANT: Contract or is not, is required to sign this document and return copies t o the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/cont ract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/ MODIFICATION NO. 5. P ROJECT NO .(If appli cable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Sep-2023

CODE

ARM Y CONTRACTING COM MAND - ROCK ISLAND

3055 RODMAN AVE

ROCK ISLAND IL 61299

W519TC 7. AD MINISTERED BY (If other t han item 6)

4. REQUISITION/PU RCHASE REQ. NO.

CODE

See I tem 6

FACILITY CODECODE

EMAIL:TEL:

W519TC23R2067

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 31-Aug-2023 10:00 AM to 20-Sep-2023 10:00 AM.

The following have been added by full text:

AMENDMENT 0001 NARRATIVE

The purpose of this amendment is to do the following:

1) Re-open the Soliciation and extend the closing date from 31 August 2023 at 1000 CST until 20 September 2023 at 1000 CST.

2) To change the “EVALUATION CRITERIA” and the “INSTRUCTIONS TO OFFERORS”. Read these sections very carefully.

3) Revise the RIPD, specifically Section 4.1 Features.

4) All other terms and conditions remain unchanged.

The following have been modified:

EVALUATION CRITERIA

1. Basis for Contract Award: The Government plans to award a single Firm Fixed Price (FFP) purchase order utilizing the Lowest Price Technically Acceptable (LPTA) source selection procedures with FAR 15.101-2. The evaluation factors include Technical(ACCEPTABLE/UNACCEPTABLE) and Price. The technical factor will be rated as ACCEPTABLE/UNACCEPTABLE. Contractors who do not receive a ACCEPTABLE rating for all technical subfactors, and an overall ACCEPTABLE rating for the Technical factor will not be further evaluated and will not be eligible for award. The Government will not rate or rank proposals, but will select the proposal that provides the best overall value to the Government based on the lowest total evaluated price of those proposals deemed technically acceptable.

2. The Government intends to evaluate proposals and award a purchase order without discussions with contractors (except clarifications as described in FAR 15.306(a)). Therefore, the offerors initial proposal should contain their best terms for technical and price. However; the Government reserves the right to conduct discussions if determined necessary by the Contracting Officer.

3. Evaluation Factors:

Factor 1: Technical

Subfactor 1: Compliances:

2.1 RIPD Compliance: Each offeror shall provide a statement of compliance. It shall be a copy of the RIPD at Attachment 0001. At the end of each and every paragraph the offeror shall type or write exactly either "COMPLY" or "NON- COMPLY". Other formats will not be considered acceptable. The offeror may include reasoning or an explanation in the case that they state “NON- COMPLY” with any paragraph.

In certain instances, the Government may determine these deficiencies as a “minor non-compliance” and to be an acceptable deviation to the specification.

ACCEPTABLE:

The offeror’s RIPD Compliance is a copy of the RIPD and at the end of each and every paragraph the vendor responded exactly either “COMPLY” or “NON-COMPLY”. If “NON-COMPLY” is written, a brief description of the non-compliance was provided. Any non-compliances which are determined to be minor non-compliances and are determined to be an acceptable deviation to the specification.

UNACCEPTABLE:

The proposal does not include a Compliance Statement or the Compliance Statement is not a copy of the RIPD and/or does not include at the end of each and every paragraph typed or written exactly either “COMPLY” or “NON-COMPLY”. If “NON-COMPLY” is written, a brief description of the noncompliance is not included.

Any non-compliances are determined to be unacceptable.

The equipment offered does not meet the requirements of the RIPD even if noted properly.

Subfactor 2: Equipment Identification: Each offeror shall identify the specific Manufacturer and model number offered against each equipment component. The offeror may provide a written brochure to provide evidence that the proposed item will meet the performance characteristics required in the RIPD. As part of the proposal, the offeror shall also identify all software device drivers required for the equipment proposed. Versions for software and driver are required to be identified for the machines proposed.

ACCEPTABLE:

The offeror identifies the manufacturer and model number of the equipment being offered. The offeror also identifies all software device drivers required for the equipment proposed. Versions for software and driver are also required to be identified for the machines proposed.

UNACCEPTABLE:

The offeror's proposal does not identify the manufacturer and model number of the equipment being offered. The software device drives are not proposed. Versions for software and driver are not identified.

Subfactor 3: Warranty: The proposal must include a minimum one year parts and labor warranty which shall begin upon final acceptance. The contractor will need to provide a writing documentation stating that the warranty will begin from date of acceptance of equipment.

ACCEPTABLE:

The offeror includes a minimum warranty of one year for parts and labor and will begin upon final acceptance.

UNACCEPTABLE:

The proposal does not include warranty information or the proposal does not include a minimum warranty of one year for parts and labor that does not begin upon final acceptance.

