1. Fabricate & Install (1) Each Hinged, Gasket Cover Plate
QUESTION #1: with regards to bullet above Is the intent of this to have a hinged and gasketed cover plate for the HVAC window unit opening, for when the unit is not installed?
Answer. Yes, to cover the hole if the unit is not installed.
QUESTION #2: Does this container need leveling jacks?
0. b/c 3.5 lbs/hr of dehumidification is going to make a lot of water in a humid climate like Vermont; and the container will end up sitting in a puddle of the outflow of the A/C unit drip tube(s)
Answer. It is not required but can be added as an option line item in the quote.