PreQuote Site Visit Minutes.pdf
PDF 119 KB Posted
- Attached to
- B318 Restroom Renovation Federal contract opportunity
- Solicitation number
- W50S8U-22-R-0003
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Slides B318 Restrooms.pptx | PPTX presentation | |
| B318 Restroom repair sign in sheet_Redacted.pdf | ||
| W50S8U-22-R-0003.pdf | ||
| W50S8U-22-R-0003-0001.pdf | ||
| Restroom Renovation 2022 Full scale.pdf | ||
| Amended Combined Synopsis.pdf | ||
| SOW- B318 Restroom Renovation v3.pdf | ||
| Combined Synopsis.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEMORANDUM FOR RECORD
SUBJECT: MINUTES OF PRE-PROPOSAL CONFERENCE AND SITE VISIT, SOLICITATION
W50S8U-22-R-0003, Building 318 RESTROOM REPAIR, TULSA AIR NATIONAL GUARD
BASE, OK
DATE: 23 June 2022/1300 hours/Forty-five (45) minutes in duration
1. The list of contractors attending the meeting is shown on the attached sign-in sheet. The following Government representatives attended the subject meeting:
Amanda Lonsdale – Contract Officer Joshua Kingori – Contract Specialist Scott Agee – Construction Manager
2. The following items were discussed during the Pre-proposal Conference:
a. The Contract period is 75 days. This includes all work to include cleanup and punch list.
We anticipate award of the contract in mid-September. Following receipt and approval of bonds, we will hold a pre-construction conference and issue NTP.
b. Interested offerors must be registered in SAM. To register go to:
https://www.sam.gov/portal/public/SAM/.
3. A power point slide presentation on the project specifics and the selection process was provided to all attendees. (Attached)
4. Questions must be submitted in writing via email, especially technical questions to:
138.FW.MSC@us.af.mil DO NOT CONTACT the Design Engineers or the Government Engineers. All questions must be routed through the Contracting Office. All Contractor questions when answered will be posted to the solicitation on the SAM.gov website. If a question arises that will result in a change to the plans or specifications, an official amendment will be issued.
All correspondence, questions and answers, amendments etc. will be issued or posted at SAM.gov.
5. After the power point slide presentation, the attendees walked to, and around, the job site.
6. Any amendments that are issued will be posted to the web site. Contractors were advised to check the website frequently.
7. The pre-proposal conference and site visit concluded at 1345 hours.
Amanda J. Lonsdale, SMSgt, OKNG Contracting Officer
Attachments:
Sign-in Sheet Power Point Slides https://www.sam.gov/portal/public/SAM/ mailto:138.FW.MSC@us.af.mil