All offerors receiving a ACCEPTABLE rating for all Technical subfactors will receive a ACCEPTABLE rating for

Factor 1: Technical aacceptable will be further evaluated on price. Offerors that do not receive a ACCEPTABLE rating for all Technical subfactors will receive a UNACCEPTABLE rating for Factor 1: Technical unacceptable will not be evaluated further and not considered for award.

Factor 2: Price: For the offerors that receive a ACCEPTABLE rating on the technical factors, their proposals will be evaluated on the prices proposed for All CLIN.

The offeror shall enter a firm fixed price at All CLIN. Prices shall be submitted on a FOB Destination basis. Ship to location is Rock Island, IL 61299. The unit price will be binding. The Government reserves the right to require the submission of any data (i.e., other than cost or pricing data) necessary to validate the reasonableness of an offer.

Pricing shall be valid for 90 days after date of proposal.

The Government intends to award to the lowest priced, technically acceptable offer.

INSTRUCTIONS TO OFFERORS

Addendum to 52.212-1 - Instructions to Offerors - Commercial Items

1. General Instructions: These instructions are a guide for preparing your proposal. These instructions generally describe the type and extent of information you should provide and address in your proposal. You are expected to review the RIPD & CDRLs contained in this solicitation for further insight into the areas that your proposal must address. You should include in the proposal sufficient information to enable the evaluators to determine your understanding of the requirements in each of the evaluated areas. It is the Government's intent to award a single Firm Fixed Price (FFP) contract. A Lowest Price Technically Acceptable (LPTA) process in accordance with FAR 15.101-2 is being utilized to select the successful offeror and no trade-offs will be made. The Government intends to evaluate proposals and award without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offerors initial response should contain the offerors best terms and price. However; the Government reserves the right to conduct discussions if determined necessary by the Contracting Officer.

2. Proposal Submission and Format: The offerors proposal shall be prepared and authorized by a person regularly employed by the offeror. The proposal should state the name of each person contributing to the authorship of the proposal, the persons position title, phone number, and email address of the person who should be contacted should a contract be awarded. The proposal should be prepared in a clear, legible, practical manner. In addition, the proposal shall be written in English and should be specific and complete as described in these instructions. Offerors must submit their proposals in electronic format prior to the closing date and time listed on the first page of this solicitation. Proposals may be emailed to the Contract Specialist listed as follows:

Contract Specialist: Heather Petersen Email: heather.j.petersen.civ@army.mil

Other formats such as (but not limited to) third party cloud file services, hard copies, CDs, and Drop Box) will not be acceptable.

Failure to provide a complete proposal package will result in the offer being determined nonresponsive and it will no longer be considered for award.

The following factors will be evaluated on an ACCEPTABLE/UNACCEPTABLE basis. ACCEPTABLE:

Proposal meets the requirements of the solicitation. UNACCEPTABLE: Proposal does not meet the requirements of the solicitation.

In order for a proposal to be rated as ACCEPTABLE for the Technical factor, each subfactor identified must receive a ACCEPTABLE rating. Only those proposals which receive a ACCEPTABLE on all Technical subfactors will be further evaluated under the Price Factors.

Proposals shall be submitted as set forth below:

Factor 1: Techncial Subfactor 1: RIPD Compliance Subfactor 2: Equipment Identification Subfactor 3: Warranty

Factor 2: Price

3. Factor 1: Technical

SubFactor 1: Compliances:

2.1 RIPD Compliance: Each offeror shall provide a statement of compliance. It shall be a copy of the RIPD at Attachment 0001. At the end of each and every paragraph the offeror shall type or write exactly either "COMPLY" or "NON-COMPLY". Other formats will not be considered acceptable. The offeror may include reasoning or an explanation in the case that they state “NONCOMPLY” with any paragraph. In certain instances, the Government may determine these deficiencies as a “minor non-compliance” and to be an acceptable deviation to the specification.

SubFactor 2: Equipment Identification: Each offeror shall identify the specific Manufacturer and model number offered against each equipment component. The offeror may provide a written brochure to provide evidence that the proposed item will meet the performance characteristics required in the RIPD. As part of the proposal, the offeror shall also identify all software device drivers required for the equipment proposed. Versions for software and driver are required to be identified for the machines proposed.

SubFactor 3: Warranty: The proposal must include a minumum one year parts and labor warranty which shall begin upon final acceptance. The contractor will need to provide written documentation stating that the warranty will begin from date of final acceptance.

4. Factor 2: Price:

A firm fixed price for all CLINs on this solicitation is required. The offerors shall enter firm fixed prices for the CLINs at the CLIN level of this solicitation.

Prices shall be submitted on a FOB Destination basis. Ship to location is Rock Island, IL 61299.

All unit prices proposed will be binding. Prices shall be valid for 1 year after date of propsal. The Government reserves the right to require the submission of any data (i.e. certified cost or pricing data or data other than certified cost or pricing data) necessary to validate the reasonableness of a proposal.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .