Q-A - Repair B102.pdf
PDF 187 KB Posted
- Attached to
- Repair B102 Federal contract opportunity
- Solicitation number
- W50S9121Q0009
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 3_W50S91-21-Q-0009 Rpr B102 Solicitation.pdf | ||
| QA_Rpr B102_Amendment 3.pdf | ||
| Amendment 2_W50S91-21-Q-0009 Rpr B102 Solicitation.pdf | ||
| Amendment 1_W50S91-21-Q-0009 Rpr B102 Solicitation.pdf | ||
| Attachment 5_BLDG_102_2nd_Floor_Dim.pdf | ||
| Attachment 3_B102 Plan Set.pdf | ||
| Attachment 1_W50S91-21-Q-0009 Rpr B102 Solicitation.pdf | ||
| Attachment 2_SOW_Rpr B102.pdf | ||
| Attachment 4_Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Responses to Questions (Q&A), 24 March 2021, RFQ: W50S91-21-Q-0009
Q1 – Is HVAC Room 207 and Communications Room 211 both to receive a new 2’ x 2’ LED panel? Rooms 207 and 211 are not listed under Project Specific Requirements under the Statement of Work.
A1 – Yes
Q2 - Please confirm symbol “WP” noted at front and rear entry on Lighting Repair Plan. If noted symbol represents an outdoor weatherproof fixture, please identify lumen and Kelvin requirements.
A2 – Weatherproof Wall Pack 5K, 7000 LM
Q3 - Please confirm scope requirements for new comm (tele/data) receptacles identified on Power Repair Plan
A3 – Single Gang box with 1” emt stubbed 8” above existing ceiling with insulting bushing
Q4 - All existing receptacles designated with ‘E’ are currently circuited to existing panelboard(s) located in Basement Level Mechanical Room. Are all existing (‘E’) receptacles to be disconnected and recircuited via mc cable/EMT raceway to new Panel 2A?
A4 – Yes
Q5 - Scope identifies a new 200A subpanel to be installed in Entry Room F-2. New panel to be furnished with 200A. 3P. main circuit breaker. Existing Panelboards A & B located on Basement Level Mechanical Room are rated at 225A. each and will not accommodate a 200A.
3P. branch circuit breaker. Please advise if a 100A 3P. branch circuit breaker is adequate to feed a new 100A subpanel?
A5 – Yes
Q6 - As part of the ceiling removal and installation, will the Contractor be responsible for the removal and reinstallation of existing smoke detectors?
A6 – Yes
Q7 - Will the Contractor be responsible for the removal of the following items:
● Wall mounted monitors
● Ceiling mounted projectors
● Ceiling mounted wireless access points
● Wall mounted marker boards
A7 – All items will be removed prior to construction start
Q8 – Will the Contractor be responsible for the removal of existing surface wall mounted at floor level thermoplastic data raceways at Future Offices 2A-9 and 2A-10 exterior wall location?
A8 – Yes
Q9 - Subparagraph 3.2.3: Room 202 currently has no door nor frame. Are we supposed to provide a door, frame and hardware at that location or just leave the cased opening as is?
A9 – Yes
Q10 – Subparagraph 3.2.1.1: Room 202 currently has a built-in counter and casework. Are those items to remain in place and we just provide a new finished floor and base adjacent to the casework?
A10 – Yes
Q10 - Subparagraphs 3.1.4, 3.2.3, 3.3.4, 3.4.5,3.5.5,3.6.3: Is there a door hardware schedule available to the bidders to specifically denote what hardware is required?
A10 – Contractor shall provide proposed hardware schedule as part of material submittal process post award
Q11 - When is the projected award and start date?
A11 – Projected award is anticipated to be early April.
Q12 – Please confirm Room 203 already has all necessary plumbing. Only connections and items specified in 3.3.5.4 are needed.
A12 – Room currently has hot water, cold water, and a drain line
Q13 - Please confirm any colors for paint, flooring, cabinetry, etc. are standard and not custom.
A13 - Contractor shall provide proposed material/color selections as part of material submittal process post award, finishes will be of standard commercial grade/availability, no custom finishes required.
Q14 – Please provide a drawing of the existing floor plan with dimensions if available.
A14 – Yes
Q15 – Are the new interior door frames hollow metal? If so, can they be KD frames (drywall) in lieu of welded?
A15 – Yes, Yes
Q16 – Please provide basis of design product info for the following materials: Solid Surface Countertops & Carpet Tiles. Material costs vary considerably based on selections.
A16 – Government may not specify product manufacturers for basis of design, please confer with contracting office for additional information, finishes will be of standard commercial grade/availability, no custom finishes required.
Q17 – In section 3.2.1.3 of the statement of work it lists the new acoustical ceiling panel as CDS- 224, is this ceiling tile to be used in all areas?
A17 – Yes, contractor may propose approved or-equal finishes as part of material submittal process post award.
Q18 – Will the entire building be unoccupied during construction?
A18 –2nd floor will be unoccupied and gym level can be vacated as needed to facilitate construction.
Q19 – Who is responsible for moving & storage of the existing furniture/equipment as required to perform the work?
A19 – 2nd floor of facility will be empty prior to construction start
Q20 – Can the project superintendent also perform QC & SSHO duties?
A20 – Yes
Q21 – Solicitation 52.228-1, Subparagraph d.: Do we have to provide a Certificate of Insurance?
If so, then what are the liability limits?
A21 – Yes, insurance requirements are as follows:
a. Workmen's Compensation $100,000
b. Comprehensive General Liability $500,000 per occurrence for (Bodily Injury)
c. Comprehensive Automobile Liability: $200,000 per person and $500,000 per accident for bodily injury and $20,000 for property damage.
Q22 – Solicitation 00100, Subparagraph 6.2: Do we have to provide Performance and/or Payments Bonds if awarded the project?
A22 – Yes